Transcontinental Gas Pipe Line Company, LLC; Notice of Application, 69846-69847 [2013-27953]
Download as PDF
tkelley on DSK3SPTVN1PROD with NOTICES
69846
Federal Register / Vol. 78, No. 225 / Thursday, November 21, 2013 / Notices
7 copies of filings made with the
Commission and must mail a copy to
the applicant and to every other party in
the proceeding. Only parties to the
proceeding can ask for court review of
Commission orders in the proceeding.
However, a person does not have to
intervene in order to have comments
considered. The second way to
participate is by filing with the
Secretary of the Commission, as soon as
possible, an original and two copies of
comments in support of or in opposition
to this project. The Commission will
consider these comments in
determining the appropriate action to be
taken, but the filing of a comment alone
will not serve to make the filer a party
to the proceeding. The Commission’s
rules require that persons filing
comments in opposition to the project
provide copies of their protests only to
the party or parties directly involved in
the protest.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commentors will be
placed on the Commission’s
environmental mailing list, will receive
copies of the environmental documents,
and will be notified of meetings
associated with the Commission’s
environmental review process.
Environmental commentors will not be
required to serve copies of filed
documents on all other parties.
However, the non-party commentors
will not receive copies of all documents
filed by other parties or issued by the
Commission (except for the mailing of
environmental documents issued by the
Commission) and will not have the right
to seek court review of the
Commission’s final order.
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the ‘‘eFiling’’ link at https://
www.ferc.gov. Persons unable to file
electronically should submit an original
and 7 copies of the protest or
intervention to the Federal Energy
regulatory Commission, 888 First Street
NE., Washington, DC 20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
VerDate Mar<15>2010
17:17 Nov 20, 2013
Jkt 232001
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: December 6, 2013.
Dated: November 15, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013–27952 Filed 11–20–13; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP14–18–000]
Transcontinental Gas Pipe Line
Company, LLC; Notice of Application
On November 7, 2013,
Transcontinental Gas Pipe Line
Company, LLC (Transco) filed with the
Federal Energy Regulatory Commission
(Commission) an application under
section 7 of the Natural Gas Act to
construct and operate its Woodbridge
Delivery Lateral Project (Project), a new
delivery lateral extending 2.4 miles from
an interconnection with Transco’s
mainline to the CPV Shore, LLC’s
Woodbridge Energy Center electric
generating station. The delivery lateral
and generating station are in Middlesex
County, New Jersey. The Project will
enable Transco to provide 264,000
dekatherms per day of incremental firm
natural gas transportation service to
CPV Shore, LLC under Transco’s Rate
Schedule FDLS, all as more fully set
forth in the application which is on file
with the Commission and open to
public inspection. The filing may also
be viewed on the web at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, please contact FERC Online
Support at FERCOnlineSupport@
ferc.gov or toll free at (866) 208–3676, or
TTY, contact (202) 502–8659.
Questions regarding this application
may be directed to Marg Camardello,
Team Leader, Rates & Regulatory at
Transcontinental Gas Pipe Line
Company, LLC, P.O. Box 1396, Houston,
Texas 77251 or by calling 713–215–
3380. In addition, 866–455–9103 may be
called toll-free or email-mail addressed
to PipelineExpansion@williams.com.
Pursuant to section 157.9 of the
Commission’s rules, 18 CFR 157.9,
within 90 days of this Notice the
Commission staff will either: Complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding; or
issue a Notice of Schedule for
PO 00000
Frm 00033
Fmt 4703
Sfmt 4703
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or EA for this proposal. The filing of the
EA in the Commission’s public record
for this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s FEIS or EA.
There are two ways to become
involved in the Commission’s review of
this project. First, any person wishing to
obtain legal status by becoming a party
to the proceedings for this project
should, on or before the comment date
stated below, file with the Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426,
a motion to intervene in accordance
with the requirements of the
Commission’s Rules of Practice and
Procedure (18 CFR 385.214 or 385.211)
and the Regulations under the NGA (18
CFR 157.10). A person obtaining party
status will be placed on the service list
maintained by the Secretary of the
Commission and will receive copies of
all documents filed by the applicant and
by all other parties. A party must submit
seven copies of filings made with the
Commission and must mail a copy to
the applicant and to every other party in
the proceeding. Only parties to the
proceeding can ask for court review of
Commission orders in the proceeding.
However, a person does not have to
intervene in order to have comments
considered. The second way to
participate is by filing with the
Secretary of the Commission, as soon as
possible, an original and two copies of
comments in support of or in opposition
to this project. The Commission will
consider these comments in
determining the appropriate action to be
taken, but the filing of a comment alone
will not serve to make the filer a party
to the proceeding. The Commission’s
rules require that persons filing
comments in opposition to the project
provide copies of their protests only to
the party or parties directly involved in
the protest.
The Commission strongly encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and seven
copies of the protest or intervention to
the Federal Energy Regulatory
E:\FR\FM\21NON1.SGM
21NON1
Federal Register / Vol. 78, No. 225 / Thursday, November 21, 2013 / Notices
Commission, 888 First Street NE.,
Washington, DC 20426. This filing is
accessible on-line at https://www.ferc.gov
using the ‘‘eLibrary’’ link and is
available for review in the
Commission’s Public Reference Room in
Washington, DC. There is an
‘‘eSubscription’’ link on the Web site
that enables subscribers to receive email
notification when a document is added
to a subscribed docket(s). For assistance
with any FERC Online service, please
email FERCOnlineSupport@ferc.gov, or
call (866) 208–3676 (toll free). For TTY,
call (202) 502–8659.
Comment Date: 5:00 p.m. Eastern
Time on December 6, 2013.
Dated: November 15, 2013.
Kimberly D. Bose,
Secretary.
Merlin One, LLC ..................
Goal Line L.P. ......................
RE Columbia 3 LLC .............
RE Columbia, LLC ...............
RE Yakima LLC ....................
Allegany Generating Station
LLC ...................................
EG13–51–000
EG13–52–000
EG13–53–000
EG13–54–000
EG13–55–000
EG13–56–000
Take notice that during the month of
October 2013, the status of the abovecaptioned entities as Exempt Wholesale
Generators became effective by
operation of the Commission’s
regulations. 18 CFR 366.7(a).
Dated: November 15, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013–27955 Filed 11–20–13; 8:45 am]
BILLING CODE 6717–01–P
[FR Doc. 2013–27953 Filed 11–20–13; 8:45 am]
DEPARTMENT OF ENERGY
BILLING CODE 6717–01–P
Federal Energy Regulatory
Commission
DEPARTMENT OF ENERGY
[Docket No. CD14–10–000]
Federal Energy Regulatory
Commission
Notice of Effectiveness of Exempt
Wholesale Generator Status
Buffalo Dunes Wind Project,
LLC ...................................
Whitetail Wind Energy, LLC
North Side Canal Company; Notice of
Preliminary Determination of a
Qualifying Conduit Hydropower
Facility and Soliciting Comments and
Motions To Intervene
On November 5, 2013, North Side
Canal Company, filed a notice of intent
EG13–49–000
EG13–50–000
69847
to construct a qualifying conduit
hydropower facility, pursuant to section
30 of the Federal Power Act, as
amended by section 4 of the
Hydropower Regulatory Efficiency Act
of 2013 (HREA). The Head of U Canal
Hydro Project would be located along
North Side Canal Company’s irrigation
system on the U Canal in Jerome
County, Idaho.
Applicant Contact: Alan W. Hansten,
Manager, North Side Canal Company,
Ltd., 921 North Lincoln, Jerome, ID
83338, Phone No. (208) 324–2319.
FERC Contact: Christopher Chaney,
Phone No. (202) 502–6778, email:
christopher.chaney@ferc.gov.
Qualifying Conduit Hydropower
Facility Description: The proposed
project would consist of: (1) A proposed
30-foot-long by 30-foot-wide control
building; (2) eight proposed siphon
turbine/generating units, each with a
capacity of 150 kilowatts, for a total
installed capacity of 1,200 kilowatts;
and (3) appurtenant facilities. The
proposed project would have an
estimated annual generating capacity of
4,200 megawatt-hours.
A qualifying conduit hydropower
facility is one that is determined or
deemed to meet all of the criteria shown
in the table below.
TABLE 1—CRITERIA FOR QUALIFYING CONDUIT HYDROPOWER FACILITY
Statutory provision
Description
Satisfies
(Y/N)
FPA 30(a)(3)(A), as amended by HREA ..
The conduit the facility uses is a tunnel, canal, pipeline, aqueduct, flume, ditch, or
similar manmade water conveyance that is operated for the distribution of water
for agricultural, municipal, or industrial consumption and not primarily for the generation of electricity.
The facility is constructed, operated, or maintained for the generation of electric
power and uses for such generation only the hydroelectric potential of a non-federally owned conduit.
The facility has an installed capacity that does not exceed 5 megawatts ..................
Y
FPA 30(a)(3)(C)(i), as amended by HREA
tkelley on DSK3SPTVN1PROD with NOTICES
FPA 30(a)(3)(C)(ii), as amended
HREA.
FPA 30(a)(3)(C)(iii), as amended
HREA.
by
by
On or before August 9, 2013, the facility is not licensed, or exempted from the licensing requirements of Part I of the FPA.
Preliminary Determination: Based
upon the above criteria, Commission
staff preliminarily determines that the
proposal satisfies the requirements for a
qualifying conduit hydropower facility
not required to be licensed or exempted
from licensing.
Comments and Motions To Intervene:
Deadline for filing comments contesting
whether the facility meets the qualifying
criteria is 45 days from the issuance
date of this notice.
Deadline for filing motions to
intervene is 30 days from the issuance
date of this notice.
Anyone may submit comments or a
motion to intervene in accordance with
VerDate Mar<15>2010
17:17 Nov 20, 2013
Jkt 232001
the requirements of Rules of Practice
and Procedure, 18 CFR 385.210 and
385.214. Any motions to intervene must
be received on or before the specified
deadline date for the particular
proceeding.
Filing and Service of Responsive
Documents: All filings must (1) bear in
all capital letters the ‘‘COMMENTS
CONTESTING QUALIFICATION FOR A
CONDUIT HYDROPOWER FACILITY’’
or ‘‘MOTION TO INTERVENE,’’ as
applicable; (2) state in the heading the
name of the applicant and the project
number of the application to which the
filing responds; (3) state the name,
address, and telephone number of the
PO 00000
Frm 00034
Fmt 4703
Sfmt 4703
Y
Y
Y
person filing; and (4) otherwise comply
with the requirements of sections
385.2001 through 385.2005 of the
Commission’s regulations.1 All
comments contesting Commission staff’s
preliminary determination that the
facility meets the qualifying criteria
must set forth their evidentiary basis.
The Commission strongly encourages
electronic filing. Please file motions to
intervene and comments using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
1 18
E:\FR\FM\21NON1.SGM
CFR 385.2001–2005 (2013).
21NON1
Agencies
[Federal Register Volume 78, Number 225 (Thursday, November 21, 2013)]
[Notices]
[Pages 69846-69847]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-27953]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP14-18-000]
Transcontinental Gas Pipe Line Company, LLC; Notice of
Application
On November 7, 2013, Transcontinental Gas Pipe Line Company, LLC
(Transco) filed with the Federal Energy Regulatory Commission
(Commission) an application under section 7 of the Natural Gas Act to
construct and operate its Woodbridge Delivery Lateral Project
(Project), a new delivery lateral extending 2.4 miles from an
interconnection with Transco's mainline to the CPV Shore, LLC's
Woodbridge Energy Center electric generating station. The delivery
lateral and generating station are in Middlesex County, New Jersey. The
Project will enable Transco to provide 264,000 dekatherms per day of
incremental firm natural gas transportation service to CPV Shore, LLC
under Transco's Rate Schedule FDLS, all as more fully set forth in the
application which is on file with the Commission and open to public
inspection. The filing may also be viewed on the web at https://www.ferc.gov using the ``eLibrary'' link. Enter the docket number
excluding the last three digits in the docket number field to access
the document. For assistance, please contact FERC Online Support at
FERCOnlineSupport@ferc.gov or toll free at (866) 208-3676, or TTY,
contact (202) 502-8659.
Questions regarding this application may be directed to Marg
Camardello, Team Leader, Rates & Regulatory at Transcontinental Gas
Pipe Line Company, LLC, P.O. Box 1396, Houston, Texas 77251 or by
calling 713-215-3380. In addition, 866-455-9103 may be called toll-free
or email-mail addressed to PipelineExpansion@williams.com.
Pursuant to section 157.9 of the Commission's rules, 18 CFR 157.9,
within 90 days of this Notice the Commission staff will either:
Complete its environmental assessment (EA) and place it into the
Commission's public record (eLibrary) for this proceeding; or issue a
Notice of Schedule for Environmental Review. If a Notice of Schedule
for Environmental Review is issued, it will indicate, among other
milestones, the anticipated date for the Commission staff's issuance of
the final environmental impact statement (FEIS) or EA for this
proposal. The filing of the EA in the Commission's public record for
this proceeding or the issuance of a Notice of Schedule for
Environmental Review will serve to notify federal and state agencies of
the timing for the completion of all necessary reviews, and the
subsequent need to complete all federal authorizations within 90 days
of the date of issuance of the Commission staff's FEIS or EA.
There are two ways to become involved in the Commission's review of
this project. First, any person wishing to obtain legal status by
becoming a party to the proceedings for this project should, on or
before the comment date stated below, file with the Federal Energy
Regulatory Commission, 888 First Street NE., Washington, DC 20426, a
motion to intervene in accordance with the requirements of the
Commission's Rules of Practice and Procedure (18 CFR 385.214 or
385.211) and the Regulations under the NGA (18 CFR 157.10). A person
obtaining party status will be placed on the service list maintained by
the Secretary of the Commission and will receive copies of all
documents filed by the applicant and by all other parties. A party must
submit seven copies of filings made with the Commission and must mail a
copy to the applicant and to every other party in the proceeding. Only
parties to the proceeding can ask for court review of Commission orders
in the proceeding.
However, a person does not have to intervene in order to have
comments considered. The second way to participate is by filing with
the Secretary of the Commission, as soon as possible, an original and
two copies of comments in support of or in opposition to this project.
The Commission will consider these comments in determining the
appropriate action to be taken, but the filing of a comment alone will
not serve to make the filer a party to the proceeding. The Commission's
rules require that persons filing comments in opposition to the project
provide copies of their protests only to the party or parties directly
involved in the protest.
The Commission strongly encourages electronic submission of
protests and interventions in lieu of paper using the ``eFiling'' link
at https://www.ferc.gov. Persons unable to file electronically should
submit an original and seven copies of the protest or intervention to
the Federal Energy Regulatory
[[Page 69847]]
Commission, 888 First Street NE., Washington, DC 20426. This filing is
accessible on-line at https://www.ferc.gov using the ``eLibrary'' link
and is available for review in the Commission's Public Reference Room
in Washington, DC. There is an ``eSubscription'' link on the Web site
that enables subscribers to receive email notification when a document
is added to a subscribed docket(s). For assistance with any FERC Online
service, please email FERCOnlineSupport@ferc.gov, or call (866) 208-
3676 (toll free). For TTY, call (202) 502-8659.
Comment Date: 5:00 p.m. Eastern Time on December 6, 2013.
Dated: November 15, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013-27953 Filed 11-20-13; 8:45 am]