Free Flow Power Missouri 2, LLC; Notice of Application Tendered for Filing With the Commission and Soliciting Additional Study Requests, 71592-71593 [2013-28541]
Download as PDF
sroberts on DSK5SPTVN1PROD with NOTICES
71592
Federal Register / Vol. 78, No. 230 / Friday, November 29, 2013 / Notices
480(c)(1)) is considered an independent
student for purposes of title IV, HEA
program assistance eligibility, and
therefore does not have to provide
parental income and asset information
to apply for title IV, HEA program
assistance. (20 U.S.C. 1087vv(d)(1)(D)).
3. Authority for Conducting the
Matching Program.
ED is authorized to participate in the
matching program under sections
480(c)(1) and 480(d)(1)(D) of the HEA
(20 U.S.C. 1087vv(c)(1) and (d)(1)(D)).
VA is authorized to participate in the
matching program under 38 U.S.C. 523.
4. Categories of Records and
Individuals Covered by the Match.
ED will provide the Social Security
number and other identifying
information of each applicant for
financial assistance under title IV of the
HEA who indicates veteran status. This
information will be disclosed from the
Federal Student Aid Application File
system of records (18–11–01), which
was most recently published in the
Federal Register on August 3, 2011 (74
FR 46774–46781). ED will disclose this
information to VA under routine use 14
of the system of records (18–11–01). ED
data will be matched against data in the
Veterans and Beneficiaries
Identification and Records Location
Subsystem—VA (38VA21) system of
records, under routine use 21, as added
to that system of records (38VA21) by a
notice published in the Federal Register
on June 4, 2001 (66 FR 30049–30050).
5. Effective Dates of the Matching
Program.
The matching program will be
effective on the latest of the following
three dates: (A) December 30, 2013; (B)
30 days from the date ED publishes a
Computer Matching Notice in the
Federal Register as required by 5 U.S.C.
552a(e)(12); or, (C) 40 days from the date
that ED transmits the report of the
matching program, as required by 5
U.S.C. 552a(r), to OMB, the U.S. House
Committee on Oversight and
Government Reform, and the U.S.
Senate Committee on Homeland
Security and Governmental Affairs,
unless OMB waives 10 or fewer days of
the 40-day review period for compelling
reasons, in which case 30 days plus
whatever number of days that OMB did
not waive from the date of ED’s
transmittal of the matching program
report.
6. Address for Receipt of Public
Comments or Inquiries.
Individuals wishing to comment on
this matching program or obtain
additional information about the
program, including requesting a copy of
the CMA between ED and VA, should
contact Ms. Marya Dennis, Management
VerDate Mar<15>2010
17:56 Nov 27, 2013
Jkt 232001
and Program Analyst, U.S. Department
of Education, Federal Student Aid,
Union Center Plaza, 830 First Street NE.,
Washington, DC 20202. Telephone:
(202) 377–3385. If you use a
telecommunications device for the deaf
(TDD) or a text telephone (TTY), call the
Federal Relay Service (FRS), toll free, at
1–800–877–8339.
Accessible Format: Individuals with
disabilities can obtain this document in
an accessible format (e.g., braille, large
print, audiotape, or compact disc) by
contacting the person listed in the
preceding paragraph.
Electronic Access to This Document:
The official version of this document is
the document published in the Federal
Register. Free Internet access to the
official edition of the Federal Register
and the Code of Federal Regulations is
available via the Federal Digital System
at: www.gpo.gov. At this site you can
view this document, as well as all other
documents of this Department
published in the Federal Register, in
text or Adobe Portable Document
Format (PDF). To use PDF you must
have Adobe Acrobat Reader, which is
available free at the site.
You may also access documents of the
Department published in the Federal
Register by using the article search
feature at: www.federalregister.gov.
Specifically through the advanced
search feature at this site, you can limit
your search to documents published by
the Department.
Dated: November 18, 2013.
James W. Runcie,
Chief Operating Officer, Federal Student Aid.
[FR Doc. 2013–28622 Filed 11–27–13; 8:45 am]
BILLING CODE 4000–01–P
DEPARTMENT OF ENERGY
National Coal Council
Department of Energy, Office of
Fossil Energy.
ACTION: Notice of renewal.
AGENCY:
Pursuant to Section
14(a)(2)(A) of the Federal Advisory
Committee Act, (Pub. L. 92–463), and in
accordance with Title 41 of the Code of
Federal Regulations, Section 102–3.65,
and following consultation with the
Committee Management Secretariat,
General Services Administration, notice
is hereby given that the National Coal
Council (NCC) will be renewed for a
two-year period.
The Committee will continue to
provide advice and recommendations to
the Secretary of Energy on general
policy matters relating to coal issues.
SUMMARY:
PO 00000
Frm 00032
Fmt 4703
Sfmt 4703
Additionally, the renewal of the
National Coal Council has been
determined to be essential to conduct
business of the Department of Energy
and to be in the public interest in
connection with the performance of
duties imposed upon the Department of
Energy by law and agreement. The
Committee will continue to operate in
accordance with the provisions of the
Federal Advisory Committee Act,
adhering to the rules and regulations in
implementation of that Act.
FOR FURTHER INFORMATION CONTACT: Dr.
Robert Wright at (202) 586–0429.
Issued in Washington, DC on November 22,
2013.
Carol A. Matthews,
Committee Management Officer.
[FR Doc. 2013–28683 Filed 11–27–13; 8:45 am]
BILLING CODE 6450–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13701–002]
Free Flow Power Missouri 2, LLC;
Notice of Application Tendered for
Filing With the Commission and
Soliciting Additional Study Requests
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: Major.
b. Project No.: P–13701–002.
c. Date filed: November 13, 2013.
d. Applicant: Free Flow Power
Missouri 2, LLC.
e. Name of Project: Sardis Lake
Hydroelectric Project.
f. Location: At the U.S. Army Corps of
Engineers’ (Corps) existing Sardis Lake
Dam, on the Little Tallahatchie River,
near the Town of Sardis, Panola County,
Mississippi. The proposed project
would occupy approximately 59 acres of
federal lands administered by the Corps.
g. Filed Pursuant to: Federal Power
Act 16 U.S.C. 791(a)–825(r).
h. Applicant Contact: Mr. Thomas
Feldman, Vice President of Project
Development, Free Flow Power
Corporation, 239 Causeway Street, Suite
300, Boston, MA 02114, (978) 283–2822.
i. FERC Contact: Patti Leppert, (202)
502–6034, patricia.leppert@ferc.gov.
j. Cooperating agencies: Federal, state,
local, and tribal agencies with
jurisdiction and/or special expertise
with respect to environmental issues
that wish to cooperate in the
preparation of the environmental
document should follow the
E:\FR\FM\29NON1.SGM
29NON1
sroberts on DSK5SPTVN1PROD with NOTICES
Federal Register / Vol. 78, No. 230 / Friday, November 29, 2013 / Notices
instructions for filing such requests
described in item l below. Cooperating
agencies should note the Commission’s
policy that agencies that cooperate in
the preparation of the environmental
document cannot also intervene. See, 94
FERC ¶ 61,076 (2001).
k. Pursuant to 18 CFR section
4.32(b)(7) of the Commission’s
regulations, if any resource agency,
Indian Tribe, or person believes that an
additional scientific study should be
conducted in order to form an adequate
factual basis for a complete analysis of
the application on its merit, the resource
agency, Indian Tribe, or person must file
a request for a study with the
Commission not later than 60 days from
the date of filing of the application, and
serve a copy of the request on the
applicant.
l. Deadline for filing additional study
requests and requests for cooperating
agency status: January 13, 2014.
The Commission strongly encourages
electronic filing. Please file additional
study requests and requests for
cooperating agency status using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp. For
assistance, please contact FERC Online
Support at FERCOnlineSupport@
ferc.gov, (866) 208–3676 (toll free), or
(202) 502–8659 (TTY). In lieu of
electronic filing, please send a paper
copy to: Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE., Washington, DC 20426. The first
page of any filing should include docket
number P–13701–002.
m. The application is not ready for
environmental analysis at this time.
n. The proposed project would utilize
the existing Corps’ Sardis Lake Dam and
Reservoir, and would consist of the
following new facilities: (1) A steel liner
installed within the existing concrete
outlet tunnel; (2) a steel-lined,
reinforced concrete bifurcation at the
end of the existing conduit dividing
flows between the existing stilling basin
and the powerhouse; (3) a 15.5-footdiameter, 250-foot-long steel penstock;
(4) a powerhouse with two generating
units having a total installed capacity of
14.6 megawatts; (5) a 200-foot-long
tailrace channel; (6) a 6,210-foot-long
transmission line; and (7) appurtenant
facilities.
o. A copy of the application is
available for review at the Commission
in the Public Reference Room or may be
viewed on the Commission’s Web site at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, contact FERC
Online Support. A copy is also available
VerDate Mar<15>2010
17:56 Nov 27, 2013
Jkt 232001
for inspection and reproduction at the
address in item h above.
You may also register online at
https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
p. With this notice, we are initiating
consultation with the Mississippi State
Historic Preservation Officer, as
required by section 106 of the National
Historic Preservation Act and the
regulations of the Advisory Council on
Historic Preservation, 36 CFR 800.4.
q. Procedural schedule: The
application will be processed according
to the following preliminary Hydro
Licensing Schedule. Revisions to the
schedule will be made as appropriate.
Issue Notice of Acceptance—March
2014.
Issue Scoping Document 1 for
comments—April 2014.
Comments on Scoping Document 1—
May 2014.
Issue Scoping Document 2 (if
necessary)—July 2014.
Issue notice of ready for
environmental analysis—July 2014.
Commission issues EA or draft EA—
January 2015.
Comments on EA or draft EA—
February 2015.
Commission issues final EA (if
necessary) April 2015.
Dated: November 21, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013–28541 Filed 11–27–13; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13702–002]
Free Flow Power Missouri 2, LLC;
Notice of Application Tendered for
Filing With the Commission and
Soliciting Additional Study Requests
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: Major.
b. Project No.: P–13702–002.
c. Date filed: November 13, 2013.
d. Applicant: Free Flow Power
Missouri 2, LLC.
e. Name of Project: Grenada Lake
Hydroelectric Project.
f. Location: At the U.S. Army Corps of
Engineers’ (Corps) existing Grenada
PO 00000
Frm 00033
Fmt 4703
Sfmt 4703
71593
Lake Dam, on the Yalobusha River, near
the Town of Grenada, Grenada County,
Mississippi. The proposed project
would occupy approximately 35.5 acres
of federal lands administered by the
Corps.
g. Filed Pursuant to: Federal Power
Act 16 U.S.C. 791(a)-825(r).
h. Applicant Contact: Mr. Thomas
Feldman, Vice President of Project
Development, Free Flow Power
Corporation, 239 Causeway Street, Suite
300, Boston, MA 02114, (978) 283–2822.
i. FERC Contact: Patti Leppert, (202)
502–6034, patricia.leppert@ferc.gov.
j. Cooperating Agencies: Federal,
state, local, and tribal agencies with
jurisdiction and/or special expertise
with respect to environmental issues
that wish to cooperate in the
preparation of the environmental
document should follow the
instructions for filing such requests
described in item l below. Cooperating
agencies should note the Commission’s
policy that agencies that cooperate in
the preparation of the environmental
document cannot also intervene. See, 94
FERC ¶ 61,076 (2001).
k. Pursuant to 18 CFR 4.32(b)(7) of the
Commission’s regulations, if any
resource agency, Indian Tribe, or person
believes that an additional scientific
study should be conducted in order to
form an adequate factual basis for a
complete analysis of the application on
its merit, the resource agency, Indian
Tribe, or person must file a request for
a study with the Commission not later
than 60 days from the date of filing of
the application, and serve a copy of the
request on the applicant.
l. Deadline for filing additional study
requests and requests for cooperating
agency status: January 13, 2014.
The Commission strongly encourages
electronic filing. Please file additional
study requests and requests for
cooperating agency status using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp. For
assistance, please contact FERC Online
Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
The first page of any filing should
include docket number P–13702–002.
m. The application is not ready for
environmental analysis at this time.
n. The proposed project would utilize
the existing Corps’ Grenada Lake Dam
and Reservoir, and would consist of the
following new facilities: (1) A steel liner
installed within the existing concrete
outlet tunnel; (2) a steel-lined,
E:\FR\FM\29NON1.SGM
29NON1
Agencies
[Federal Register Volume 78, Number 230 (Friday, November 29, 2013)]
[Notices]
[Pages 71592-71593]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-28541]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 13701-002]
Free Flow Power Missouri 2, LLC; Notice of Application Tendered
for Filing With the Commission and Soliciting Additional Study Requests
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: Major.
b. Project No.: P-13701-002.
c. Date filed: November 13, 2013.
d. Applicant: Free Flow Power Missouri 2, LLC.
e. Name of Project: Sardis Lake Hydroelectric Project.
f. Location: At the U.S. Army Corps of Engineers' (Corps) existing
Sardis Lake Dam, on the Little Tallahatchie River, near the Town of
Sardis, Panola County, Mississippi. The proposed project would occupy
approximately 59 acres of federal lands administered by the Corps.
g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)-825(r).
h. Applicant Contact: Mr. Thomas Feldman, Vice President of Project
Development, Free Flow Power Corporation, 239 Causeway Street, Suite
300, Boston, MA 02114, (978) 283-2822.
i. FERC Contact: Patti Leppert, (202) 502-6034,
patricia.leppert@ferc.gov.
j. Cooperating agencies: Federal, state, local, and tribal agencies
with jurisdiction and/or special expertise with respect to
environmental issues that wish to cooperate in the preparation of the
environmental document should follow the
[[Page 71593]]
instructions for filing such requests described in item l below.
Cooperating agencies should note the Commission's policy that agencies
that cooperate in the preparation of the environmental document cannot
also intervene. See, 94 FERC ] 61,076 (2001).
k. Pursuant to 18 CFR section 4.32(b)(7) of the Commission's
regulations, if any resource agency, Indian Tribe, or person believes
that an additional scientific study should be conducted in order to
form an adequate factual basis for a complete analysis of the
application on its merit, the resource agency, Indian Tribe, or person
must file a request for a study with the Commission not later than 60
days from the date of filing of the application, and serve a copy of
the request on the applicant.
l. Deadline for filing additional study requests and requests for
cooperating agency status: January 13, 2014.
The Commission strongly encourages electronic filing. Please file
additional study requests and requests for cooperating agency status
using the Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. For assistance, please contact FERC Online Support
at FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202)
502-8659 (TTY). In lieu of electronic filing, please send a paper copy
to: Secretary, Federal Energy Regulatory Commission, 888 First Street
NE., Washington, DC 20426. The first page of any filing should include
docket number P-13701-002.
m. The application is not ready for environmental analysis at this
time.
n. The proposed project would utilize the existing Corps' Sardis
Lake Dam and Reservoir, and would consist of the following new
facilities: (1) A steel liner installed within the existing concrete
outlet tunnel; (2) a steel-lined, reinforced concrete bifurcation at
the end of the existing conduit dividing flows between the existing
stilling basin and the powerhouse; (3) a 15.5-foot-diameter, 250-foot-
long steel penstock; (4) a powerhouse with two generating units having
a total installed capacity of 14.6 megawatts; (5) a 200-foot-long
tailrace channel; (6) a 6,210-foot-long transmission line; and (7)
appurtenant facilities.
o. A copy of the application is available for review at the
Commission in the Public Reference Room or may be viewed on the
Commission's Web site at https://www.ferc.gov using the ``eLibrary''
link. Enter the docket number excluding the last three digits in the
docket number field to access the document. For assistance, contact
FERC Online Support. A copy is also available for inspection and
reproduction at the address in item h above.
You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
p. With this notice, we are initiating consultation with the
Mississippi State Historic Preservation Officer, as required by section
106 of the National Historic Preservation Act and the regulations of
the Advisory Council on Historic Preservation, 36 CFR 800.4.
q. Procedural schedule: The application will be processed according
to the following preliminary Hydro Licensing Schedule. Revisions to the
schedule will be made as appropriate.
Issue Notice of Acceptance--March 2014.
Issue Scoping Document 1 for comments--April 2014.
Comments on Scoping Document 1--May 2014.
Issue Scoping Document 2 (if necessary)--July 2014.
Issue notice of ready for environmental analysis--July 2014.
Commission issues EA or draft EA--January 2015.
Comments on EA or draft EA--February 2015.
Commission issues final EA (if necessary) April 2015.
Dated: November 21, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013-28541 Filed 11-27-13; 8:45 am]