Houston Pipe Line Company, LP; Notice of Intent to Prepare an Environmental Assessment for the Proposed 24-Inch Border Crossing Project and Request for Comments on Environmental Issues, 78350-78352 [2013-30783]

Download as PDF emcdonald on DSK67QTVN1PROD with NOTICES 78350 Federal Register / Vol. 78, No. 248 / Thursday, December 26, 2013 / Notices the Federal Energy Regulatory Commission’s (Commission) regulations, 18 CFR Part 380 (Order No. 486, 52 FR 47897), the Office of Energy Projects has reviewed the application for an original license for the Pomperaug Hydro Project, to be located on the Pomperaug River, in the town of Woodbury, Litchfield County, Connecticut, and has prepared a draft Environmental Assessment (EA). The draft EA contains the staff’s analysis of the potential environmental impacts of the project and concludes that licensing the project, with appropriate environmental protective measures, would not constitute a major federal action that would significantly affect the quality of the human environment. A copy of the draft EA is on file with the Commission and is available for public inspection. The draft EA may also be viewed on the Commission’s Web site at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number, excluding the last three digits in the docket number field, to access the document. For assistance, contact FERC Online Support at FERCOnlineSupport@ferc.gov or tollfree at 1–866–208–3676, or for TTY, (202) 502–8659. You may also register online at https://www.ferc.gov/docsfiling/esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support. Any comments should be filed within 30 days from the date of this notice. Comments may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site https:// www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support. Although the Commission strongly encourages electronic filing, documents may also be paper-filed. To paper-file, mail comments to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. The first page of any filing should include docket number P–12790–002. For further information, contact Steve Kartalia at (202) 502–6131 or Stephen.Kartalia@ferc.gov. VerDate Mar<15>2010 18:06 Dec 24, 2013 Jkt 232001 Dated: December 19, 2013. Kimberly D. Bose, Secretary. [FR Doc. 2013–30834 Filed 12–24–13; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP14–13–000] Houston Pipe Line Company, LP; Notice of Intent to Prepare an Environmental Assessment for the Proposed 24-Inch Border Crossing Project and Request for Comments on Environmental Issues The staff of the Federal Energy Regulatory Commission (FERC or Commission) will prepare an environmental assessment (EA) that will discuss the environmental impacts of the 24-Inch Border Crossing Project (Project) involving construction and operation of border crossing facilities at the international border between Mexico and the United States in Hidalgo County, Texas by Houston Pipe Line Company, LP (HPL). The Commission will use this EA in its decision-making process to determine whether the Project is in the public convenience and necessity. This notice announces the opening of the scoping process the Commission will use to gather input from the public and interested agencies on the Project. Your input will help the Commission staff determine what issues they need to evaluate in the EA. Please note that the scoping period will close on January 17, 2014. You may submit comments in written form or verbally. Further details on how to submit written comments are in the Public Participation section of this notice. This notice is being sent to the Commission’s current environmental mailing list for the Project. State and local government representatives should notify their constituents of this planned project and encourage them to comment on their areas of concern. If you are a landowner receiving this notice, a pipeline company representative may contact you about the acquisition of an easement to construct, operate, and maintain the planned facilities. The company would seek to negotiate a mutually acceptable agreement. However, if the Commission approves the Project, that approval conveys with it the right of eminent domain. Therefore, if easement negotiations fail to produce an PO 00000 Frm 00026 Fmt 4703 Sfmt 4703 agreement, the pipeline company could initiate condemnation proceedings where compensation would be determined in accordance with state law. HPL provided landowners with a fact sheet prepared by the FERC entitled ‘‘An Interstate Natural Gas Facility On My Land? What Do I Need To Know?’’ This fact sheet addresses a number of typically-asked questions, including the use of eminent domain and how to participate in the Commission’s proceedings. It is also available for viewing on the FERC Web site (www.ferc.gov). Summary of the Proposed Project HPL proposes to construct a new border crossing at the international boundary between the United States and Mexico in Hidalgo County, Texas. The Project would consist of approximately 703 feet of 24-inch-diameter natural gas pipeline, directionally drilled underneath the Rio Grande River in Hidalgo County, Texas. The new pipeline would have a design capacity of approximately 140 million cubic feet per day (Mmcf/d) and a maximum allowable operating pressure of 1,300 pounds per square inch gauge designed to transport natural gas to a new delivery interconnect with HPL’s nonjurisdictional intrastate pipeline and to a new interconnection with the Pemex Pipeline at the United States-Mexico border. The general location of the Project is shown in Appendix 1. Land Requirements for Construction Construction of the planned facilities would require ground disturbance of approximately 4.1 acres of land for temporary workspace. Following construction, HPL would maintain 0.81 acre for operation of the Project and the remaining 3.3 acres would be revegetated. In its application, HPL indicates that it would also construct pipeline facilities that are not under the jurisdiction of the FERC. Although FERC doesn’t have the regulatory authority to modify or deny the construction of these facilities, we will disclose available information regarding the construction impacts in our EA. These facilities would include approximately 23 miles of 24-inch1 The appendices referenced in this notice will not appear in the Federal Register. Copies of the appendices were sent to all those receiving this notice in the mail and are available at www.ferc.gov using the link called ‘‘eLibrary’’ or from the Commission’s Public Reference Room, 888 First Street NE., Washington, DC 20426, or call (202) 502–8371. For instructions on connecting to eLibrary, refer to the last page of this notice. E:\FR\FM\26DEN1.SGM 26DEN1 Federal Register / Vol. 78, No. 248 / Thursday, December 26, 2013 / Notices emcdonald on DSK67QTVN1PROD with NOTICES diameter intrastate pipeline, to interconnect with the existing Edinburg Lateral Pipeline in Hidalgo County, Texas. The EA Process The National Environmental Policy Act (NEPA) requires the Commission to take into account the environmental impacts that could result from an action whenever it considers the issuance of a Certificate of Public Convenience and Necessity. NEPA also requires us 2 to discover and address concerns the public may have about proposals. This process is referred to as ‘‘scoping.’’ The main goal of the scoping process is to focus the analysis in the EA on the important environmental issues. By this notice, the Commission requests public comments on the scope of the issues to address in the EA. We will consider all filed comments during the preparation of the EA. In the EA we will discuss impacts that could occur as a result of the construction and operation of the planned Project under these general headings: • geology and soils; • water resources and fisheries; • vegetation, wildlife, and endangered and threatened species; • land use and cumulative impacts; • cultural resources; • air quality and noise; and • public safety. We will also evaluate possible alternatives to the planned project or portions of the project, and make recommendations on how to lessen or avoid impacts on the various resource areas. The EA will present our independent analysis of the issues. The EA will be available in the public record through eLibrary. Depending on the comments received during the scoping process, we may also publish and distribute the EA to the public for an allotted comment period. We will consider all comments on the EA before making our recommendations to the Commission. To ensure we have the opportunity to consider and address your comments, please carefully follow the instructions in the Public Participation section below. With this notice, we are asking agencies with jurisdiction by law and/ or special expertise with respect to the environmental issues related to this Project to formally cooperate with us in the preparation of the EA.3 2 ‘‘We,’’ ‘‘us,’’ and ‘‘our’’ refer to the environmental staff of the Commission’s Office of Energy Projects. 3 The Council on Environmental Quality regulations addressing cooperating agency VerDate Mar<15>2010 18:06 Dec 24, 2013 Jkt 232001 Agencies that would like to request cooperating agency status should follow the instructions for filing comments provided under the Public Participation section of this notice. Consultations Under Section 106 of the National Historic Preservation Act In accordance with the Advisory Council on Historic Preservation’s implementing regulations for section 106 of the National Historic Preservation Act, we are using this notice to initiate consultation with the Texas Historical Commission (THC), and to solicit their views and those of other government agencies, interested Indian tribes, and the public on the Project’s potential effects on historic properties.4 We will define the Projectspecific Area of Potential Effects in consultation with the State Historic Preservation Officer as the Project develops. On natural gas facility projects, the Area of Potential Effects at a minimum encompasses all areas subject to ground disturbance (examples include construction right-of-way, contractor/pipe storage yards, meter stations, and access roads). Our EA for this Project will document our findings on the impacts on historic properties and summarize the status of consultations under section 106. Public Participation You can make a difference by providing us with your specific comments or concerns about the Project. Your comments should focus on the potential environmental effects, reasonable alternatives, and measures to avoid or lessen environmental impacts. The more specific your comments, the more useful they will be. To ensure that your comments are timely and properly recorded, please send your comments so that the Commission receives them in Washington, DC on or before January 17, 2013. For your convenience, there are three methods you can use to submit your comments to the Commission. In all instances, please reference the Project docket number (CP14–13–000) with your submission. The Commission encourages electronic filing of comments and has expert staff available to assist you at (202) 502–8258 or efiling@ferc.gov. responsibilities are at Title 40, Code of Federal Regulations, Part 1501.6. 4 The Advisory Council on Historic Preservation’s regulations are at Title 36, Code of Federal Regulations, Part 800. Those regulations define historic properties as any prehistoric or historic district, site, building, structure, or object included in or eligible for inclusion in the National Register of Historic Places. PO 00000 Frm 00027 Fmt 4703 Sfmt 4703 78351 (1) You can file your comments electronically using the eComment feature located on the Commission’s Web site (www.ferc.gov) under the link to Documents and Filings. This is an easy method for interested persons to submit brief, text-only comments on a project; (2) You can file your comments electronically using the eFiling feature located on the Commission’s Web site (www.ferc.gov) under the link to Documents and Filings. With eFiling, you can provide comments in a variety of formats by attaching them as a file with your submission. New eFiling users must first create an account by clicking on ‘‘eRegister.’’ You must select the type of filing you are making. If you are filing a comment on a particular project, please select ‘‘Comment on a Filing’’; or (3) You can file a paper copy of your comments by mailing them to the following address: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Room 1A, Washington, DC 20426. Environmental Mailing List The environmental mailing list includes federal, state, and local government representatives and agencies; elected officials; environmental and public interest groups; Native American Tribes; other interested parties; and local libraries and newspapers. This list also includes all affected landowners (as defined in the Commission’s regulations) who are potential right-of-way grantors, whose property may be used temporarily for project purposes, or who own homes within certain distances of aboveground facilities, and anyone who submits comments on the Project. We will update the environmental mailing list as the analysis proceeds to ensure that we send the information related to this environmental review to all individuals, organizations, and government entities interested in and/or potentially affected by the planned Project. If we publish and distribute the EA, copies of the completed EA will be sent to the environmental mailing list for public review and comment. If you would prefer to receive a paper copy of the document instead of the CD version or would like to remove your name from the mailing list, please return the attached Information Request (Appendix 2). Becoming an Intervenor In addition to involvement in the EA scoping process, you may want to become an ‘‘intervenor,’’ which is an official party to the Commission’s E:\FR\FM\26DEN1.SGM 26DEN1 78352 Federal Register / Vol. 78, No. 248 / Thursday, December 26, 2013 / Notices proceeding. Intervenors play a more formal role in the process and are able to file briefs, appear at hearings, and be heard by the courts if they choose to appeal the Commission’s final ruling. An intervenor formally participates in the proceeding by filing a request to intervene. Instructions for becoming an intervenor are in the User’s Guide under the ‘‘e-filing’’ link on the Commission’s Web site at https://www.ferc.gov/help/ how-to/intervene.asp. Additional Information Additional information about the Project is available from the Commission’s Office of External Affairs, at (866) 208–FERC, or on the FERC Web site (www.ferc.gov) using the eLibrary link. Click on the eLibrary link, click on ‘‘General Search’’ and enter the docket number, excluding the last three digits in the Docket Number field (i.e., CP14– 13). Be sure you have selected an appropriate date range. For assistance, please contact FERC Online Support at FercOnlineSupport@ferc.gov or toll free at (866) 208–3676, or for TTY, contact (202) 502–8659. The eLibrary link also provides access to the texts of formal documents issued by the Commission, such as orders, notices, and rulemakings. In addition, the Commission offers a free service called eSubscription which allows you to keep track of all formal issuances and submittals in specific dockets. This can reduce the amount of time you spend researching proceedings by automatically providing you with notification of these filings, document summaries, and direct links to the documents. Go to www.ferc.gov/ esubscribenow.htm. Finally, public meetings or site visits will be posted on the Commission’s calendar located at www.ferc.gov/ EventCalendar/EventsList.aspx along with other related information. Dated: December 18, 2013. Kimberly D. Bose, Secretary. Order No. 1000 Further Regional Compliance Filing to be effective 1/1/ 2015. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. On or before the comment date, it is not necessary to serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 5 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5:00 p.m. Eastern Time on January 16, 2014. Dated: December 19, 2013. Kimberly D. Bose, Secretary. [FR Doc. 2013–30832 Filed 12–24–13; 8:45 am] BILLING CODE 6717–01–P [FR Doc. 2013–30783 Filed 12–24–13; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY emcdonald on DSK67QTVN1PROD with NOTICES DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Federal Energy Regulatory Commission [Docket No. ER14–660–000] Orlando Utilities Commission; Notice of Filing Plant-E Corp; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization Take notice that on December 18, 2013, Orlando Utilities Commission submitted its tariff filing per 35.28(e): This is a supplemental notice in the above-referenced proceeding, of Plant-E Corp’s application for market-based rate [Docket No. NJ14–4–000] VerDate Mar<15>2010 18:06 Dec 24, 2013 Jkt 232001 PO 00000 Frm 00028 Fmt 4703 Sfmt 9990 authority, with an accompanying rate schedule, noting that such application includes a request for blanket authorization, under 18 CFR Part 34, of future issuances of securities and assumptions of liability. Any person desiring to intervene or to protest should file with the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426, in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. Notice is hereby given that the deadline for filing protests with regard to the applicant’s request for blanket authorization, under 18 CFR Part 34, of future issuances of securities and assumptions of liability is January 7, 2014. The Commission encourages electronic submission of protests and interventions in lieu of paper, using the FERC Online links at https:// www.ferc.gov. To facilitate electronic service, persons with Internet access who will eFile a document and/or be listed as a contact for an intervenor must create and validate an eRegistration account using the eRegistration link. Select the eFiling link to log on and submit the intervention or protests. Persons unable to file electronically should submit an original and 5 copies of the intervention or protest to the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. The filings in the above-referenced proceeding(s) are accessible in the Commission’s eLibrary system by clicking on the appropriate link in the above list. They are also available for review in the Commission’s Public Reference Room in Washington, DC. There is an eSubscription link on the Web site that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov. or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: December 18, 2013. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2013–30697 Filed 12–24–13; 8:45 am] BILLING CODE 6717–01–P E:\FR\FM\26DEN1.SGM 26DEN1

Agencies

[Federal Register Volume 78, Number 248 (Thursday, December 26, 2013)]
[Notices]
[Pages 78350-78352]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-30783]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP14-13-000]


Houston Pipe Line Company, LP; Notice of Intent to Prepare an 
Environmental Assessment for the Proposed 24-Inch Border Crossing 
Project and Request for Comments on Environmental Issues

    The staff of the Federal Energy Regulatory Commission (FERC or 
Commission) will prepare an environmental assessment (EA) that will 
discuss the environmental impacts of the 24-Inch Border Crossing 
Project (Project) involving construction and operation of border 
crossing facilities at the international border between Mexico and the 
United States in Hidalgo County, Texas by Houston Pipe Line Company, LP 
(HPL). The Commission will use this EA in its decision-making process 
to determine whether the Project is in the public convenience and 
necessity.
    This notice announces the opening of the scoping process the 
Commission will use to gather input from the public and interested 
agencies on the Project. Your input will help the Commission staff 
determine what issues they need to evaluate in the EA. Please note that 
the scoping period will close on January 17, 2014.
    You may submit comments in written form or verbally. Further 
details on how to submit written comments are in the Public 
Participation section of this notice.
    This notice is being sent to the Commission's current environmental 
mailing list for the Project. State and local government 
representatives should notify their constituents of this planned 
project and encourage them to comment on their areas of concern.
    If you are a landowner receiving this notice, a pipeline company 
representative may contact you about the acquisition of an easement to 
construct, operate, and maintain the planned facilities. The company 
would seek to negotiate a mutually acceptable agreement. However, if 
the Commission approves the Project, that approval conveys with it the 
right of eminent domain. Therefore, if easement negotiations fail to 
produce an agreement, the pipeline company could initiate condemnation 
proceedings where compensation would be determined in accordance with 
state law.
    HPL provided landowners with a fact sheet prepared by the FERC 
entitled ``An Interstate Natural Gas Facility On My Land? What Do I 
Need To Know?'' This fact sheet addresses a number of typically-asked 
questions, including the use of eminent domain and how to participate 
in the Commission's proceedings. It is also available for viewing on 
the FERC Web site (www.ferc.gov).

Summary of the Proposed Project

    HPL proposes to construct a new border crossing at the 
international boundary between the United States and Mexico in Hidalgo 
County, Texas. The Project would consist of approximately 703 feet of 
24-inch-diameter natural gas pipeline, directionally drilled underneath 
the Rio Grande River in Hidalgo County, Texas. The new pipeline would 
have a design capacity of approximately 140 million cubic feet per day 
(Mmcf/d) and a maximum allowable operating pressure of 1,300 pounds per 
square inch gauge designed to transport natural gas to a new delivery 
interconnect with HPL's non-jurisdictional intrastate pipeline and to a 
new interconnection with the Pemex Pipeline at the United States-Mexico 
border.
    The general location of the Project is shown in Appendix \1\.
---------------------------------------------------------------------------

    \1\ The appendices referenced in this notice will not appear in 
the Federal Register. Copies of the appendices were sent to all 
those receiving this notice in the mail and are available at 
www.ferc.gov using the link called ``eLibrary'' or from the 
Commission's Public Reference Room, 888 First Street NE., 
Washington, DC 20426, or call (202) 502-8371. For instructions on 
connecting to eLibrary, refer to the last page of this notice.
---------------------------------------------------------------------------

Land Requirements for Construction

    Construction of the planned facilities would require ground 
disturbance of approximately 4.1 acres of land for temporary workspace. 
Following construction, HPL would maintain 0.81 acre for operation of 
the Project and the remaining 3.3 acres would be revegetated.
    In its application, HPL indicates that it would also construct 
pipeline facilities that are not under the jurisdiction of the FERC. 
Although FERC doesn't have the regulatory authority to modify or deny 
the construction of these facilities, we will disclose available 
information regarding the construction impacts in our EA. These 
facilities would include approximately 23 miles of 24-inch-

[[Page 78351]]

diameter intrastate pipeline, to interconnect with the existing 
Edinburg Lateral Pipeline in Hidalgo County, Texas.

The EA Process

    The National Environmental Policy Act (NEPA) requires the 
Commission to take into account the environmental impacts that could 
result from an action whenever it considers the issuance of a 
Certificate of Public Convenience and Necessity. NEPA also requires us 
\2\ to discover and address concerns the public may have about 
proposals. This process is referred to as ``scoping.'' The main goal of 
the scoping process is to focus the analysis in the EA on the important 
environmental issues. By this notice, the Commission requests public 
comments on the scope of the issues to address in the EA. We will 
consider all filed comments during the preparation of the EA.
---------------------------------------------------------------------------

    \2\ ``We,'' ``us,'' and ``our'' refer to the environmental staff 
of the Commission's Office of Energy Projects.
---------------------------------------------------------------------------

    In the EA we will discuss impacts that could occur as a result of 
the construction and operation of the planned Project under these 
general headings:
     geology and soils;
     water resources and fisheries;
     vegetation, wildlife, and endangered and threatened 
species;
     land use and cumulative impacts;
     cultural resources;
     air quality and noise; and
     public safety.
    We will also evaluate possible alternatives to the planned project 
or portions of the project, and make recommendations on how to lessen 
or avoid impacts on the various resource areas.
    The EA will present our independent analysis of the issues. The EA 
will be available in the public record through eLibrary. Depending on 
the comments received during the scoping process, we may also publish 
and distribute the EA to the public for an allotted comment period. We 
will consider all comments on the EA before making our recommendations 
to the Commission. To ensure we have the opportunity to consider and 
address your comments, please carefully follow the instructions in the 
Public Participation section below.
    With this notice, we are asking agencies with jurisdiction by law 
and/or special expertise with respect to the environmental issues 
related to this Project to formally cooperate with us in the 
preparation of the EA.\3\
---------------------------------------------------------------------------

    \3\ The Council on Environmental Quality regulations addressing 
cooperating agency responsibilities are at Title 40, Code of Federal 
Regulations, Part 1501.6.
---------------------------------------------------------------------------

    Agencies that would like to request cooperating agency status 
should follow the instructions for filing comments provided under the 
Public Participation section of this notice.

Consultations Under Section 106 of the National Historic Preservation 
Act

    In accordance with the Advisory Council on Historic Preservation's 
implementing regulations for section 106 of the National Historic 
Preservation Act, we are using this notice to initiate consultation 
with the Texas Historical Commission (THC), and to solicit their views 
and those of other government agencies, interested Indian tribes, and 
the public on the Project's potential effects on historic 
properties.\4\ We will define the Project-specific Area of Potential 
Effects in consultation with the State Historic Preservation Officer as 
the Project develops. On natural gas facility projects, the Area of 
Potential Effects at a minimum encompasses all areas subject to ground 
disturbance (examples include construction right-of-way, contractor/
pipe storage yards, meter stations, and access roads). Our EA for this 
Project will document our findings on the impacts on historic 
properties and summarize the status of consultations under section 106.
---------------------------------------------------------------------------

    \4\ The Advisory Council on Historic Preservation's regulations 
are at Title 36, Code of Federal Regulations, Part 800. Those 
regulations define historic properties as any prehistoric or 
historic district, site, building, structure, or object included in 
or eligible for inclusion in the National Register of Historic 
Places.
---------------------------------------------------------------------------

Public Participation

    You can make a difference by providing us with your specific 
comments or concerns about the Project. Your comments should focus on 
the potential environmental effects, reasonable alternatives, and 
measures to avoid or lessen environmental impacts. The more specific 
your comments, the more useful they will be. To ensure that your 
comments are timely and properly recorded, please send your comments so 
that the Commission receives them in Washington, DC on or before 
January 17, 2013.
    For your convenience, there are three methods you can use to submit 
your comments to the Commission. In all instances, please reference the 
Project docket number (CP14-13-000) with your submission. The 
Commission encourages electronic filing of comments and has expert 
staff available to assist you at (202) 502-8258 or efiling@ferc.gov.
    (1) You can file your comments electronically using the eComment 
feature located on the Commission's Web site (www.ferc.gov) under the 
link to Documents and Filings. This is an easy method for interested 
persons to submit brief, text-only comments on a project;
    (2) You can file your comments electronically using the eFiling 
feature located on the Commission's Web site (www.ferc.gov) under the 
link to Documents and Filings. With eFiling, you can provide comments 
in a variety of formats by attaching them as a file with your 
submission. New eFiling users must first create an account by clicking 
on ``eRegister.'' You must select the type of filing you are making. If 
you are filing a comment on a particular project, please select 
``Comment on a Filing''; or
    (3) You can file a paper copy of your comments by mailing them to 
the following address: Kimberly D. Bose, Secretary, Federal Energy 
Regulatory Commission, 888 First Street NE., Room 1A, Washington, DC 
20426.

Environmental Mailing List

    The environmental mailing list includes federal, state, and local 
government representatives and agencies; elected officials; 
environmental and public interest groups; Native American Tribes; other 
interested parties; and local libraries and newspapers. This list also 
includes all affected landowners (as defined in the Commission's 
regulations) who are potential right-of-way grantors, whose property 
may be used temporarily for project purposes, or who own homes within 
certain distances of aboveground facilities, and anyone who submits 
comments on the Project. We will update the environmental mailing list 
as the analysis proceeds to ensure that we send the information related 
to this environmental review to all individuals, organizations, and 
government entities interested in and/or potentially affected by the 
planned Project.
    If we publish and distribute the EA, copies of the completed EA 
will be sent to the environmental mailing list for public review and 
comment. If you would prefer to receive a paper copy of the document 
instead of the CD version or would like to remove your name from the 
mailing list, please return the attached Information Request (Appendix 
2).

Becoming an Intervenor

    In addition to involvement in the EA scoping process, you may want 
to become an ``intervenor,'' which is an official party to the 
Commission's

[[Page 78352]]

proceeding. Intervenors play a more formal role in the process and are 
able to file briefs, appear at hearings, and be heard by the courts if 
they choose to appeal the Commission's final ruling. An intervenor 
formally participates in the proceeding by filing a request to 
intervene. Instructions for becoming an intervenor are in the User's 
Guide under the ``e-filing'' link on the Commission's Web site at 
https://www.ferc.gov/help/how-to/intervene.asp.

Additional Information

    Additional information about the Project is available from the 
Commission's Office of External Affairs, at (866) 208-FERC, or on the 
FERC Web site (www.ferc.gov) using the eLibrary link. Click on the 
eLibrary link, click on ``General Search'' and enter the docket number, 
excluding the last three digits in the Docket Number field (i.e., CP14-
13). Be sure you have selected an appropriate date range. For 
assistance, please contact FERC Online Support at 
FercOnlineSupport@ferc.gov or toll free at (866) 208-3676, or for TTY, 
contact (202) 502-8659. The eLibrary link also provides access to the 
texts of formal documents issued by the Commission, such as orders, 
notices, and rulemakings.
    In addition, the Commission offers a free service called 
eSubscription which allows you to keep track of all formal issuances 
and submittals in specific dockets. This can reduce the amount of time 
you spend researching proceedings by automatically providing you with 
notification of these filings, document summaries, and direct links to 
the documents. Go to www.ferc.gov/esubscribenow.htm.
    Finally, public meetings or site visits will be posted on the 
Commission's calendar located at www.ferc.gov/EventCalendar/EventsList.aspx along with other related information.

    Dated: December 18, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013-30783 Filed 12-24-13; 8:45 am]
BILLING CODE 6717-01-P