Mid-Atlantic Hydro, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications, 69081 [2013-27529]
Download as PDF
Federal Register / Vol. 78, No. 222 / Monday, November 18, 2013 / Notices
LLC, 1044 NW 12th Drive, Pendleton,
OR 97801–1268; phone: (541) 969–2276.
FERC Contact: Sean O’Neill; phone:
(202) 502–6462.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36.
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, notices of intent,
and competing applications using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
The first page of any filing should
include docket number P–14546–000.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of Commission’s Web site at https://
www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P–14546) in
the docket number field to access the
document. For assistance, contact FERC
Online Support.
Dated: November 8, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013–27525 Filed 11–15–13; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
mstockstill on DSK4VPTVN1PROD with NOTICES
[Project No. 14555–000]
Mid-Atlantic Hydro, LLC; Notice of
Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Competing Applications
On September 9, 2013, Mid-Atlantic
Hydro, LLC, filed an application for a
preliminary permit, pursuant to section
4(f) of the Federal Power Act (FPA),
proposing to study the feasibility of the
Tuttle Creek Hydroelectric Project
VerDate Mar<15>2010
17:33 Nov 15, 2013
Jkt 232001
(Tuttle Creek Project or project) to be
located on Big Blue River, in the city of
Manhattan, Riley County, Kansas. The
sole purpose of a preliminary permit, if
issued, is to grant the permit holder
priority to file a license application
during the permit term. A preliminary
permit does not authorize the permit
holder to perform any land-disturbing
activities or otherwise enter upon lands
or waters owned by others without the
owners’ express permission.
The proposed project would consist of
the following: (1) A new 350-foot-long,
16-foot-diameter steel penstock; (2) a
new 100-foot-long, 50-foot-wide
concrete powerhouse, containing one
7.9-megawatt (MW) turbine generator
unit; (3) a new 2.8-mile-long, 25-kilovolt
(kV) transmission line; (4) an existing
860-foot-long, 20-foot-diameter
horseshoe conduit; (5) a new 40-footlong, 50-foot-wide switchyard
connecting to the existing Weststar
Substation; and (6) appurtenant
facilities. The estimated annual
generation of the Tuttle Creek Project
would be 30,500 megawatt-hours per
year.
Applicant Contact: Ms. Kristina
Johnson, Mid-Atlantic Hydro, LLC, 5425
Wisconsin Avenue, Suite 600, Chevy
Chase, MD 20815; phone: (301) 718–
4432.
FERC Contact: Chelsea Hudock;
phone: (202) 502–8448, email:
chelsea.hudock@ferc.gov.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36.
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, notices of intent,
and competing applications using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
The first page of any filing should
include docket number P–14555–000.
More information about this project,
including a copy of the application, can
PO 00000
Frm 00042
Fmt 4703
Sfmt 4703
69081
be viewed or printed on the ‘‘eLibrary’’
link of Commission’s Web site at https://
www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P–14555) in
the docket number field to access the
document. For assistance, contact FERC
Online Support.
Dated: November 8, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013–27529 Filed 11–15–13; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13679–004]
JD Products, LLC; Notice of
Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Competing Applications
On October 1, 2013, JD Products, LLC
(JD Products) filed an application for a
successive preliminary permit, pursuant
to section 4(f) of the Federal Power Act,
proposing to study the feasibility of the
proposed San Onofre Electricity Farm
Project (project). The proposed project
would utilize up to 1,314 generation
units, with an estimated installed
capacity of 2,000 megawatts with a
projected average annual generation of
about 17,519 megawatthours. The
requested project boundary comprises of
approximately 6 square nautical miles
of coastal waters and lands located
along the coast of San Diego County,
California, near the towns of San Onofre
and San Clemente, and include portions
of the San Onofre California State Park
and the United States Marine Corps
Base Camp Pendleton.
The sole purpose of a preliminary
permit, if issued, is to grant the permit
holder priority to file a license
application during the permit term. A
preliminary permit does not authorize
the permit holder to perform any land
disturbing or construction activities or
to otherwise enter upon lands or waters
owned by others without the owners’
express permission.
Applicant Contact: Chong Hun Kim,
JD Products, LLC., 16807 Woodridge
Circle, Fountain Valley, CA 92708;
(714)964–5419.
FERC Contact: Kenneth Hogan, (202)
502–8434, or via email at:
Kenneth.hogan@ferc.gov.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
E:\FR\FM\18NON1.SGM
18NON1
Agencies
[Federal Register Volume 78, Number 222 (Monday, November 18, 2013)]
[Notices]
[Page 69081]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-27529]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 14555-000]
Mid-Atlantic Hydro, LLC; Notice of Preliminary Permit Application
Accepted for Filing and Soliciting Comments, Motions To Intervene, and
Competing Applications
On September 9, 2013, Mid-Atlantic Hydro, LLC, filed an application
for a preliminary permit, pursuant to section 4(f) of the Federal Power
Act (FPA), proposing to study the feasibility of the Tuttle Creek
Hydroelectric Project (Tuttle Creek Project or project) to be located
on Big Blue River, in the city of Manhattan, Riley County, Kansas. The
sole purpose of a preliminary permit, if issued, is to grant the permit
holder priority to file a license application during the permit term. A
preliminary permit does not authorize the permit holder to perform any
land-disturbing activities or otherwise enter upon lands or waters
owned by others without the owners' express permission.
The proposed project would consist of the following: (1) A new 350-
foot-long, 16-foot-diameter steel penstock; (2) a new 100-foot-long,
50-foot-wide concrete powerhouse, containing one 7.9-megawatt (MW)
turbine generator unit; (3) a new 2.8-mile-long, 25-kilovolt (kV)
transmission line; (4) an existing 860-foot-long, 20-foot-diameter
horseshoe conduit; (5) a new 40-foot-long, 50-foot-wide switchyard
connecting to the existing Weststar Substation; and (6) appurtenant
facilities. The estimated annual generation of the Tuttle Creek Project
would be 30,500 megawatt-hours per year.
Applicant Contact: Ms. Kristina Johnson, Mid-Atlantic Hydro, LLC,
5425 Wisconsin Avenue, Suite 600, Chevy Chase, MD 20815; phone: (301)
718-4432.
FERC Contact: Chelsea Hudock; phone: (202) 502-8448, email:
chelsea.hudock@ferc.gov.
Deadline for filing comments, motions to intervene, competing
applications (without notices of intent), or notices of intent to file
competing applications: 60 days from the issuance of this notice.
Competing applications and notices of intent must meet the requirements
of 18 CFR 4.36.
The Commission strongly encourages electronic filing. Please file
comments, motions to intervene, notices of intent, and competing
applications using the Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief
comments up to 6,000 characters, without prior registration, using the
eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You
must include your name and contact information at the end of your
comments. For assistance, please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to:
Secretary, Federal Energy Regulatory Commission, 888 First Street NE.,
Washington, DC 20426. The first page of any filing should include
docket number P-14555-000.
More information about this project, including a copy of the
application, can be viewed or printed on the ``eLibrary'' link of
Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P-14555) in the docket number field to access
the document. For assistance, contact FERC Online Support.
Dated: November 8, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013-27529 Filed 11-15-13; 8:45 am]