Notice of Effectiveness of Exempt Wholesale Generator Status, 69847 [2013-27955]

Download as PDF Federal Register / Vol. 78, No. 225 / Thursday, November 21, 2013 / Notices Commission, 888 First Street NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5:00 p.m. Eastern Time on December 6, 2013. Dated: November 15, 2013. Kimberly D. Bose, Secretary. Merlin One, LLC .................. Goal Line L.P. ...................... RE Columbia 3 LLC ............. RE Columbia, LLC ............... RE Yakima LLC .................... Allegany Generating Station LLC ................................... EG13–51–000 EG13–52–000 EG13–53–000 EG13–54–000 EG13–55–000 EG13–56–000 Take notice that during the month of October 2013, the status of the abovecaptioned entities as Exempt Wholesale Generators became effective by operation of the Commission’s regulations. 18 CFR 366.7(a). Dated: November 15, 2013. Kimberly D. Bose, Secretary. [FR Doc. 2013–27955 Filed 11–20–13; 8:45 am] BILLING CODE 6717–01–P [FR Doc. 2013–27953 Filed 11–20–13; 8:45 am] DEPARTMENT OF ENERGY BILLING CODE 6717–01–P Federal Energy Regulatory Commission DEPARTMENT OF ENERGY [Docket No. CD14–10–000] Federal Energy Regulatory Commission Notice of Effectiveness of Exempt Wholesale Generator Status Buffalo Dunes Wind Project, LLC ................................... Whitetail Wind Energy, LLC North Side Canal Company; Notice of Preliminary Determination of a Qualifying Conduit Hydropower Facility and Soliciting Comments and Motions To Intervene On November 5, 2013, North Side Canal Company, filed a notice of intent EG13–49–000 EG13–50–000 69847 to construct a qualifying conduit hydropower facility, pursuant to section 30 of the Federal Power Act, as amended by section 4 of the Hydropower Regulatory Efficiency Act of 2013 (HREA). The Head of U Canal Hydro Project would be located along North Side Canal Company’s irrigation system on the U Canal in Jerome County, Idaho. Applicant Contact: Alan W. Hansten, Manager, North Side Canal Company, Ltd., 921 North Lincoln, Jerome, ID 83338, Phone No. (208) 324–2319. FERC Contact: Christopher Chaney, Phone No. (202) 502–6778, email: christopher.chaney@ferc.gov. Qualifying Conduit Hydropower Facility Description: The proposed project would consist of: (1) A proposed 30-foot-long by 30-foot-wide control building; (2) eight proposed siphon turbine/generating units, each with a capacity of 150 kilowatts, for a total installed capacity of 1,200 kilowatts; and (3) appurtenant facilities. The proposed project would have an estimated annual generating capacity of 4,200 megawatt-hours. A qualifying conduit hydropower facility is one that is determined or deemed to meet all of the criteria shown in the table below. TABLE 1—CRITERIA FOR QUALIFYING CONDUIT HYDROPOWER FACILITY Statutory provision Description Satisfies (Y/N) FPA 30(a)(3)(A), as amended by HREA .. The conduit the facility uses is a tunnel, canal, pipeline, aqueduct, flume, ditch, or similar manmade water conveyance that is operated for the distribution of water for agricultural, municipal, or industrial consumption and not primarily for the generation of electricity. The facility is constructed, operated, or maintained for the generation of electric power and uses for such generation only the hydroelectric potential of a non-federally owned conduit. The facility has an installed capacity that does not exceed 5 megawatts .................. Y FPA 30(a)(3)(C)(i), as amended by HREA tkelley on DSK3SPTVN1PROD with NOTICES FPA 30(a)(3)(C)(ii), as amended HREA. FPA 30(a)(3)(C)(iii), as amended HREA. by by On or before August 9, 2013, the facility is not licensed, or exempted from the licensing requirements of Part I of the FPA. Preliminary Determination: Based upon the above criteria, Commission staff preliminarily determines that the proposal satisfies the requirements for a qualifying conduit hydropower facility not required to be licensed or exempted from licensing. Comments and Motions To Intervene: Deadline for filing comments contesting whether the facility meets the qualifying criteria is 45 days from the issuance date of this notice. Deadline for filing motions to intervene is 30 days from the issuance date of this notice. Anyone may submit comments or a motion to intervene in accordance with VerDate Mar<15>2010 17:17 Nov 20, 2013 Jkt 232001 the requirements of Rules of Practice and Procedure, 18 CFR 385.210 and 385.214. Any motions to intervene must be received on or before the specified deadline date for the particular proceeding. Filing and Service of Responsive Documents: All filings must (1) bear in all capital letters the ‘‘COMMENTS CONTESTING QUALIFICATION FOR A CONDUIT HYDROPOWER FACILITY’’ or ‘‘MOTION TO INTERVENE,’’ as applicable; (2) state in the heading the name of the applicant and the project number of the application to which the filing responds; (3) state the name, address, and telephone number of the PO 00000 Frm 00034 Fmt 4703 Sfmt 4703 Y Y Y person filing; and (4) otherwise comply with the requirements of sections 385.2001 through 385.2005 of the Commission’s regulations.1 All comments contesting Commission staff’s preliminary determination that the facility meets the qualifying criteria must set forth their evidentiary basis. The Commission strongly encourages electronic filing. Please file motions to intervene and comments using the Commission’s eFiling system at https:// www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior 1 18 E:\FR\FM\21NON1.SGM CFR 385.2001–2005 (2013). 21NON1

Agencies

[Federal Register Volume 78, Number 225 (Thursday, November 21, 2013)]
[Notices]
[Page 69847]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-27955]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Notice of Effectiveness of Exempt Wholesale Generator Status

Buffalo Dunes Wind Project, LLC.........................     EG13-49-000
Whitetail Wind Energy, LLC..............................     EG13-50-000
Merlin One, LLC.........................................     EG13-51-000
Goal Line L.P...........................................     EG13-52-000
RE Columbia 3 LLC.......................................     EG13-53-000
RE Columbia, LLC........................................     EG13-54-000
RE Yakima LLC...........................................     EG13-55-000
Allegany Generating Station LLC.........................     EG13-56-000
 

    Take notice that during the month of October 2013, the status of 
the above-captioned entities as Exempt Wholesale Generators became 
effective by operation of the Commission's regulations. 18 CFR 
366.7(a).

    Dated: November 15, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013-27955 Filed 11-20-13; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.