Drawbridge Operation Regulation; Upper Mississippi River, Sabula, IA, 1741 [2014-00284]

Download as PDF Federal Register / Vol. 79, No. 7 / Friday, January 10, 2014 / Rules and Regulations (b) * * * (4) * * * (ii) * * * The effectiveness of this device for this use has not been demonstrated; (5) * * * If the amount charged is $250 or less, the requirement for a report by an independent certified public accountant or an attestation by a responsible individual of the organization is waived; and (6) Information concerning pediatric uses of the device, as required by § 814.20(b)(13). * * * * * ■ 10. In 814.116, redesignate paragraphs (c)(2) through (c)(4) as paragraphs (c)(3) through (c)(5), respectively, and add new paragraph (c)(2) to read as follows: § 814.116 HDE. Procedures for review of an * * * * * (c) * * * (2) The submission of additional information concerning pediatric uses of the device, as required by § 814.20(b)(13); * * * * * Dated: January 6, 2014. Leslie Kux, Assistant Commissioner for Policy. [FR Doc. 2014–00267 Filed 1–9–14; 8:45 am] BILLING CODE 4160–01–P DEPARTMENT OF HOMELAND SECURITY Coast Guard 33 CFR Part 117 [Docket No. USCG–2013–1039] Drawbridge Operation Regulation; Upper Mississippi River, Sabula, IA Coast Guard, DHS. Notice of deviation from drawbridge regulations. AGENCY: ACTION: The Coast Guard has issued a temporary deviation from the operating schedule that governs the Sabula Railroad Drawbridge across the Upper Mississippi River, mile 535.0, at Sabula, Iowa. The deviation is necessary to allow the bridge owner time to perform repairs and maintenance that is essential to the continued safe operation of the drawbridge. This deviation allows the bridge to remain in the closed-tonavigation position while a damaged gear assembly is replaced and structural steel repairs are completed. DATES: This deviation is effective from 7 a.m., January 6, 2014 to 7 a.m., March 4, 2014. mstockstill on DSK4VPTVN1PROD with RULES SUMMARY: VerDate Mar<15>2010 16:30 Jan 09, 2014 Jkt 232001 The docket for this deviation, USCG–2013–1039 is available at https://www.regulations.gov. Type the docket number in the ‘‘SEARCH’’ box and click ‘‘SEARCH’’. Click on Open Docket Folder on the line associated with this deviation. You may also visit the Docket Management Facility in Room W12–140 on the ground floor of the Department of Transportation West Building, 1200 New Jersey Avenue SE., Washington, DC 20590, between 9 a.m. and 5 p.m., Monday through Friday, except Federal holidays. FOR FURTHER INFORMATION CONTACT: If you have questions on this temporary deviation, call or email Eric A. Washburn, Bridge Administrator, Western Rivers, Coast Guard; telephone 314–269–2378, email Eric.Washburn@ uscg.mil. If you have questions on viewing the docket, call Cheryl Collins, Program Manager, Docket Operations, telephone 202–366–9826. SUPPLEMENTARY INFORMATION: The Canadian Pacific Railway requested a temporary deviation for the Sabula Railroad Drawbridge, across the Upper Mississippi River, mile 535.0, at Sabula, Iowa to remain in the closed-tonavigation position while a damaged gear assembly is replaced and structural steel repairs are completed. The closure period will start at 7 a.m., January 6, 2014 to 7 a.m., March 4, 2014. Work is scheduled in the winter and when there is less impact on navigation; instead of scheduling work in the summer, when river traffic increases. Once the gear assembly is removed and structural steel repairs have commenced, the swing span will not be able to open, even for emergencies, until repairs are complete and gear assembly is installed. The Sabula Railroad Drawbridge currently operates in accordance with 33 CFR 117.5, which states the general requirement that drawbridges shall open promptly and fully for the passage of vessels when a request to open is given in accordance with the subpart. In order to facilitate the needed bridge work, the drawbridge must be kept in the closedto-navigation position. There are no alternate routes for vessels transiting this section of the Upper Mississippi River. The Sabula Railroad Drawbridge, in the closed-to-navigation position, provides a vertical clearance of 18.1 feet above normal pool. Navigation on the waterway consists primarily of commercial tows and recreational watercraft. This temporary deviation has been coordinated with the waterway users. No objections were received. ADDRESSES: PO 00000 Frm 00009 Fmt 4700 Sfmt 4700 1741 In accordance with 33 CFR 117.35(e), the drawbridge must return to its regular operating schedule immediately at the end of the effective period of this temporary deviation. This deviation from the operating regulations is authorized under 33 CFR 117.35. Dated: December 18, 2013. Eric A. Washburn, Bridge Administrator, Western Rivers. [FR Doc. 2014–00284 Filed 1–9–14; 8:45 am] BILLING CODE 9110–04–P DEPARTMENT OF HEALTH AND HUMAN SERVICES Centers for Medicare & Medicaid Services 42 CFR Parts 412, 413, 414, 419, 424, 482, 485, and 489 [CMS–1599–CN4] RIN 0938–AR53 Medicare Program; Hospital Inpatient Prospective Payment Systems for Acute Care Hospitals and the LongTerm Care Hospital Prospective Payment System and Fiscal Year 2014 Rates; Quality Reporting Requirements for Specific Providers; Hospital Conditions of Participation; Payment Policies Related to Patient Status; Corrections Centers for Medicare & Medicaid Services (CMS), HHS. ACTION: Final rule; correction. AGENCY: This document corrects technical errors in the correcting document that appeared in the January 2, 2014 Federal Register entitled ‘‘Medicare Program; Hospital Inpatient Prospective Payment Systems for Acute Care Hospitals and the Long-Term Care Hospital Prospective Payment System and Fiscal Year 2014 Rates; Quality Reporting Requirements for Specific Providers; Hospital Conditions of Participation; Payment Policies Related to Patient Status; Corrections.’’ DATES: Effective Date: This correcting document is effective January 8, 2014. Applicability Date: This correcting document is applicable on January 1, 2014. SUMMARY: FOR FURTHER INFORMATION CONTACT: Tzvi Hefter, (410) 786–4487. SUPPLEMENTARY INFORMATION: I. Background In the August 19, 2013 Federal Register (78 FR 50495), we published a final rule entitled ‘‘Medicare Program; Hospital Inpatient Prospective Payment E:\FR\FM\10JAR1.SGM 10JAR1

Agencies

[Federal Register Volume 79, Number 7 (Friday, January 10, 2014)]
[Rules and Regulations]
[Page 1741]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2014-00284]


=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF HOMELAND SECURITY

Coast Guard

33 CFR Part 117

[Docket No. USCG-2013-1039]


Drawbridge Operation Regulation; Upper Mississippi River, Sabula, 
IA

AGENCY: Coast Guard, DHS.

ACTION: Notice of deviation from drawbridge regulations.

-----------------------------------------------------------------------

SUMMARY: The Coast Guard has issued a temporary deviation from the 
operating schedule that governs the Sabula Railroad Drawbridge across 
the Upper Mississippi River, mile 535.0, at Sabula, Iowa. The deviation 
is necessary to allow the bridge owner time to perform repairs and 
maintenance that is essential to the continued safe operation of the 
drawbridge. This deviation allows the bridge to remain in the closed-
to-navigation position while a damaged gear assembly is replaced and 
structural steel repairs are completed.

DATES: This deviation is effective from 7 a.m., January 6, 2014 to 7 
a.m., March 4, 2014.

ADDRESSES: The docket for this deviation, USCG-2013-1039 is available 
at https://www.regulations.gov. Type the docket number in the ``SEARCH'' 
box and click ``SEARCH''. Click on Open Docket Folder on the line 
associated with this deviation. You may also visit the Docket 
Management Facility in Room W12-140 on the ground floor of the 
Department of Transportation West Building, 1200 New Jersey Avenue SE., 
Washington, DC 20590, between 9 a.m. and 5 p.m., Monday through Friday, 
except Federal holidays.

FOR FURTHER INFORMATION CONTACT: If you have questions on this 
temporary deviation, call or email Eric A. Washburn, Bridge 
Administrator, Western Rivers, Coast Guard; telephone 314-269-2378, 
email Eric.Washburn@uscg.mil. If you have questions on viewing the 
docket, call Cheryl Collins, Program Manager, Docket Operations, 
telephone 202-366-9826.

SUPPLEMENTARY INFORMATION: The Canadian Pacific Railway requested a 
temporary deviation for the Sabula Railroad Drawbridge, across the 
Upper Mississippi River, mile 535.0, at Sabula, Iowa to remain in the 
closed-to-navigation position while a damaged gear assembly is replaced 
and structural steel repairs are completed. The closure period will 
start at 7 a.m., January 6, 2014 to 7 a.m., March 4, 2014. Work is 
scheduled in the winter and when there is less impact on navigation; 
instead of scheduling work in the summer, when river traffic increases.
    Once the gear assembly is removed and structural steel repairs have 
commenced, the swing span will not be able to open, even for 
emergencies, until repairs are complete and gear assembly is installed.
    The Sabula Railroad Drawbridge currently operates in accordance 
with 33 CFR 117.5, which states the general requirement that 
drawbridges shall open promptly and fully for the passage of vessels 
when a request to open is given in accordance with the subpart. In 
order to facilitate the needed bridge work, the drawbridge must be kept 
in the closed-to-navigation position.
    There are no alternate routes for vessels transiting this section 
of the Upper Mississippi River.
    The Sabula Railroad Drawbridge, in the closed-to-navigation 
position, provides a vertical clearance of 18.1 feet above normal pool. 
Navigation on the waterway consists primarily of commercial tows and 
recreational watercraft. This temporary deviation has been coordinated 
with the waterway users. No objections were received.
    In accordance with 33 CFR 117.35(e), the drawbridge must return to 
its regular operating schedule immediately at the end of the effective 
period of this temporary deviation. This deviation from the operating 
regulations is authorized under 33 CFR 117.35.

    Dated: December 18, 2013.
Eric A. Washburn,
Bridge Administrator, Western Rivers.
[FR Doc. 2014-00284 Filed 1-9-14; 8:45 am]
BILLING CODE 9110-04-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.