Notice of Passenger Facility Charge (PFC) Approvals and Disapprovals, 76382-76383 [2013-29926]

Download as PDF 76382 Federal Register / Vol. 78, No. 242 / Tuesday, December 17, 2013 / Notices Estimated per Company Cost to Store Consent Forms—$300. Dated: December 12, 2013. Faye Lipsky, Reports Clearance Director, Social Security Administration. [FR Doc. 2013–29907 Filed 12–16–13; 8:45 am] BILLING CODE 4191–02–P DEPARTMENT OF TRANSPORTATION Federal Aviation Administration Notice of Cancellation of Environmental Impact Statement for the Norfolk International Airport, Norfolk, Virginia Federal Aviation Administration (FAA), DOT. ACTION: Notice of cancellation of preparation of environmental impact statement. AGENCY: The Federal Aviation Administration (FAA) announces that it has discontinued preparation of an Environmental Impact Statement (EIS) for the proposed construction of new Runway 5R/23L and associated development at Norfolk International Airport, Norfolk, Virginia. The FAA’s discontinued preparation of the EIS is based upon the length of time that has elapsed since the issuance of the Notice of Intent (NOI) in 2001 for the project and the need to consider results from additional planning efforts completed by the Norfolk Airport Authority (NAA), the owner and operator of the airport. The additional planning effort by NAA has modified the project purpose and need and refined various project elements, including the need to relocate the Very High Frequency Omnidirectional Range/Tactical Air Navigation (VORTAC) facility. As a result of the additional planning studies, refinements to the project scope, and the time elapsed; the FAA has decided to discontinue the EIS as proposed in the NOI from 2001. FOR FURTHER INFORMATION CONTACT: Andrew Brooks, Environmental Program Manager, Airports Division AEA–610, Federal Aviation Administration, Eastern Region, 1 Aviation Plaza, Jamaica, New York 11434; Telephone (718) 553–2511. SUPPLEMENTARY INFORMATION: On June 28, 2001, the FAA, published in the wreier-aviles on DSK5TPTVN1PROD with NOTICES SUMMARY: Periodically, SSA will calculate our costs to provide CBSV services and adjust the fee charged as needed. SSA notifies companies in writing and via Federal Register Notice of any changes and companies have the opportunity to cancel the agreement or continue service using the new transaction fee. VerDate Mar<15>2010 14:45 Dec 16, 2013 Jkt 232001 Federal Register a Notice of Intent (NOI) to prepare an Environmental Impact Statement (EIS) and hold a Public Scoping Meeting at Norfolk International Airport (Volume 66, Number 125, FR 34508–34509). The EIS and Public Scoping Meeting were to address the proposed construction of new Runway 5R/23L and associated development at the airport, including new taxiway construction, taxiway relocation, runway safety area construction, new airfield lighting, improvements to existing lighting, relocation of the VORTAC facility, installation of a Medium Intensity Approach Lighting System with Runway Alignment Indicator Lights (MALSR) for the new Runway 23L, and a Category II Instrument Landing MALSR for new Runway 5R. In 2001, the FAA based its decision to prepare the EIS on the procedures described in FAA Order 5050.4A, Airport Environmental Handbook, and FAA Order 1050.1D, Policies and Procedures for Considering Environmental Impacts. FAA also based its decision to prepare a federal EIS primarily on NAA’s proposal to construct a new Runway 5R/23L in parallel to the existing Runway 5/23, which would be re-designated as Runway 5L/23R. The new runway was proposed to be 8,000 feet long and 150 feet wide and would have a runway centerline separation from the existing runway of 845 feet. Subsequently, NAA completed supplemental planning efforts that necessitated making changes to the proposed project’s purpose and need. Therefore, the proposed project’s purpose and need has recently been revised and various project components, including the relocation of the VORTAC, are no longer required. The NAA submitted an Airport Layout Plan revision to the FAA that depicted the refined project elements. The Airport Layout Plan was conditionally approved, subject to environmental review by the FAA on October 5, 2011. The FAA will determine the appropriate National Environmental Policy Act (NEPA) documentation necessary to assess the environmental effects of the proposed improvements pursuant to FAA Order 5050.4B, National Environmental Policy Act (NEPA) Implementing Instructions for Airport Actions, and FAA Order 1050.1E, Environmental Impacts: Policies and Procedures. PO 00000 Frm 00114 Fmt 4703 Sfmt 4703 Issued in Jamaica, New York, on December 5, 2013. Debbie Roth, Manager, Airports Division, Eastern Region, AEA–600. [FR Doc. 2013–29981 Filed 12–16–13; 8:45 am] BILLING CODE 4910–13–P DEPARTMENT OF TRANSPORTATION Federal Aviation Administration Notice of Passenger Facility Charge (PFC) Approvals and Disapprovals Federal Aviation Administration (FAA), DOT. ACTION: Monthly Notice of PFC Approvals and Disapprovals. In May 2013, there were four applications approved. Additionally, 10 approved amendments to previously approved applications are listed. AGENCY: The FAA publishes a monthly notice, as appropriate, of PFC approvals and disapprovals under the provisions of the Aviation Safety and Capacity Expansion Act of 1990 (Title IX of the Omnibus Budget Reconciliation Act of 1990) (Pub. L. 101–508) and Part 158 of the Federal Aviation Regulations (14 CFR part 158). This notice is published pursuant to paragraph d of § 158.29. SUMMARY: PFC Applications Approved PUBLIC AGENCY: County of Sonoma, Santa Rosa, California. APPLICATION NUMBER: 13–05–C– 00–STS. APPLICATION TYPE: Impose and use a PFC. PFC LEVEL: $4.50. TOTAL PFC REVENUE APPROVED IN THIS DECISION: $425,000. EARLIEST CHARGE EFFECTIVE DATE: July 1, 2013. ESTIMATED CHARGE EXPIRATION DATE: June 1, 2014. CLASS OF AIR CARRIERS NOT REQUIRED TO COLLECT PFC’S: None. BRIEF DESCRIPTION OF PROJECTS APPROVED FOR COLLECTION AND USE: Acquire protective equipment for aircraft rescue and firefighting personnel. Acquire Americans with Disabilities Act passenger boarding ramp. Install common use flight information system. DECISION DATE: May 13, 2013. FOR FURTHER INFORMATION CONTACT: Neil Kumar, San Francisco Airports District Office, (650) 827–7627. PUBLIC AGENCY: City of Minot, North Dakota. APPLICATION NUMBER: 13–08–C– 00–MOT. APPLICATION TYPE: Impose and use a PFC. E:\FR\FM\17DEN1.SGM 17DEN1 Federal Register / Vol. 78, No. 242 / Tuesday, December 17, 2013 / Notices PFC LEVEL: $4.50. TOTAL PFC REVENUE APPROVED IN THIS DECISION: $11,706,547. EARLIEST CHARGE EFFECTIVE DATE: July 1, 2013. ESTIMATED CHARGE EXPIRATION DATE: August 1, 2023. CLASSES OF AIR CARRIERS NOT REQUIRED TO COLLECT PFC’S: (1) Non-scheduled/on-demand air carriers filing FAA Form 1800–31; and (2) small certificated air carriers filing DOT Form T–100. DETERMINATION: Approved. Based on information contained in the public agency’s application, the FAA has determined that each proposed class accounts for less than 1 percent of the total annual enplanements at Minot International Airport. BRIEF DESCRIPTION OF PROJECTS APPROVED FOR COLLECTION AND USE: Construction and design of taxiway D. Passenger terminal apron—design and construction. Relocate snow removal equipment building—design and construction. Passenger terminal building—design and construction. Terminal access road—design and construction. Terminal area study. Preparation of PFC application 8. Acquire snow removal equipment (sweeper). DECISION DATE: May 13, 2013. FOR FURTHER INFORMATION CONTACT: Mark Holzer, Bismarck Airports District Office, (701) 323–7390. PUBLIC AGENCY: Greater Orlando Aviation Authority, Orlando, Florida. APPLICATION NUMBER: 13–15–C– 00–MCO. APPLICATION TYPE: Impose and use a PFC. PFC LEVEL: $4.50. TOTAL PFC REVENUE APPROVED IN THIS DECISION: $189,994,500. EARLIEST CHARGE EFFECTIVE DATE: June 1, 2026. ESTIMATED CHARGE EXPIRATION DATE: December 1, 2028. CLASS OF AIR CARRIERS NOT REQUIRED TO COLLECT PFC’S: None. BRIEF DESCRIPTION OF PROJECT PARTIALLY APPROVED FOR COLLECTION AND USE AT A $4.50 PFC LEVEL: North terminal passenger capacity improvements 9 design and construction). DETERMINATION. Partially approved. The reconfiguration and relocation of airline operations space and other tenant spaces does not meet the requirements of 14 CFR 158.15(b). BRIEF DESCRIPTION OF PROJECT PARTIALLY APPROVED FOR COLLECTION AND USE AT A $3.00 PFC LEVEL: Baggage handling system capacity improvements (design and construction)—phase 2. DETERMINATION. Partially approved. The expansion of the emergency generator building and 76383 replacement of emergency generators for the baggage handling system do not meet the requirements of 14 CFR 158.15(b). DECISION DATE: May 17, 2013. FOR FURTHER INFORMATION CONTACT: Susan Moore, Orlando Airports District Office, (407) 812–6331. PUBLIC AGENCY: City of Billings Aviation and Transit Department, Billings, Montana. APPLICATION NUMBER: 13–08–C– 00–BIL. APPLICATION TYPE: Impose and use a PFC. PFC LEVEL: $3.00. TOTAL PFC REVENUE APPROVED IN THIS DECISION: $2,033,000. EARLIEST CHARGE EFFECTIVE DATE: July 1, 2013. ESTIMATED CHARGE EXPIRATION DATE: May 1, 2015. CLASS OF AIR CARRIERS NOT REQUIRED TO COLLECT PFC’S: None. BRIEF DESCRIPTION OF PROJECTS APPROVED FOR COLLECTION AND USE: Snow removal equipment—ramp blade replacement. Reimbursement of construction costs—east end taxilane expansion. Runway 10L/28R rehabilitation. Snow removal equipment. DECISION DATE: May 23, 2013. FOR FURTHER INFORMATION CONTACT: Jason Garwood, Helena Airports District Office, (406) 449–5078. AMENDMENT TO PFC APPROVALS Amendment approved date Amendment No., City, State 09–02–C–01–MMH, Mammoth Lakes, CA ...................................................... 04–07–C–02–PHX, Phoenix, AZ ........... 07–08–C–01–PHX, Phoenix, AZ ........... 09–09–C–01–PHX, Phoenix, AZ ........... 11–04–C–01–CMI, Savoy, IL ................ 06–06–C–01–MSO, Missoula, MT ......... 11–07–C–01–SUN, Hailey, ID ............... 02–06–C–02–MSP, Minneapolis, MN .... 05–07–U–02–MSP, Minneapolis, MN .... * 13–03–C–01–LNS, Lititz, PA ............... 05/07/13 05/10/13 05/10/13 05/10/13 05/14/13 05/14/13 05/17/13 05/20/13 05/20/13 05/23/13 Original approved net PFC revenue Amended approved net PFC revenue Original estimated charge exp. date Amended estimated charge exp. date $399,917 222,250,000 202,200,000 1,858,836,000 1,359,105 3,334,760 505,918 793,254,352 NA 35,917 $665,010 246,977,086 187,649,602 1,940,493,949 1,445,255 3,255,904 310,775 774,213,674 NA 35,917 11/01/25 08/01/08 08/01/10 11/01/28 08/01/14 02/01/09 03/01/14 12/01/15 12/01/15 05/01/15 11/01/15 08/01/08 08/01/10 08/01/30 09/01/14 01/01/09 07/01/12 04/01/14 04/01/14 05/01/15 wreier-aviles on DSK5TPTVN1PROD with NOTICES Notes: The amendment denoted by an asterisk (*) include a change to the PFC level charged from $3.00 per enplaned passenger to $4.50 per enplaned passenger. For Lititz, PA, this change is effective on July 1, 2013. Dated: Issued in Washington, DC, on December 6, 2013. Joe Hebert, Manager, Financial Analysis and Passenger Facility Charge Branch. [FR Doc. 2013–29926 Filed 12–16–13; 8:45 am] 14:45 Dec 16, 2013 Federal Aviation Administration Notice of Passenger Facility Charge (PFC) Approvals and Disapprovals Federal Aviation Administration (FAA), DOT. ACTION: Monthly Notice of PFC Approvals and Disapprovals. In April AGENCY: BILLING CODE 4910–13–P VerDate Mar<15>2010 DEPARTMENT OF TRANSPORTATION Jkt 232001 PO 00000 Frm 00115 Fmt 4703 Sfmt 4703 2013, there were six applications approved. This notice also includes information on five applications, approved in March 2013, inadvertently left off the March 2013 notice. Additionally, seven approved amendments to previously approved applications are listed. The FAA publishes a monthly notice, as appropriate, of PFC approvals SUMMARY: E:\FR\FM\17DEN1.SGM 17DEN1

Agencies

[Federal Register Volume 78, Number 242 (Tuesday, December 17, 2013)]
[Notices]
[Pages 76382-76383]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-29926]


-----------------------------------------------------------------------

DEPARTMENT OF TRANSPORTATION

Federal Aviation Administration


Notice of Passenger Facility Charge (PFC) Approvals and 
Disapprovals

AGENCY: Federal Aviation Administration (FAA), DOT.

ACTION: Monthly Notice of PFC Approvals and Disapprovals. In May 2013, 
there were four applications approved. Additionally, 10 approved 
amendments to previously approved applications are listed.

-----------------------------------------------------------------------

SUMMARY: The FAA publishes a monthly notice, as appropriate, of PFC 
approvals and disapprovals under the provisions of the Aviation Safety 
and Capacity Expansion Act of 1990 (Title IX of the Omnibus Budget 
Reconciliation Act of 1990) (Pub. L. 101-508) and Part 158 of the 
Federal Aviation Regulations (14 CFR part 158). This notice is 
published pursuant to paragraph d of Sec.  158.29.

PFC Applications Approved

    PUBLIC AGENCY: County of Sonoma, Santa Rosa, California.
    APPLICATION NUMBER: 13-05-C-00-STS.
    APPLICATION TYPE: Impose and use a PFC.
    PFC LEVEL: $4.50.
    TOTAL PFC REVENUE APPROVED IN THIS DECISION: $425,000.
    EARLIEST CHARGE EFFECTIVE DATE: July 1, 2013.
    ESTIMATED CHARGE EXPIRATION DATE: June 1, 2014.
    CLASS OF AIR CARRIERS NOT REQUIRED TO COLLECT PFC'S: None.
    BRIEF DESCRIPTION OF PROJECTS APPROVED FOR COLLECTION AND USE: 
Acquire protective equipment for aircraft rescue and firefighting 
personnel. Acquire Americans with Disabilities Act passenger boarding 
ramp. Install common use flight information system.
    DECISION DATE: May 13, 2013.

FOR FURTHER INFORMATION CONTACT: Neil Kumar, San Francisco Airports 
District Office, (650) 827-7627.
    PUBLIC AGENCY: City of Minot, North Dakota.
    APPLICATION NUMBER: 13-08-C-00-MOT.
    APPLICATION TYPE: Impose and use a PFC.

[[Page 76383]]

    PFC LEVEL: $4.50.
    TOTAL PFC REVENUE APPROVED IN THIS DECISION: $11,706,547.
    EARLIEST CHARGE EFFECTIVE DATE: July 1, 2013.
    ESTIMATED CHARGE EXPIRATION DATE: August 1, 2023.
    CLASSES OF AIR CARRIERS NOT REQUIRED TO COLLECT PFC'S: (1) Non-
scheduled/on-demand air carriers filing FAA Form 1800-31; and (2) small 
certificated air carriers filing DOT Form T-100.
    DETERMINATION: Approved. Based on information contained in the 
public agency's application, the FAA has determined that each proposed 
class accounts for less than 1 percent of the total annual enplanements 
at Minot International Airport.
    BRIEF DESCRIPTION OF PROJECTS APPROVED FOR COLLECTION AND USE:
    Construction and design of taxiway D.
    Passenger terminal apron--design and construction.
    Relocate snow removal equipment building--design and construction.
    Passenger terminal building--design and construction.
    Terminal access road--design and construction.
    Terminal area study.
    Preparation of PFC application 8.
    Acquire snow removal equipment (sweeper).
    DECISION DATE: May 13, 2013.

FOR FURTHER INFORMATION CONTACT: Mark Holzer, Bismarck Airports 
District Office, (701) 323-7390.
    PUBLIC AGENCY: Greater Orlando Aviation Authority, Orlando, 
Florida.
    APPLICATION NUMBER: 13-15-C-00-MCO.
    APPLICATION TYPE: Impose and use a PFC.
    PFC LEVEL: $4.50.
    TOTAL PFC REVENUE APPROVED IN THIS DECISION: $189,994,500.
    EARLIEST CHARGE EFFECTIVE DATE: June 1, 2026.
    ESTIMATED CHARGE EXPIRATION DATE: December 1, 2028.
    CLASS OF AIR CARRIERS NOT REQUIRED TO COLLECT PFC'S: None.
    BRIEF DESCRIPTION OF PROJECT PARTIALLY APPROVED FOR COLLECTION AND 
USE AT A $4.50 PFC LEVEL: North terminal passenger capacity 
improvements 9 design and construction).
    DETERMINATION. Partially approved. The reconfiguration and 
relocation of airline operations space and other tenant spaces does not 
meet the requirements of 14 CFR 158.15(b).
    BRIEF DESCRIPTION OF PROJECT PARTIALLY APPROVED FOR COLLECTION AND 
USE AT A $3.00 PFC LEVEL: Baggage handling system capacity improvements 
(design and construction)--phase 2.
    DETERMINATION. Partially approved. The expansion of the emergency 
generator building and replacement of emergency generators for the 
baggage handling system do not meet the requirements of 14 CFR 
158.15(b).
    DECISION DATE: May 17, 2013.

FOR FURTHER INFORMATION CONTACT: Susan Moore, Orlando Airports District 
Office, (407) 812-6331.
    PUBLIC AGENCY: City of Billings Aviation and Transit Department, 
Billings, Montana.
    APPLICATION NUMBER: 13-08-C-00-BIL.
    APPLICATION TYPE: Impose and use a PFC.
    PFC LEVEL: $3.00.
    TOTAL PFC REVENUE APPROVED IN THIS DECISION: $2,033,000.
    EARLIEST CHARGE EFFECTIVE DATE: July 1, 2013.
    ESTIMATED CHARGE EXPIRATION DATE: May 1, 2015.
    CLASS OF AIR CARRIERS NOT REQUIRED TO COLLECT PFC'S: None.
    BRIEF DESCRIPTION OF PROJECTS APPROVED FOR COLLECTION AND USE:
    Snow removal equipment--ramp blade replacement.
    Reimbursement of construction costs--east end taxilane expansion.
    Runway 10L/28R rehabilitation.
    Snow removal equipment.
    DECISION DATE: May 23, 2013.

FOR FURTHER INFORMATION CONTACT: Jason Garwood, Helena Airports 
District Office, (406) 449-5078.

                                                               Amendment to PFC Approvals
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                                                                                         Original           Amended
                Amendment No., City, State                     Amendment      Original approved  Amended  approved   estimated charge   estimated charge
                                                             approved date     net PFC revenue    net PFC revenue       exp. date          exp. date
--------------------------------------------------------------------------------------------------------------------------------------------------------
09-02-C-01-MMH, Mammoth Lakes, CA........................           05/07/13           $399,917           $665,010           11/01/25           11/01/15
04-07-C-02-PHX, Phoenix, AZ..............................           05/10/13        222,250,000        246,977,086           08/01/08           08/01/08
07-08-C-01-PHX, Phoenix, AZ..............................           05/10/13        202,200,000        187,649,602           08/01/10           08/01/10
09-09-C-01-PHX, Phoenix, AZ..............................           05/10/13      1,858,836,000      1,940,493,949           11/01/28           08/01/30
11-04-C-01-CMI, Savoy, IL................................           05/14/13          1,359,105          1,445,255           08/01/14           09/01/14
06-06-C-01-MSO, Missoula, MT.............................           05/14/13          3,334,760          3,255,904           02/01/09           01/01/09
11-07-C-01-SUN, Hailey, ID...............................           05/17/13            505,918            310,775           03/01/14           07/01/12
02-06-C-02-MSP, Minneapolis, MN..........................           05/20/13        793,254,352        774,213,674           12/01/15           04/01/14
05-07-U-02-MSP, Minneapolis, MN..........................           05/20/13                 NA                 NA           12/01/15           04/01/14
* 13-03-C-01-LNS, Lititz, PA.............................           05/23/13             35,917             35,917           05/01/15           05/01/15
--------------------------------------------------------------------------------------------------------------------------------------------------------
Notes: The amendment denoted by an asterisk (*) include a change to the PFC level charged from $3.00 per enplaned passenger to $4.50 per enplaned
  passenger. For Lititz, PA, this change is effective on July 1, 2013.


    Dated: Issued in Washington, DC, on December 6, 2013.
Joe Hebert,
Manager, Financial Analysis and Passenger Facility Charge Branch.
[FR Doc. 2013-29926 Filed 12-16-13; 8:45 am]
BILLING CODE 4910-13-P