Grand River Dam Authority; Notice of Application Tendered for Filing With the Commission and Establishing Procedural Schedule for Licensing and Deadline for Submission of Final Amendments, 76604-76605 [2013-30037]
Download as PDF
76604
Federal Register / Vol. 78, No. 243 / Wednesday, December 18, 2013 / Notices
proceeding can ask for court review of
Commission orders in the proceeding.
However, a person does not have to
intervene in order to have comments
considered. The second way to
participate is by filing with the
Secretary of the Commission, as soon as
possible, an original and two copies of
comments in support of or in opposition
to this project. The Commission will
consider these comments in
determining the appropriate action to be
taken, but the filing of a comment alone
will not serve to make the filer a party
to the proceeding. The Commission’s
rules require that persons filing
comments in opposition to the project
provide copies of their protests only to
the party or parties directly involved in
the protest.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commentors will be
placed on the Commission’s
environmental mailing list, will receive
copies of the environmental documents,
and will be notified of meetings
associated with the Commission’s
environmental review process.
Environmental commentors will not be
required to serve copies of filed
documents on all other parties.
However, the non-party commentors
will not receive copies of all documents
filed by other parties or issued by the
Commission (except for the mailing of
environmental documents issued by the
Commission) and will not have the right
to seek court review of the
Commission’s final order.
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the ‘‘eFiling’’ link at https://
www.ferc.gov. Persons unable to file
electronically should submit an original
and 14 copies of the protest or
intervention to the Federal Energy
regulatory Commission, 888 First Street
NE., Washington, DC 20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: January 2, 2014.
Dated: December 11, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013–30035 Filed 12–17–13; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2524–021]
Grand River Dam Authority; Notice of
Application Tendered for Filing With
the Commission and Establishing
Procedural Schedule for Licensing and
Deadline for Submission of Final
Amendments
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: New Major
License.
b. Project No.: P–2524–021.
c. Date Filed: November 27, 2013.
d. Applicant: Grand River Dam
Authority.
e. Name of Project: Salina Pumped
Storage Project.
f. Location: The existing project is
located on the Saline Creek arm of Lake
Hudson in the Grand River basin in
Mayes County, Oklahoma. The project
does not affect federal lands.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791(a)–825(r).
h. Applicant Contact: Dr. Darrell
Townsend, P.O. Box 70, Langley,
Oklahoma, 74350–0070; (918) 256–
0616; dtownsend@grda.com.
i. FERC Contact: Stephen Bowler,
(202) 502–6861, or stephen.bowler@
ferc.gov.
j. This application is not ready for
environmental analysis at this time.
k. Description of Existing Project
Facilities: The existing Salina Pumped
Storage Project consists of: (1) The 762acre W.R. Holway Reservoir (the upper
reservoir), with a normal pool elevation
between 850 feet and 865 feet National
Geodetic Vertical Datum; (2) three rim
dikes around the upper reservoir; (3) an
1,800-foot-long concrete-lined canal; (4)
a 336-foot-wide, 62-foot-high forebay
structure; (5) a 2,300-foot-long, 185-foothigh earthen dam; (6) six 14-footdiameter penstocks, each between 630
and 680 feet long; (7) a powerhouse
with six reversible pump-turbine units,
each rated at 43.3 megawatt (MW), for
a total installed capacity of 260 MW; (8)
a substation; (9) an approximately 6mile-long, 161-kilovolt transmission
line; and (10) appurtenant facilities. The
project utilizes Lake Hudson (the lower
reservoir), which is the reservoir for the
Grand River Dam Authority’s Markham
Ferry Project No. 2183, for pumped
storage operations.
l. Locations of the Application: A
copy of the application is available for
review at the Commission in the Public
Reference Room, or may be viewed on
the Commission’s Web site at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number, excluding the
last three digits in the docket number
field, to access the document. For
assistance, contact FERC Online
Support at FERCOnlineSupport@
ferc.gov, or toll-free at 1–866–208–3676,
or for TTY, (202) 502–8659. Copies are
also available for inspection and
reproduction at the public libraries in
Vinita and Salina, Oklahoma, and at the
Administrative Headquarters of the
Grand River Dam Authority at 226 W.
Dwain Willis Avenue, Vinita,
Oklahoma.
m. You may also register online at
https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
n. Procedural Schedule:
The application will be processed
according to the following preliminary
Hydro Licensing Schedule. Revisions to
the schedule may be made as
appropriate.
ehiers on DSK2VPTVN1PROD with NOTICES
Milestone
Target date
Notice of Acceptance/Notice of Ready for Environmental Analysis .......................................................................................
Filing of recommendations, preliminary terms and conditions, and fishway prescriptions .....................................................
Commission issues Draft EA ...................................................................................................................................................
Comments on Draft EA ...........................................................................................................................................................
Modified Terms and Conditions ...............................................................................................................................................
Commission Issues Final EA ...................................................................................................................................................
VerDate Mar<15>2010
15:27 Dec 17, 2013
Jkt 232001
PO 00000
Frm 00012
Fmt 4703
Sfmt 4703
E:\FR\FM\18DEN1.SGM
18DEN1
January 2014.
March 2014.
September 2014.
October 2014.
December 2014.
March 2015.
Federal Register / Vol. 78, No. 243 / Wednesday, December 18, 2013 / Notices
o. Final amendments to the
application must be filed with the
Commission no later than 30 days from
the issuance date of the notice of ready
for environmental analysis.
Dated: December 11, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013–30037 Filed 12–17–13; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 12486–008]
Franklin County Idaho; Notice of
Application Tendered for Filing With
the Commission and Establishing
Procedural Schedule for Licensing and
Deadline for Submission of Final
Amendments
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: Original Major
License.
b. Project No.: 12486–008.
c. Date Filed: November 27, 2013.
d. Applicant: Twin Lakes Canal
Company (Twin Lakes).
e. Name of Project: Bear River
Narrows Hydroelectric Project.
f. Location: The proposed project
would be located on the Bear River, near
the city of Preston, in Franklin County,
Idaho. The project would occupy 243
acres of federal land managed by the
Bureau of Land Management.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791(a)–825(r).
h. Applicant Contact: Nick E. Josten,
Geosense, 2742 Saint Charles Avenue,
Idaho Falls, ID 83404, (208) 528–6152.
i. FERC Contact: Shana Murray at
shana.murray@ferc.gov or (202) 502–
8333.
j. This application is not ready for
environmental analysis at this time.
k. The Project Description: The
proposed project facilities include: (1) A
new 109-foot-high roller compacted
concrete dam and spillway creating a
reservoir with a gross storage capacity of
12,467 acre-foot; (2) a 48-foot-long, 16foot-wide, and 20-foot-high concrete
intake structure near the upstream toe of
the dam; (3) a 14-foot-diameter, 600foot-long steel penstock; (3) an 80-footlong, 52-foot-wide, and 24-foot-high
powerhouse containing two, 5-megawatt
vertical Francis turbines with a
combined maximum hydraulic capacity
of 1,400 cubic feet per second (cfs); (4)
a 0.74-mile, 46-kilovolt transmission
line connecting a proposed substation
near the base of the powerhouse to an
existing, PacifiCorp-owned transmission
line; and (5) appurtenant facilities.
Except for irrigation withdrawals
during dry years, Twin Lakes proposes
to operate in the project run-of-river,
with daily releases from the new
reservoir matching releases from the
upstream Oneida Project (FERC No. 20).
During dry water year irrigation
releases, Twin Lakes proposes to release
additional water for irrigation purposes
but maintain a minimum flow
downstream of the proposed project.
As an alternative, Twin Lakes is
considering using the new reservoir to
re-regulate discharge from upstream
Oneida Reservoir, providing potential
benefits to downstream aquatic habitat.
In this mode the reservoir elevation
would vary each day over a range of
several feet.
Twin Lakes estimates that the average
annual generation would be about
48,531 megawatt-hours.
l. Locations of the Application: A
copy of the application is available for
review at the Commission in the Public
Reference Room or may be viewed on
the Commission’s Web site at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC Online
Support at FERCOnlineSupport@
ferc.gov or toll-free at 1–866–208–3676,
or for TTY, (202) 502–8659. A copy is
also available for inspection and
reproduction at the address in item (h)
above.
m. You may also register online at
https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
n. Procedural Schedule: The
application will be processed according
to the following preliminary Hydro
Licensing Schedule. Revisions to the
schedule may be made as appropriate.
Milestone
Target date
Notice of Acceptance/Notice of Ready for Environmental Analysis .......................................................................................
Filing of recommendations, preliminary terms and conditions, and fishway prescriptions .....................................................
Commission issues Draft EIS ..................................................................................................................................................
Comments on Draft EIS ..........................................................................................................................................................
Modified Terms and Conditions ...............................................................................................................................................
Commission Issues Final EIS ..................................................................................................................................................
o. Final amendments to the
application must be filed with the
Commission no later than 30 days from
the issuance date of the notice of ready
for environmental analysis.
ehiers on DSK2VPTVN1PROD with NOTICES
Dated: December 11, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013–30038 Filed 12–17–13; 8:45 am]
BILLING CODE 6717–01–P
VerDate Mar<15>2010
15:27 Dec 17, 2013
Jkt 232001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC11–60–004.
Applicants: Progress Energy, Inc.,
Duke Energy Corporation.
Description: Duke Energy submits a
Motion to Supplement Compliance
Filing and workpapers of Dr. Peter FoxPenner.
PO 00000
Frm 00013
Fmt 4703
76605
Sfmt 4703
March 7, 2014.
May 6, 2014.
November 3, 2014.
January 12, 2015.
March 3, 2015.
June 1, 2015.
Filed Date: 12/6/13.
Accession Number: 20131211–0023.
Comments Due: 5 p.m. ET 12/27/13.
Docket Numbers: EC14–36–000.
Applicants: Duke Energy Ohio, Inc.
Description: Application 203 of Duke
Energy Ohio, Inc.
Filed Date: 12/10/13.
Accession Number: 20131210–5161.
Comments Due: 5 p.m. ET 12/31/13.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER13–2157–002.
Applicants: Midcontinent
Independent System Operator, Inc.
E:\FR\FM\18DEN1.SGM
18DEN1
Agencies
[Federal Register Volume 78, Number 243 (Wednesday, December 18, 2013)]
[Notices]
[Pages 76604-76605]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-30037]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2524-021]
Grand River Dam Authority; Notice of Application Tendered for
Filing With the Commission and Establishing Procedural Schedule for
Licensing and Deadline for Submission of Final Amendments
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: New Major License.
b. Project No.: P-2524-021.
c. Date Filed: November 27, 2013.
d. Applicant: Grand River Dam Authority.
e. Name of Project: Salina Pumped Storage Project.
f. Location: The existing project is located on the Saline Creek
arm of Lake Hudson in the Grand River basin in Mayes County, Oklahoma.
The project does not affect federal lands.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r).
h. Applicant Contact: Dr. Darrell Townsend, P.O. Box 70, Langley,
Oklahoma, 74350-0070; (918) 256-0616; dtownsend@grda.com.
i. FERC Contact: Stephen Bowler, (202) 502-6861, or
stephen.bowler@ferc.gov.
j. This application is not ready for environmental analysis at this
time.
k. Description of Existing Project Facilities: The existing Salina
Pumped Storage Project consists of: (1) The 762-acre W.R. Holway
Reservoir (the upper reservoir), with a normal pool elevation between
850 feet and 865 feet National Geodetic Vertical Datum; (2) three rim
dikes around the upper reservoir; (3) an 1,800-foot-long concrete-lined
canal; (4) a 336-foot-wide, 62-foot-high forebay structure; (5) a
2,300-foot-long, 185-foot-high earthen dam; (6) six 14-foot-diameter
penstocks, each between 630 and 680 feet long; (7) a powerhouse with
six reversible pump-turbine units, each rated at 43.3 megawatt (MW),
for a total installed capacity of 260 MW; (8) a substation; (9) an
approximately 6-mile-long, 161-kilovolt transmission line; and (10)
appurtenant facilities. The project utilizes Lake Hudson (the lower
reservoir), which is the reservoir for the Grand River Dam Authority's
Markham Ferry Project No. 2183, for pumped storage operations.
l. Locations of the Application: A copy of the application is
available for review at the Commission in the Public Reference Room, or
may be viewed on the Commission's Web site at https://www.ferc.gov using
the ``eLibrary'' link. Enter the docket number, excluding the last
three digits in the docket number field, to access the document. For
assistance, contact FERC Online Support at FERCOnlineSupport@ferc.gov,
or toll-free at 1-866-208-3676, or for TTY, (202) 502-8659. Copies are
also available for inspection and reproduction at the public libraries
in Vinita and Salina, Oklahoma, and at the Administrative Headquarters
of the Grand River Dam Authority at 226 W. Dwain Willis Avenue, Vinita,
Oklahoma.
m. You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
n. Procedural Schedule:
The application will be processed according to the following
preliminary Hydro Licensing Schedule. Revisions to the schedule may be
made as appropriate.
------------------------------------------------------------------------
Milestone Target date
------------------------------------------------------------------------
Notice of Acceptance/Notice of Ready January 2014.
for Environmental Analysis.
Filing of recommendations, March 2014.
preliminary terms and conditions,
and fishway prescriptions.
Commission issues Draft EA........... September 2014.
Comments on Draft EA................. October 2014.
Modified Terms and Conditions........ December 2014.
Commission Issues Final EA........... March 2015.
------------------------------------------------------------------------
[[Page 76605]]
o. Final amendments to the application must be filed with the
Commission no later than 30 days from the issuance date of the notice
of ready for environmental analysis.
Dated: December 11, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013-30037 Filed 12-17-13; 8:45 am]
BILLING CODE 6717-01-P