Notice of Intent To Prepare a Supplemental Draft Environmental Impact Statement-Interconnection of the Proposed Wilton IV Wind Energy Center Project, North Dakota (DOE/EIS-0469), 69664 [2013-27861]
Download as PDF
69664
Federal Register / Vol. 78, No. 224 / Wednesday, November 20, 2013 / Notices
DEPARTMENT OF ENERGY
Western Area Power Administration
Notice of Intent To Prepare a
Supplemental Draft Environmental
Impact Statement—Interconnection of
the Proposed Wilton IV Wind Energy
Center Project, North Dakota (DOE/
EIS–0469)
Western Area Power
Administration, DOE.
ACTION: Notice of Intent to Prepare a
Supplemental Draft Environmental
Impact Statement and to Conduct a
Scoping Meeting; Notice of Floodplain
and Wetlands Involvement.
AGENCY:
Western Area Power
Administration (Western), an agency of
the U.S. Department of Energy (DOE),
intends to prepare a Supplemental Draft
Environmental Impact Statement
(SDEIS) for the interconnection of
NextEra Energy Resources’ proposed
Wilton IV Wind Energy Center Project
(Project), Burleigh County, North
Dakota. Western is issuing this Notice of
Intent (NOI) to inform the public and
interested parties about a change in the
proposed Project and to invite the
public to comment on the scope,
proposed action, and other issues to be
addressed in the SDEIS. Based on
substantial changes to the proposed
Project, Western has made the decision
to prepare an SDEIS. These changes
include the relocation of 30 planned
turbine locations and 5 alternate turbine
locations in Crofte Township, and
moving them as far as 12 miles northeast to Rock Hill Township.
Additionally, up to 20 miles of new
overhead transmission line will be
necessary to connect the Project
collector substation to the existing
Wilton/Baldwin substation. Portions of
the proposed Project may affect
floodplains and wetlands, so this NOI
also serves as a notice of proposed
floodplain or wetland action in
accordance with DOE floodplain and
wetland environmental review
requirements.
DATES: A public scoping meeting will be
held on December 11, 2013, from 5 p.m.
to 8 p.m. at the Wilton Memorial Hall,
located at 105 Dakota Avenue, Wilton,
North Dakota. Local notification of this
meeting has been made through direct
mailings to affected parties and by
advertising in local media to ensure a
minimum of 15 days of prior notice. The
public scoping period starts with the
publication of this notice and ends on
December 20, 2013. Western will
consider all comments on the scope of
the SDEIS received or postmarked by
tkelley on DSK3SPTVN1PROD with NOTICES
SUMMARY:
VerDate Mar<15>2010
16:04 Nov 19, 2013
Jkt 232001
that date. However, the public is invited
to submit comments on the proposed
Project at any time during the SDEIS
process.
Western will host a public
scoping meeting at the Wilton Memorial
Hall, located at 105 Dakota Avenue,
Wilton, North Dakota, to provide
information on the Project and gather
comments on the proposal. Oral or
written comments may be provided at
the public scoping meeting or mailed or
emailed to Matt Marsh, Upper Great
Plains Regional Office, Western Area
Power Administration, P.O. Box 35800,
Billings, MT 59107–5800, email
MMarsh@wapa.gov, telephone (800)
358–3415.
FOR FURTHER INFORMATION CONTACT: For
additional information on the proposed
Project, the SDEIS process, or to receive
a copy of the SDEIS when it is
published, contact Matt Marsh at the
addresses above. For general
information on the DOE’s NEPA review
process, contact Carol M. Borgstrom,
Director of NEPA Policy and
Compliance, GC–54, U.S. Department of
Energy, 1000 Independence Avenue
SW., Washington, DC 20585–0119,
telephone (202) 586–4600 or (800) 472–
2756, facsimile (202) 586–7031.
ADDRESSES:
Dated: November 12, 2013.
Mark A. Gabriel,
Administrator.
[FR Doc. 2013–27861 Filed 11–19–13; 8:45 am]
BILLING CODE 6450–01–P
ENVIRONMENTAL PROTECTION
AGENCY
[EPA–HQ–OW–2006–0394; FRL–9903–09–
OW]
Proposed Information Collection
Request; Comment Request; Approval
of State Coastal Nonpoint Pollution
Control Programs
Environmental Protection
Agency (EPA).
ACTION: Notice.
AGENCY:
The Environmental Protection
Agency is planning to submit an
information collection request (ICR),
‘‘Approval of State Coastal Nonpoint
Pollution Control Programs (CZARA
Section 6217)’’ (EPA ICR No. 1569.08,
OMB Control No. 2040–0153) to the
Office of Management and Budget
(OMB) for review and approval in
accordance with the Paperwork
Reduction Act. Before doing so, EPA is
soliciting public comments on specific
aspects of the proposed information
collection as described below. This is a
SUMMARY:
PO 00000
Frm 00025
Fmt 4703
Sfmt 4703
proposed extension of the ICR, which is
currently approved through January 31,
2014. An Agency may not conduct or
sponsor and a person is not required to
respond to a collection of information
unless it displays a currently valid OMB
control number.
DATES: Comments must be submitted on
or before January 21, 2014.
ADDRESSES: Submit your comments,
referencing Docket ID No. EPA–HQ–
OW–2006–0394, online using
www.regulations.gov (our preferred
method), by email to OW-Docket@
epa.gov, or by mail to: EPA Docket
Center, Environmental Protection
Agency, Mail Code 28221T, 1200
Pennsylvania Ave. NW., Washington,
DC 20460.
EPA’s policy is that all comments
received will be included in the public
docket without change including any
personal information provided, unless
the comment includes profanity, threats,
information claimed to be Confidential
Business Information (CBI) or other
information whose disclosure is
restricted by statute.
FOR FURTHER INFORMATION CONTACT: Don
Waye, Assessment and Watershed
Protection Division, Office of Wetlands
Oceans and Watersheds, Mail Code
4503–T, Environmental Protection
Agency, 1200 Pennsylvania Ave. NW.,
Washington, DC 20460; telephone
number: (202) 566–1170; fax number:
(202) 566–1333; email address:
waye.don@epa.gov.
SUPPLEMENTARY INFORMATION:
Supporting documents which explain in
detail the information that the EPA will
be collecting are available in the public
docket for this ICR. The docket can be
viewed online at www.regulations.gov
or in person at the EPA Docket Center,
EPA West, Room 3334, 1301
Constitution Ave. NW., Washington,
DC. The telephone number for the
Docket Center is 202–566–1744. For
additional information about EPA’s
public docket, visit https://www.epa.gov/
dockets.
Pursuant to section 3506(c)(2)(A) of
the PRA, EPA is soliciting comments
and information to enable it to: (i)
Evaluate whether the proposed
collection of information is necessary
for the proper performance of the
functions of the Agency, including
whether the information will have
practical utility; (ii) evaluate the
accuracy of the Agency’s estimate of the
burden of the proposed collection of
information, including the validity of
the methodology and assumptions used;
(iii) enhance the quality, utility, and
clarity of the information to be
collected; and (iv) minimize the burden
E:\FR\FM\20NON1.SGM
20NON1
Agencies
[Federal Register Volume 78, Number 224 (Wednesday, November 20, 2013)]
[Notices]
[Page 69664]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-27861]
[[Page 69664]]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Western Area Power Administration
Notice of Intent To Prepare a Supplemental Draft Environmental
Impact Statement--Interconnection of the Proposed Wilton IV Wind Energy
Center Project, North Dakota (DOE/EIS-0469)
AGENCY: Western Area Power Administration, DOE.
ACTION: Notice of Intent to Prepare a Supplemental Draft Environmental
Impact Statement and to Conduct a Scoping Meeting; Notice of Floodplain
and Wetlands Involvement.
-----------------------------------------------------------------------
SUMMARY: Western Area Power Administration (Western), an agency of the
U.S. Department of Energy (DOE), intends to prepare a Supplemental
Draft Environmental Impact Statement (SDEIS) for the interconnection of
NextEra Energy Resources' proposed Wilton IV Wind Energy Center Project
(Project), Burleigh County, North Dakota. Western is issuing this
Notice of Intent (NOI) to inform the public and interested parties
about a change in the proposed Project and to invite the public to
comment on the scope, proposed action, and other issues to be addressed
in the SDEIS. Based on substantial changes to the proposed Project,
Western has made the decision to prepare an SDEIS. These changes
include the relocation of 30 planned turbine locations and 5 alternate
turbine locations in Crofte Township, and moving them as far as 12
miles north-east to Rock Hill Township. Additionally, up to 20 miles of
new overhead transmission line will be necessary to connect the Project
collector substation to the existing Wilton/Baldwin substation.
Portions of the proposed Project may affect floodplains and wetlands,
so this NOI also serves as a notice of proposed floodplain or wetland
action in accordance with DOE floodplain and wetland environmental
review requirements.
DATES: A public scoping meeting will be held on December 11, 2013, from
5 p.m. to 8 p.m. at the Wilton Memorial Hall, located at 105 Dakota
Avenue, Wilton, North Dakota. Local notification of this meeting has
been made through direct mailings to affected parties and by
advertising in local media to ensure a minimum of 15 days of prior
notice. The public scoping period starts with the publication of this
notice and ends on December 20, 2013. Western will consider all
comments on the scope of the SDEIS received or postmarked by that date.
However, the public is invited to submit comments on the proposed
Project at any time during the SDEIS process.
ADDRESSES: Western will host a public scoping meeting at the Wilton
Memorial Hall, located at 105 Dakota Avenue, Wilton, North Dakota, to
provide information on the Project and gather comments on the proposal.
Oral or written comments may be provided at the public scoping meeting
or mailed or emailed to Matt Marsh, Upper Great Plains Regional Office,
Western Area Power Administration, P.O. Box 35800, Billings, MT 59107-
5800, email MMarsh@wapa.gov, telephone (800) 358-3415.
FOR FURTHER INFORMATION CONTACT: For additional information on the
proposed Project, the SDEIS process, or to receive a copy of the SDEIS
when it is published, contact Matt Marsh at the addresses above. For
general information on the DOE's NEPA review process, contact Carol M.
Borgstrom, Director of NEPA Policy and Compliance, GC-54, U.S.
Department of Energy, 1000 Independence Avenue SW., Washington, DC
20585-0119, telephone (202) 586-4600 or (800) 472-2756, facsimile (202)
586-7031.
Dated: November 12, 2013.
Mark A. Gabriel,
Administrator.
[FR Doc. 2013-27861 Filed 11-19-13; 8:45 am]