Oliver Hydro LLC; Notice of Application Ready for Environmental Analysis and Soliciting Comments, Recommendations, Terms and Conditions, and Prescriptions, 73853-73854 [2013-29328]
Download as PDF
Federal Register / Vol. 78, No. 236 / Monday, December 9, 2013 / Notices
conference facility to conduct a public
vote on the results of the Fiscal Year
2013 ‘‘Creating an Innovation Culture’’
Study. The ASB board members will
cast a vote to accept the results of this
study and record that vote for the record
according to the Army Science Board
Bylaws, Article VII, Section 2 and
Sunshine in the Government Act of
1976.
Committee’s Designated Federal
Officer (DFO)/Point of Contact: COL
William McLagan at (703) 545–8651 or
email: william.m.mclagan.mil@mail.mil
or Ms. Carolyn German at (703) 545–
8654 or email:
carolyn.t.german.civ@mail.mil.
SUPPLEMENTARY INFORMATION (Filing
Written Statement): Pursuant to 41 CFR
102–3.140d, the Committee is not
obligated to allow the public to speak;
however, interested persons may submit
a written statement for consideration by
the Subcommittees. Individuals
submitting a written statement must
submit their statement to the Designated
Federal Officer (DFO) at the address
listed below. Written statements not
received at least 10 calendar days prior
to the meeting may not be considered by
the Board prior to its scheduled
meeting.
The DFO will review all timely
submissions with the Board’s executive
committee and ensure they are provided
to the specific study members as
necessary before, during, or after the
meeting. After reviewing written
comments, the study chairs and the
DFO may choose to invite the submitter
of the comments to orally present their
issue during a future open meeting.
The DFO, in consultation with the
executive committee, may allot a
specific amount of time for members of
the public to present their issues for
discussion.
FOR FURTHER INFORMATION CONTACT:
Army Science Board, Designated
Federal Officer, 2530 Crystal Drive,
Suite 7098, Arlington,VA 22202.
Brenda S. Bowen,
Army Federal Register Liaison Officer.
maindgalligan on DSK5TPTVN1PROD with NOTICES
[FR Doc. 2013–29250 Filed 12–6–13; 8:45 am]
BILLING CODE 3710–08–P
VerDate Mar<15>2010
17:03 Dec 06, 2013
Jkt 232001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13005–003]
Oliver Hydro LLC; Notice of
Application Ready for Environmental
Analysis and Soliciting Comments,
Recommendations, Terms and
Conditions, and Prescriptions
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: Original Major
License.
b. Project No.: 13005–003.
c. Date filed: December 14, 2011.
d. Applicant: Oliver Hydro LLC.
e. Name of Project: William Bacon
Oliver Lock and Dam Hydroelectric
Project.
f. Location: At the U.S. Army Corps of
Engineers’ (Corps) William Bacon Oliver
Lock and Dam on the Black Warrior
River, in Tuscaloosa County, Alabama.
The project would occupy 8.7 acres of
United States lands administered by the
Corps’ Mobile District.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791(a)–825(r).
h. Applicant Contact: Vincent A.
Lamarra, Symbiotics LLC, 975 South
State Highway, Logan, UT 84321; (435)
752–2580; or email at
vincent.lamarra@symbioticsenergy.com.
i. FERC Contact: Michael Spencer at
(202) 502–8365, or via email at
michael.spencer@ferc.gov.
j. Deadline for filing comments,
recommendations, terms and
conditions, and prescriptions: 60 days
from the issuance date of this notice;
reply comments are due 105 days from
the issuance date of this notice.
The Commission strongly encourages
electronic filing. Please file comments,
recommendations, terms and
conditions, and prescriptions using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
The first page of any filing should
include docket number P–13005–003.
PO 00000
Frm 00038
Fmt 4703
Sfmt 4703
73853
The Commission’s Rules of Practice
require all intervenors filing documents
with the Commission to serve a copy of
that document on each person on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
k. This application has been accepted
and is now ready for environmental
analysis.
l. The proposed project would utilize
the Corps’ existing William Bacon
Oliver Lock and Dam, and would
consist of the following new facilities:
(1) A forebay; (2) an intake structure; (3)
a powerhouse containing two generating
units with a total capacity of 11.72
megawatts (MW); (4) a 150-foot-long, 68foot-wide tailrace; (5) a proposed 1.7mile-long, 25 kilovolt (kV) transmission
line; (6) a switchyard; and (7)
appurtenant facilities. The proposed
project would have an average annual
generation of 42.6 GWh, and operate in
a run-of-river mode utilizing surplus
water from the William Bacon Oliver
Lock and Dam, as directed by the Corps.
m. A copy of the application is
available for review at the Commission
in the Public Reference Room or may be
viewed on the Commission’s Web site at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, contact FERC
Online Support. A copy is also available
for inspection and reproduction at the
address in item h above.
All filings must (1) bear in all capital
letters the title ‘‘COMMENTS’’, ‘‘REPLY
COMMENTS’’,
‘‘RECOMMENDATIONS,’’ ‘‘TERMS
AND CONDITIONS,’’ or
‘‘PRESCRIPTIONS;’’ (2) set forth in the
heading the name of the applicant and
the project number of the application to
which the filing responds; (3) furnish
the name, address, and telephone
number of the person submitting the
filing; and (4) otherwise comply with
the requirements of 18 CFR 385.2001
through 385.2005. All comments,
recommendations, terms and conditions
or prescriptions must set forth their
evidentiary basis and otherwise comply
with the requirements of 18 CFR 4.34(b).
Agencies may obtain copies of the
application directly from the applicant.
Each filing must be accompanied by
proof of service on all persons listed on
the service list prepared by the
Commission in this proceeding, in
E:\FR\FM\09DEN1.SGM
09DEN1
73854
Federal Register / Vol. 78, No. 236 / Monday, December 9, 2013 / Notices
accordance with 18 CFR 4.34(b), and
385.2010.
You may also register online at
https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
n. Public notice of the filing of the
initial development application, which
has already been given, established the
due date for filing competing
applications or notices of intent. Under
the Commission’s regulations, any
competing development application
must be filed in response to and in
compliance with public notice of the
initial development application. No
competing applications or notices of
intent may be filed in response to this
notice.
o. A license applicant must file no
later than 60 days following the date of
issuance of this notice: (1) A copy of the
water quality certification; (2) a copy of
the request for certification, including
proof of the date on which the certifying
agency received the request; or (3)
evidence of waiver of water quality
certification.
Dated: December 2, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013–29328 Filed 12–6–13; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
maindgalligan on DSK5TPTVN1PROD with NOTICES
Combined Notice of Filings #1
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER10–2253–009.
Applicants: Astoria Energy LLC.
Description: Notice of Non-material
Change in Status of Astoria Energy LLC.
Filed Date: 11/27/13.
Accession Number: 20131127–5056.
Comments Due: 5 p.m. ET 12/18/13.
Docket Numbers: ER11–2447–001.
Applicants: Pacific Northwest
Generating Cooperative, Inc.
Description: Notice of change in status
of Pacific Northwest Generating
Cooperative, Inc.
Filed Date: 11/26/13.
Accession Number: 20131126–5189.
Comments Due: 5 p.m. ET 12/17/13.
Docket Numbers: ER14–97–000.
Applicants: Midcontinent
Independent System Operator, Inc.
VerDate Mar<15>2010
17:03 Dec 06, 2013
Jkt 232001
Description: Supplement to October
15, 2013 Midcontinent Independent
System Operator, Inc. tariff filing.
Filed Date: 11/25/13.
Accession Number: 20131125–5128.
Comments Due: 5 p.m. ET 12/9/13.
Docket Numbers: ER14–116–001.
Applicants: American Electric Power
Service Corporation, Ohio Power
Company, AEP Ohio Transmission
Company, Inc., PJM Interconnection,
L.L.C.
Description: AEP submits an
amendment to the 39th Revised Service
Agmt No. 1336 in ER14–116 to be
effective 9/19/2013.
Filed Date: 11/26/13.
Accession Number: 20131126–5163.
Comments Due: 5 p.m. ET 12/17/13.
Docket Numbers: ER14–161–001.
Applicants: American Electric Power
Service Corporation, AEP Indiana
Michigan Transmission Company,
Indiana Michigan Power Company,
Wabash Valley Power Association, Inc.,
PJM Interconnection, L.L.C.
Description: AEP submits an
Amendment to the 10th Revised
ILDSA–PJM SA No. 1262 in ER14–161
to be effective 4/11/2013.
Filed Date: 11/26/13.
Accession Number: 20131126–5176.
Comments Due: 5 p.m. ET 12/17/13.
Docket Numbers: ER14–172–000.
Applicants: ISO New England Inc.
Description: ISO New England Inc.
submits Supplement to Conforming
Filing to be effective N/A.
Filed Date: 11/27/13.
Accession Number: 20131127–5083.
Comments Due: 5 p.m. ET 12/18/13.
Docket Numbers: ER14–463–000.
Applicants: ISO New England Inc.
Description: Exigent Circumstances
Filing of Revisions to FCM Rules to be
effective 1/24/2014.
Filed Date: 11/25/13.
Accession Number: 20131125–5196.
Comments Due: 5 p.m. ET 12/16/13.
Docket Numbers: ER14–474–000.
Applicants: Sempra Generation.
Description: Sempra Generation LLC
Notice of Succession and MBR Tariff to
be effective 11/27/2013.
Filed Date: 11/26/13.
Accession Number: 20131126–5115.
Comments Due: 5 p.m. ET 12/17/13.
Docket Numbers: ER14–475–000.
Applicants: New York Independent
System Operator, Inc., Rochester Gas
and Electric Corporation
Description: LGIA between RG&E and
Allegany Generator, SA No. 2036 to be
effective 11/1/2013.
Filed Date: 11/26/13.
Accession Number: 20131126–5125.
Comments Due: 5 p.m. ET 12/17/13.
PO 00000
Frm 00039
Fmt 4703
Sfmt 4703
Docket Numbers: ER14–476–000.
Applicants: Portsmouth Genco, LLC.
Description: 2nd Rev MBR to be
effective 11/27/2013.
Filed Date: 11/26/13.
Accession Number: 20131126–5131.
Comments Due: 5 p.m. ET 12/17/13.
Docket Numbers: ER14–477–000.
Applicants: Red Oak Power, LLC.
Description: 2nd Rev MBR to be
effective 11/27/2013.
Filed Date: 11/26/13.
Accession Number: 20131126–5132.
Comments Due: 5 p.m. ET 12/17/13.
Docket Numbers: ER14–478–000.
Applicants: James River Genco, LLC.
Description: 2nd Revised MBR to be
effective 11/27/2013.
Filed Date: 11/26/13.
Accession Number: 20131126–5148.
Comments Due: 5 p.m. ET 12/17/13.
Docket Numbers: ER14–479–000.
Applicants: Great Bay Energy V, LLC.
Description: Baseline new to be
effective 12/1/2013.
Filed Date: 11/26/13.
Accession Number: 20131126–5150.
Comments Due: 5 p.m. ET 12/17/13.
Docket Numbers: ER14–480–000.
Applicants: California Independent
System Operator Corporation.
Description: 2013–11–26_
Order764MarketChanges to be effective
4/1/2014.
Filed Date: 11/26/13.
Accession Number: 20131126–5175.
Comments Due: 5 p.m. ET 12/17/13.
Docket Numbers: ER14–481–000.
Applicants: Duke Energy Carolinas,
LLC.
Description: Smoky Mountain IA
Filing to be effective 11/1/2013.
Filed Date: 11/27/13.
Accession Number: 20131127–5002.
Comments Due: 5 p.m. ET 12/18/13.
Docket Numbers: ER14–482–000.
Applicants: DTE Electric Company.
Description: DTE Electric Company
submits Revised Wholesale Distribution
Agreements to be effective 1/1/2014.
Filed Date: 11/27/13.
Accession Number: 20131127–5040.
Comments Due: 5 p.m. ET 12/18/13.
Docket Numbers: ER14–483–000.
Applicants: Niagara Mohawk Power
Corporation.
Description: Notice of Cancellation of
Grandfathered Network Integration
Transmission Service Agreement No.
118 of Niagara Mohawk Power
Corporation.
Filed Date: 11/26/13.
Accession Number: 20131126–5187.
Comments Due: 5 p.m. ET 12/17/13.
Docket Numbers: ER14–484–000.
Applicants: Niagara Mohawk Power
Corporation.
E:\FR\FM\09DEN1.SGM
09DEN1
Agencies
[Federal Register Volume 78, Number 236 (Monday, December 9, 2013)]
[Notices]
[Pages 73853-73854]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-29328]
=======================================================================
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 13005-003]
Oliver Hydro LLC; Notice of Application Ready for Environmental
Analysis and Soliciting Comments, Recommendations, Terms and
Conditions, and Prescriptions
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: Original Major License.
b. Project No.: 13005-003.
c. Date filed: December 14, 2011.
d. Applicant: Oliver Hydro LLC.
e. Name of Project: William Bacon Oliver Lock and Dam Hydroelectric
Project.
f. Location: At the U.S. Army Corps of Engineers' (Corps) William
Bacon Oliver Lock and Dam on the Black Warrior River, in Tuscaloosa
County, Alabama. The project would occupy 8.7 acres of United States
lands administered by the Corps' Mobile District.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r).
h. Applicant Contact: Vincent A. Lamarra, Symbiotics LLC, 975 South
State Highway, Logan, UT 84321; (435) 752-2580; or email at
vincent.lamarra@symbioticsenergy.com.
i. FERC Contact: Michael Spencer at (202) 502-8365, or via email at
michael.spencer@ferc.gov.
j. Deadline for filing comments, recommendations, terms and
conditions, and prescriptions: 60 days from the issuance date of this
notice; reply comments are due 105 days from the issuance date of this
notice.
The Commission strongly encourages electronic filing. Please file
comments, recommendations, terms and conditions, and prescriptions
using the Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000
characters, without prior registration, using the eComment system at
https://www.ferc.gov/docs-filing/ecomment.asp. You must include your
name and contact information at the end of your comments. For
assistance, please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to:
Secretary, Federal Energy Regulatory Commission, 888 First Street NE.,
Washington, DC 20426. The first page of any filing should include
docket number P-13005-003.
The Commission's Rules of Practice require all intervenors filing
documents with the Commission to serve a copy of that document on each
person on the official service list for the project. Further, if an
intervenor files comments or documents with the Commission relating to
the merits of an issue that may affect the responsibilities of a
particular resource agency, they must also serve a copy of the document
on that resource agency.
k. This application has been accepted and is now ready for
environmental analysis.
l. The proposed project would utilize the Corps' existing William
Bacon Oliver Lock and Dam, and would consist of the following new
facilities: (1) A forebay; (2) an intake structure; (3) a powerhouse
containing two generating units with a total capacity of 11.72
megawatts (MW); (4) a 150-foot-long, 68-foot-wide tailrace; (5) a
proposed 1.7-mile-long, 25 kilovolt (kV) transmission line; (6) a
switchyard; and (7) appurtenant facilities. The proposed project would
have an average annual generation of 42.6 GWh, and operate in a run-of-
river mode utilizing surplus water from the William Bacon Oliver Lock
and Dam, as directed by the Corps.
m. A copy of the application is available for review at the
Commission in the Public Reference Room or may be viewed on the
Commission's Web site at https://www.ferc.gov using the ``eLibrary''
link. Enter the docket number excluding the last three digits in the
docket number field to access the document. For assistance, contact
FERC Online Support. A copy is also available for inspection and
reproduction at the address in item h above.
All filings must (1) bear in all capital letters the title
``COMMENTS'', ``REPLY COMMENTS'', ``RECOMMENDATIONS,'' ``TERMS AND
CONDITIONS,'' or ``PRESCRIPTIONS;'' (2) set forth in the heading the
name of the applicant and the project number of the application to
which the filing responds; (3) furnish the name, address, and telephone
number of the person submitting the filing; and (4) otherwise comply
with the requirements of 18 CFR 385.2001 through 385.2005. All
comments, recommendations, terms and conditions or prescriptions must
set forth their evidentiary basis and otherwise comply with the
requirements of 18 CFR 4.34(b). Agencies may obtain copies of the
application directly from the applicant. Each filing must be
accompanied by proof of service on all persons listed on the service
list prepared by the Commission in this proceeding, in
[[Page 73854]]
accordance with 18 CFR 4.34(b), and 385.2010.
You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
n. Public notice of the filing of the initial development
application, which has already been given, established the due date for
filing competing applications or notices of intent. Under the
Commission's regulations, any competing development application must be
filed in response to and in compliance with public notice of the
initial development application. No competing applications or notices
of intent may be filed in response to this notice.
o. A license applicant must file no later than 60 days following
the date of issuance of this notice: (1) A copy of the water quality
certification; (2) a copy of the request for certification, including
proof of the date on which the certifying agency received the request;
or (3) evidence of waiver of water quality certification.
Dated: December 2, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013-29328 Filed 12-6-13; 8:45 am]
BILLING CODE 6717-01-P