Hydro Green Energy, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications, 78353-78354 [2013-30830]
Download as PDF
Federal Register / Vol. 78, No. 248 / Thursday, December 26, 2013 / Notices
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. OR14–12–000]
emcdonald on DSK67QTVN1PROD with NOTICES
NuStar Crude Oil Pipeline L.P.; Notice
of Petiton for Declaratory Order
Take notice that on December 13,
2013, pursuant to Rule 207(a)(2) of the
Commission’s Rules of Practice and
Procedure, 18 CFR 385.207(a)(2)(2013),
NuStar Crude Oil Pipeline L.P. (NuStar)
filed a petition requesting a declaratory
order approving the general tariff and
rate structure for expansion of NuStar’s
South Texas Crude Oil Pipeline system
to transport additional Eagle Ford shale
crude. Among other things, NuStar
seeks approval of its transportation and
deficiency agreement for Committed
Shippers including priority
transportation rights and prorationing
provisions of its pro forma tariff, all as
more fully explained in the petition.
Any person desiring to intervene or to
protest in this proceeding must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Anyone filing a motion
to intervene or protest must serve a copy
of that document on the Petitioner.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with Internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 14 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First St. NE., Washington, DC
20426.
The filings in the above proceeding
are accessible in the Commission’s
eLibrary system by clicking on the
appropriate link in the above list. They
are also available for review in the
Commission’s Public Reference Room in
Washington, DC. There is an
eSubscription link on the Web site that
enables subscribers to receive email
notification when a document is added
VerDate Mar<15>2010
18:06 Dec 24, 2013
Jkt 232001
to a subscribed docket(s). For assistance
with any FERC Online service, please
email FERCOnlineSupport@ferc.gov. or
call (866) 208–3676 (toll free). For TTY,
call (202) 502–8659.
Comment Date: 5:00 p.m. Eastern time
on January 13, 2014.
Dated: December 17, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013–30784 Filed 12–24–13; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14544–000]
Hydro Green Energy, LLC; Notice of
Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Competing Applications
On August 5, 2013, Hydro Green
Energy, LLC, filed an application for a
preliminary permit, pursuant to section
4(f) of the Federal Power Act (FPA),
proposing to study the feasibility of the
Vandenberg West Project to be located
near Vandenberg Air Force Base in
Santa Barbara County, California. The
sole purpose of a preliminary permit, if
issued, is to grant the permit holder
priority to file a license application
during the permit term. A preliminary
permit does not authorize the permit
holder to perform any land-disturbing
activities or otherwise enter upon lands
or waters owned by others without the
owners’ express permission.
The proposed project would consist of
the following: (1) A 30-foot-high, 4,450foot-long upper earthen embankment
constructed with rubber sheet and
asphalt lining; (2) an upper reservoir
having a total/usable storage capacity of
7,104 acre-feet at normal maximum
operation elevation of 1,200 feet above
mean sea level; (3) seven 7,500-foot-long
by 10-foot-diameter steel lined
penstocks; (4) a 500-foot-long, 250-footdiameter concrete lined tailrace; (5) a
concrete and steel lined pressure shaft;
(6) seven 193-megawatt, reversible
variable-speed pump-turbines; (7) a new
powerhouse and substation located
approximately 100 feet below ground
and approximately 250 feet long by 75
feet wide by 100 feet high; (8) a vertical
access tunnel approximately 400 feet
high and 30 feet in diameter; (9) a
breakwater constructed from precast
concrete tetrapods; and (10) a new
single-circuit 230-kilovolt transmission
line approximately 20 miles in length.
PO 00000
Frm 00029
Fmt 4703
Sfmt 4703
78353
The estimated annual generation of the
Vandenberg West Project would be
approximately 3,952 gigawatt-hours.
Applicant Contact: Mr. Mark Stover,
Hydro Green, LLC, 900 Oakmont Lane,
Suite 310, Westmont, IL 60559; phone:
(877) 556–6566 ext. 709.
FERC Contact: Mary Greene; phone:
(202) 502–8865.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36.
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, notices of intent,
and competing applications using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
The first page of any filing should
include docket number P–14544–000.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of Commission’s Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–14544) in the docket number field to
access the document. For assistance,
contact FERC Online Support.
Dated: December 19, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013–30828 Filed 12–24–13; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14548–000]
Hydro Green Energy, LLC; Notice of
Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Competing Applications
On August 15, 2013, Hydro Green
Energy, LLC, filed an application for a
E:\FR\FM\26DEN1.SGM
26DEN1
emcdonald on DSK67QTVN1PROD with NOTICES
78354
Federal Register / Vol. 78, No. 248 / Thursday, December 26, 2013 / Notices
preliminary permit, pursuant to section
4(f) of the Federal Power Act (FPA),
proposing to study the feasibility of the
Pendleton South Project to be located
near Camp Pendleton South in San
Diego County, California. The sole
purpose of a preliminary permit, if
issued, is to grant the permit holder
priority to file a license application
during the permit term. A preliminary
permit does not authorize the permit
holder to perform any land-disturbing
activities or otherwise enter upon lands
or waters owned by others without the
owners’ express permission.
The proposed project would consist of
the following: (1) A 30-foot-high, 5,108foot-long upper earthen embankment
constructed with rubber sheet and
asphalt lining; (2) an upper reservoir
having a total/usable storage capacity of
8,894 acre-feet at normal maximum
operation elevation of 1,032 feet above
mean sea level; (3) eight approximately
25,000-foot-long by 10-foot-diameter
steel lined penstocks; (4) a 500-footlong, 250-foot-diameter concrete lined
tailrace; (5) a concrete and steel lined
pressure shaft; (6) eight 154-megawatt,
reversible variable-speed pumpturbines; (7) a new powerhouse and
substation located approximately 100
feet below ground and approximately
250 feet long by 75 feet wide by 100 feet
high; (8) a vertical access tunnel
approximately 400 feet high and 30 feet
in diameter; (9) a breakwater
constructed from precast concrete
tetrapods; and (10) a new single-circuit
230-kilovolt transmission line
approximately 9 miles in length. The
estimated annual generation of the
Pendleton South Project would be
approximately 3,607 gigawatt-hours.
Applicant Contact: Mr. Mark Stover,
Hydro Green, LLC, 900 Oakmont Lane,
Suite 310, Westmont, IL 60559; phone:
(877) 556–6566 ext. 709.
FERC Contact: Mary Greene; phone:
(202) 502–8865.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36.
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, notices of intent,
and competing applications using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
VerDate Mar<15>2010
18:06 Dec 24, 2013
Jkt 232001
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
The first page of any filing should
include docket number P–14548–000.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of Commission’s Web site at https://
www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P–14548) in
the docket number field to access the
document. For assistance, contact FERC
Online Support.
Dated: December 19, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013–30830 Filed 12–24–13; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14560–000]
Borough of Weatherly; Notice of
Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Competing Applications
On November 4, 2013, the Borough of
Weatherly (Borough) filed an
application for a preliminary permit,
pursuant to section 4(f) of the Federal
Power Act (FPA), proposing to study the
feasibility of the Francis E. Walter Dam
and Reservoir (Francis Walter Project or
project) to be located at the U.S. Army
Corps of Engineers’ (Corps) Francis E.
Walter Dam on the Lehigh River in
Luzerne County, Pennsylvania. The sole
purpose of a preliminary permit, if
issued, is to grant the permit holder
priority to file a license application
during the permit term. A preliminary
permit does not authorize the permit
holder to perform any land-disturbing
activities or otherwise enter upon lands
or waters owned by others without the
owners’ express permission.
The Borough’s permit application is
filed in competition with Mid-Atlantic
Hydro, LLC’s proposed Francis E.
Walter Hydroelectric Project No. 14549–
000, which was publicly noticed
September 25, 2013. The deadline for
filing competing applications was
November 24, 2013. The Borough’s
PO 00000
Frm 00030
Fmt 4703
Sfmt 4703
competing permit application is timely
filed.
The proposed project would consist of
the following: (1) A concrete reinforced
powerhouse to be located near the outlet
structure of the existing penstock; (2) a
substation to be located outside the
powerhouse on the west side; (3) two
unequal-sized turbine-generators for a
total installed capacity of between 9.0
megawatts (MW) and 11.5 MW; (4) a
proposed 0.5-mile-long, 12.47-kilovolt
transmission line interconnecting with
an existing Pennsylvania Power and
Light transmission line; and (5)
appurtenant facilities. The estimated
annual generation of the project would
range between 13 gigawatt-hours (GWh)
and 26 GWh.
Applicant Contact: Mr. Harold
Pudliner, Borough of Weatherly, 10
Wilbur Street, Weatherly, PA 18225;
phone: (570) 427–8640.
FERC Contact: Woohee Choi; phone:
(202) 502–6336.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36.
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, notices of intent,
and competing applications using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426.
The first page of any filing should
include docket number P–14560–000.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of the Commission’s Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–14560) in the docket number field to
access the document. For assistance,
contact FERC Online Support.
E:\FR\FM\26DEN1.SGM
26DEN1
Agencies
[Federal Register Volume 78, Number 248 (Thursday, December 26, 2013)]
[Notices]
[Pages 78353-78354]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-30830]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 14548-000]
Hydro Green Energy, LLC; Notice of Preliminary Permit Application
Accepted for Filing and Soliciting Comments, Motions To Intervene, and
Competing Applications
On August 15, 2013, Hydro Green Energy, LLC, filed an application
for a
[[Page 78354]]
preliminary permit, pursuant to section 4(f) of the Federal Power Act
(FPA), proposing to study the feasibility of the Pendleton South
Project to be located near Camp Pendleton South in San Diego County,
California. The sole purpose of a preliminary permit, if issued, is to
grant the permit holder priority to file a license application during
the permit term. A preliminary permit does not authorize the permit
holder to perform any land-disturbing activities or otherwise enter
upon lands or waters owned by others without the owners' express
permission.
The proposed project would consist of the following: (1) A 30-foot-
high, 5,108-foot-long upper earthen embankment constructed with rubber
sheet and asphalt lining; (2) an upper reservoir having a total/usable
storage capacity of 8,894 acre-feet at normal maximum operation
elevation of 1,032 feet above mean sea level; (3) eight approximately
25,000-foot-long by 10-foot-diameter steel lined penstocks; (4) a 500-
foot-long, 250-foot-diameter concrete lined tailrace; (5) a concrete
and steel lined pressure shaft; (6) eight 154-megawatt, reversible
variable-speed pump-turbines; (7) a new powerhouse and substation
located approximately 100 feet below ground and approximately 250 feet
long by 75 feet wide by 100 feet high; (8) a vertical access tunnel
approximately 400 feet high and 30 feet in diameter; (9) a breakwater
constructed from precast concrete tetrapods; and (10) a new single-
circuit 230-kilovolt transmission line approximately 9 miles in length.
The estimated annual generation of the Pendleton South Project would be
approximately 3,607 gigawatt-hours.
Applicant Contact: Mr. Mark Stover, Hydro Green, LLC, 900 Oakmont
Lane, Suite 310, Westmont, IL 60559; phone: (877) 556-6566 ext. 709.
FERC Contact: Mary Greene; phone: (202) 502-8865.
Deadline for filing comments, motions to intervene, competing
applications (without notices of intent), or notices of intent to file
competing applications: 60 days from the issuance of this notice.
Competing applications and notices of intent must meet the requirements
of 18 CFR 4.36.
The Commission strongly encourages electronic filing. Please file
comments, motions to intervene, notices of intent, and competing
applications using the Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief
comments up to 6,000 characters, without prior registration, using the
eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You
must include your name and contact information at the end of your
comments. For assistance, please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to:
Secretary, Federal Energy Regulatory Commission, 888 First Street NE.,
Washington, DC 20426. The first page of any filing should include
docket number P-14548-000.
More information about this project, including a copy of the
application, can be viewed or printed on the ``eLibrary'' link of
Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P-14548) in the docket number field to access
the document. For assistance, contact FERC Online Support.
Dated: December 19, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013-30830 Filed 12-24-13; 8:45 am]
BILLING CODE 6717-01-P