Notice of Effectiveness of Exempt Wholesale Generator Status, 69847 [2013-27955]
Download as PDF
Federal Register / Vol. 78, No. 225 / Thursday, November 21, 2013 / Notices
Commission, 888 First Street NE.,
Washington, DC 20426. This filing is
accessible on-line at https://www.ferc.gov
using the ‘‘eLibrary’’ link and is
available for review in the
Commission’s Public Reference Room in
Washington, DC. There is an
‘‘eSubscription’’ link on the Web site
that enables subscribers to receive email
notification when a document is added
to a subscribed docket(s). For assistance
with any FERC Online service, please
email FERCOnlineSupport@ferc.gov, or
call (866) 208–3676 (toll free). For TTY,
call (202) 502–8659.
Comment Date: 5:00 p.m. Eastern
Time on December 6, 2013.
Dated: November 15, 2013.
Kimberly D. Bose,
Secretary.
Merlin One, LLC ..................
Goal Line L.P. ......................
RE Columbia 3 LLC .............
RE Columbia, LLC ...............
RE Yakima LLC ....................
Allegany Generating Station
LLC ...................................
EG13–51–000
EG13–52–000
EG13–53–000
EG13–54–000
EG13–55–000
EG13–56–000
Take notice that during the month of
October 2013, the status of the abovecaptioned entities as Exempt Wholesale
Generators became effective by
operation of the Commission’s
regulations. 18 CFR 366.7(a).
Dated: November 15, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013–27955 Filed 11–20–13; 8:45 am]
BILLING CODE 6717–01–P
[FR Doc. 2013–27953 Filed 11–20–13; 8:45 am]
DEPARTMENT OF ENERGY
BILLING CODE 6717–01–P
Federal Energy Regulatory
Commission
DEPARTMENT OF ENERGY
[Docket No. CD14–10–000]
Federal Energy Regulatory
Commission
Notice of Effectiveness of Exempt
Wholesale Generator Status
Buffalo Dunes Wind Project,
LLC ...................................
Whitetail Wind Energy, LLC
North Side Canal Company; Notice of
Preliminary Determination of a
Qualifying Conduit Hydropower
Facility and Soliciting Comments and
Motions To Intervene
On November 5, 2013, North Side
Canal Company, filed a notice of intent
EG13–49–000
EG13–50–000
69847
to construct a qualifying conduit
hydropower facility, pursuant to section
30 of the Federal Power Act, as
amended by section 4 of the
Hydropower Regulatory Efficiency Act
of 2013 (HREA). The Head of U Canal
Hydro Project would be located along
North Side Canal Company’s irrigation
system on the U Canal in Jerome
County, Idaho.
Applicant Contact: Alan W. Hansten,
Manager, North Side Canal Company,
Ltd., 921 North Lincoln, Jerome, ID
83338, Phone No. (208) 324–2319.
FERC Contact: Christopher Chaney,
Phone No. (202) 502–6778, email:
christopher.chaney@ferc.gov.
Qualifying Conduit Hydropower
Facility Description: The proposed
project would consist of: (1) A proposed
30-foot-long by 30-foot-wide control
building; (2) eight proposed siphon
turbine/generating units, each with a
capacity of 150 kilowatts, for a total
installed capacity of 1,200 kilowatts;
and (3) appurtenant facilities. The
proposed project would have an
estimated annual generating capacity of
4,200 megawatt-hours.
A qualifying conduit hydropower
facility is one that is determined or
deemed to meet all of the criteria shown
in the table below.
TABLE 1—CRITERIA FOR QUALIFYING CONDUIT HYDROPOWER FACILITY
Statutory provision
Description
Satisfies
(Y/N)
FPA 30(a)(3)(A), as amended by HREA ..
The conduit the facility uses is a tunnel, canal, pipeline, aqueduct, flume, ditch, or
similar manmade water conveyance that is operated for the distribution of water
for agricultural, municipal, or industrial consumption and not primarily for the generation of electricity.
The facility is constructed, operated, or maintained for the generation of electric
power and uses for such generation only the hydroelectric potential of a non-federally owned conduit.
The facility has an installed capacity that does not exceed 5 megawatts ..................
Y
FPA 30(a)(3)(C)(i), as amended by HREA
tkelley on DSK3SPTVN1PROD with NOTICES
FPA 30(a)(3)(C)(ii), as amended
HREA.
FPA 30(a)(3)(C)(iii), as amended
HREA.
by
by
On or before August 9, 2013, the facility is not licensed, or exempted from the licensing requirements of Part I of the FPA.
Preliminary Determination: Based
upon the above criteria, Commission
staff preliminarily determines that the
proposal satisfies the requirements for a
qualifying conduit hydropower facility
not required to be licensed or exempted
from licensing.
Comments and Motions To Intervene:
Deadline for filing comments contesting
whether the facility meets the qualifying
criteria is 45 days from the issuance
date of this notice.
Deadline for filing motions to
intervene is 30 days from the issuance
date of this notice.
Anyone may submit comments or a
motion to intervene in accordance with
VerDate Mar<15>2010
17:17 Nov 20, 2013
Jkt 232001
the requirements of Rules of Practice
and Procedure, 18 CFR 385.210 and
385.214. Any motions to intervene must
be received on or before the specified
deadline date for the particular
proceeding.
Filing and Service of Responsive
Documents: All filings must (1) bear in
all capital letters the ‘‘COMMENTS
CONTESTING QUALIFICATION FOR A
CONDUIT HYDROPOWER FACILITY’’
or ‘‘MOTION TO INTERVENE,’’ as
applicable; (2) state in the heading the
name of the applicant and the project
number of the application to which the
filing responds; (3) state the name,
address, and telephone number of the
PO 00000
Frm 00034
Fmt 4703
Sfmt 4703
Y
Y
Y
person filing; and (4) otherwise comply
with the requirements of sections
385.2001 through 385.2005 of the
Commission’s regulations.1 All
comments contesting Commission staff’s
preliminary determination that the
facility meets the qualifying criteria
must set forth their evidentiary basis.
The Commission strongly encourages
electronic filing. Please file motions to
intervene and comments using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
1 18
E:\FR\FM\21NON1.SGM
CFR 385.2001–2005 (2013).
21NON1
Agencies
[Federal Register Volume 78, Number 225 (Thursday, November 21, 2013)]
[Notices]
[Page 69847]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-27955]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Notice of Effectiveness of Exempt Wholesale Generator Status
Buffalo Dunes Wind Project, LLC......................... EG13-49-000
Whitetail Wind Energy, LLC.............................. EG13-50-000
Merlin One, LLC......................................... EG13-51-000
Goal Line L.P........................................... EG13-52-000
RE Columbia 3 LLC....................................... EG13-53-000
RE Columbia, LLC........................................ EG13-54-000
RE Yakima LLC........................................... EG13-55-000
Allegany Generating Station LLC......................... EG13-56-000
Take notice that during the month of October 2013, the status of
the above-captioned entities as Exempt Wholesale Generators became
effective by operation of the Commission's regulations. 18 CFR
366.7(a).
Dated: November 15, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013-27955 Filed 11-20-13; 8:45 am]
BILLING CODE 6717-01-P