Transcontinental Gas Pipe Line Company, LLC; Notice of Application, 69846-69847 [2013-27953]

Download as PDF tkelley on DSK3SPTVN1PROD with NOTICES 69846 Federal Register / Vol. 78, No. 225 / Thursday, November 21, 2013 / Notices 7 copies of filings made with the Commission and must mail a copy to the applicant and to every other party in the proceeding. Only parties to the proceeding can ask for court review of Commission orders in the proceeding. However, a person does not have to intervene in order to have comments considered. The second way to participate is by filing with the Secretary of the Commission, as soon as possible, an original and two copies of comments in support of or in opposition to this project. The Commission will consider these comments in determining the appropriate action to be taken, but the filing of a comment alone will not serve to make the filer a party to the proceeding. The Commission’s rules require that persons filing comments in opposition to the project provide copies of their protests only to the party or parties directly involved in the protest. Persons who wish to comment only on the environmental review of this project should submit an original and two copies of their comments to the Secretary of the Commission. Environmental commentors will be placed on the Commission’s environmental mailing list, will receive copies of the environmental documents, and will be notified of meetings associated with the Commission’s environmental review process. Environmental commentors will not be required to serve copies of filed documents on all other parties. However, the non-party commentors will not receive copies of all documents filed by other parties or issued by the Commission (except for the mailing of environmental documents issued by the Commission) and will not have the right to seek court review of the Commission’s final order. The Commission strongly encourages electronic filings of comments, protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https:// www.ferc.gov. Persons unable to file electronically should submit an original and 7 copies of the protest or intervention to the Federal Energy regulatory Commission, 888 First Street NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov, or call VerDate Mar<15>2010 17:17 Nov 20, 2013 Jkt 232001 (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: December 6, 2013. Dated: November 15, 2013. Kimberly D. Bose, Secretary. [FR Doc. 2013–27952 Filed 11–20–13; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP14–18–000] Transcontinental Gas Pipe Line Company, LLC; Notice of Application On November 7, 2013, Transcontinental Gas Pipe Line Company, LLC (Transco) filed with the Federal Energy Regulatory Commission (Commission) an application under section 7 of the Natural Gas Act to construct and operate its Woodbridge Delivery Lateral Project (Project), a new delivery lateral extending 2.4 miles from an interconnection with Transco’s mainline to the CPV Shore, LLC’s Woodbridge Energy Center electric generating station. The delivery lateral and generating station are in Middlesex County, New Jersey. The Project will enable Transco to provide 264,000 dekatherms per day of incremental firm natural gas transportation service to CPV Shore, LLC under Transco’s Rate Schedule FDLS, all as more fully set forth in the application which is on file with the Commission and open to public inspection. The filing may also be viewed on the web at https:// www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, please contact FERC Online Support at FERCOnlineSupport@ ferc.gov or toll free at (866) 208–3676, or TTY, contact (202) 502–8659. Questions regarding this application may be directed to Marg Camardello, Team Leader, Rates & Regulatory at Transcontinental Gas Pipe Line Company, LLC, P.O. Box 1396, Houston, Texas 77251 or by calling 713–215– 3380. In addition, 866–455–9103 may be called toll-free or email-mail addressed to PipelineExpansion@williams.com. Pursuant to section 157.9 of the Commission’s rules, 18 CFR 157.9, within 90 days of this Notice the Commission staff will either: Complete its environmental assessment (EA) and place it into the Commission’s public record (eLibrary) for this proceeding; or issue a Notice of Schedule for PO 00000 Frm 00033 Fmt 4703 Sfmt 4703 Environmental Review. If a Notice of Schedule for Environmental Review is issued, it will indicate, among other milestones, the anticipated date for the Commission staff’s issuance of the final environmental impact statement (FEIS) or EA for this proposal. The filing of the EA in the Commission’s public record for this proceeding or the issuance of a Notice of Schedule for Environmental Review will serve to notify federal and state agencies of the timing for the completion of all necessary reviews, and the subsequent need to complete all federal authorizations within 90 days of the date of issuance of the Commission staff’s FEIS or EA. There are two ways to become involved in the Commission’s review of this project. First, any person wishing to obtain legal status by becoming a party to the proceedings for this project should, on or before the comment date stated below, file with the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426, a motion to intervene in accordance with the requirements of the Commission’s Rules of Practice and Procedure (18 CFR 385.214 or 385.211) and the Regulations under the NGA (18 CFR 157.10). A person obtaining party status will be placed on the service list maintained by the Secretary of the Commission and will receive copies of all documents filed by the applicant and by all other parties. A party must submit seven copies of filings made with the Commission and must mail a copy to the applicant and to every other party in the proceeding. Only parties to the proceeding can ask for court review of Commission orders in the proceeding. However, a person does not have to intervene in order to have comments considered. The second way to participate is by filing with the Secretary of the Commission, as soon as possible, an original and two copies of comments in support of or in opposition to this project. The Commission will consider these comments in determining the appropriate action to be taken, but the filing of a comment alone will not serve to make the filer a party to the proceeding. The Commission’s rules require that persons filing comments in opposition to the project provide copies of their protests only to the party or parties directly involved in the protest. The Commission strongly encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and seven copies of the protest or intervention to the Federal Energy Regulatory E:\FR\FM\21NON1.SGM 21NON1 Federal Register / Vol. 78, No. 225 / Thursday, November 21, 2013 / Notices Commission, 888 First Street NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5:00 p.m. Eastern Time on December 6, 2013. Dated: November 15, 2013. Kimberly D. Bose, Secretary. Merlin One, LLC .................. Goal Line L.P. ...................... RE Columbia 3 LLC ............. RE Columbia, LLC ............... RE Yakima LLC .................... Allegany Generating Station LLC ................................... EG13–51–000 EG13–52–000 EG13–53–000 EG13–54–000 EG13–55–000 EG13–56–000 Take notice that during the month of October 2013, the status of the abovecaptioned entities as Exempt Wholesale Generators became effective by operation of the Commission’s regulations. 18 CFR 366.7(a). Dated: November 15, 2013. Kimberly D. Bose, Secretary. [FR Doc. 2013–27955 Filed 11–20–13; 8:45 am] BILLING CODE 6717–01–P [FR Doc. 2013–27953 Filed 11–20–13; 8:45 am] DEPARTMENT OF ENERGY BILLING CODE 6717–01–P Federal Energy Regulatory Commission DEPARTMENT OF ENERGY [Docket No. CD14–10–000] Federal Energy Regulatory Commission Notice of Effectiveness of Exempt Wholesale Generator Status Buffalo Dunes Wind Project, LLC ................................... Whitetail Wind Energy, LLC North Side Canal Company; Notice of Preliminary Determination of a Qualifying Conduit Hydropower Facility and Soliciting Comments and Motions To Intervene On November 5, 2013, North Side Canal Company, filed a notice of intent EG13–49–000 EG13–50–000 69847 to construct a qualifying conduit hydropower facility, pursuant to section 30 of the Federal Power Act, as amended by section 4 of the Hydropower Regulatory Efficiency Act of 2013 (HREA). The Head of U Canal Hydro Project would be located along North Side Canal Company’s irrigation system on the U Canal in Jerome County, Idaho. Applicant Contact: Alan W. Hansten, Manager, North Side Canal Company, Ltd., 921 North Lincoln, Jerome, ID 83338, Phone No. (208) 324–2319. FERC Contact: Christopher Chaney, Phone No. (202) 502–6778, email: christopher.chaney@ferc.gov. Qualifying Conduit Hydropower Facility Description: The proposed project would consist of: (1) A proposed 30-foot-long by 30-foot-wide control building; (2) eight proposed siphon turbine/generating units, each with a capacity of 150 kilowatts, for a total installed capacity of 1,200 kilowatts; and (3) appurtenant facilities. The proposed project would have an estimated annual generating capacity of 4,200 megawatt-hours. A qualifying conduit hydropower facility is one that is determined or deemed to meet all of the criteria shown in the table below. TABLE 1—CRITERIA FOR QUALIFYING CONDUIT HYDROPOWER FACILITY Statutory provision Description Satisfies (Y/N) FPA 30(a)(3)(A), as amended by HREA .. The conduit the facility uses is a tunnel, canal, pipeline, aqueduct, flume, ditch, or similar manmade water conveyance that is operated for the distribution of water for agricultural, municipal, or industrial consumption and not primarily for the generation of electricity. The facility is constructed, operated, or maintained for the generation of electric power and uses for such generation only the hydroelectric potential of a non-federally owned conduit. The facility has an installed capacity that does not exceed 5 megawatts .................. Y FPA 30(a)(3)(C)(i), as amended by HREA tkelley on DSK3SPTVN1PROD with NOTICES FPA 30(a)(3)(C)(ii), as amended HREA. FPA 30(a)(3)(C)(iii), as amended HREA. by by On or before August 9, 2013, the facility is not licensed, or exempted from the licensing requirements of Part I of the FPA. Preliminary Determination: Based upon the above criteria, Commission staff preliminarily determines that the proposal satisfies the requirements for a qualifying conduit hydropower facility not required to be licensed or exempted from licensing. Comments and Motions To Intervene: Deadline for filing comments contesting whether the facility meets the qualifying criteria is 45 days from the issuance date of this notice. Deadline for filing motions to intervene is 30 days from the issuance date of this notice. Anyone may submit comments or a motion to intervene in accordance with VerDate Mar<15>2010 17:17 Nov 20, 2013 Jkt 232001 the requirements of Rules of Practice and Procedure, 18 CFR 385.210 and 385.214. Any motions to intervene must be received on or before the specified deadline date for the particular proceeding. Filing and Service of Responsive Documents: All filings must (1) bear in all capital letters the ‘‘COMMENTS CONTESTING QUALIFICATION FOR A CONDUIT HYDROPOWER FACILITY’’ or ‘‘MOTION TO INTERVENE,’’ as applicable; (2) state in the heading the name of the applicant and the project number of the application to which the filing responds; (3) state the name, address, and telephone number of the PO 00000 Frm 00034 Fmt 4703 Sfmt 4703 Y Y Y person filing; and (4) otherwise comply with the requirements of sections 385.2001 through 385.2005 of the Commission’s regulations.1 All comments contesting Commission staff’s preliminary determination that the facility meets the qualifying criteria must set forth their evidentiary basis. The Commission strongly encourages electronic filing. Please file motions to intervene and comments using the Commission’s eFiling system at https:// www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior 1 18 E:\FR\FM\21NON1.SGM CFR 385.2001–2005 (2013). 21NON1

Agencies

[Federal Register Volume 78, Number 225 (Thursday, November 21, 2013)]
[Notices]
[Pages 69846-69847]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-27953]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP14-18-000]


Transcontinental Gas Pipe Line Company, LLC; Notice of 
Application

    On November 7, 2013, Transcontinental Gas Pipe Line Company, LLC 
(Transco) filed with the Federal Energy Regulatory Commission 
(Commission) an application under section 7 of the Natural Gas Act to 
construct and operate its Woodbridge Delivery Lateral Project 
(Project), a new delivery lateral extending 2.4 miles from an 
interconnection with Transco's mainline to the CPV Shore, LLC's 
Woodbridge Energy Center electric generating station. The delivery 
lateral and generating station are in Middlesex County, New Jersey. The 
Project will enable Transco to provide 264,000 dekatherms per day of 
incremental firm natural gas transportation service to CPV Shore, LLC 
under Transco's Rate Schedule FDLS, all as more fully set forth in the 
application which is on file with the Commission and open to public 
inspection. The filing may also be viewed on the web at https://www.ferc.gov using the ``eLibrary'' link. Enter the docket number 
excluding the last three digits in the docket number field to access 
the document. For assistance, please contact FERC Online Support at 
FERCOnlineSupport@ferc.gov or toll free at (866) 208-3676, or TTY, 
contact (202) 502-8659.
    Questions regarding this application may be directed to Marg 
Camardello, Team Leader, Rates & Regulatory at Transcontinental Gas 
Pipe Line Company, LLC, P.O. Box 1396, Houston, Texas 77251 or by 
calling 713-215-3380. In addition, 866-455-9103 may be called toll-free 
or email-mail addressed to PipelineExpansion@williams.com.
    Pursuant to section 157.9 of the Commission's rules, 18 CFR 157.9, 
within 90 days of this Notice the Commission staff will either: 
Complete its environmental assessment (EA) and place it into the 
Commission's public record (eLibrary) for this proceeding; or issue a 
Notice of Schedule for Environmental Review. If a Notice of Schedule 
for Environmental Review is issued, it will indicate, among other 
milestones, the anticipated date for the Commission staff's issuance of 
the final environmental impact statement (FEIS) or EA for this 
proposal. The filing of the EA in the Commission's public record for 
this proceeding or the issuance of a Notice of Schedule for 
Environmental Review will serve to notify federal and state agencies of 
the timing for the completion of all necessary reviews, and the 
subsequent need to complete all federal authorizations within 90 days 
of the date of issuance of the Commission staff's FEIS or EA.
    There are two ways to become involved in the Commission's review of 
this project. First, any person wishing to obtain legal status by 
becoming a party to the proceedings for this project should, on or 
before the comment date stated below, file with the Federal Energy 
Regulatory Commission, 888 First Street NE., Washington, DC 20426, a 
motion to intervene in accordance with the requirements of the 
Commission's Rules of Practice and Procedure (18 CFR 385.214 or 
385.211) and the Regulations under the NGA (18 CFR 157.10). A person 
obtaining party status will be placed on the service list maintained by 
the Secretary of the Commission and will receive copies of all 
documents filed by the applicant and by all other parties. A party must 
submit seven copies of filings made with the Commission and must mail a 
copy to the applicant and to every other party in the proceeding. Only 
parties to the proceeding can ask for court review of Commission orders 
in the proceeding.
    However, a person does not have to intervene in order to have 
comments considered. The second way to participate is by filing with 
the Secretary of the Commission, as soon as possible, an original and 
two copies of comments in support of or in opposition to this project. 
The Commission will consider these comments in determining the 
appropriate action to be taken, but the filing of a comment alone will 
not serve to make the filer a party to the proceeding. The Commission's 
rules require that persons filing comments in opposition to the project 
provide copies of their protests only to the party or parties directly 
involved in the protest.
    The Commission strongly encourages electronic submission of 
protests and interventions in lieu of paper using the ``eFiling'' link 
at https://www.ferc.gov. Persons unable to file electronically should 
submit an original and seven copies of the protest or intervention to 
the Federal Energy Regulatory

[[Page 69847]]

Commission, 888 First Street NE., Washington, DC 20426. This filing is 
accessible on-line at https://www.ferc.gov using the ``eLibrary'' link 
and is available for review in the Commission's Public Reference Room 
in Washington, DC. There is an ``eSubscription'' link on the Web site 
that enables subscribers to receive email notification when a document 
is added to a subscribed docket(s). For assistance with any FERC Online 
service, please email FERCOnlineSupport@ferc.gov, or call (866) 208-
3676 (toll free). For TTY, call (202) 502-8659.
    Comment Date: 5:00 p.m. Eastern Time on December 6, 2013.

    Dated: November 15, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013-27953 Filed 11-20-13; 8:45 am]
BILLING CODE 6717-01-P