Drawbridge Operation Regulation; Upper Mississippi River, Clinton, IA, 76750 [2013-30215]
Download as PDF
76750
Federal Register / Vol. 78, No. 244 / Thursday, December 19, 2013 / Rules and Regulations
approval of the Commissioner. The
Commissioner may approve withdrawal,
with or without prejudice against
resubmission of the petition.
*
*
*
*
*
Dated: December 13, 2013.
Leslie Kux,
Assistant Commissioner for Policy.
[FR Doc. 2013–30150 Filed 12–18–13; 8:45 am]
BILLING CODE 4160–01–P
DEPARTMENT OF HOMELAND
SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG–2013–1008]
Drawbridge Operation Regulation;
Upper Mississippi River, Clinton, IA
Coast Guard, DHS.
Notice of deviation from
drawbridge regulations.
AGENCY:
ACTION:
The Coast Guard has issued a
temporary deviation from the operating
schedule that governs the Clinton
Railroad Drawbridge across the Upper
Mississippi River, mile 518.0, at
Clinton, Iowa. The deviation is
necessary to allow the bridge owner
time to perform preventive maintenance
that is essential to the continued safe
operation of the drawbridge. This
deviation allows the bridge to open on
signal if at least 24 hours advance notice
is given.
DATES: This deviation is effective from
December 19, 2013 through 9 a.m.,
March 4, 2014, and has been enforced
with actual notice since 12:01 a.m.,
December 15, 2013.
ADDRESSES: The docket for this
deviation, (USCG–2013–1008) is
available at https://www.regulations.gov.
Type the docket number in the
‘‘SEARCH’’ box and click ‘‘SEARCH.’’
Click on Open Docket Folder on the line
associated with this deviation. You may
also visit the Docket Management
Facility in Room W12–140 on the
ground floor of the Department of
Transportation, West Building, 1200
New Jersey Avenue SE., Washington,
DC 20590, between 9 a.m. and 5 p.m.,
Monday through Friday, except Federal
Holidays.
FOR FURTHER INFORMATION CONTACT: If
you have questions on this temporary
deviation, call or email Eric A.
Washburn, Bridge Administrator,
Western Rivers, Coast Guard; telephone
314–269–2378, email Eric.Washburn@
uscg.mil. If you have questions on
pmangrum on DSK3VPTVN1PROD with RULES
SUMMARY:
VerDate Mar<15>2010
15:16 Dec 18, 2013
Jkt 232001
viewing the docket, call Cheryl F.
Collins, Program Manager, Docket
Operations, telephone 202–366–9826.
The Union
Pacific Railroad requested a temporary
deviation for the Clinton Railroad
Drawbridge, across the Upper
Mississippi River, mile 518.0, at
Clinton, Iowa to open on signal if at
least 24 hours advance notice is given
from 12:01 a.m., December 15, 2013 to
9 a.m., March 15, 2014 to allow the
bridge owner time for preventive
maintenance. The Clinton Railroad
Drawbridge will resume its normal
operating schedule at 9 a.m., March 4,
2014 to align with the opening of Locks
on the Upper Mississippi River.
Winter conditions on the Upper
Mississippi River coupled with the
closure of Army Corps of Engineer’s
Lock No. 16 (Mile 457.2 UMR), Lock No.
17 (Mile 437.1 UMR), and Lock No. 18
(Mile 410.5 UMR) until 11:00 a.m.,
March 4, 2014 will preclude any
significant navigation demands for the
drawspan opening.
The Clinton Railroad Drawbridge
currently operates in accordance with
33 CFR 117.5, which states the general
requirement that drawbridge shall open
promptly and fully for the passage of
vessels when a request to open is given
in accordance with the subpart.
There are no alternate routes for
vessels transiting this section of the
Upper Mississippi River.
The Clinton Railroad Drawbridge, in
the closed-to-navigation position,
provides a vertical clearance of 18.7 feet
above normal pool. Navigation on the
waterway consists primarily of
commercial tows and recreational
watercraft. The drawbridge will open if
at least 24 hours advance notice is
given. This temporary deviation has
been coordinated with waterway users.
No objections were received.
In accordance with 33 CFR 117.35(e),
the drawbridge must return to its regular
operating schedule immediately at the
end of the effective period of this
temporary deviation. This deviation
from the operating regulations is
authorized under 33 CFR 117.35.
SUPPLEMENTARY INFORMATION:
Dated: December 5, 2013.
Eric A. Washburn,
Bridge Administrator, Western Rivers.
[FR Doc. 2013–30215 Filed 12–18–13; 8:45 am]
BILLING CODE 9110–04–P
PO 00000
Frm 00030
Fmt 4700
Sfmt 4700
DEPARTMENT OF HOMELAND
SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG–2013–0990]
Drawbridge Operation Regulation;
Chambers Creek, Steilacoom, WA
Coast Guard, DHS.
Notice of deviation from
drawbridge regulation.
AGENCY:
ACTION:
The Coast Guard has issued a
temporary deviation from the operating
schedule that governs the Burlington
Northern Santa Fe (BNSF) Chambers
Creek Railway Bridge across Chambers
Creek, mile 0.0, at Steilacoom, WA. The
deviation is necessary to allow BNSF to
perform maintenance and upgrade items
to this vertical lift bridge in support of
Positive Train Control requirements per
the Rail Safety Improvement Act of
2008. This will require locking the
bridge in the closed position and
locking out the power to the drive
system while the work is conducted.
This deviation allows the bridge to
remain in the closed position for 45
days during the maintenance and
upgrade work.
DATES: This deviation is effective from
8 a.m. on January 6, 2014 to 5 p.m. on
February 19, 2014.
ADDRESSES: The docket for this
deviation, [USCG–2013–0990], is
available at https://www.regulations.gov.
Type the docket number in the
‘‘SEARCH’’ box and click ‘‘SEARCH.’’
Click on Open Docket Folder on the line
associated with this deviation. You may
also visit the Docket Management
Facility in Room W12–140 on the
ground floor of the Department of
Transportation West Building, 1200
New Jersey Avenue SE., Washington,
DC 20590, between 9 a.m. and 5 p.m.,
Monday through Friday, except Federal
holidays.
FOR FURTHER INFORMATION CONTACT: If
you have questions on this temporary
deviation, call or email Steven Fischer,
Thirteenth District Bridge Program
Administrator, Coast Guard; telephone
206–220–7282, Steven.M.Fischer3@
uscg.mil. If you have questions on
viewing the docket, call Barbara
Hairston, Program Manager, Docket
Operations, telephone 202–366–9826.
SUPPLEMENTARY INFORMATION: Burlington
Northern Santa Fe (BNSF) will be
performing lift bridge maintenance and
upgrades for the BNSF Chambers Creek
Railway Bridge across Chambers Creek,
mile 0.0, near Steilacoom, WA. The
SUMMARY:
E:\FR\FM\19DER1.SGM
19DER1
Agencies
[Federal Register Volume 78, Number 244 (Thursday, December 19, 2013)]
[Rules and Regulations]
[Page 76750]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-30215]
=======================================================================
-----------------------------------------------------------------------
DEPARTMENT OF HOMELAND SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG-2013-1008]
Drawbridge Operation Regulation; Upper Mississippi River,
Clinton, IA
AGENCY: Coast Guard, DHS.
ACTION: Notice of deviation from drawbridge regulations.
-----------------------------------------------------------------------
SUMMARY: The Coast Guard has issued a temporary deviation from the
operating schedule that governs the Clinton Railroad Drawbridge across
the Upper Mississippi River, mile 518.0, at Clinton, Iowa. The
deviation is necessary to allow the bridge owner time to perform
preventive maintenance that is essential to the continued safe
operation of the drawbridge. This deviation allows the bridge to open
on signal if at least 24 hours advance notice is given.
DATES: This deviation is effective from December 19, 2013 through 9
a.m., March 4, 2014, and has been enforced with actual notice since
12:01 a.m., December 15, 2013.
ADDRESSES: The docket for this deviation, (USCG-2013-1008) is available
at https://www.regulations.gov. Type the docket number in the ``SEARCH''
box and click ``SEARCH.'' Click on Open Docket Folder on the line
associated with this deviation. You may also visit the Docket
Management Facility in Room W12-140 on the ground floor of the
Department of Transportation, West Building, 1200 New Jersey Avenue
SE., Washington, DC 20590, between 9 a.m. and 5 p.m., Monday through
Friday, except Federal Holidays.
FOR FURTHER INFORMATION CONTACT: If you have questions on this
temporary deviation, call or email Eric A. Washburn, Bridge
Administrator, Western Rivers, Coast Guard; telephone 314-269-2378,
email Eric.Washburn@uscg.mil. If you have questions on viewing the
docket, call Cheryl F. Collins, Program Manager, Docket Operations,
telephone 202-366-9826.
SUPPLEMENTARY INFORMATION: The Union Pacific Railroad requested a
temporary deviation for the Clinton Railroad Drawbridge, across the
Upper Mississippi River, mile 518.0, at Clinton, Iowa to open on signal
if at least 24 hours advance notice is given from 12:01 a.m., December
15, 2013 to 9 a.m., March 15, 2014 to allow the bridge owner time for
preventive maintenance. The Clinton Railroad Drawbridge will resume its
normal operating schedule at 9 a.m., March 4, 2014 to align with the
opening of Locks on the Upper Mississippi River.
Winter conditions on the Upper Mississippi River coupled with the
closure of Army Corps of Engineer's Lock No. 16 (Mile 457.2 UMR), Lock
No. 17 (Mile 437.1 UMR), and Lock No. 18 (Mile 410.5 UMR) until 11:00
a.m., March 4, 2014 will preclude any significant navigation demands
for the drawspan opening.
The Clinton Railroad Drawbridge currently operates in accordance
with 33 CFR 117.5, which states the general requirement that drawbridge
shall open promptly and fully for the passage of vessels when a request
to open is given in accordance with the subpart.
There are no alternate routes for vessels transiting this section
of the Upper Mississippi River.
The Clinton Railroad Drawbridge, in the closed-to-navigation
position, provides a vertical clearance of 18.7 feet above normal pool.
Navigation on the waterway consists primarily of commercial tows and
recreational watercraft. The drawbridge will open if at least 24 hours
advance notice is given. This temporary deviation has been coordinated
with waterway users. No objections were received.
In accordance with 33 CFR 117.35(e), the drawbridge must return to
its regular operating schedule immediately at the end of the effective
period of this temporary deviation. This deviation from the operating
regulations is authorized under 33 CFR 117.35.
Dated: December 5, 2013.
Eric A. Washburn,
Bridge Administrator, Western Rivers.
[FR Doc. 2013-30215 Filed 12-18-13; 8:45 am]
BILLING CODE 9110-04-P