Description: 11/27/13 Negotiated
Rates—JP Morgan Ventures (RTS) 6025–
26 to be effective 12/1/2013.
Filed Date: 11/27/13.
Accession Number: 20131127–5090.
Comments Due: 5 p.m. ET 12/9/13.
Docket Numbers: RP14–231–000.
Applicants: Northern Natural Gas
Company.
Description: 20131127 Negotiated
Rate to be effective 12/1/2013.
Filed Date: 11/27/13.
Accession Number: 20131127–5111.
Comments Due: 5 p.m. ET 12/9/13.
Docket Numbers: RP14–232–000.
Applicants: Young Gas Storage
Company, Ltd.
Description: Young Fuel
Reimbursement Filing to be effective 1/
1/2014.
Filed Date: 11/27/13.
Accession Number: 20131127–5115.
Comments Due: 5 p.m. ET 12/9/13.
Docket Numbers: RP14–233–000.
Applicants: El Paso Natural Gas
Company, L.L.C.
Description: Non-Conforming
Transportation Service Agreements
Filing to be effective 1/1/2014.
Filed Date: 11/27/13.
Accession Number: 20131127–5159.
Comments Due: 5 p.m. ET 12/9/13.
Docket Numbers: RP14–234–000.
Applicants: Texas Eastern
Transmission, LP.
Description: ConocoPhillips 12–01–
2013 Releases to be effective 12/1/2013.
Filed Date: 11/27/13.
Accession Number: 20131127–5195.
Comments Due: 5 p.m. ET 12/9/13.
Docket Numbers: RP14–235–000.
Applicants: Tallgrass Interstate Gas
Transmission, L.
Description: Neg Rate 2013–12–2
Green Plains Wood River fka/Pioneer
Trail A&R NC NRA to be effective 12/
1/2013.
Filed Date: 11/27/13.
Accession Number: 20131127–5196.
Comments Due: 5 p.m. ET 12/9/13.
Docket Numbers: RP14–236–000.
Applicants: Natural Gas Pipeline
Company of America.
Description: Negotiated Rate Filing—
Tenaska LPS—RO 143863 to be effective
12/1/2013.
Filed Date: 11/27/13.
Accession Number: 20131127–5215.
Comments Due: 5 p.m. ET 12/9/13.
Docket Numbers: RP14–237–000.
Applicants: Alliance Pipeline L.P.
Description: Dec 1 2013 Permanent
Assignments to be effective 12/1/2013.
Filed Date: 11/27/13.
Accession Number: 20131127–5223.
Comments Due: 5 p.m. ET 12/9/13.
Docket Numbers: RP14–238–000.
VerDate Mar<15>2010
16:45 Dec 11, 2013
Jkt 232001
Applicants: ETC Tiger Pipeline, LLC.
Description: Tiger Cost and Revenue
Study CP09–460.
Filed Date: 11/27/13.
Accession Number: 20131127–5225.
Comments Due: 5 p.m. ET 12/9/13.
Docket Numbers: RP14–239–000.
Applicants: Fayetteville Express
Pipeline LLC.
Description: FEP Cost and Revenue
Study CP09–433.
Filed Date: 11/27/13.
Accession Number: 20131127–5231.
Comments Due: 5 p.m. ET 12/9/13.
Docket Numbers: RP14–240–000.
Applicants: Alliance Pipeline L.P.
Description: 2014 Negotiated Rate
Filing to be effective 1/1/2014.
Filed Date: 11/29/13.
Accession Number: 20131129–5030.
Comments Due: 5 p.m. ET 12/11/13.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: December 2, 2013.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2013–29564 Filed 12–11–13; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER11–3697–000.
Applicants: Southern California
Edison Company.
Description: Informational Filing of
Formula Transmission Rate 2014
Annual Update of Southern California
Edison Company.
Filed Date: 11/26/13.
PO 00000
Frm 00013
Fmt 4703
Sfmt 4703
75555
Accession Number: 20131126–5195.
Comments Due: 5 p.m. ET 12/16/13.
Docket Numbers: ER13–298–002.
Applicants: New York Independent
System Operator, Inc.
Description: NYISO compliance filing
tariff revision on Market Mitigation to
be effective 9/25/2013.
Filed Date: 12/3/13.
Accession Number: 20131203–5137.
Comments Due: 5 p.m. ET 12/24/13.
Docket Numbers: ER13–1346–000.
Applicants: Mesa Wind Power
Corporation.
Description: Mesa Wind Power
Corporation submits Mesa Wind Refund
Report 12.4.2013 to be effective N/A.
Filed Date: 12/4/13.
Accession Number: 20131204–5049.
Comments Due: 5 p.m. ET 12/26/13.
Docket Numbers: ER14–206–002.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: 2013–12–03 Appendix A
SOC Revs to be effective 12/28/2013.
Filed Date: 12/3/13.
Accession Number: 20131203–5084.
Comments Due: 5 p.m. ET 12/24/13.
Docket Numbers: ER14–209–001.
Applicants: PowerOne Corporation.
Description: Amendment to MBR
Application to be effective 11/28/2013.
Filed Date: 12/3/13.
Accession Number: 20131203–5162.
Comments Due: 5 p.m. ET 12/24/13.
Docket Numbers: ER14–382–001.
Applicants: Cheyenne Light, Fuel and
Power Company.
Description: Cheyenne Light, Fuel and
Power Company submits Order No. 764
Compliance Filing Amendment to be
effective 12/4/2013.
Filed Date: 12/4/13.
Accession Number: 20131204–5069.
Comments Due: 5 p.m. ET 12/26/13.
Docket Numbers: ER14–517–000.
Applicants: Arizona Public Service
Company.
Description: Amendment to APS RS
No. 259, WAPA Bouse Switchyard
Construction Agreement to be effective
12/31/2013.
Filed Date: 12/3/13.
Accession Number: 20131203–5099.
Comments Due: 5 p.m. ET 12/24/13.
Docket Numbers: ER14–518–000.
Applicants: Powerex Corp.
Description: Amendment to Powerex
FERC Rate Schedule No. 1 to be
effective 12/3/2013.
Filed Date: 12/3/13.
Accession Number: 20131203–5100.
Comments Due: 5 p.m. ET 12/24/13.
Docket Numbers: ER14–519–000.
Applicants: Astral Energy LLC.
Description: Astral Energy Market
Based Rate Tariff to be effective 1/15/
2014.
E:\FR\FM\12DEN1.SGM
12DEN1
maindgalligan on DSK5TPTVN1PROD with NOTICES
75556
Federal Register / Vol. 78, No. 239 / Thursday, December 12, 2013 / Notices
Filed Date: 12/3/13.
Accession Number: 20131203–5134.
Comments Due: 5 p.m. ET 12/24/13.
Docket Numbers: ER14–520–000.
Applicants: Ivanpah Master Holdings,
LLC.
Description: Ivanpah Master Holdings,
LLC submits Cancellation of MBR Tariff
to be effective 12/5/2013.
Filed Date: 12/4/13.
Accession Number: 20131204–5029.
Comments Due: 5 p.m. ET 12/26/13.
Docket Numbers: ER14–521–000.
Applicants: Southwest Power Pool,
Inc.
Description: Southwest Power Pool,
Inc. submits Service Agreement Mass
Cancellation Filing—Group #1 to be
effective 12/1/2013.
Filed Date: 12/4/13.
Accession Number: 20131204–5035.
Comments Due: 5 p.m. ET 12/26/13.
Docket Numbers: ER14–522–000.
Applicants: Southwest Power Pool,
Inc.
Description: Southwest Power Pool,
Inc. submits Service Agreement Mass
Cancellation Filing—Group #2 to be
effective 12/1/2013.
Filed Date: 12/4/13.
Accession Number: 20131204–5037.
Comments Due: 5 p.m. ET 12/26/13.
Docket Numbers: ER14–523–000.
Applicants: Southwest Power Pool,
Inc.
Description: Southwest Power Pool,
Inc. submits Service Agreement Mass
Cancellation Filing—Group #3 to be
effective 12/1/2013.
Filed Date: 12/4/13.
Accession Number: 20131204–5041.
Comments Due: 5 p.m. ET 12/26/13.
Docket Numbers: ER14–524–000.
Applicants: Southwest Power Pool,
Inc.
Description: Southwest Power Pool,
Inc. submits Service Agreement Mass
Cancellation Filing—Group #4 to be
effective 12/1/2013.
Filed Date: 12/4/13.
Accession Number: 20131204–5042.
Comments Due: 5 p.m. ET 12/26/13.
Docket Numbers: ER14–525–000.
Applicants: ISO New England Inc.,
New England Power Pool Participants
Committee.
Description: ISO New England Inc.
submits Rev. Related to FA for NonCommercial Capacity in the FCM to be
effective 3/28/2014.
Filed Date: 12/4/13.
Accession Number: 20131204–5045.
Comments Due: 5 p.m. ET 12/26/13.
Docket Numbers: ER14–526–000.
Applicants: Southwest Power Pool,
Inc.
Description: Southwest Power Pool,
Inc. submits Service Agreement Mass
VerDate Mar<15>2010
16:45 Dec 11, 2013
Jkt 232001
Cancellation Filing—Group #5 to be
effective 12/1/2013.
Filed Date: 12/4/13.
Accession Number: 20131204–5047.
Comments Due: 5 p.m. ET 12/26/13.
Docket Numbers: ER14–527–000.
Applicants: Green Current Solutions,
LLC.
Description: Green Current Solutions,
LLC submits Green Current Solutions
Market Based Rate Tariff to be effective
1/20/2014.
Filed Date: 12/4/13.
Accession Number: 20131204–5048.
Comments Due: 5 p.m. ET 12/26/13.
Docket Numbers: ER14–528–000.
Applicants: Southwest Power Pool,
Inc.
Description: Southwest Power Pool,
Inc. submits Service Agreement Mass
Cancellation Filing—Group #6 to be
effective 12/1/2013.
Filed Date: 12/4/13.
Accession Number: 20131204–5050.
Comments Due: 5 p.m. ET 12/26/13.
Docket Numbers: ER14–529–000.
Applicants: Southwest Power Pool,
Inc.
Description: Southwest Power Pool,
Inc. submits Service Agreement Mass
Cancellation Filing—Group #7 to be
effective 12/1/2013.
Filed Date: 12/4/13.
Accession Number: 20131204–5053.
Comments Due: 5 p.m. ET 12/26/13.
Docket Numbers: ER14–530–000.
Applicants: Southwest Power Pool,
Inc.
Description: Southwest Power Pool,
Inc. submits Service Agreement Mass
Cancellation Filing—Group #8 to be
effective 12/1/2013.
Filed Date: 12/4/13.
Accession Number: 20131204–5054.
Comments Due: 5 p.m. ET 12/26/13.
Docket Numbers: ER14–531–000.
Applicants: Southwest Power Pool,
Inc.
Description: Southwest Power Pool,
Inc. submits Service Agreement Mass
Cancellation Filing—Group #9 to be
effective 12/1/2013.
Filed Date: 12/4/13.
Accession Number: 20131204–5057.
Comments Due: 5 p.m. ET 12/26/13.
Docket Numbers: ER14–532–000.
Applicants: Southwest Power Pool,
Inc.
Description: Southwest Power Pool,
Inc. submits Service Agreement Mass
Cancellation Filing—Group #10 to be
effective 12/1/2013.
Filed Date: 12/4/13.
Accession Number: 20131204–5060.
Comments Due: 5 p.m. ET 12/26/13.
Docket Numbers: ER14–533–000.
Applicants: Arizona Public Service
Company.
PO 00000
Frm 00014
Fmt 4703
Sfmt 4703
Description: Arizona Public Service
Company submits Schedule No. 217—
Raceway—Exhibit B.RWY, Revision No.
6 to be effective 2/3/2014.
Filed Date: 12/4/13.
Accession Number: 20131204–5061.
Comments Due: 5 p.m. ET 12/26/13.
Docket Numbers: ER14–534–000.
Applicants: Arizona Public Service
Company.
Description: Arizona Public Service
Company submits Rate Schedule No.
217—Gila-Gila Valley—Exhibit
B.GLA.GLV, Revision No. 2 to be
effective 2/3/2014.
Filed Date: 12/4/13.
Accession Number: 20131204–5062.
Comments Due: 5 p.m. ET 12/26/13.
Docket Numbers: ER14–535–000.
Applicants: Alcoa Power Generating
Inc.
Description: Alcoa Power Generating
Inc. submits OATT Order Nos. 764 and
784 Compliance Filing to be effective
12/5/2013.
Filed Date: 12/4/13.
Accession Number: 20131204–5095.
Comments Due: 5 p.m. ET 12/26/13.
Take notice that the Commission
received the following electric
reliability filings:
Docket Numbers: RR13–9–002.
Applicants: North American Electric
Reliability Corporation.
Description: North American Electric
Reliability Corporation’s Filing of
Corrected Appendix 2 to its 2014
Business Plan and Budget under RR13–
9.
Filed Date: 12/3/13.
Accession Number: 20131203–5185.
Comments Due: 5 p.m. ET 12/24/13.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
E:\FR\FM\12DEN1.SGM
12DEN1
Federal Register / Vol. 78, No. 239 / Thursday, December 12, 2013 / Notices
Dated: December 4, 2013.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2013–29570 Filed 12–11–13; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. PF13–11–000]
maindgalligan on DSK5TPTVN1PROD with NOTICES
CE FLNG, LLC, CE Pipeline, LLC;
Notice of Intent To Prepare an
Environmental Impact Statement for
the Planned CE FLNG Project, Request
for Comments on Environmental
Issues, and Notice of Public Scoping
Meeting
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) will prepare an
environmental impact statement (EIS)
that will discuss the environmental
impacts of the CE FLNG Project
involving construction and operation of
liquefied natural gas (LNG) export, and
interstate natural gas transmission
pipeline facilities by CE FLNG, LLC and
CE Pipeline, LLC (collectively referred
to as CE FLNG) in Plaquemines Parish,
Louisiana. The Commission will use
this EIS in its decision-making process
to determine whether to authorize the
LNG facilities. The Commission will
also use this EIS to help determine
whether the pipeline facilities are in the
public convenience and necessity.
This notice announces the opening of
the scoping process the Commission
will use to gather input from the public
and interested agencies about the
project. Your input will help the
Commission’s staff determine what
issues need to be evaluated in the EIS.
Please note that the scoping period will
close on January 6, 2014.
Comments about the project may be
submitted in writing or verbally. The
Public Participation section of this
notice describes how to submit written
comments. Verbal comments can be
provided at the public scoping meeting
scheduled as follows: FERC Public
Scoping Meeting, CE FLNG Project,
Wednesday—December 18, 2013—6:00
p.m., Buras Auditorium, 35619 Highway
11, Buras, Louisiana 70041.
CE FLNG representatives will be
available at 5:30 p.m. to provide
information and answer questions about
the project.
This notice is being sent to the
Commission’s current environmental
mailing list for this project. State and
local government representatives should
notify their constituents of this project
VerDate Mar<15>2010
16:45 Dec 11, 2013
Jkt 232001
and encourage them to comment about
their concerns.
If you are a landowner receiving this
notice, a CE FLNG representative may
contact you about the acquisition of an
easement to construct, operate, and
maintain the natural gas transmission
pipeline facilities. The company would
seek to negotiate a mutually acceptable
agreement. However, if the Commission
approves the facilities, that approval
conveys with it the right of eminent
domain. Therefore, if easement
negotiations fail to produce an
agreement, a condemnation proceeding
could be initiated in a federal or state
court where compensation would be
determined in accordance with state
law.
The ‘‘For Citizens’’ section of the
FERC Web site (www.ferc.gov) provides
more information about the FERC, the
environmental review process, and
LNG. This section also includes
information about getting involved in
FERC jurisdictional projects, and a
citizens’ guide entitled ‘‘An Interstate
Natural Gas Facility On My Land? What
Do I Need to Know?’’ This guide
addresses a number of frequently-asked
questions including the use of eminent
domain and how to participate in the
Commission’s proceedings.
Summary of the Planned Project
CE FLNG plans to construct and
operate a LNG export terminal, and
approximately 37 miles of 42-inchdiameter natural gas transmission
pipeline in Plaquemines Parish,
Louisiana. The LNG terminal would be
located along the east bank of the
Mississippi River at approximately mile
marker 12.5, northeast of the
community of Venice. CE FLNG plans to
moor two self-propelled, natural gas
liquefaction, storage, and offloading
vessels at the terminal. The floating
LNG (FLNG) vessels would each be
about 1,100 feet long, 180 feet wide, and
extend up to 80 feet above the waterline.
The FLNG vessels would be capable of
producing up to 8 million tons per
annum of LNG and storing 250,000
cubic meters of LNG.
Approximately 80 to 130 LNG carriers
(LNGC), with cargo capacities ranging
from 125,000 to 170,000 cubic meters,
would call upon the terminal each year
during operation. CE FLNG plans to use
tug boats to maneuver the FLNG vessels
and LNGCs. During storm events, the
vessels could leave the terminal for the
Gulf of Mexico. A CE FLNG office
would be located at the Venice Port
Complex, and the tug boats would
operate out of that port.
The planned transmission pipeline
would connect the terminal to existing
PO 00000
Frm 00015
Fmt 4703
Sfmt 4703
75557
natural gas infrastructure facilities. The
northern terminus of the pipeline would
connect with a Tennessee Gas Pipeline
Company pipeline and the southern
pipeline terminus would connect with
the Targa Gas Plant and Gulf South
Pipeline Company, Texas Eastern
Transmission Company, and Columbia
Gulf Transmission pipelines.
The general locations of the planned
facilities are shown in Appendix 1.1
Land Requirements
Constructing the LNG terminal along
the east bank of the Mississippi River
would require dredging approximately
125 acres of wetlands/open water.
Additional lands and waters could be
impacted by the establishment of safety
zones for operation of the LNG terminal
and LNGCs calling on the terminal. Any
safety zones would be established by the
U.S. Coast Guard-New Orleans Sector
(Coast Guard) following a review of
safety and security issues. CE FLNG is
currently evaluating potential sites for
dredge material placement. Dredge
disposal would be authorized by the
U.S. Army Corps of Engineers–New
Orleans District (USACOE).
Constructing the pipeline would require
the temporary use of approximately 900
acres of wetland/open water, and the
permanent use of approximately 225
acres of wetland/open water to maintain
and operate the pipeline.
The EIS Process
The National Environmental Policy
Act (NEPA) requires the Commission to
take into account the environmental
impacts that could result from an action
whenever it considers the issuance of an
Order Granting Section 3 Authorization,
and a Certificate of Public Convenience
and Necessity under Section 7 of the
Natural Gas Act (NGA). The NEPA also
requires us 2 to discover and address
concerns the public may have about
proposals. This discovery process is
commonly referred to as scoping. The
main goal of the scoping process is to
focus the analysis in the EIS on the
important environmental issues. By this
notice, the Commission requests public
comments on the scope of the issues to
be addressed in the EIS. All comments
received will be considered during the
1 The appendices referenced in this notice will
not appear in the Federal Register. Copies of the
appendices were sent to all those receiving this
notice in the mail and are available at www.ferc.gov
using the ‘‘eLibrary’’ or from the Commission’s
Public Reference Room, 888 First Street NE.,
Washington, DC 20426, (202) 502–8371. For
instructions on using eLibrary, refer to the last page
of this notice.
2 ‘‘We’’, ‘‘us’’, and ‘‘our’’ refer to the
environmental staff of the Commission’s Office of
Energy Projects.
E:\FR\FM\12DEN1.SGM
12DEN1
Agencies
[Federal Register Volume 78, Number 239 (Thursday, December 12, 2013)]
[Notices]
[Pages 75555-75557]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-29570]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings 1
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER11-3697-000.
Applicants: Southern California Edison Company.
Description: Informational Filing of Formula Transmission Rate 2014
Annual Update of Southern California Edison Company.
Filed Date: 11/26/13.
Accession Number: 20131126-5195.
Comments Due: 5 p.m. ET 12/16/13.
Docket Numbers: ER13-298-002.
Applicants: New York Independent System Operator, Inc.
Description: NYISO compliance filing tariff revision on Market
Mitigation to be effective 9/25/2013.
Filed Date: 12/3/13.
Accession Number: 20131203-5137.
Comments Due: 5 p.m. ET 12/24/13.
Docket Numbers: ER13-1346-000.
Applicants: Mesa Wind Power Corporation.
Description: Mesa Wind Power Corporation submits Mesa Wind Refund
Report 12.4.2013 to be effective N/A.
Filed Date: 12/4/13.
Accession Number: 20131204-5049.
Comments Due: 5 p.m. ET 12/26/13.
Docket Numbers: ER14-206-002.
Applicants: Midcontinent Independent System Operator, Inc.
Description: 2013-12-03 Appendix A SOC Revs to be effective 12/28/
2013.
Filed Date: 12/3/13.
Accession Number: 20131203-5084.
Comments Due: 5 p.m. ET 12/24/13.
Docket Numbers: ER14-209-001.
Applicants: PowerOne Corporation.
Description: Amendment to MBR Application to be effective 11/28/
2013.
Filed Date: 12/3/13.
Accession Number: 20131203-5162.
Comments Due: 5 p.m. ET 12/24/13.
Docket Numbers: ER14-382-001.
Applicants: Cheyenne Light, Fuel and Power Company.
Description: Cheyenne Light, Fuel and Power Company submits Order
No. 764 Compliance Filing Amendment to be effective 12/4/2013.
Filed Date: 12/4/13.
Accession Number: 20131204-5069.
Comments Due: 5 p.m. ET 12/26/13.
Docket Numbers: ER14-517-000.
Applicants: Arizona Public Service Company.
Description: Amendment to APS RS No. 259, WAPA Bouse Switchyard
Construction Agreement to be effective 12/31/2013.
Filed Date: 12/3/13.
Accession Number: 20131203-5099.
Comments Due: 5 p.m. ET 12/24/13.
Docket Numbers: ER14-518-000.
Applicants: Powerex Corp.
Description: Amendment to Powerex FERC Rate Schedule No. 1 to be
effective 12/3/2013.
Filed Date: 12/3/13.
Accession Number: 20131203-5100.
Comments Due: 5 p.m. ET 12/24/13.
Docket Numbers: ER14-519-000.
Applicants: Astral Energy LLC.
Description: Astral Energy Market Based Rate Tariff to be effective
1/15/2014.
[[Page 75556]]
Filed Date: 12/3/13.
Accession Number: 20131203-5134.
Comments Due: 5 p.m. ET 12/24/13.
Docket Numbers: ER14-520-000.
Applicants: Ivanpah Master Holdings, LLC.
Description: Ivanpah Master Holdings, LLC submits Cancellation of
MBR Tariff to be effective 12/5/2013.
Filed Date: 12/4/13.
Accession Number: 20131204-5029.
Comments Due: 5 p.m. ET 12/26/13.
Docket Numbers: ER14-521-000.
Applicants: Southwest Power Pool, Inc.
Description: Southwest Power Pool, Inc. submits Service Agreement
Mass Cancellation Filing--Group 1 to be effective 12/1/2013.
Filed Date: 12/4/13.
Accession Number: 20131204-5035.
Comments Due: 5 p.m. ET 12/26/13.
Docket Numbers: ER14-522-000.
Applicants: Southwest Power Pool, Inc.
Description: Southwest Power Pool, Inc. submits Service Agreement
Mass Cancellation Filing--Group 2 to be effective 12/1/2013.
Filed Date: 12/4/13.
Accession Number: 20131204-5037.
Comments Due: 5 p.m. ET 12/26/13.
Docket Numbers: ER14-523-000.
Applicants: Southwest Power Pool, Inc.
Description: Southwest Power Pool, Inc. submits Service Agreement
Mass Cancellation Filing--Group 3 to be effective 12/1/2013.
Filed Date: 12/4/13.
Accession Number: 20131204-5041.
Comments Due: 5 p.m. ET 12/26/13.
Docket Numbers: ER14-524-000.
Applicants: Southwest Power Pool, Inc.
Description: Southwest Power Pool, Inc. submits Service Agreement
Mass Cancellation Filing--Group 4 to be effective 12/1/2013.
Filed Date: 12/4/13.
Accession Number: 20131204-5042.
Comments Due: 5 p.m. ET 12/26/13.
Docket Numbers: ER14-525-000.
Applicants: ISO New England Inc., New England Power Pool
Participants Committee.
Description: ISO New England Inc. submits Rev. Related to FA for
Non-Commercial Capacity in the FCM to be effective 3/28/2014.
Filed Date: 12/4/13.
Accession Number: 20131204-5045.
Comments Due: 5 p.m. ET 12/26/13.
Docket Numbers: ER14-526-000.
Applicants: Southwest Power Pool, Inc.
Description: Southwest Power Pool, Inc. submits Service Agreement
Mass Cancellation Filing--Group 5 to be effective 12/1/2013.
Filed Date: 12/4/13.
Accession Number: 20131204-5047.
Comments Due: 5 p.m. ET 12/26/13.
Docket Numbers: ER14-527-000.
Applicants: Green Current Solutions, LLC.
Description: Green Current Solutions, LLC submits Green Current
Solutions Market Based Rate Tariff to be effective 1/20/2014.
Filed Date: 12/4/13.
Accession Number: 20131204-5048.
Comments Due: 5 p.m. ET 12/26/13.
Docket Numbers: ER14-528-000.
Applicants: Southwest Power Pool, Inc.
Description: Southwest Power Pool, Inc. submits Service Agreement
Mass Cancellation Filing--Group 6 to be effective 12/1/2013.
Filed Date: 12/4/13.
Accession Number: 20131204-5050.
Comments Due: 5 p.m. ET 12/26/13.
Docket Numbers: ER14-529-000.
Applicants: Southwest Power Pool, Inc.
Description: Southwest Power Pool, Inc. submits Service Agreement
Mass Cancellation Filing--Group 7 to be effective 12/1/2013.
Filed Date: 12/4/13.
Accession Number: 20131204-5053.
Comments Due: 5 p.m. ET 12/26/13.
Docket Numbers: ER14-530-000.
Applicants: Southwest Power Pool, Inc.
Description: Southwest Power Pool, Inc. submits Service Agreement
Mass Cancellation Filing--Group 8 to be effective 12/1/2013.
Filed Date: 12/4/13.
Accession Number: 20131204-5054.
Comments Due: 5 p.m. ET 12/26/13.
Docket Numbers: ER14-531-000.
Applicants: Southwest Power Pool, Inc.
Description: Southwest Power Pool, Inc. submits Service Agreement
Mass Cancellation Filing--Group 9 to be effective 12/1/2013.
Filed Date: 12/4/13.
Accession Number: 20131204-5057.
Comments Due: 5 p.m. ET 12/26/13.
Docket Numbers: ER14-532-000.
Applicants: Southwest Power Pool, Inc.
Description: Southwest Power Pool, Inc. submits Service Agreement
Mass Cancellation Filing--Group 10 to be effective 12/1/2013.
Filed Date: 12/4/13.
Accession Number: 20131204-5060.
Comments Due: 5 p.m. ET 12/26/13.
Docket Numbers: ER14-533-000.
Applicants: Arizona Public Service Company.
Description: Arizona Public Service Company submits Schedule No.
217--Raceway--Exhibit B.RWY, Revision No. 6 to be effective 2/3/2014.
Filed Date: 12/4/13.
Accession Number: 20131204-5061.
Comments Due: 5 p.m. ET 12/26/13.
Docket Numbers: ER14-534-000.
Applicants: Arizona Public Service Company.
Description: Arizona Public Service Company submits Rate Schedule
No. 217--Gila-Gila Valley--Exhibit B.GLA.GLV, Revision No. 2 to be
effective 2/3/2014.
Filed Date: 12/4/13.
Accession Number: 20131204-5062.
Comments Due: 5 p.m. ET 12/26/13.
Docket Numbers: ER14-535-000.
Applicants: Alcoa Power Generating Inc.
Description: Alcoa Power Generating Inc. submits OATT Order Nos.
764 and 784 Compliance Filing to be effective 12/5/2013.
Filed Date: 12/4/13.
Accession Number: 20131204-5095.
Comments Due: 5 p.m. ET 12/26/13.
Take notice that the Commission received the following electric
reliability filings:
Docket Numbers: RR13-9-002.
Applicants: North American Electric Reliability Corporation.
Description: North American Electric Reliability Corporation's
Filing of Corrected Appendix 2 to its 2014 Business Plan and Budget
under RR13-9.
Filed Date: 12/3/13.
Accession Number: 20131203-5185.
Comments Due: 5 p.m. ET 12/24/13.
The filings are accessible in the Commission's eLibrary system by
clicking on the links or querying the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
[[Page 75557]]
Dated: December 4, 2013.
Nathaniel J. Davis, Sr.,
Deputy Secretary.