Notice of Appointments of Individuals to Serve as Members of Performance Review Boards, 70352 [2013-28153]
Download as PDF
70352
Federal Register / Vol. 78, No. 227 / Monday, November 25, 2013 / Notices
TABLE 1—TEST STANDARDS OSHA IS PROPOSING TO ADD TO THE NRTL PROGRAM’S LIST OF APPROPRIATE TEST
STANDARDS—Continued
Test standard
Test standard title
UL 60079–7 ...............
UL 60335–2–40 .........
Explosive Atmospheres—Part 7: Equipment Protection by Increased Safety ‘e’.
Household and Similar Electrical Appliances, Part 2: Particular Requirements for Electrical Heat Pumps, Air-Conditioners
and Dehumidifiers.
Automatic Electrical Controls for Household and Similar Use; Part 2 Particular Requirements for Thermal Motor Protectors.
Hand-Held Motor-Operated Electric Tools—Safety—Part 1: General Requirements.
Hand-Held Motor-Operated Electric Tools—Safety—Part 2–1: Particular Requirements for Drills and Impact Drills.
Hand-Held Motor-Operated Electric Tools—Safety—Part 2–13: Particular Requirements For Chain Saws.
Hand-Held Motor-Operated Electric Tools—Safety—Part 2–14: Particular Requirements for Planers.
Hand-Held Motor-Operated Electric Tools—Safety—Part 2–15: Particular Requirements for Hedge Trimmers.
Hand-Held Motor-Operated Electric Tools—Safety—Part 2–17: Particular Requirements for Routers and Trimmers.
Hand-Held Motor-Operated Electric Tools—Safety—Part 2–19: Particular Requirements For Jointers.
Hand-Held Motor-Operated Electric Tools—Safety—Part 2–21: Particular Requirements For Drain Cleaners.
Hand-Held Motor-Operated Electric Tools—Safety—Part 2–22: Particular Requirements For Cut-Off Machines.
Hand-Held Motor-Operated Electric Tools—Safety—Part 2–3: Particular Requirements for Grinders, Polishers and DiskType Sanders.
Hand-Held Motor-Operated Electric Tools—Safety—Part 2–5: Particular Requirements for Circular Saws.
Low Voltage Switchgear and Controlgear—Part 4–1: Contactors and Motor-starters-Electromechanical Contractors and
Motor-starters.
Low-voltage Switchgear and Controlgear—Part 5–2: Control Circuit Devices and Switching Elements—Proximity Switches.
Information Technology Equipment Safety—Part 1: General Requirements.
Information Technology Equipment—Safety—Part 21: Remote Power Feeding.
Information Technology Equipment Safety—Part 22: Equipment to be Installed Outdoors.
Information Technology Equipment Safety—Part 23: Large Data Storage Equipment.
Electrical Equipment for Measurement, Control, and Laboratory Use; Part 031: Safety Requirements for Hand-Held
Probe Assemblies for Electrical Measurement and Test.
Electrical Equipment for Measurement, Control, and Laboratory Use; Part 1: General Requirements.
Safety Requirements for Electrical Equipment for Measurement, Control, and Laboratory Use—Part 2–030: Particular
Requirements for Testing and Measuring Circuits.
Switches for Appliances—Part 1: General Requirements.
Adjustable Speed Electrical Power Drive Systems—Part 5–1: Safety Requirements—Electrical, Thermal and Energy.
Cable Management Systems—Cable Ties for Electrical Installations.
Audio/Video, Information and Communication Technology Equipment—Part 1: Safety Requirements.
UL 60730–2–2 ...........
UL
UL
UL
UL
UL
UL
UL
UL
UL
UL
60745–1 ...............
60745–2–1 ...........
60745–2–13 .........
60745–2–14 .........
60745–2–15 .........
60745–2–17 .........
60745–2–19 .........
60745–2–21 .........
60745–2–22 .........
60745–2–3 ...........
UL 60745–2–5 ...........
UL 60947–4–1A ........
UL 60947–5–2 ...........
UL
UL
UL
UL
UL
60950–1 ...............
60950–21 .............
60950–22 .............
60950–23 .............
61010–031 ...........
UL 61010–1 ...............
UL 61010–2–030 .......
UL
UL
UL
UL
61058–1 ...............
61800–5–1 ...........
62275 ...................
62368–1 ...............
V. Authority and Signature
David Michaels, Ph.D., MPH,
Assistant Secretary of Labor for
Occupational Safety and Health, 200
Constitution Avenue NW., Washington,
DC 20210, authorized the preparation of
this notice. Accordingly, the Agency is
issuing this notice pursuant to 29 U.S.C.
657(g)(2), Secretary of Labor’s Order No.
1–2012 (77 FR 3912, Jan. 25, 2012), and
29 CFR 1910.7.
Signed at Washington, DC, on November
19, 2013.
David Michaels,
Assistant Secretary of Labor for Occupational
Safety and Health.
[FR Doc. 2013–28093 Filed 11–22–13; 8:45 am]
sroberts on DSK5SPTVN1PROD with NOTICES
BILLING CODE 4510–26–P
NATIONAL LABOR RELATIONS
BOARD
Notice of Appointments of Individuals
to Serve as Members of Performance
Review Boards
AGENCY:
National Labor Relations
Board.
VerDate Mar<15>2010
19:31 Nov 22, 2013
The National Labor Relations
Board is issuing this notice that the
individuals whose names and position
titles appear below have been appointed
to serve as members of performance
review boards in the National Labor
Relations Board for the rating year
beginning October 1, 2012 and ending
September 30, 2013.
ACTION:
Jkt 232001
Gary
Shinners, Executive Secretary, National
Labor Relations Board, 1099 14th Street
NW., Washington, DC 20570, (202) 273–
3737 (this is not a toll-free number), 1–
866–315–6572 (TTY/TDD).
FOR FURTHER INFORMATION CONTACT:
By Direction of the Board.
William B. Cowen,
Solicitor.
[FR Doc. 2013–28153 Filed 11–22–13; 8:45 am]
Authority: 5 U.S.C. 4314(c)(4).
BILLING CODE 7545–01–P
Name and Title
Kathleen A. Nixon—Deputy Chief
Counsel to the Chairman
Gary W. Shinners—Executive Secretary
William B. Cowen—Solicitor
Robert Schiff—Executive Assistant to
the Chairman
Anne G. Purcell—Associate General
Counsel, Division of Operations
Management
Linda Dreeben—Deputy Associate
General Counsel, Division of
Enforcement Litigation
John H. Ferguson—Associate General
Counsel, Division of Enforcement
Litigation
Barry J. Kearney—Associate General
Counsel, Division of Advice
PO 00000
Frm 00096
Fmt 4703
Sfmt 4703
NEIGHBORHOOD REINVESTMENT
CORPORATION
Notice of Government in the Sunshine
Regular Board of Directors Meeting
3:30 p.m., Monday,
December 2, 2013.
PLACE: NeighborWorks America—
Gramlich Boardroom, 999 North Capitol
Street NE., Washington DC 20002.
STATUS: Open.
CONTACT PERSON: Jeffrey Bryson,
General Counsel/Secretary, (202) 760–
4101; jbryson@nw.org.
AGENDA:
TIME AND DATE:
E:\FR\FM\25NON1.SGM
25NON1
Agencies
[Federal Register Volume 78, Number 227 (Monday, November 25, 2013)]
[Notices]
[Page 70352]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-28153]
=======================================================================
-----------------------------------------------------------------------
NATIONAL LABOR RELATIONS BOARD
Notice of Appointments of Individuals to Serve as Members of
Performance Review Boards
AGENCY: National Labor Relations Board.
ACTION: The National Labor Relations Board is issuing this notice that
the individuals whose names and position titles appear below have been
appointed to serve as members of performance review boards in the
National Labor Relations Board for the rating year beginning October 1,
2012 and ending September 30, 2013.
-----------------------------------------------------------------------
Authority: 5 U.S.C. 4314(c)(4).
Name and Title
Kathleen A. Nixon--Deputy Chief Counsel to the Chairman
Gary W. Shinners--Executive Secretary
William B. Cowen--Solicitor
Robert Schiff--Executive Assistant to the Chairman
Anne G. Purcell--Associate General Counsel, Division of Operations
Management
Linda Dreeben--Deputy Associate General Counsel, Division of
Enforcement Litigation
John H. Ferguson--Associate General Counsel, Division of Enforcement
Litigation
Barry J. Kearney--Associate General Counsel, Division of Advice
FOR FURTHER INFORMATION CONTACT: Gary Shinners, Executive Secretary,
National Labor Relations Board, 1099 14th Street NW., Washington, DC
20570, (202) 273-3737 (this is not a toll-free number), 1-866-315-6572
(TTY/TDD).
By Direction of the Board.
William B. Cowen,
Solicitor.
[FR Doc. 2013-28153 Filed 11-22-13; 8:45 am]
BILLING CODE 7545-01-P