PFC LEVEL: $4.50.
TOTAL PFC REVENUE APPROVED
IN THIS DECISION: $11,706,547.
EARLIEST CHARGE EFFECTIVE
DATE: July 1, 2013.
ESTIMATED CHARGE EXPIRATION
DATE: August 1, 2023.
CLASSES OF AIR CARRIERS NOT
REQUIRED TO COLLECT PFC’S: (1)
Non-scheduled/on-demand air carriers
filing FAA Form 1800–31; and (2) small
certificated air carriers filing DOT Form
T–100.
DETERMINATION: Approved. Based
on information contained in the public
agency’s application, the FAA has
determined that each proposed class
accounts for less than 1 percent of the
total annual enplanements at Minot
International Airport.
BRIEF DESCRIPTION OF PROJECTS
APPROVED FOR COLLECTION AND
USE:
Construction and design of taxiway D.
Passenger terminal apron—design and
construction.
Relocate snow removal equipment
building—design and construction.
Passenger terminal building—design
and construction.
Terminal access road—design and
construction.
Terminal area study.
Preparation of PFC application 8.
Acquire snow removal equipment
(sweeper).
DECISION DATE: May 13, 2013.
FOR FURTHER INFORMATION CONTACT:
Mark Holzer, Bismarck Airports District
Office, (701) 323–7390.
PUBLIC AGENCY: Greater Orlando
Aviation Authority, Orlando, Florida.
APPLICATION NUMBER: 13–15–C–
00–MCO.
APPLICATION TYPE: Impose and use
a PFC.
PFC LEVEL: $4.50.
TOTAL PFC REVENUE APPROVED
IN THIS DECISION: $189,994,500.
EARLIEST CHARGE EFFECTIVE
DATE: June 1, 2026.
ESTIMATED CHARGE EXPIRATION
DATE: December 1, 2028.
CLASS OF AIR CARRIERS NOT
REQUIRED TO COLLECT PFC’S: None.
BRIEF DESCRIPTION OF PROJECT
PARTIALLY APPROVED FOR
COLLECTION AND USE AT A $4.50
PFC LEVEL: North terminal passenger
capacity improvements 9 design and
construction).
DETERMINATION. Partially
approved. The reconfiguration and
relocation of airline operations space
and other tenant spaces does not meet
the requirements of 14 CFR 158.15(b).
BRIEF DESCRIPTION OF PROJECT
PARTIALLY APPROVED FOR
COLLECTION AND USE AT A $3.00
PFC LEVEL: Baggage handling system
capacity improvements (design and
construction)—phase 2.
DETERMINATION. Partially
approved. The expansion of the
emergency generator building and
76383
replacement of emergency generators for
the baggage handling system do not
meet the requirements of 14 CFR
158.15(b).
DECISION DATE: May 17, 2013.
FOR FURTHER INFORMATION CONTACT:
Susan Moore, Orlando Airports District
Office, (407) 812–6331.
PUBLIC AGENCY: City of Billings
Aviation and Transit Department,
Billings, Montana.
APPLICATION NUMBER: 13–08–C–
00–BIL.
APPLICATION TYPE: Impose and use
a PFC.
PFC LEVEL: $3.00.
TOTAL PFC REVENUE APPROVED
IN THIS DECISION: $2,033,000.
EARLIEST CHARGE EFFECTIVE
DATE: July 1, 2013.
ESTIMATED CHARGE EXPIRATION
DATE: May 1, 2015.
CLASS OF AIR CARRIERS NOT
REQUIRED TO COLLECT PFC’S: None.
BRIEF DESCRIPTION OF PROJECTS
APPROVED FOR COLLECTION AND
USE:
Snow removal equipment—ramp
blade replacement.
Reimbursement of construction
costs—east end taxilane expansion.
Runway 10L/28R rehabilitation.
Snow removal equipment.
DECISION DATE: May 23, 2013.
FOR FURTHER INFORMATION CONTACT:
Jason Garwood, Helena Airports District
Office, (406) 449–5078.
AMENDMENT TO PFC APPROVALS
Amendment
approved date
Amendment No., City, State
09–02–C–01–MMH, Mammoth Lakes,
CA ......................................................
04–07–C–02–PHX, Phoenix, AZ ...........
07–08–C–01–PHX, Phoenix, AZ ...........
09–09–C–01–PHX, Phoenix, AZ ...........
11–04–C–01–CMI, Savoy, IL ................
06–06–C–01–MSO, Missoula, MT .........
11–07–C–01–SUN, Hailey, ID ...............
02–06–C–02–MSP, Minneapolis, MN ....
05–07–U–02–MSP, Minneapolis, MN ....
* 13–03–C–01–LNS, Lititz, PA ...............
05/07/13
05/10/13
05/10/13
05/10/13
05/14/13
05/14/13
05/17/13
05/20/13
05/20/13
05/23/13
Original approved
net PFC revenue
Amended
approved net PFC
revenue
Original estimated
charge exp. date
Amended
estimated charge
exp. date
$399,917
222,250,000
202,200,000
1,858,836,000
1,359,105
3,334,760
505,918
793,254,352
NA
35,917
$665,010
246,977,086
187,649,602
1,940,493,949
1,445,255
3,255,904
310,775
774,213,674
NA
35,917
11/01/25
08/01/08
08/01/10
11/01/28
08/01/14
02/01/09
03/01/14
12/01/15
12/01/15
05/01/15
11/01/15
08/01/08
08/01/10
08/01/30
09/01/14
01/01/09
07/01/12
04/01/14
04/01/14
05/01/15
wreier-aviles on DSK5TPTVN1PROD with NOTICES
Notes: The amendment denoted by an asterisk (*) include a change to the PFC level charged from $3.00 per enplaned passenger to $4.50
per enplaned passenger. For Lititz, PA, this change is effective on July 1, 2013.
Dated: Issued in Washington, DC, on
December 6, 2013.
Joe Hebert,
Manager, Financial Analysis and Passenger
Facility Charge Branch.
[FR Doc. 2013–29926 Filed 12–16–13; 8:45 am]
14:45 Dec 16, 2013
Federal Aviation Administration
Notice of Passenger Facility Charge
(PFC) Approvals and Disapprovals
Federal Aviation
Administration (FAA), DOT.
ACTION: Monthly Notice of PFC
Approvals and Disapprovals. In April
AGENCY:
BILLING CODE 4910–13–P
VerDate Mar<15>2010
DEPARTMENT OF TRANSPORTATION
Jkt 232001
PO 00000
Frm 00115
Fmt 4703
Sfmt 4703
2013, there were six applications
approved. This notice also includes
information on five applications,
approved in March 2013, inadvertently
left off the March 2013 notice.
Additionally, seven approved
amendments to previously approved
applications are listed.
The FAA publishes a monthly
notice, as appropriate, of PFC approvals
SUMMARY:
E:\FR\FM\17DEN1.SGM
17DEN1
76384
Federal Register / Vol. 78, No. 242 / Tuesday, December 17, 2013 / Notices
wreier-aviles on DSK5TPTVN1PROD with NOTICES
and disapprovals under the provisions
of the Aviation Safety and Capacity
Expansion Act of 1990 (Title IX of the
Omnibus Budget Reconciliation Act of
1990) (Pub. L. 101–508) and Part 158 of
the Federal Aviation Regulations (14
CFR part 158). This notice is published
pursuant to paragraph d of § 158.29.
PFC Applications Approved
Public Agency: Port Authority of New
York and New Jersey, New York, New
York.
Application Number: 12–08–C–00–
EWR.
Application Type: Impose and use a
PFC.
PFC Level: $4.50.
Total PFC Revenue Approved in This
Decision: $121,393,042.
Earliest Charge Effective Date: August
1, 2014.
Estimated Charge Expiration Date:
October 1, 2017.
Class of Air Carriers Not Required To
Collect PFC’S: Nonscheduled/ondemand air carriers operating at Newark
Liberty International Airport (EWR).
Determination: Approved. Based on
information submitted in the public
agency’s application, the FAA has
determined that the proposed class
accounts for less than 1 percent of the
total annual enplanements at EWR.
Brief Description of Project Approved
for Collection at EWR and Use at La
Guardia Airport (LGA) at a $4.50 PFC
Level: LGA runways 4 and 31 runway
safety area planning, environmental,
and engineering.
Brief Description of Project Partially
Approved for Collection at EWR for
Future Use at EWR at a $4.50 PFC Level:
EWR delay reduction phase II—
construction.
Determination: Partially approved.
Certain project components were
determined to be ineligible for PFC
funding.
Brief Description of Projects Partially
Approved for Collection at EWR and
Use at EWR at a $4.50 PFC Level:
EWR runway 4R/22L rehabilitation.
EWR taxiway P rehabilitation including
high-speed taxiways.
EWR runway 4L/22R rehabilitation.
EWR runway 11 runway safety area and
relocation of Brewster Road.
EWR electrical distribution and
substation improvements.
Determination: Partially approved.
Certain components in each project
were determined to be ineligible for PFC
funding.
Brief Description of Project Partially
Approved for Collection at EWR for
Future Use at LGA at a $4.50 PFC Level:
LGA runways 4 and 31 runway safety
area construction.
VerDate Mar<15>2010
14:45 Dec 16, 2013
Jkt 232001
Determination: Partially approved.
Certain project components were
determined to be ineligible for PFC
funding.
Brief Description of Project Approved
for Collection at EWR for Future Use at
John F. Kennedy International Airport
(JFK) at a $4.50 PFC Level: JFK runway
4L/22R rehabilitation.
Brief Description of Project Approved
for Collection at EWR and Use at JFK at
a $3.00 PFC Level: JFK taxiway P
rehabilitation planning and engineering.
Brief Description of Project Approved
for Collection at EWR and Use at EWR
at a $3.00 PFC Level: EWR delay
reduction phase II—planning and
engineering.
Brief Description of Project Approved
for Collection at EWR and Use at EWR,
JFK, LGA, and Stewart International
Airport (SWF) at a $3.00 PFC Level: PFC
planning and program administration.
Decision Date: March 8, 2013.
FOR FURTHER INFORMATION CONTACT:
Steve Urlass, New York Airports District
Office, (516) 227–3803.
Public Agency: Port Authority of New
York and New Jersey, New York, New
York.
Application Number: 12–08–C–00–
JFK.
Application Type: Impose and use a
PFC.
PFC Level: $4.50.
Total PFC Revenue Approved in This
Decision: $296,109,860.
Earliest Charge Effective Date: June 1,
2014.
Estimated Charge Expiration Date:
September 1, 2017.
Class of Air Carriers Not Required To
Collect PFC’S: Nonscheduled/ondemand air carriers operating at JFK.
Determination: Approved. Based on
information submitted in the public
agency’s application, the FAA has
determined that the proposed class
accounts for less than 1 percent of the
total annual enplanements at JFK.
Brief Description of Project Approved
for Collection at JFK and Use at LGA at
a $4.50 PFC Level: LGA runways 4 and
31 runway safety area planning,
environmental, and engineering.
Brief Description of Project Partially
Approved for Collection at JFK for
Future Use at EWR at a $4.50 PFC level:
EWR delay reduction phase II—
construction.
Determination: Partially approved.
Certain project components were
determined to be ineligible for PFC
funding.
Brief Description of Projects Partially
Approved for Collection at JFK and Use
at EWR at a $4.50 PFC Level:
EWR runway 4R/22L rehabilitation.
PO 00000
Frm 00116
Fmt 4703
Sfmt 4703
EWR taxiway P rehabilitation including
high-speed taxiways.
EWR runway 4L/22R rehabilitation.
EWR runway 11 runway safety area and
relocation of Brewster Road.
EWR electrical distribution and
substation improvements.
Determination: Partially approved.
Certain components in each project
were determined to be ineligible for PFC
funding.
Brief Description of Project Partially
Approved for Collection at JFK for
Future Use at LGA at a $4.50 PFC Level:
LGA runways 4 and 31 runway safety
area construction.
Determination: Partially approved.
Certain project components were
determined to be ineligible for PFC
funding.
Brief Description of Project Approved
for Collection at JFK for Future Use at
JFK at a $4.50 PFC Level: JFK runway
4L/22R rehabilitation.
Brief Description of Project Approved
for Collection at JFK and Use at JFK at
a $3.00 PFC Level: JFK taxiway P
rehabilitation planning and engineering.
Brief Description of Project Approved
for Collection at JFK and Use at EWR at
a $3.00 PFC Level: EWR delay reduction
phase II—planning and engineering.
Brief Description of Project Approved
for Collection at JFK and Use at EWR,
JFK, LGA, and SWF at a $3.00 PFC
Level: PFC planning and program
administration.
Decision Date: March 8, 2013.
FOR FURTHER INFORMATION CONTACT:
Steve Urlass, New York Airports District
Office, (516) 227–3803.
Public Agency: Port Authority of New
York and New Jersey, New York, New
York.
Application Number: 12–08–C–00–
LGA.
Application Type: Impose and use a
PFC.
PFC Level: $4.50.
Total PFC Revenue Approved in This
Decision: $150,655,394.
Earliest Charge Effective Date: June 1,
2014.
Estimated Charge Expiration Date:
September 1, 2017.
Class of Air Carriers Not Required to
Collect PFC’s: Nonscheduled/ondemand air carriers operating at LGA.
Determination: Approved. Based on
information submitted in the public
agency’s application, the FAA has
determined that the proposed class
accounts for less than 1 percent of the
total annual enplanements at LGA.
Brief Description of Project Approved
for Collection at LGA and Use at LGA
at a $4.50 PFC Level: LGA runways 4
and 31 runway safety area planning,
environmental, and engineering.
E:\FR\FM\17DEN1.SGM
17DEN1
wreier-aviles on DSK5TPTVN1PROD with NOTICES
Federal Register / Vol. 78, No. 242 / Tuesday, December 17, 2013 / Notices
Brief Description of Project Partially
Approved for Collection at LGA for
Future Use at EWR at a $4.50 PFC Level:
EWR delay reduction phase II—
construction.
Determination: Partially approved.
Certain project components were
determined to be ineligible for PFC
funding.
Brief Description of Projects Partially
Approved for Collection at LGA and Use
at EWR at a $4.50 PFC Level:
EWR runway 4R/22L rehabilitation.
EWR taxiway P rehabilitation including
high-speed taxiways.
EWR runway 4L/22R rehabilitation.
EWR runway 11 runway safety area and
relocation of Brewster Road.
EWR electrical distribution and
substation improvements.
Determination: Partially approved.
Certain components in each project
were determined to be ineligible for PFC
funding.
Brief Description of Project Partially
Approved for Collection at LGA for
Future Use at LGA at a $4.50 PFC Level:
LGA runways 4 and 31 runway safety
area construction.
Determination: Partially approved.
Certain project components were
determined to be ineligible for PFC
funding.
Brief Description of Project Approved
for Collection at LGA for Future Use at
JFK at a $4.50 PFC Level: JFK runway
4L/22R rehabilitation.
Brief Description of Project Approved
for Collection at LGA and Use at JFK at
a $3.00 PFC Level: JFK taxiway P
rehabilitation planning and engineering.
Brief Description of Project Approved
for Collection at LGA and Use at EWR
at a $3.00 PFC Level: EWR delay
reduction phase II—planning and
engineering.
Brief Description of Project Approved
for Collection at LGA and Use at EWR,
JFK, LGA, and SWF at a $3.00 PFC
Level: PFC planning and program
administration.
Decision Date: March 8, 2013.
FOR FURTHER INFORMATION CONTACT:
Steve Urlass, New York Airports District
Office, (516) 227–3803.
Public Agency: Port Authority of New
York and New Jersey, New York, New
York.
Application Number: 12–05–C–00–
SWF.
Application Type: Impose and use a
PFC.
PFC Level: $4.50.
Total PFC Revenue Approved in This
Decision: $3,372,027.
Earliest Charge Effective Date:
February 1, 2014.
Estimated Charge Expiration Date:
February 1, 2018.
VerDate Mar<15>2010
14:45 Dec 16, 2013
Jkt 232001
Class of Air Carriers Not Required to
Collect PFC’s: Nonscheduled/ondemand air carriers operating at SWF.
Determination: Approved. Based on
information submitted in the public
agency’s application, the FAA has
determined that the proposed class
accounts for less than 1 percent of the
total annual enplanements at SWF.
Brief Description of Project Approved
for Collection at SWF and Use at LGA
at a $4.50 PFC Level: LGA runways 4
and 31 runway safety area planning,
environmental, and engineering.
Brief Description of Project Partially
Approved for Collection at SWF for
Future Use at EWR at a $4.50 PFC Level:
EWR delay reduction phase II—
construction.
Determination: Partially approved.
Certain project components were
determined to be ineligible for PFC
funding.
Brief Description of Projects Partially
Approved for Collection at SWF and
Use at EWR at a $4.50 PFC Level:
EWR runway 4R/22L rehabilitation.
EWR taxiway P rehabilitation including
high-speed taxiways.
EWR runway 4L/22R rehabilitation.
EWR runway 11 runway safety area and
relocation of Brewster Road.
EWR electrical distribution and
substation improvements.
Determination: Partially approved.
Certain components in each project
were determined to be ineligible for PFC
funding.
Brief Description of Project Partially
Approved for Collection at SWF for
Future Use at LGA at a $4.50 PFC Level:
LGA runways 4 and 31 runway safety
area construction.
Determination: Partially approved.
Certain project components were
determined to be ineligible for PFC
funding.
Brief Description of Project Approved
for Collection at SWF for Future Use at
JFK at a $4.50 PFC Level: JFK runway
4L/22R rehabilitation.
Brief Description of Project Approved
for Collection at SWF and Use at JFK at
a $3.00 PFC Level: JFK taxiway P
rehabilitation planning and engineering.
Brief Description of Project Approved
for Collection at SWF and Use at EWR
at a $3.00 PFC Level: EWR delay
reduction phase II—planning and
engineering.
Brief Description of Project Approved
for Collection at SWF and Use at EWR,
JFK, LGA, and SWF at a $3.00 PFC
Level: PFC planning and program
administration.
Decision Date: March 8, 2013.
FOR FURTHER INFORMATION CONTACT:
Steve Urlass, New York Airports District
Office, (516) 227–3803.
PO 00000
Frm 00117
Fmt 4703
Sfmt 4703
76385
Public Agency: Jackson Hole Airport
Board, Jackson Hole, Wyoming.
Application Number: 13–13–C–00–
JAC.
Application Type: Impose and use a
PFC.
PFC Level: $4.50.
Total PFC Revenue Approved in This
Decision: $14,221,770.
Earliest Charge Effective Date: July 1,
2026.
Estimated Charge Expiration Date:
September 1, 2041.
Class of Air Carriers Not Required to
Collect PFC’S: None.
Brief Description of Projects
Approved for Collection and Use:
Terminal baggage claim expansion and
renovation.
Construct deicing (glycol) containment
facility.
Install runway centerline lights.
Acquire snow removal equipment.
Improve runway safety area.
Develop wildlife management plan.
PFC administrative costs.
Decision Date: March 28, 2013.
FOR FURTHER INFORMATION CONTACT:
Jesse Lyman, Denver Airports District
Office, (303) 342–1262.
Public Agency: Ports of Douglas
County and Chelan County, East
Wenatchee, Washington.
Application Number: 13–11–C–00–
EAT.
Application Type: Impose and use a
PFC.
PFC Level: $4.50.
Total PFC Revenue Approved in This
Decision: $556,704.
Earliest Charge Effective Date: August
1, 2014.
Estimated Charge Expiration Date:
August 1, 2016.
Class of Air Carriers Not Required to
Collect PFC’s: None.
Brief Description of Projects
Approved for Collection and Use:
Rehabilitate aircraft rescue and
firefighting station.
Terminal building security
improvements.
Modify terminal building (phase VI).
Brief Description of Project Approved
for Use: Aircraft rescue and firefighting
truck purchase.
Decision Date: April 5, 2013.
FOR FURTHER INFORMATION CONTACT:
Trang Tran, Seattle Airports District
Office, (425) 227–1662.
Public Agency: Westmoreland County
Airport Authority, Latrobe,
Pennsylvania.
Application Number: 13–02–C–00–
LBE.
Application Type: Impose and use a
PFC.
E:\FR\FM\17DEN1.SGM
17DEN1
wreier-aviles on DSK5TPTVN1PROD with NOTICES
76386
Federal Register / Vol. 78, No. 242 / Tuesday, December 17, 2013 / Notices
PFC Level: $4.50.
Total PFC Revenue Approved in This
Decision: $829,690.
Earliest Charge Effective Date: July 1,
2013.
Estimated Charge Expiration Date:
January 1, 2014.
Class of Air Carriers Not Required to
Collect PFC’s: None.
Brief Description of Projects
Approved for Collection and Use:
Master plan update.
Part 150 noise study.
Purchase snow removal equipment.
Install security/perimeter fencing.
Perimeter fence and gates.
Acquire aircraft rescue and firefighting
safety equipment.
Rehabilitate terminal apron.
Environmental assessment.
Install automated weather observing
system phase III.
Acquire snow removal equipment.
Extend access taxiway.
Expand maintenance building.
Improve terminal heating, ventilation,
and air conditioning.
Construct taxiways.
Security enhancements.
Construct T-hangar taxiway.
Improve runway 5/23 runway safety
area phase I.
Remove obstructions.
Acquire snow removal equipment.
Security enhancements.
Improve runway 5/23 runway safety
area phase II.
Acquire air traffic control tower
equipment.
Improve runway 5/23 runway safety
area phase III.
Improve airport drainage.
Acquire snow removal equipment.
Acquire land.
Construct T-hangar taxiway phase II.
Acquire passenger loading bridge.
Improve air traffic control tower.
Acquire deicing equipment.
Rehabilitate access road phase I.
Improve runway 5/23 runway safety
area phase IV.
Improve terminal utilities.
Acquire snow removal equipment.
Upgrade medium intensity approach
light system and runway alignment
indicator lights.
Rehabilitate air traffic control tower.
Acquire aircraft rescue and firefighting
vehicle.
Rehabilitate access road phase II.
Wildlife assessment.
Rehabilitate access road phase III.
Rehabilitate runway 5/23 phase I.
Expand aircraft rescue and firefighting
building.
Upgrade medium intensity approach
light system and runway alignment
indicator lights phase II.
VerDate Mar<15>2010
14:45 Dec 16, 2013
Jkt 232001
Rehabilitate parallel taxiway phase II.
Expand aircraft rescue and firefighting
building phase II.
Rehabilitate access road phase IV.
Expand terminal parking phase V.
Rehabilitate passenger loading bridge.
Rehabilitate runway 5/23 phase II.
Upgrade medium intensity approach
light system and runway alignment
indicator lights phase III.
Wildlife hazard management plan.
Decision Date: April 17, 2013.
FOR FURTHER INFORMATION CONTACT: Lori
Ledebohm, Harrisburg Airports District
Office, (717) 730–2835.
Public Agency: Mobile Airport
Authority, Mobile, Alabama.
Application Number: 13–06–C–00–
MOB.
Application Type: Impose and use a
PFC.
PFC Level: $3.00.
Total PFC Revenue Approved in This
Decision: $3,705,879.
Earliest Charge Effective Date: June 1,
2013.
Estimated Charge Expiration Date:
October 1, 2017.
Class of Air Carriers Not Required to
Collect PFC’s: Air taxi/commercial
operators filing FAA Form 1800–31 and
operating at Mobile Regional Airport
(MOB).
Determination: Approved. Based on
information submitted in the public
agency’s application, the FAA has
determined that the proposed class
accounts for less than 1 percent of the
total annual enplanements at MOB.
Brief Description of Projects
Approved for Collection and Use:
Wildlife hazard assessment and
management plan.
Noise mitigation program.
East airfield storm water detention area.
Replace airfield beacon.
Baggage conveyor chutes.
Terminal rehabilitation phase II.
Terminal road rehabilitation phase II.
Taxiway R rehabilitation.
Runway 18/36 and partial taxiway R
rehabilitation.
12-foot culvert rehabilitation under
runway 14/32 (design).
Master plan update.
Aircraft rescue and firefighting building
rehabilitation.
Aircraft rescue and firefighting quick
response vehicle.
Replace airfield signage (design).
Security lighting upgrade phase II.
Airfield drainage phase III
(construction).
Security system rehabilitation (design).
Baggage information display system/
flight information display system
rehabilitation (design).
Rehabilitate 12-foot culvert under
runway 14/32 (construction).
PO 00000
Frm 00118
Fmt 4703
Sfmt 4703
Replace airfield signage (construction).
Update security system construction.
Part 139 interactive employee training
equipment and workstations.
Airfield lighting vault improvements.
Terminal rehabilitation phase III.
Brief Description of Project Approved
for Collection: Expand apron.
Brief Description of Disapproved
Project: Security towing vehicle.
Determination: Disapproved. This
project does not meet the requirements
of § 158.15(b).
Decision Date: April 18, 2013.
FOR FURTHER INFORMATION CONTACT:
Jonathan Linquist, Jackson Airports
District Office, (601) 664–9893.
Public Agency: Charleston County
Aviation Authority, Charleston, South
Carolina.
Application Number: 13–03–C–00–
CHS.
Application Type: Impose and use a
PFC.
PFC Level: $4.50.
Total PFC Revenue Approved in This
Decision: $173,506,475.
Earliest Charge Effective Date: May 1,
2015.
Estimated Charge Expiration Date:
November 1, 2040.
Class of Air Carriers Not Required to
Collect PFC’s: Air taxi/commercial
operators filing FAA Form 1800–31 that
operate at Charleston International
Airport (CHS).
Determination: Approved. Based on
information submitted in the public
agency’s application, the FAA has
determined that the proposed class
accounts for less than 1 percent of the
total annual enplanements at CHS.
Brief Description of Project Approved
for Collection and Use: PFC application
development and implementation.
Brief Description of Project Partially
Approved for Collection and Use:
Terminal redevelopment and
improvement.
Determination: Partially approved.
Several areas of the terminal were
determined to be revenue-producing
and, thus, ineligible for PFC funding.
Decision Date: April 18, 2013.
FOR FURTHER INFORMATION CONTACT:
Robert Rau, Atlanta Airports District
Office, (404) 305–7004.
Public Agency: City of El Paso, Texas.
Application Number: 13–06–C–00–ELP.
Application Type: Impose and use a
PFC.
PFC Level: $4.50.
Total PFC Revenue Approved in This
Decision: $19,085,123.
Earliest Charge Effective Date: June 1,
2013.
Estimated Charge Expiration Date:
December 1, 2016.
E:\FR\FM\17DEN1.SGM
17DEN1
Federal Register / Vol. 78, No. 242 / Tuesday, December 17, 2013 / Notices
Class of Air Carriers Not Required to
Collect PFC’s: Air taxi/commercial
operators filing FAA Form 1800–31.
Determination: Approved. Based on
information submitted in the public
agency’s application, the FAA has
determined that the proposed class
accounts for less than 1 percent of the
total annual enplanements at El Paso
International Airport.
Brief Description of Projects
Approved for Collection and Use:
Baggage claim units.
Baggage makeup area.
PFC implementation and administrative
costs.
Brief Description of Projects Partially
Approved for Collection and Use:
Passenger loading bridges.
Determination: Partially approved.
One of the loading bridges proposed for
replacement was determined to still be
within its useful life and to still be
operating appropriately. Therefore, the
replacement loading bridge for this gate
was determined to be ineligible under
§ 158.15(b).
Airport access control system.
Determination: Partially approved.
The public agency identified 16 separate
components in this project but the FAA
determined that only two of the
components were eligible for PFC
funding.
Central plant upgrade.
Determination: Partially approved.
Two of the proposed components,
replacement of terminal lighting and
installation of terminal window solar
film, both intended to provide efficiency
improvements, did not meet the
requirements of § 158.15(b).
Decision Date: April 23, 2013.
FOR FURTHER INFORMATION CONTACT:
Mike Nicely, Texas Airports
Development Office, (817) 222–5650.
Public Agency: County of Albany and
City of Laramie, Laramie, Wyoming.
Application Number: 13–03–C–00–
LAR.
Application Type: Impose and use a
PFC.
PFC Level: $4.50.
Total PFC Revenue Approved in This
Decision: $185,425.
76387
Earliest Charge Effective Date: June 1,
2013.
Estimated Charge Expiration Date:
June 1, 2017.
Class of Air Carriers Not Required to
Collect PFC’s: Air taxi/commercial
operators filing FAA Form 1800–31.
Determination: Approved. Based on
information submitted in the public
agency’s application, the FAA has
determined that the proposed class
accounts for less than 1 percent of the
total annual enplanements at Laramie
regional Airport.
Brief Description of Projects
Approved for Collection and Use:
Update airport master plan.
Rehabilitate apron.
Rehabilitate runway 12/30
(maintenance).
Construct access road.
Rehabilitate runway 12/30.
Acquire snow removal equipment.
PFC administration.
Decision Date: April 24, 2013.
FOR FURTHER INFORMATION CONTACT:
Jesse Lyman, Denver Airports District
Office, (303) 342–1262.
AMENDMENTS TO PFC APPROVALS
Amendment
approved date
Amendment No. city, state
09–04–C–01–HNL, Honolulu, HI .........................................
09–04–C–01–OGG, Kahului, HI ..........................................
09–04–C–01–KOA, Kailua Kona, HI ...................................
09–04–C–01–LIH, Lihue, HI ................................................
08–07–C–02–MOD, Modesto, CA .......................................
10–10–C–01–EAT, Wenatchee, WA ...................................
08–05–C–03–AVP, Avoca, PA ............................................
Issued in Washington, DC, on December 6,
2013.
Joe Hebert,
Manager, Financial Analysis and Passenger
Facility Charge Branch.
[FR Doc. 2013–29934 Filed 12–16–13; 8:45 am]
BILLING CODE 4910–13–P
DEPARTMENT OF TRANSPORTATION
Federal Aviation Administration
Notice of Passenger Facility Charge
(PFC) Approvals and Disapprovals
04/03/13
04/03/13
04/03/13
04/03/13
04/05/13
04/05/13
04/09/13
Original approved net
PFC revenue
Amended approved net
PFC revenue
Original estimated charge
exp. date
Amended estimated charge
exp. date
$105,909,130
24,663,770
7,254,050
7,254,050
337,634
881,750
5,790,104
$127,112,161
29,601,463
8,706,313
8,706,313
304,183
381,750
1,518,104
02/01/14
02/01/14
02/01/14
02/01/14
04/01/12
08/01/14
08/01/17
02/01/14
02/01/14
02/01/14
02/01/14
04/01/12
08/01/14
12/01/16
Additionally, 12 approved amendments
to previously approved applications are
listed.
The FAA publishes a monthly
notice, as appropriate, of PFC approvals
and disapprovals under the provisions
of the Aviation Safety and Capacity
Expansion Act of 1990 (Title IX of the
Omnibus Budget Reconciliation Act of
1990) (Pub. L. 101–508) and Part 158 of
the Federal Aviation Regulations (14
CFR Part 158). This notice is published
pursuant to paragraph d of § 158.29.
SUMMARY:
PFC Applications Approved
Federal Aviation
Administration (FAA), DOT.
wreier-aviles on DSK5TPTVN1PROD with NOTICES
AGENCY:
Monthly Notice of PFC
Approvals and Disapprovals. In July
2013, there were seven applications
approved. This notice also includes
information on one application,
approved in April 2013, inadvertently
left off the April 2013 notice.
ACTION:
VerDate Mar<15>2010
14:45 Dec 16, 2013
Jkt 232001
Public Agency: Tweed-New Haven
Airport Authority, New Haven,
Connecticut.
Application Number: 13–06–C–00–
HVN.
Application Type: Impose and use a
PFC.
PFC Level: $4.50.
PO 00000
Frm 00119
Fmt 4703
Sfmt 4703
Total PFC Revenue Approved in this
Decision: $1,240,855.
Earliest Charge Effective Date:
December 1, 2013.
Estimated Charge Expiration Date:
July 1, 2020.
Class of Air Carriers Not Required to
Collect PFC’s: Air taxi/commercial
operators nonscheduled/on demand air
carriers.
Determination: Approved. Based on
information contained in the public
agency’s application, the FAA has
determined that the proposed class
accounts for less than 1 percent of the
total annual enplanements at TweedNew Haven Regional Airport.
Brief Description of Project Approved
for Collection and Use: Property
acquisition.
Decision Date: April 17, 2013.
FOR FURTHER INFORMATION CONTACT:
Priscilla Scott, New England region
Airports Division, (781) 238–7614.
E:\FR\FM\17DEN1.SGM
17DEN1
Agencies
[Federal Register Volume 78, Number 242 (Tuesday, December 17, 2013)]
[Notices]
[Pages 76383-76387]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-29934]
-----------------------------------------------------------------------
DEPARTMENT OF TRANSPORTATION
Federal Aviation Administration
Notice of Passenger Facility Charge (PFC) Approvals and
Disapprovals
AGENCY: Federal Aviation Administration (FAA), DOT.
ACTION: Monthly Notice of PFC Approvals and Disapprovals. In April
2013, there were six applications approved. This notice also includes
information on five applications, approved in March 2013, inadvertently
left off the March 2013 notice. Additionally, seven approved amendments
to previously approved applications are listed.
-----------------------------------------------------------------------
SUMMARY: The FAA publishes a monthly notice, as appropriate, of PFC
approvals
[[Page 76384]]
and disapprovals under the provisions of the Aviation Safety and
Capacity Expansion Act of 1990 (Title IX of the Omnibus Budget
Reconciliation Act of 1990) (Pub. L. 101-508) and Part 158 of the
Federal Aviation Regulations (14 CFR part 158). This notice is
published pursuant to paragraph d of Sec. 158.29.
PFC Applications Approved
Public Agency: Port Authority of New York and New Jersey, New York,
New York.
Application Number: 12-08-C-00-EWR.
Application Type: Impose and use a PFC.
PFC Level: $4.50.
Total PFC Revenue Approved in This Decision: $121,393,042.
Earliest Charge Effective Date: August 1, 2014.
Estimated Charge Expiration Date: October 1, 2017.
Class of Air Carriers Not Required To Collect PFC'S: Nonscheduled/
on-demand air carriers operating at Newark Liberty International
Airport (EWR).
Determination: Approved. Based on information submitted in the
public agency's application, the FAA has determined that the proposed
class accounts for less than 1 percent of the total annual enplanements
at EWR.
Brief Description of Project Approved for Collection at EWR and Use
at La Guardia Airport (LGA) at a $4.50 PFC Level: LGA runways 4 and 31
runway safety area planning, environmental, and engineering.
Brief Description of Project Partially Approved for Collection at
EWR for Future Use at EWR at a $4.50 PFC Level: EWR delay reduction
phase II--construction.
Determination: Partially approved. Certain project components were
determined to be ineligible for PFC funding.
Brief Description of Projects Partially Approved for Collection at
EWR and Use at EWR at a $4.50 PFC Level:
EWR runway 4R/22L rehabilitation.
EWR taxiway P rehabilitation including high-speed taxiways.
EWR runway 4L/22R rehabilitation.
EWR runway 11 runway safety area and relocation of Brewster Road.
EWR electrical distribution and substation improvements.
Determination: Partially approved. Certain components in each
project were determined to be ineligible for PFC funding.
Brief Description of Project Partially Approved for Collection at
EWR for Future Use at LGA at a $4.50 PFC Level: LGA runways 4 and 31
runway safety area construction.
Determination: Partially approved. Certain project components were
determined to be ineligible for PFC funding.
Brief Description of Project Approved for Collection at EWR for
Future Use at John F. Kennedy International Airport (JFK) at a $4.50
PFC Level: JFK runway 4L/22R rehabilitation.
Brief Description of Project Approved for Collection at EWR and Use
at JFK at a $3.00 PFC Level: JFK taxiway P rehabilitation planning and
engineering.
Brief Description of Project Approved for Collection at EWR and Use
at EWR at a $3.00 PFC Level: EWR delay reduction phase II--planning and
engineering.
Brief Description of Project Approved for Collection at EWR and Use
at EWR, JFK, LGA, and Stewart International Airport (SWF) at a $3.00
PFC Level: PFC planning and program administration.
Decision Date: March 8, 2013.
FOR FURTHER INFORMATION CONTACT: Steve Urlass, New York Airports
District Office, (516) 227-3803.
Public Agency: Port Authority of New York and New Jersey, New York,
New York.
Application Number: 12-08-C-00-JFK.
Application Type: Impose and use a PFC.
PFC Level: $4.50.
Total PFC Revenue Approved in This Decision: $296,109,860.
Earliest Charge Effective Date: June 1, 2014.
Estimated Charge Expiration Date: September 1, 2017.
Class of Air Carriers Not Required To Collect PFC'S: Nonscheduled/
on-demand air carriers operating at JFK.
Determination: Approved. Based on information submitted in the
public agency's application, the FAA has determined that the proposed
class accounts for less than 1 percent of the total annual enplanements
at JFK.
Brief Description of Project Approved for Collection at JFK and Use
at LGA at a $4.50 PFC Level: LGA runways 4 and 31 runway safety area
planning, environmental, and engineering.
Brief Description of Project Partially Approved for Collection at
JFK for Future Use at EWR at a $4.50 PFC level: EWR delay reduction
phase II--construction.
Determination: Partially approved. Certain project components were
determined to be ineligible for PFC funding.
Brief Description of Projects Partially Approved for Collection at
JFK and Use at EWR at a $4.50 PFC Level:
EWR runway 4R/22L rehabilitation.
EWR taxiway P rehabilitation including high-speed taxiways.
EWR runway 4L/22R rehabilitation.
EWR runway 11 runway safety area and relocation of Brewster Road.
EWR electrical distribution and substation improvements.
Determination: Partially approved. Certain components in each
project were determined to be ineligible for PFC funding.
Brief Description of Project Partially Approved for Collection at
JFK for Future Use at LGA at a $4.50 PFC Level: LGA runways 4 and 31
runway safety area construction.
Determination: Partially approved. Certain project components were
determined to be ineligible for PFC funding.
Brief Description of Project Approved for Collection at JFK for
Future Use at JFK at a $4.50 PFC Level: JFK runway 4L/22R
rehabilitation.
Brief Description of Project Approved for Collection at JFK and Use
at JFK at a $3.00 PFC Level: JFK taxiway P rehabilitation planning and
engineering.
Brief Description of Project Approved for Collection at JFK and Use
at EWR at a $3.00 PFC Level: EWR delay reduction phase II--planning and
engineering.
Brief Description of Project Approved for Collection at JFK and Use
at EWR, JFK, LGA, and SWF at a $3.00 PFC Level: PFC planning and
program administration.
Decision Date: March 8, 2013.
FOR FURTHER INFORMATION CONTACT: Steve Urlass, New York Airports
District Office, (516) 227-3803.
Public Agency: Port Authority of New York and New Jersey, New York,
New York.
Application Number: 12-08-C-00-LGA.
Application Type: Impose and use a PFC.
PFC Level: $4.50.
Total PFC Revenue Approved in This Decision: $150,655,394.
Earliest Charge Effective Date: June 1, 2014.
Estimated Charge Expiration Date: September 1, 2017.
Class of Air Carriers Not Required to Collect PFC's: Nonscheduled/
on-demand air carriers operating at LGA.
Determination: Approved. Based on information submitted in the
public agency's application, the FAA has determined that the proposed
class accounts for less than 1 percent of the total annual enplanements
at LGA.
Brief Description of Project Approved for Collection at LGA and Use
at LGA at a $4.50 PFC Level: LGA runways 4 and 31 runway safety area
planning, environmental, and engineering.
[[Page 76385]]
Brief Description of Project Partially Approved for Collection at
LGA for Future Use at EWR at a $4.50 PFC Level: EWR delay reduction
phase II--construction.
Determination: Partially approved. Certain project components were
determined to be ineligible for PFC funding.
Brief Description of Projects Partially Approved for Collection at
LGA and Use at EWR at a $4.50 PFC Level:
EWR runway 4R/22L rehabilitation.
EWR taxiway P rehabilitation including high-speed taxiways.
EWR runway 4L/22R rehabilitation.
EWR runway 11 runway safety area and relocation of Brewster Road.
EWR electrical distribution and substation improvements.
Determination: Partially approved. Certain components in each
project were determined to be ineligible for PFC funding.
Brief Description of Project Partially Approved for Collection at
LGA for Future Use at LGA at a $4.50 PFC Level: LGA runways 4 and 31
runway safety area construction.
Determination: Partially approved. Certain project components were
determined to be ineligible for PFC funding.
Brief Description of Project Approved for Collection at LGA for
Future Use at JFK at a $4.50 PFC Level: JFK runway 4L/22R
rehabilitation.
Brief Description of Project Approved for Collection at LGA and Use
at JFK at a $3.00 PFC Level: JFK taxiway P rehabilitation planning and
engineering.
Brief Description of Project Approved for Collection at LGA and Use
at EWR at a $3.00 PFC Level: EWR delay reduction phase II--planning and
engineering.
Brief Description of Project Approved for Collection at LGA and Use
at EWR, JFK, LGA, and SWF at a $3.00 PFC Level: PFC planning and
program administration.
Decision Date: March 8, 2013.
FOR FURTHER INFORMATION CONTACT: Steve Urlass, New York Airports
District Office, (516) 227-3803.
Public Agency: Port Authority of New York and New Jersey, New York,
New York.
Application Number: 12-05-C-00-SWF.
Application Type: Impose and use a PFC.
PFC Level: $4.50.
Total PFC Revenue Approved in This Decision: $3,372,027.
Earliest Charge Effective Date: February 1, 2014.
Estimated Charge Expiration Date: February 1, 2018.
Class of Air Carriers Not Required to Collect PFC's: Nonscheduled/
on-demand air carriers operating at SWF.
Determination: Approved. Based on information submitted in the
public agency's application, the FAA has determined that the proposed
class accounts for less than 1 percent of the total annual enplanements
at SWF.
Brief Description of Project Approved for Collection at SWF and Use
at LGA at a $4.50 PFC Level: LGA runways 4 and 31 runway safety area
planning, environmental, and engineering.
Brief Description of Project Partially Approved for Collection at
SWF for Future Use at EWR at a $4.50 PFC Level: EWR delay reduction
phase II--construction.
Determination: Partially approved. Certain project components were
determined to be ineligible for PFC funding.
Brief Description of Projects Partially Approved for Collection at
SWF and Use at EWR at a $4.50 PFC Level:
EWR runway 4R/22L rehabilitation.
EWR taxiway P rehabilitation including high-speed taxiways.
EWR runway 4L/22R rehabilitation.
EWR runway 11 runway safety area and relocation of Brewster Road.
EWR electrical distribution and substation improvements.
Determination: Partially approved. Certain components in each
project were determined to be ineligible for PFC funding.
Brief Description of Project Partially Approved for Collection at
SWF for Future Use at LGA at a $4.50 PFC Level: LGA runways 4 and 31
runway safety area construction.
Determination: Partially approved. Certain project components were
determined to be ineligible for PFC funding.
Brief Description of Project Approved for Collection at SWF for
Future Use at JFK at a $4.50 PFC Level: JFK runway 4L/22R
rehabilitation.
Brief Description of Project Approved for Collection at SWF and Use
at JFK at a $3.00 PFC Level: JFK taxiway P rehabilitation planning and
engineering.
Brief Description of Project Approved for Collection at SWF and Use
at EWR at a $3.00 PFC Level: EWR delay reduction phase II--planning and
engineering.
Brief Description of Project Approved for Collection at SWF and Use
at EWR, JFK, LGA, and SWF at a $3.00 PFC Level: PFC planning and
program administration.
Decision Date: March 8, 2013.
FOR FURTHER INFORMATION CONTACT: Steve Urlass, New York Airports
District Office, (516) 227-3803.
Public Agency: Jackson Hole Airport Board, Jackson Hole, Wyoming.
Application Number: 13-13-C-00-JAC.
Application Type: Impose and use a PFC.
PFC Level: $4.50.
Total PFC Revenue Approved in This Decision: $14,221,770.
Earliest Charge Effective Date: July 1, 2026.
Estimated Charge Expiration Date: September 1, 2041.
Class of Air Carriers Not Required to Collect PFC'S: None.
Brief Description of Projects Approved for Collection and Use:
Terminal baggage claim expansion and renovation.
Construct deicing (glycol) containment facility.
Install runway centerline lights.
Acquire snow removal equipment.
Improve runway safety area.
Develop wildlife management plan.
PFC administrative costs.
Decision Date: March 28, 2013.
FOR FURTHER INFORMATION CONTACT: Jesse Lyman, Denver Airports District
Office, (303) 342-1262.
Public Agency: Ports of Douglas County and Chelan County, East
Wenatchee, Washington.
Application Number: 13-11-C-00-EAT.
Application Type: Impose and use a PFC.
PFC Level: $4.50.
Total PFC Revenue Approved in This Decision: $556,704.
Earliest Charge Effective Date: August 1, 2014.
Estimated Charge Expiration Date: August 1, 2016.
Class of Air Carriers Not Required to Collect PFC's: None.
Brief Description of Projects Approved for Collection and Use:
Rehabilitate aircraft rescue and firefighting station.
Terminal building security improvements.
Modify terminal building (phase VI).
Brief Description of Project Approved for Use: Aircraft rescue and
firefighting truck purchase.
Decision Date: April 5, 2013.
FOR FURTHER INFORMATION CONTACT: Trang Tran, Seattle Airports District
Office, (425) 227-1662.
Public Agency: Westmoreland County Airport Authority, Latrobe,
Pennsylvania.
Application Number: 13-02-C-00-LBE.
Application Type: Impose and use a PFC.
[[Page 76386]]
PFC Level: $4.50.
Total PFC Revenue Approved in This Decision: $829,690.
Earliest Charge Effective Date: July 1, 2013.
Estimated Charge Expiration Date: January 1, 2014.
Class of Air Carriers Not Required to Collect PFC's: None.
Brief Description of Projects Approved for Collection and Use:
Master plan update.
Part 150 noise study.
Purchase snow removal equipment.
Install security/perimeter fencing.
Perimeter fence and gates.
Acquire aircraft rescue and firefighting safety equipment.
Rehabilitate terminal apron.
Environmental assessment.
Install automated weather observing system phase III.
Acquire snow removal equipment.
Extend access taxiway.
Expand maintenance building.
Improve terminal heating, ventilation, and air conditioning.
Construct taxiways.
Security enhancements.
Construct T-hangar taxiway.
Improve runway 5/23 runway safety area phase I.
Remove obstructions.
Acquire snow removal equipment.
Security enhancements.
Improve runway 5/23 runway safety area phase II.
Acquire air traffic control tower equipment.
Improve runway 5/23 runway safety area phase III.
Improve airport drainage.
Acquire snow removal equipment.
Acquire land.
Construct T-hangar taxiway phase II.
Acquire passenger loading bridge.
Improve air traffic control tower.
Acquire deicing equipment.
Rehabilitate access road phase I.
Improve runway 5/23 runway safety area phase IV.
Improve terminal utilities.
Acquire snow removal equipment.
Upgrade medium intensity approach light system and runway alignment
indicator lights.
Rehabilitate air traffic control tower.
Acquire aircraft rescue and firefighting vehicle.
Rehabilitate access road phase II.
Wildlife assessment.
Rehabilitate access road phase III.
Rehabilitate runway 5/23 phase I.
Expand aircraft rescue and firefighting building.
Upgrade medium intensity approach light system and runway alignment
indicator lights phase II.
Rehabilitate parallel taxiway phase II.
Expand aircraft rescue and firefighting building phase II.
Rehabilitate access road phase IV.
Expand terminal parking phase V.
Rehabilitate passenger loading bridge.
Rehabilitate runway 5/23 phase II.
Upgrade medium intensity approach light system and runway alignment
indicator lights phase III.
Wildlife hazard management plan.
Decision Date: April 17, 2013.
FOR FURTHER INFORMATION CONTACT: Lori Ledebohm, Harrisburg Airports
District Office, (717) 730-2835.
Public Agency: Mobile Airport Authority, Mobile, Alabama.
Application Number: 13-06-C-00-MOB.
Application Type: Impose and use a PFC.
PFC Level: $3.00.
Total PFC Revenue Approved in This Decision: $3,705,879.
Earliest Charge Effective Date: June 1, 2013.
Estimated Charge Expiration Date: October 1, 2017.
Class of Air Carriers Not Required to Collect PFC's: Air taxi/
commercial operators filing FAA Form 1800-31 and operating at Mobile
Regional Airport (MOB).
Determination: Approved. Based on information submitted in the
public agency's application, the FAA has determined that the proposed
class accounts for less than 1 percent of the total annual enplanements
at MOB.
Brief Description of Projects Approved for Collection and Use:
Wildlife hazard assessment and management plan.
Noise mitigation program.
East airfield storm water detention area.
Replace airfield beacon.
Baggage conveyor chutes.
Terminal rehabilitation phase II.
Terminal road rehabilitation phase II.
Taxiway R rehabilitation.
Runway 18/36 and partial taxiway R rehabilitation.
12-foot culvert rehabilitation under runway 14/32 (design).
Master plan update.
Aircraft rescue and firefighting building rehabilitation.
Aircraft rescue and firefighting quick response vehicle.
Replace airfield signage (design).
Security lighting upgrade phase II.
Airfield drainage phase III (construction).
Security system rehabilitation (design).
Baggage information display system/flight information display system
rehabilitation (design).
Rehabilitate 12-foot culvert under runway 14/32 (construction).
Replace airfield signage (construction).
Update security system construction.
Part 139 interactive employee training equipment and workstations.
Airfield lighting vault improvements.
Terminal rehabilitation phase III.
Brief Description of Project Approved for Collection: Expand apron.
Brief Description of Disapproved Project: Security towing vehicle.
Determination: Disapproved. This project does not meet the
requirements of Sec. 158.15(b).
Decision Date: April 18, 2013.
FOR FURTHER INFORMATION CONTACT: Jonathan Linquist, Jackson Airports
District Office, (601) 664-9893.
Public Agency: Charleston County Aviation Authority, Charleston,
South Carolina.
Application Number: 13-03-C-00-CHS.
Application Type: Impose and use a PFC.
PFC Level: $4.50.
Total PFC Revenue Approved in This Decision: $173,506,475.
Earliest Charge Effective Date: May 1, 2015.
Estimated Charge Expiration Date: November 1, 2040.
Class of Air Carriers Not Required to Collect PFC's: Air taxi/
commercial operators filing FAA Form 1800-31 that operate at Charleston
International Airport (CHS).
Determination: Approved. Based on information submitted in the
public agency's application, the FAA has determined that the proposed
class accounts for less than 1 percent of the total annual enplanements
at CHS.
Brief Description of Project Approved for Collection and Use: PFC
application development and implementation.
Brief Description of Project Partially Approved for Collection and
Use: Terminal redevelopment and improvement.
Determination: Partially approved. Several areas of the terminal
were determined to be revenue-producing and, thus, ineligible for PFC
funding.
Decision Date: April 18, 2013.
FOR FURTHER INFORMATION CONTACT: Robert Rau, Atlanta Airports District
Office, (404) 305-7004.
Public Agency: City of El Paso, Texas.
Application Number: 13-06-C-00-ELP.
Application Type: Impose and use a PFC.
PFC Level: $4.50.
Total PFC Revenue Approved in This Decision: $19,085,123.
Earliest Charge Effective Date: June 1, 2013.
Estimated Charge Expiration Date: December 1, 2016.
[[Page 76387]]
Class of Air Carriers Not Required to Collect PFC's: Air taxi/
commercial operators filing FAA Form 1800-31.
Determination: Approved. Based on information submitted in the
public agency's application, the FAA has determined that the proposed
class accounts for less than 1 percent of the total annual enplanements
at El Paso International Airport.
Brief Description of Projects Approved for Collection and Use:
Baggage claim units.
Baggage makeup area.
PFC implementation and administrative costs.
Brief Description of Projects Partially Approved for Collection and
Use: Passenger loading bridges.
Determination: Partially approved. One of the loading bridges
proposed for replacement was determined to still be within its useful
life and to still be operating appropriately. Therefore, the
replacement loading bridge for this gate was determined to be
ineligible under Sec. 158.15(b).
Airport access control system.
Determination: Partially approved. The public agency identified 16
separate components in this project but the FAA determined that only
two of the components were eligible for PFC funding.
Central plant upgrade.
Determination: Partially approved. Two of the proposed components,
replacement of terminal lighting and installation of terminal window
solar film, both intended to provide efficiency improvements, did not
meet the requirements of Sec. 158.15(b).
Decision Date: April 23, 2013.
FOR FURTHER INFORMATION CONTACT: Mike Nicely, Texas Airports
Development Office, (817) 222-5650.
Public Agency: County of Albany and City of Laramie, Laramie,
Wyoming.
Application Number: 13-03-C-00-LAR.
Application Type: Impose and use a PFC.
PFC Level: $4.50.
Total PFC Revenue Approved in This Decision: $185,425.
Earliest Charge Effective Date: June 1, 2013.
Estimated Charge Expiration Date: June 1, 2017.
Class of Air Carriers Not Required to Collect PFC's: Air taxi/
commercial operators filing FAA Form 1800-31.
Determination: Approved. Based on information submitted in the
public agency's application, the FAA has determined that the proposed
class accounts for less than 1 percent of the total annual enplanements
at Laramie regional Airport.
Brief Description of Projects Approved for Collection and Use:
Update airport master plan.
Rehabilitate apron.
Rehabilitate runway 12/30 (maintenance).
Construct access road.
Rehabilitate runway 12/30.
Acquire snow removal equipment.
PFC administration.
Decision Date: April 24, 2013.
FOR FURTHER INFORMATION CONTACT: Jesse Lyman, Denver Airports District
Office, (303) 342-1262.
Amendments to PFC Approvals
----------------------------------------------------------------------------------------------------------------
Original Amended
Amendment Original Amended estimated estimated
Amendment No. city, state approved date approved net approved net charge exp. charge exp.
PFC revenue PFC revenue date date
----------------------------------------------------------------------------------------------------------------
09-04-C-01-HNL, Honolulu, HI.... 04/03/13 $105,909,130 $127,112,161 02/01/14 02/01/14
09-04-C-01-OGG, Kahului, HI..... 04/03/13 24,663,770 29,601,463 02/01/14 02/01/14
09-04-C-01-KOA, Kailua Kona, HI. 04/03/13 7,254,050 8,706,313 02/01/14 02/01/14
09-04-C-01-LIH, Lihue, HI....... 04/03/13 7,254,050 8,706,313 02/01/14 02/01/14
08-07-C-02-MOD, Modesto, CA..... 04/05/13 337,634 304,183 04/01/12 04/01/12
10-10-C-01-EAT, Wenatchee, WA... 04/05/13 881,750 381,750 08/01/14 08/01/14
08-05-C-03-AVP, Avoca, PA....... 04/09/13 5,790,104 1,518,104 08/01/17 12/01/16
----------------------------------------------------------------------------------------------------------------
Issued in Washington, DC, on December 6, 2013.
Joe Hebert,