Transcontinental Gas Pipe Line Company, LLC; Notice of Intent To Prepare an Environmental Assessment for the Proposed Woodbridge Delivery Lateral Project and Request for Comments on Environmental Issues, 71599-71601 [2013-28718]
Download as PDF
Federal Register / Vol. 78, No. 230 / Friday, November 29, 2013 / Notices
Posting Deadline to be effective
12/20/2013.
Filed Date: 11/19/13.
Accession Number: 20131119–5114.
Comments Due: 5 p.m. ET 12/2/13.
Docket Numbers: RP14–176–001.
Applicants: Saltville Gas Storage
Company L.L.C.
Description: Saltville Gas Storage
Company L.L.C. submits tariff filing per
154.205(b): Errata to Modification of
Posting Deadline to be effective
12/20/2013.
Filed Date: 11/19/13.
Accession Number: 20131119–5121.
Comments Due: 5 p.m. ET 12/2/13.
Any person desiring to protest in any
of the above proceedings must file in
accordance with Rule 211 of the
Commission’s Regulations (18 CFR
385.211) on or before 5:00 p.m. Eastern
time on the specified comment date.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: November 20, 2013.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2013–28631 Filed 11–27–13; 8:45 am]
BILLING CODE 6717–01–P
would be installed above-ground and a
4,000-foot-long temporary construction
access road would be used during
construction. In its amendment
application, the licensee proposes to
bury the entire penstock instead,
including the drilling and blasting of a
700-foot-long, 16-foot-diameter tunnel
through which a segment of the
penstock would be routed. In addition,
the licensee proposes changes to the
construction access roads. Staff
prepared an environmental assessment
(EA) which analyzes the potential
environmental effects of the proposed
amendment, and concludes that
amending the license, with appropriate
environmental protective measures,
would not constitute a major federal
action that would significantly affect the
quality of the human environment.
A copy of the EA may be viewed on
the Commission’s Web site at https://
www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P–13124) in
the docket number field to access the
document. You may also register online
at https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, call 1–866–208–3676 or
email FERCOnlineSupport@ferc.gov, for
TTY, call (202) 502–8659. A copy is also
available for inspection and
reproduction at the Commission’s
Public Reference Room located at 888
First Street NE., Room 2A, Washington,
DC 20426, or by calling (202) 502–8371.
DEPARTMENT OF ENERGY
Dated: November 20, 2013.
Kimberly D. Bose,
Secretary.
Federal Energy Regulatory
Commission
[FR Doc. 2013–28547 Filed 11–27–13; 8:45 am]
BILLING CODE 6717–01–P
[Project No. 13124–005]
DEPARTMENT OF ENERGY
sroberts on DSK5SPTVN1PROD with NOTICES
Copper Valley Electric Association,
Inc.; Notice of Availability of
Environmental Assessment
Federal Energy Regulatory
Commission
In accordance with the National
Environmental Policy Act of 1969 and
the Federal Energy Regulatory
Commission’s (Commission or FERC’s)
regulations, 18 Code of Federal
Regulations (CFR) Part 380 (Order No.
486, 52 Federal Register 47897), the
Office of Energy Projects has reviewed
Copper Valley Electric Association,
Inc.’s application to amend its license
for the Allison Creek Hydroelectric
Project (FERC Project No. 13124). The
6.5-megawatt project is located on
Allison Creek near Valdez, Alaska. The
project does not occupy any federal
lands.
As licensed, the majority of the
project’s 7,000-foot-long penstock
VerDate Mar<15>2010
17:56 Nov 27, 2013
Jkt 232001
Transcontinental Gas Pipe Line
Company, LLC; Notice of Intent To
Prepare an Environmental Assessment
for the Proposed Woodbridge Delivery
Lateral Project and Request for
Comments on Environmental Issues
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) will prepare an
environmental assessment (EA) that will
discuss the environmental impacts of
the Woodbridge Delivery Lateral Project
involving construction and operation of
facilities by Transcontinental Gas Pipe
Line Company, LLC (Transco) in
Frm 00039
Fmt 4703
Sfmt 4703
Middlesex County, New Jersey. The
Commission will use this EA in its
decision-making process to determine
whether the project is in the public
convenience and necessity.
This notice announces the opening of
the scoping process the Commission
will use to gather input from the public
and interested agencies on the project.
Your input will help the Commission
staff determine what issues they need to
evaluate in the EA. Please note that the
scoping period will close on December
23, 2013.
This notice is being sent to the
Commission’s current environmental
mailing list for this project. State and
local government representatives should
notify their constituents of this
proposed project and encourage them to
comment on their areas of concern.
If you are a landowner receiving this
notice, a pipeline company
representative may contact you about
the acquisition of an easement to
construct, operate, and maintain the
proposed facilities. The company would
seek to negotiate a mutually acceptable
agreement. However, if the Commission
approves the project, that approval
conveys with it the right of eminent
domain. Therefore, if easement
negotiations fail to produce an
agreement, the pipeline company could
initiate condemnation proceedings
where compensation would be
determined in accordance with state
law.
Transco provided landowners with a
fact sheet prepared by the FERC entitled
‘‘An Interstate Natural Gas Facility On
My Land? What Do I Need To Know?’’
This fact sheet addresses a number of
typically-asked questions, including the
use of eminent domain and how to
participate in the Commission’s
proceedings. It is also available for
viewing on the FERC Web site
(www.ferc.gov).
Summary of the Proposed Project
[Docket No. CP14–18–000]
PO 00000
71599
Transco proposes to construct and
operate approximately 2.4 miles of 20inch-diameter natural gas lateral
pipeline in Middlesex County, New
Jersey. In addition, a new meter station
and other appurtenant facilities are
proposed at the terminus of the project.
The Woodbridge Delivery Lateral
Project would provide 264,000
dekatherms per day of natural gas per
day to the Woodbridge Energy Center, a
new gas fired electric generating station.
The general location of the project
facilities is shown in appendix 1.1
1 The appendices referenced in this notice will
not appear in the Federal Register. Copies of
E:\FR\FM\29NON1.SGM
Continued
29NON1
71600
Federal Register / Vol. 78, No. 230 / Friday, November 29, 2013 / Notices
Land Requirements for Construction
Construction of the proposed facilities
would disturb about 40 acres of land for
the aboveground facilities and the
pipeline. Following construction,
Transco would maintain about 9.4 acres
for permanent operation of the project’s
facilities; the remaining acreage would
be restored and revert to former uses.
The EA Process
sroberts on DSK5SPTVN1PROD with NOTICES
The National Environmental Policy
Act (NEPA) requires the Commission to
take into account the environmental
impacts that could result from an action
whenever it considers the issuance of a
Certificate of Public Convenience and
Necessity. NEPA also requires us 2 to
discover and address concerns the
public may have about proposals. This
process is referred to as ‘‘scoping.’’ The
main goal of the scoping process is to
focus the analysis in the EA on the
important environmental issues. By this
notice, the Commission requests public
comments on the scope of the issues to
address in the EA. We will consider all
filed comments during the preparation
of the EA.
In the EA we will discuss impacts that
could occur as a result of the
construction and operation of the
proposed project under these general
headings:
• geology and soils;
• land use;
• water resources, fisheries, and
wetlands;
• cultural resources;
• vegetation and wildlife;
• air quality and noise;
• endangered and threatened species;
and
• public safety.
We will also evaluate reasonable
alternatives to the proposed project or
portions of the project, and make
recommendations on how to lessen or
avoid impacts on the various resource
areas.
The EA will present our independent
analysis of the issues. The EA will be
available in the public record through
eLibrary. Depending on the comments
received during the scoping process, we
may also publish and distribute the EA
to the public for an allotted comment
period. We will consider all comments
on the EA before making our
appendices were sent to all those receiving this
notice in the mail and are available at www.ferc.gov
using the link called ‘‘eLibrary’’ or from the
Commission’s Public Reference Room, 888 First
Street NE., Washington, DC 20426, or call (202)
502–8371. For instructions on connecting to
eLibrary, refer to the last page of this notice.
2 ‘‘We,’’ ‘‘us,’’ and ‘‘our’’ refer to the
environmental staff of the Commission’s Office of
Energy Projects.
VerDate Mar<15>2010
17:56 Nov 27, 2013
Jkt 232001
recommendations to the Commission.
To ensure we have the opportunity to
consider and address your comments,
please carefully follow the instructions
in the Public Participation section
beginning on page 4.
With this notice, we are asking
agencies with jurisdiction by law and/
or special expertise with respect to the
environmental issues of this project to
formally cooperate with us in the
preparation of the EA.3 Agencies that
would like to request cooperating
agency status should follow the
instructions for filing comments
provided under the Public Participation
section of this notice.
Consultations Under Section 106 of the
National Historic Preservation Act
In accordance with the Advisory
Council on Historic Preservation’s
implementing regulations for section
106 of the National Historic
Preservation Act, we are using this
notice to initiate consultation with the
applicable State Historic Preservation
Office (SHPO), and to solicit their views
and those of other government agencies,
interested Indian tribes, and the public
on the project’s potential effects on
historic properties.4 We will define the
project-specific Area of Potential Effects
(APE) in consultation with the SHPO as
the project develops. On natural gas
facility projects, the APE at a minimum
encompasses all areas subject to ground
disturbance (examples include
construction right-of-way, contractor/
pipe storage yards, compressor stations,
and access roads). Our EA for this
project will document our findings on
the impacts on historic properties and
summarize the status of consultations
under section 106.
Public Participation
You can make a difference by
providing us with your specific
comments or concerns about the project.
Your comments should focus on the
potential environmental effects,
reasonable alternatives, and measures to
avoid or lessen environmental impacts.
The more specific your comments, the
more useful they will be. To ensure that
your comments are timely and properly
recorded, please send your comments so
that the Commission receives them in
3 The Council on Environmental Quality
regulations addressing cooperating agency
responsibilities are at Title 40, Code of Federal
Regulations, Part 1501.6.
4 The Advisory Council on Historic Preservation’s
regulations are at Title 36, Code of Federal
Regulations, Part 800. Those regulations define
historic properties as any prehistoric or historic
district, site, building, structure, or object included
in or eligible for inclusion in the National Register
of Historic Places.
PO 00000
Frm 00040
Fmt 4703
Sfmt 4703
Washington, DC on or before December
23, 2013.
For your convenience, there are three
methods which you can use to submit
your comments to the Commission. In
all instances please reference the project
docket number (CP14–18–000) with
your submission. The Commission
encourages electronic filing of
comments and has expert staff available
to assist you at (202) 502–8258 or
efiling@ferc.gov.
(1) You can file your comments
electronically using the eComment
feature on the Commission’s Web site
(www.ferc.gov) under the link to
Documents and Filings. This is an easy
method for interested persons to submit
brief, text-only comments on a project;
(2) You can file your comments
electronically using the eFiling feature
on the Commission’s Web site
(www.ferc.gov) under the link to
Documents and Filings. With eFiling,
you can provide comments in a variety
of formats by attaching them as a file
with your submission. New eFiling
users must first create an account by
clicking on ‘‘eRegister.’’ You must select
the type of filing you are making. If you
are filing a comment on a particular
project, please select ‘‘Comment on a
Filing’’; or
(3) You can file a paper copy of your
comments by mailing them to the
following address: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 888 First Street NE., Room
1A, Washington, DC 20426.
Environmental Mailing List
The environmental mailing list
includes federal, state, and local
government representatives and
agencies; elected officials; Native
American Tribes; other interested
parties; and local libraries and
newspapers. This list also includes all
affected landowners (as defined in the
Commission’s regulations) who are
potential right-of-way grantors, whose
property may be used temporarily for
project purposes, or who own homes
within certain distances of aboveground
facilities, and anyone who submits
comments on the project. We will
update the environmental mailing list as
the analysis proceeds to ensure that we
send the information related to this
environmental review to all individuals,
organizations, and government entities
interested in and/or potentially affected
by the proposed project.
If we publish and distribute the EA,
copies will be sent to the environmental
mailing list for public review and
comment. If you would prefer to receive
a paper copy of the document instead of
the CD version or would like to remove
E:\FR\FM\29NON1.SGM
29NON1
Federal Register / Vol. 78, No. 230 / Friday, November 29, 2013 / Notices
your name from the mailing list, please
return the attached Information Request
(appendix 2).
Becoming an Intervenor
Additional Information
sroberts on DSK5SPTVN1PROD with NOTICES
Additional information about the
project is available from the
Commission’s Office of External Affairs,
at (866) 208–FERC, or on the FERC Web
site at www.ferc.gov using the
‘‘eLibrary’’ link. Click on the eLibrary
link, click on ‘‘General Search’’ and
enter the docket number, excluding the
last three digits in the Docket Number
field (i.e., CP14–18–000). Be sure you
have selected an appropriate date range.
For assistance, please contact FERC
Online Support at FercOnlineSupport@
ferc.gov or toll free at (866) 208–3676, or
for TTY, contact (202) 502–8659. The
eLibrary link also provides access to the
texts of formal documents issued by the
Commission, such as orders, notices,
and rulemakings.
In addition, the Commission now
offers a free service called eSubscription
which allows you to keep track of all
formal issuances and submittals in
specific dockets. This can reduce the
amount of time you spend researching
proceedings by automatically providing
you with notification of these filings,
document summaries, and direct links
to the documents. Go to www.ferc.gov/
esubscribenow.htm.
Finally, public meetings or site visits
will be posted on the Commission’s
calendar located at www.ferc.gov/
EventCalendar/EventsList.aspx along
with other related information.
Dated: November 22, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013–28718 Filed 11–27–13; 8:45 am]
BILLING CODE 6717–01–P
17:56 Nov 27, 2013
Federal Energy Regulatory
Commission
[Docket No. OR14–9–000]
In addition to involvement in the EA
scoping process, you may want to
become an ‘‘intervenor’’ which is an
official party to the Commission’s
proceeding. Intervenors play a more
formal role in the process and are able
to file briefs, appear at hearings, and be
heard by the courts if they choose to
appeal the Commission’s final ruling.
An intervenor formally participates in
the proceeding by filing a request to
intervene. Instructions for becoming an
intervenor are in the User’s Guide under
the ‘‘e-filing’’ link on the Commission’s
Web site.
VerDate Mar<15>2010
DEPARTMENT OF ENERGY
Jkt 232001
Shell Pipeline Company LP; Notice of
Petition for Declaratory Order
Take notice that on November 14,
2013, pursuant to Rule 207(a)(2) of the
Commission’s Rules of Practices and
Procedure, 18 CFR 385.207(a)(2)(2013),
Shell Pipeline Company LP (SPLC) filed
a petition requesting a declaratory order
approving SPLC’s proposed contract
rates and proposed service priority
rights and prorationing provisions for
shippers that have executed
Transportation Service Agreements in
accordance with the terms of the
recently concluded binding open
season, for SPLC’s proposed
transportation service from Nederland
and Port Neches, TX to St. James and
Clovelly, LA, and any other additional
further receipt or delivery points, as
explained more fully in the petition.
Any person desiring to intervene or to
protest in this proceedings must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Anyone filing a motion
to intervene or protest must serve a copy
of that document on the Petitioner.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with Internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 14 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First St. NE., Washington, DC
20426.
The filings in the above proceedings
are accessible in the Commission’s
eLibrary system by clicking on the
appropriate link in the above list. They
are also available for review in the
Commission’s Public Reference Room in
Washington, DC. There is an
eSubscription link on the Web site that
PO 00000
Frm 00041
Fmt 4703
Sfmt 4703
71601
enables subscribers to receive email
notification when a document is added
to a subscribed docket(s). For assistance
with any FERC Online service, please
email FERCOnlineSupport@ferc.gov. or
call (866) 208–3676 (toll free). For TTY,
call (202) 502–8659.
Comment Date: 5:00 p.m. Eastern time
on December 16, 2013.
Dated: November 20, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013–28545 Filed 11–27–13; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project Nos. 14521–001, 14561–000]
KC Small Hydro LLC; Advanced
Hydropower, Inc.; Notice of
Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Competing Applications
On May 13, 2013, KC Scoby LLC filed
an application for a preliminary permit,
pursuant to section 4(f) of the Federal
Power Act (FPA), and on October 30,
2013 filed for amendment of the
application, changing the applicant to
KC Small Hydro LLC. (KCS Hydro). On
November 5, 2013, Advanced
Hydropower, Inc. (Advanced Hydro)
filed a competing application for a
preliminary permit. Both applicants
propose to study the feasibility of a
hydropower project to be located at the
U.S. Army Corps of Engineers’ (Corps)
Falls Lake Dam on the Neuse River near
the town of Raleigh in Wake County,
North Carolina. The sole purpose of a
preliminary permit, if issued, is to grant
the permit holder priority to file a
license application during the permit
term. A preliminary permit does not
authorize the permit holder to perform
any land-disturbing activities or
otherwise enter upon lands or waters
owned by others without the owners’
express permission.
KCS Hydro’s proposed project would
consist of the following: (1) Two
turbine/generator units, with a total
capacity of 1,700 kilowatts (kW),
installed within the existing intake
tower; (2) an electrical control booth
constructed on top of the intake tower;
and (3) a 700-foot-long, 13.2 kilo-Volt
(kV) underground transmission line.
The proposed project would have an
average annual generation of 5,000
megawatt-hours (MWh), and operate as
directed by the Corps.
E:\FR\FM\29NON1.SGM
29NON1
Agencies
[Federal Register Volume 78, Number 230 (Friday, November 29, 2013)]
[Notices]
[Pages 71599-71601]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-28718]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP14-18-000]
Transcontinental Gas Pipe Line Company, LLC; Notice of Intent To
Prepare an Environmental Assessment for the Proposed Woodbridge
Delivery Lateral Project and Request for Comments on Environmental
Issues
The staff of the Federal Energy Regulatory Commission (FERC or
Commission) will prepare an environmental assessment (EA) that will
discuss the environmental impacts of the Woodbridge Delivery Lateral
Project involving construction and operation of facilities by
Transcontinental Gas Pipe Line Company, LLC (Transco) in Middlesex
County, New Jersey. The Commission will use this EA in its decision-
making process to determine whether the project is in the public
convenience and necessity.
This notice announces the opening of the scoping process the
Commission will use to gather input from the public and interested
agencies on the project. Your input will help the Commission staff
determine what issues they need to evaluate in the EA. Please note that
the scoping period will close on December 23, 2013.
This notice is being sent to the Commission's current environmental
mailing list for this project. State and local government
representatives should notify their constituents of this proposed
project and encourage them to comment on their areas of concern.
If you are a landowner receiving this notice, a pipeline company
representative may contact you about the acquisition of an easement to
construct, operate, and maintain the proposed facilities. The company
would seek to negotiate a mutually acceptable agreement. However, if
the Commission approves the project, that approval conveys with it the
right of eminent domain. Therefore, if easement negotiations fail to
produce an agreement, the pipeline company could initiate condemnation
proceedings where compensation would be determined in accordance with
state law.
Transco provided landowners with a fact sheet prepared by the FERC
entitled ``An Interstate Natural Gas Facility On My Land? What Do I
Need To Know?'' This fact sheet addresses a number of typically-asked
questions, including the use of eminent domain and how to participate
in the Commission's proceedings. It is also available for viewing on
the FERC Web site (www.ferc.gov).
Summary of the Proposed Project
Transco proposes to construct and operate approximately 2.4 miles
of 20-inch-diameter natural gas lateral pipeline in Middlesex County,
New Jersey. In addition, a new meter station and other appurtenant
facilities are proposed at the terminus of the project. The Woodbridge
Delivery Lateral Project would provide 264,000 dekatherms per day of
natural gas per day to the Woodbridge Energy Center, a new gas fired
electric generating station.
The general location of the project facilities is shown in appendix
1.\1\
---------------------------------------------------------------------------
\1\ The appendices referenced in this notice will not appear in
the Federal Register. Copies of appendices were sent to all those
receiving this notice in the mail and are available at www.ferc.gov
using the link called ``eLibrary'' or from the Commission's Public
Reference Room, 888 First Street NE., Washington, DC 20426, or call
(202) 502-8371. For instructions on connecting to eLibrary, refer to
the last page of this notice.
---------------------------------------------------------------------------
[[Page 71600]]
Land Requirements for Construction
Construction of the proposed facilities would disturb about 40
acres of land for the aboveground facilities and the pipeline.
Following construction, Transco would maintain about 9.4 acres for
permanent operation of the project's facilities; the remaining acreage
would be restored and revert to former uses.
The EA Process
The National Environmental Policy Act (NEPA) requires the
Commission to take into account the environmental impacts that could
result from an action whenever it considers the issuance of a
Certificate of Public Convenience and Necessity. NEPA also requires us
\2\ to discover and address concerns the public may have about
proposals. This process is referred to as ``scoping.'' The main goal of
the scoping process is to focus the analysis in the EA on the important
environmental issues. By this notice, the Commission requests public
comments on the scope of the issues to address in the EA. We will
consider all filed comments during the preparation of the EA.
---------------------------------------------------------------------------
\2\ ``We,'' ``us,'' and ``our'' refer to the environmental staff
of the Commission's Office of Energy Projects.
---------------------------------------------------------------------------
In the EA we will discuss impacts that could occur as a result of
the construction and operation of the proposed project under these
general headings:
geology and soils;
land use;
water resources, fisheries, and wetlands;
cultural resources;
vegetation and wildlife;
air quality and noise;
endangered and threatened species; and
public safety.
We will also evaluate reasonable alternatives to the proposed
project or portions of the project, and make recommendations on how to
lessen or avoid impacts on the various resource areas.
The EA will present our independent analysis of the issues. The EA
will be available in the public record through eLibrary. Depending on
the comments received during the scoping process, we may also publish
and distribute the EA to the public for an allotted comment period. We
will consider all comments on the EA before making our recommendations
to the Commission. To ensure we have the opportunity to consider and
address your comments, please carefully follow the instructions in the
Public Participation section beginning on page 4.
With this notice, we are asking agencies with jurisdiction by law
and/or special expertise with respect to the environmental issues of
this project to formally cooperate with us in the preparation of the
EA.\3\ Agencies that would like to request cooperating agency status
should follow the instructions for filing comments provided under the
Public Participation section of this notice.
---------------------------------------------------------------------------
\3\ The Council on Environmental Quality regulations addressing
cooperating agency responsibilities are at Title 40, Code of Federal
Regulations, Part 1501.6.
---------------------------------------------------------------------------
Consultations Under Section 106 of the National Historic Preservation
Act
In accordance with the Advisory Council on Historic Preservation's
implementing regulations for section 106 of the National Historic
Preservation Act, we are using this notice to initiate consultation
with the applicable State Historic Preservation Office (SHPO), and to
solicit their views and those of other government agencies, interested
Indian tribes, and the public on the project's potential effects on
historic properties.\4\ We will define the project-specific Area of
Potential Effects (APE) in consultation with the SHPO as the project
develops. On natural gas facility projects, the APE at a minimum
encompasses all areas subject to ground disturbance (examples include
construction right-of-way, contractor/pipe storage yards, compressor
stations, and access roads). Our EA for this project will document our
findings on the impacts on historic properties and summarize the status
of consultations under section 106.
---------------------------------------------------------------------------
\4\ The Advisory Council on Historic Preservation's regulations
are at Title 36, Code of Federal Regulations, Part 800. Those
regulations define historic properties as any prehistoric or
historic district, site, building, structure, or object included in
or eligible for inclusion in the National Register of Historic
Places.
---------------------------------------------------------------------------
Public Participation
You can make a difference by providing us with your specific
comments or concerns about the project. Your comments should focus on
the potential environmental effects, reasonable alternatives, and
measures to avoid or lessen environmental impacts. The more specific
your comments, the more useful they will be. To ensure that your
comments are timely and properly recorded, please send your comments so
that the Commission receives them in Washington, DC on or before
December 23, 2013.
For your convenience, there are three methods which you can use to
submit your comments to the Commission. In all instances please
reference the project docket number (CP14-18-000) with your submission.
The Commission encourages electronic filing of comments and has expert
staff available to assist you at (202) 502-8258 or efiling@ferc.gov.
(1) You can file your comments electronically using the eComment
feature on the Commission's Web site (www.ferc.gov) under the link to
Documents and Filings. This is an easy method for interested persons to
submit brief, text-only comments on a project;
(2) You can file your comments electronically using the eFiling
feature on the Commission's Web site (www.ferc.gov) under the link to
Documents and Filings. With eFiling, you can provide comments in a
variety of formats by attaching them as a file with your submission.
New eFiling users must first create an account by clicking on
``eRegister.'' You must select the type of filing you are making. If
you are filing a comment on a particular project, please select
``Comment on a Filing''; or
(3) You can file a paper copy of your comments by mailing them to
the following address: Kimberly D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street NE., Room 1A, Washington, DC
20426.
Environmental Mailing List
The environmental mailing list includes federal, state, and local
government representatives and agencies; elected officials; Native
American Tribes; other interested parties; and local libraries and
newspapers. This list also includes all affected landowners (as defined
in the Commission's regulations) who are potential right-of-way
grantors, whose property may be used temporarily for project purposes,
or who own homes within certain distances of aboveground facilities,
and anyone who submits comments on the project. We will update the
environmental mailing list as the analysis proceeds to ensure that we
send the information related to this environmental review to all
individuals, organizations, and government entities interested in and/
or potentially affected by the proposed project.
If we publish and distribute the EA, copies will be sent to the
environmental mailing list for public review and comment. If you would
prefer to receive a paper copy of the document instead of the CD
version or would like to remove
[[Page 71601]]
your name from the mailing list, please return the attached Information
Request (appendix 2).
Becoming an Intervenor
In addition to involvement in the EA scoping process, you may want
to become an ``intervenor'' which is an official party to the
Commission's proceeding. Intervenors play a more formal role in the
process and are able to file briefs, appear at hearings, and be heard
by the courts if they choose to appeal the Commission's final ruling.
An intervenor formally participates in the proceeding by filing a
request to intervene. Instructions for becoming an intervenor are in
the User's Guide under the ``e-filing'' link on the Commission's Web
site.
Additional Information
Additional information about the project is available from the
Commission's Office of External Affairs, at (866) 208-FERC, or on the
FERC Web site at www.ferc.gov using the ``eLibrary'' link. Click on the
eLibrary link, click on ``General Search'' and enter the docket number,
excluding the last three digits in the Docket Number field (i.e., CP14-
18-000). Be sure you have selected an appropriate date range. For
assistance, please contact FERC Online Support at
FercOnlineSupport@ferc.gov or toll free at (866) 208-3676, or for TTY,
contact (202) 502-8659. The eLibrary link also provides access to the
texts of formal documents issued by the Commission, such as orders,
notices, and rulemakings.
In addition, the Commission now offers a free service called
eSubscription which allows you to keep track of all formal issuances
and submittals in specific dockets. This can reduce the amount of time
you spend researching proceedings by automatically providing you with
notification of these filings, document summaries, and direct links to
the documents. Go to www.ferc.gov/esubscribenow.htm.
Finally, public meetings or site visits will be posted on the
Commission's calendar located at www.ferc.gov/EventCalendar/EventsList.aspx along with other related information.
Dated: November 22, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013-28718 Filed 11-27-13; 8:45 am]