Browns Valley Irrigation District; Notice of Preliminary Determination of a Qualifying Conduit Hydropower Facility and Soliciting Comments and Motions To Intervene, 69662-69663 [2013-27746]

Download as PDF 69662 Federal Register / Vol. 78, No. 224 / Wednesday, November 20, 2013 / Notices Entergy Arkansas, Inc ........................................................................................................................................... Entergy Corp., Midwest Independent Transmission System Operator, Inc. and ITC Holdings Corp ............. Midwest Independent Transmission System Operator, Inc ............................................................................... Entergy Services, Inc ............................................................................................................................................ Entergy Services, Inc ............................................................................................................................................ Entergy Services, Inc ............................................................................................................................................ Entergy Services, Inc ............................................................................................................................................ Entergy Arkansas, Inc. and Entergy Mississippi, Inc ......................................................................................... Entergy Arkansas, Inc. and Entergy Louisiana, LLC .......................................................................................... ITC Arkansas LLC, et al ....................................................................................................................................... Midwest Independent Transmission System Operator, Inc ............................................................................... Midwest Independent Transmission System Operator, Inc ............................................................................... Entergy Services, Inc ............................................................................................................................................ Entergy Services, Inc ............................................................................................................................................ Entergy Services, Inc ............................................................................................................................................ Entergy Services, Inc ............................................................................................................................................ Entergy Services, Inc ............................................................................................................................................ Entergy Arkansas, Inc ........................................................................................................................................... Entergy Gulf States Louisiana, L.L.C ................................................................................................................... Entergy Louisiana, LLC ........................................................................................................................................ Entergy Mississippi, Inc ....................................................................................................................................... Entergy New Orleans, Inc .................................................................................................................................... Entergy Texas, Inc ................................................................................................................................................ Entergy Services, Inc ............................................................................................................................................ Entergy Services, Inc ............................................................................................................................................ Midcontinent Independent System Operator ..................................................................................................... Entergy Services, Inc ............................................................................................................................................ Entergy Arkansas, Inc ........................................................................................................................................... Entergy Gulf States Louisiana, L.L.C ................................................................................................................... Entergy Louisiana, LLC ........................................................................................................................................ Entergy Mississippi, Inc ....................................................................................................................................... Entergy New Orleans, Inc .................................................................................................................................... Entergy Texas, Inc ................................................................................................................................................ Entergy Arkansas, Inc ........................................................................................................................................... Midcontinent Independent System Operator ..................................................................................................... Midcontinent Independent System Operator and Entergy Services, Inc .......................................................... Midcontinent Independent System Operator and Entergy Services, Inc .......................................................... Midcontinent Independent System Operator ..................................................................................................... Entergy Services, Inc ............................................................................................................................................ Midcontinent Independent System Operator ..................................................................................................... Midcontinent Independent System Operator ..................................................................................................... Entergy Texas, Inc ................................................................................................................................................ Entergy Mississippi, Inc ....................................................................................................................................... Entergy Arkansas, Inc ........................................................................................................................................... Midcontinent Independent System Operator ..................................................................................................... Midcontinent Independent System Operator ..................................................................................................... Entergy Services, Inc ............................................................................................................................................ Union Power Partners, L.P ................................................................................................................................... Entergy Services, Inc ............................................................................................................................................ These meetings are open to the public. For more information, contact Patrick Clarey, Office of Energy Market Regulation, Federal Energy Regulatory Commission at (317) 249–5937 or patrick.clarey@ferc.gov. Dated: November 13, 2013. Kimberly D. Bose, Secretary. [FR Doc. 2013–27745 Filed 11–19–13; 8:45 am] tkelley on DSK3SPTVN1PROD with NOTICES 16:04 Nov 19, 2013 Federal Energy Regulatory Commission [Docket No. CD14–6–000] Browns Valley Irrigation District; Notice of Preliminary Determination of a Qualifying Conduit Hydropower Facility and Soliciting Comments and Motions To Intervene On November 1, 2013, Browns Valley Irrigation District (BVID) filed a notice of intent to construct a qualifying conduit hydropower facility, pursuant to section 30 of the Federal Power Act, as amended by section 4 of the Hydropower Regulatory Efficiency Act of 2013 (HREA). The 985 kW Tennessee Ditch Hydropower Project would utilize a new pipeline paralleling BVID’s BILLING CODE 6717–01–P VerDate Mar<15>2010 DEPARTMENT OF ENERGY Jkt 232001 PO 00000 Frm 00023 Fmt 4703 Sfmt 4703 Docket Docket Docket Docket Docket Docket Docket Docket Docket Docket Docket Docket Docket Docket Docket Docket Docket Docket Docket Docket Docket Docket Docket Docket Docket Docket Docket Docket Docket Docket Docket Docket Docket Docket Docket Docket Docket Docket Docket Docket Docket Docket Docket Docket Docket Docket Docket Docket Docket No. ER12–1428 Nos. ER12–2681 No. ER12–2682 No. ER12–2683 No. ER12–2693 No. ER13–288 No. ER13–432 No. ER13–769 No. ER13–770 No. ER13–782 No. ER13–868 No. ER13–945 No. ER13–948 No. ER13–1194 No. ER13–1195 No. ER13–1303 No. ER13–1317 No. ER13–1508 No. ER13–1509 No. ER13–1510 No. ER13–1511 No. ER13–1512 No. ER13–1513 No. ER13–1556 No. ER13–1623 No. ER13–2385 No. ER14–73 No. ER14–75 No. ER14–76 No. ER14–77 No. ER14–78 No. ER14–79 No. ER14–80 No. ER14–89 No. ER14–97 No. ER14–98 No. ER14–100 No. ER14–107 No. ER14–108 No. ER14–114 No. ER14–115 No. ER14–128 No. ER14–131 No. ER14–134 No. ER14–136 No. ER14–148 No. ER14–273 No. ER14–296 No. ER14–369 existing Tennessee Ditch conduit structure, which delivers water to Tennessee Creek for downstream irrigation purposes. The project would be located in Yuba County, California. Applicant Contact: Walter Cotter, Browns Valley Irrigation District, 9370 Browns Valley School Road, P.O. Box 6, Browns Valley, CA 95918, Phone No. (530) 743–5703. FERC Contact: Robert Bell, Phone No. (202) 502–6062, email: robert.bell@ ferc.gov. Qualifying Conduit Hydropower Facility Description: The proposed project would consist of: (1) A new intake structure at the end of a tunnel that transports water from Collins Lake; (2) a new 7,225-foot-long, 36-inch diameter PVC intake pipe running parallel with the Tennessee Ditch; (3) a new powerhouse containing one new E:\FR\FM\20NON1.SGM 20NON1 Federal Register / Vol. 78, No. 224 / Wednesday, November 20, 2013 / Notices 985-kilowatt generating unit; (4) a new discharge pool under the powerhouse, which will discharge water into Tennessee Creek; and (5) appurtenant facilities. The proposed project would have an estimated annual generating capacity of 3,900 megawatt-hours. 69663 A qualifying conduit hydropower facility is one that is determined or deemed to meet all of the criteria shown in the table below. TABLE 1—CRITERIA FOR QUALIFYING CONDUIT HYDROPOWER FACILITY Statutory provision Description Satisfies (Y/N) FPA 30(a)(3)(A), as amended by HREA .... The conduit the facility uses is a tunnel, canal, pipeline, aqueduct, flume, ditch, or similar manmade water conveyance that is operated for the distribution of water for agricultural, municipal, or industrial consumption and not primarily for the generation of electricity. The facility is constructed, operated, or maintained for the generation of electric power and uses for such generation only the hydroelectric potential of a non-federally owned conduit. The facility has an installed capacity that does not exceed 5 megawatts .................... On or before August 9, 2013, the facility is not licensed, or exempted from the licensing requirements of Part I of the FPA. Y FPA 30(a)(3)(C)(i), as amended by HREA tkelley on DSK3SPTVN1PROD with NOTICES FPA 30(a)(3)(C)(ii), as amended by HREA FPA 30(a)(3)(C)(iii), as amended by HREA Preliminary Determination: Based upon the above criteria, Commission staff preliminarily determines that the proposal satisfies the requirements for a qualifying conduit hydropower facility not required to be licensed or exempted from licensing. Comments and Motions to Intervene: Deadline for filing comments contesting whether the facility meets the qualifying criteria is 45 days from the issuance date of this notice. Deadline for filing motions to intervene is 30 days from the issuance date of this notice. Anyone may submit comments or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210 and 385.214. Any motions to intervene must be received on or before the specified deadline date for the particular proceeding. Filing and Service of Responsive Documents: All filings must (1) bear in all capital letters the ‘‘COMMENTS CONTESTING QUALIFICATION FOR A CONDUIT HYDROPOWER FACILITY’’ or ‘‘MOTION TO INTERVENE,’’ as applicable; (2) state in the heading the name of the applicant and the project number of the application to which the filing responds; (3) state the name, address, and telephone number of the person filing; and (4) otherwise comply with the requirements of sections 385.2001 through 385.2005 of the Commission’s regulations.1 All comments contesting Commission staff’s preliminary determination that the facility meets the qualifying criteria must set forth their evidentiary basis. The Commission strongly encourages electronic filing. Please file motions to intervene and comments using the Commission’s eFiling system at https:// 1 18 www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, please send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. A copy of all other filings in reference to this application must be accompanied by proof of service on all persons listed in the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 4.34(b) and 385.2010. Locations of Notice of Intent: Copies of the notice of intent can be obtained directly from the applicant or such copies can be viewed and reproduced at the Commission in its Public Reference Room, Room 2A, 888 First Street NE., Washington, DC 20426. The filing may also be viewed on the web at https:// www.ferc.gov/docs-filing/elibrary.asp using the ‘‘eLibrary’’ link. Enter the docket number (e.g., CD14–6–000) in the docket number field to access the document. For assistance, call toll-free 1–866–208–3676 or email FERCOnlineSupport@ferc.gov. For TTY, call (202) 502–8659. 16:04 Nov 19, 2013 Y Y DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13381–007] Jonathan and Jayne Chase Troy Mills Hydroelectric Inc.; Notice of Transfer of Exemption 1. By letter filed October 15, 2013, Jonathan Chase informed the Commission that the exemption from licensing for the Troy Hydroelectric Project, FERC No. 13381, originally issued December 2, 2011,1 has been transferred to Troy Mills Hydroelectric Inc. The project is located on the Missisquoi River in Orleans County, Vermont. The transfer of an exemption does not require Commission approval. 2. Troy Mills Hydroelectric Inc. is now the exemptee of the Troy Hydroelectric Project, FERC No. 13381. All correspondence should be forwarded to: Mr. Jonathan Chase, President, Troy Mills Hydroelectric Inc., 361 Goodall Road, Derby Line, Vermont 05830. Dated: November 13, 2013. Kimberly D. Bose, Secretary. [FR Doc. 2013–27748 Filed 11–19–13; 8:45 am] BILLING CODE 6717–01–P Dated: November 13, 2013. Kimberly D. Bose, Secretary. [FR Doc. 2013–27746 Filed 11–19–13; 8:45 am] BILLING CODE 6717–01–P 1 137 FERC ¶ 62,205, Order Granting Exemption From Licensing (5 MW OR LESS). CFR 385.2001–2005 (2013). VerDate Mar<15>2010 Y Jkt 232001 PO 00000 Frm 00024 Fmt 4703 Sfmt 9990 E:\FR\FM\20NON1.SGM 20NON1

Agencies

[Federal Register Volume 78, Number 224 (Wednesday, November 20, 2013)]
[Notices]
[Pages 69662-69663]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-27746]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CD14-6-000]


Browns Valley Irrigation District; Notice of Preliminary 
Determination of a Qualifying Conduit Hydropower Facility and 
Soliciting Comments and Motions To Intervene

    On November 1, 2013, Browns Valley Irrigation District (BVID) filed 
a notice of intent to construct a qualifying conduit hydropower 
facility, pursuant to section 30 of the Federal Power Act, as amended 
by section 4 of the Hydropower Regulatory Efficiency Act of 2013 
(HREA). The 985 kW Tennessee Ditch Hydropower Project would utilize a 
new pipeline paralleling BVID's existing Tennessee Ditch conduit 
structure, which delivers water to Tennessee Creek for downstream 
irrigation purposes. The project would be located in Yuba County, 
California.
    Applicant Contact: Walter Cotter, Browns Valley Irrigation 
District, 9370 Browns Valley School Road, P.O. Box 6, Browns Valley, CA 
95918, Phone No. (530) 743-5703.
    FERC Contact: Robert Bell, Phone No. (202) 502-6062, email: 
robert.bell@ferc.gov.
    Qualifying Conduit Hydropower Facility Description: The proposed 
project would consist of: (1) A new intake structure at the end of a 
tunnel that transports water from Collins Lake; (2) a new 7,225-foot-
long, 36-inch diameter PVC intake pipe running parallel with the 
Tennessee Ditch; (3) a new powerhouse containing one new

[[Page 69663]]

985-kilowatt generating unit; (4) a new discharge pool under the 
powerhouse, which will discharge water into Tennessee Creek; and (5) 
appurtenant facilities. The proposed project would have an estimated 
annual generating capacity of 3,900 megawatt-hours.
    A qualifying conduit hydropower facility is one that is determined 
or deemed to meet all of the criteria shown in the table below.

                          Table 1--Criteria for Qualifying Conduit Hydropower Facility
----------------------------------------------------------------------------------------------------------------
                                                                                                      Satisfies
            Statutory provision                                   Description                           (Y/N)
----------------------------------------------------------------------------------------------------------------
FPA 30(a)(3)(A), as amended by HREA.......  The conduit the facility uses is a tunnel, canal,                 Y
                                             pipeline, aqueduct, flume, ditch, or similar manmade
                                             water conveyance that is operated for the
                                             distribution of water for agricultural, municipal, or
                                             industrial consumption and not primarily for the
                                             generation of electricity.
FPA 30(a)(3)(C)(i), as amended by HREA....  The facility is constructed, operated, or maintained              Y
                                             for the generation of electric power and uses for
                                             such generation only the hydroelectric potential of a
                                             non-federally owned conduit.
FPA 30(a)(3)(C)(ii), as amended by HREA...  The facility has an installed capacity that does not              Y
                                             exceed 5 megawatts.
FPA 30(a)(3)(C)(iii), as amended by HREA..  On or before August 9, 2013, the facility is not                  Y
                                             licensed, or exempted from the licensing requirements
                                             of Part I of the FPA.
----------------------------------------------------------------------------------------------------------------

    Preliminary Determination: Based upon the above criteria, 
Commission staff preliminarily determines that the proposal satisfies 
the requirements for a qualifying conduit hydropower facility not 
required to be licensed or exempted from licensing.
    Comments and Motions to Intervene: Deadline for filing comments 
contesting whether the facility meets the qualifying criteria is 45 
days from the issuance date of this notice.
    Deadline for filing motions to intervene is 30 days from the 
issuance date of this notice.
    Anyone may submit comments or a motion to intervene in accordance 
with the requirements of Rules of Practice and Procedure, 18 CFR 
385.210 and 385.214. Any motions to intervene must be received on or 
before the specified deadline date for the particular proceeding.
    Filing and Service of Responsive Documents: All filings must (1) 
bear in all capital letters the ``COMMENTS CONTESTING QUALIFICATION FOR 
A CONDUIT HYDROPOWER FACILITY'' or ``MOTION TO INTERVENE,'' as 
applicable; (2) state in the heading the name of the applicant and the 
project number of the application to which the filing responds; (3) 
state the name, address, and telephone number of the person filing; and 
(4) otherwise comply with the requirements of sections 385.2001 through 
385.2005 of the Commission's regulations.\1\ All comments contesting 
Commission staff's preliminary determination that the facility meets 
the qualifying criteria must set forth their evidentiary basis.
---------------------------------------------------------------------------

    \1\ 18 CFR 385.2001-2005 (2013).
---------------------------------------------------------------------------

    The Commission strongly encourages electronic filing. Please file 
motions to intervene and comments using the Commission's eFiling system 
at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit 
brief comments up to 6,000 characters, without prior registration, 
using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information at the 
end of your comments. For assistance, please contact FERC Online 
Support at FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or 
(202) 502-8659 (TTY). In lieu of electronic filing, please send a paper 
copy to: Secretary, Federal Energy Regulatory Commission, 888 First 
Street NE., Washington, DC 20426. A copy of all other filings in 
reference to this application must be accompanied by proof of service 
on all persons listed in the service list prepared by the Commission in 
this proceeding, in accordance with 18 CFR 4.34(b) and 385.2010.
    Locations of Notice of Intent: Copies of the notice of intent can 
be obtained directly from the applicant or such copies can be viewed 
and reproduced at the Commission in its Public Reference Room, Room 2A, 
888 First Street NE., Washington, DC 20426. The filing may also be 
viewed on the web at https://www.ferc.gov/docs-filing/elibrary.asp using 
the ``eLibrary'' link. Enter the docket number (e.g., CD14-6-000) in 
the docket number field to access the document. For assistance, call 
toll-free 1-866-208-3676 or email FERCOnlineSupport@ferc.gov. For TTY, 
call (202) 502-8659.

    Dated: November 13, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013-27746 Filed 11-19-13; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.