Drawbridge Operation Regulation; Upper Mississippi River, Sabula, IA, 1741 [2014-00284]
Download as PDF
Federal Register / Vol. 79, No. 7 / Friday, January 10, 2014 / Rules and Regulations
(b) * * *
(4) * * *
(ii) * * * The effectiveness of this
device for this use has not been
demonstrated;
(5) * * * If the amount charged is
$250 or less, the requirement for a
report by an independent certified
public accountant or an attestation by a
responsible individual of the
organization is waived; and
(6) Information concerning pediatric
uses of the device, as required by
§ 814.20(b)(13).
*
*
*
*
*
■ 10. In 814.116, redesignate paragraphs
(c)(2) through (c)(4) as paragraphs (c)(3)
through (c)(5), respectively, and add
new paragraph (c)(2) to read as follows:
§ 814.116
HDE.
Procedures for review of an
*
*
*
*
*
(c) * * *
(2) The submission of additional
information concerning pediatric uses of
the device, as required by
§ 814.20(b)(13);
*
*
*
*
*
Dated: January 6, 2014.
Leslie Kux,
Assistant Commissioner for Policy.
[FR Doc. 2014–00267 Filed 1–9–14; 8:45 am]
BILLING CODE 4160–01–P
DEPARTMENT OF HOMELAND
SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG–2013–1039]
Drawbridge Operation Regulation;
Upper Mississippi River, Sabula, IA
Coast Guard, DHS.
Notice of deviation from
drawbridge regulations.
AGENCY:
ACTION:
The Coast Guard has issued a
temporary deviation from the operating
schedule that governs the Sabula
Railroad Drawbridge across the Upper
Mississippi River, mile 535.0, at Sabula,
Iowa. The deviation is necessary to
allow the bridge owner time to perform
repairs and maintenance that is
essential to the continued safe operation
of the drawbridge. This deviation allows
the bridge to remain in the closed-tonavigation position while a damaged
gear assembly is replaced and structural
steel repairs are completed.
DATES: This deviation is effective from
7 a.m., January 6, 2014 to 7 a.m., March
4, 2014.
mstockstill on DSK4VPTVN1PROD with RULES
SUMMARY:
VerDate Mar<15>2010
16:30 Jan 09, 2014
Jkt 232001
The docket for this
deviation, USCG–2013–1039 is available
at https://www.regulations.gov. Type the
docket number in the ‘‘SEARCH’’ box
and click ‘‘SEARCH’’. Click on Open
Docket Folder on the line associated
with this deviation. You may also visit
the Docket Management Facility in
Room W12–140 on the ground floor of
the Department of Transportation West
Building, 1200 New Jersey Avenue SE.,
Washington, DC 20590, between 9 a.m.
and 5 p.m., Monday through Friday,
except Federal holidays.
FOR FURTHER INFORMATION CONTACT: If
you have questions on this temporary
deviation, call or email Eric A.
Washburn, Bridge Administrator,
Western Rivers, Coast Guard; telephone
314–269–2378, email Eric.Washburn@
uscg.mil. If you have questions on
viewing the docket, call Cheryl Collins,
Program Manager, Docket Operations,
telephone 202–366–9826.
SUPPLEMENTARY INFORMATION: The
Canadian Pacific Railway requested a
temporary deviation for the Sabula
Railroad Drawbridge, across the Upper
Mississippi River, mile 535.0, at Sabula,
Iowa to remain in the closed-tonavigation position while a damaged
gear assembly is replaced and structural
steel repairs are completed. The closure
period will start at 7 a.m., January 6,
2014 to 7 a.m., March 4, 2014. Work is
scheduled in the winter and when there
is less impact on navigation; instead of
scheduling work in the summer, when
river traffic increases.
Once the gear assembly is removed
and structural steel repairs have
commenced, the swing span will not be
able to open, even for emergencies, until
repairs are complete and gear assembly
is installed.
The Sabula Railroad Drawbridge
currently operates in accordance with
33 CFR 117.5, which states the general
requirement that drawbridges shall open
promptly and fully for the passage of
vessels when a request to open is given
in accordance with the subpart. In order
to facilitate the needed bridge work, the
drawbridge must be kept in the closedto-navigation position.
There are no alternate routes for
vessels transiting this section of the
Upper Mississippi River.
The Sabula Railroad Drawbridge, in
the closed-to-navigation position,
provides a vertical clearance of 18.1 feet
above normal pool. Navigation on the
waterway consists primarily of
commercial tows and recreational
watercraft. This temporary deviation has
been coordinated with the waterway
users. No objections were received.
ADDRESSES:
PO 00000
Frm 00009
Fmt 4700
Sfmt 4700
1741
In accordance with 33 CFR 117.35(e),
the drawbridge must return to its regular
operating schedule immediately at the
end of the effective period of this
temporary deviation. This deviation
from the operating regulations is
authorized under 33 CFR 117.35.
Dated: December 18, 2013.
Eric A. Washburn,
Bridge Administrator, Western Rivers.
[FR Doc. 2014–00284 Filed 1–9–14; 8:45 am]
BILLING CODE 9110–04–P
DEPARTMENT OF HEALTH AND
HUMAN SERVICES
Centers for Medicare & Medicaid
Services
42 CFR Parts 412, 413, 414, 419, 424,
482, 485, and 489
[CMS–1599–CN4]
RIN 0938–AR53
Medicare Program; Hospital Inpatient
Prospective Payment Systems for
Acute Care Hospitals and the LongTerm Care Hospital Prospective
Payment System and Fiscal Year 2014
Rates; Quality Reporting Requirements
for Specific Providers; Hospital
Conditions of Participation; Payment
Policies Related to Patient Status;
Corrections
Centers for Medicare &
Medicaid Services (CMS), HHS.
ACTION: Final rule; correction.
AGENCY:
This document corrects
technical errors in the correcting
document that appeared in the January
2, 2014 Federal Register entitled
‘‘Medicare Program; Hospital Inpatient
Prospective Payment Systems for Acute
Care Hospitals and the Long-Term Care
Hospital Prospective Payment System
and Fiscal Year 2014 Rates; Quality
Reporting Requirements for Specific
Providers; Hospital Conditions of
Participation; Payment Policies Related
to Patient Status; Corrections.’’
DATES: Effective Date: This correcting
document is effective January 8, 2014.
Applicability Date: This correcting
document is applicable on January 1,
2014.
SUMMARY:
FOR FURTHER INFORMATION CONTACT:
Tzvi
Hefter, (410) 786–4487.
SUPPLEMENTARY INFORMATION:
I. Background
In the August 19, 2013 Federal
Register (78 FR 50495), we published a
final rule entitled ‘‘Medicare Program;
Hospital Inpatient Prospective Payment
E:\FR\FM\10JAR1.SGM
10JAR1
Agencies
[Federal Register Volume 79, Number 7 (Friday, January 10, 2014)]
[Rules and Regulations]
[Page 1741]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2014-00284]
=======================================================================
-----------------------------------------------------------------------
DEPARTMENT OF HOMELAND SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG-2013-1039]
Drawbridge Operation Regulation; Upper Mississippi River, Sabula,
IA
AGENCY: Coast Guard, DHS.
ACTION: Notice of deviation from drawbridge regulations.
-----------------------------------------------------------------------
SUMMARY: The Coast Guard has issued a temporary deviation from the
operating schedule that governs the Sabula Railroad Drawbridge across
the Upper Mississippi River, mile 535.0, at Sabula, Iowa. The deviation
is necessary to allow the bridge owner time to perform repairs and
maintenance that is essential to the continued safe operation of the
drawbridge. This deviation allows the bridge to remain in the closed-
to-navigation position while a damaged gear assembly is replaced and
structural steel repairs are completed.
DATES: This deviation is effective from 7 a.m., January 6, 2014 to 7
a.m., March 4, 2014.
ADDRESSES: The docket for this deviation, USCG-2013-1039 is available
at https://www.regulations.gov. Type the docket number in the ``SEARCH''
box and click ``SEARCH''. Click on Open Docket Folder on the line
associated with this deviation. You may also visit the Docket
Management Facility in Room W12-140 on the ground floor of the
Department of Transportation West Building, 1200 New Jersey Avenue SE.,
Washington, DC 20590, between 9 a.m. and 5 p.m., Monday through Friday,
except Federal holidays.
FOR FURTHER INFORMATION CONTACT: If you have questions on this
temporary deviation, call or email Eric A. Washburn, Bridge
Administrator, Western Rivers, Coast Guard; telephone 314-269-2378,
email Eric.Washburn@uscg.mil. If you have questions on viewing the
docket, call Cheryl Collins, Program Manager, Docket Operations,
telephone 202-366-9826.
SUPPLEMENTARY INFORMATION: The Canadian Pacific Railway requested a
temporary deviation for the Sabula Railroad Drawbridge, across the
Upper Mississippi River, mile 535.0, at Sabula, Iowa to remain in the
closed-to-navigation position while a damaged gear assembly is replaced
and structural steel repairs are completed. The closure period will
start at 7 a.m., January 6, 2014 to 7 a.m., March 4, 2014. Work is
scheduled in the winter and when there is less impact on navigation;
instead of scheduling work in the summer, when river traffic increases.
Once the gear assembly is removed and structural steel repairs have
commenced, the swing span will not be able to open, even for
emergencies, until repairs are complete and gear assembly is installed.
The Sabula Railroad Drawbridge currently operates in accordance
with 33 CFR 117.5, which states the general requirement that
drawbridges shall open promptly and fully for the passage of vessels
when a request to open is given in accordance with the subpart. In
order to facilitate the needed bridge work, the drawbridge must be kept
in the closed-to-navigation position.
There are no alternate routes for vessels transiting this section
of the Upper Mississippi River.
The Sabula Railroad Drawbridge, in the closed-to-navigation
position, provides a vertical clearance of 18.1 feet above normal pool.
Navigation on the waterway consists primarily of commercial tows and
recreational watercraft. This temporary deviation has been coordinated
with the waterway users. No objections were received.
In accordance with 33 CFR 117.35(e), the drawbridge must return to
its regular operating schedule immediately at the end of the effective
period of this temporary deviation. This deviation from the operating
regulations is authorized under 33 CFR 117.35.
Dated: December 18, 2013.
Eric A. Washburn,
Bridge Administrator, Western Rivers.
[FR Doc. 2014-00284 Filed 1-9-14; 8:45 am]
BILLING CODE 9110-04-P