Southern Star Central Gas Pipeline, Inc.; Notice of Request Under Blanket Authorization, 68835 [2013-27290]

Download as PDF Federal Register / Vol. 78, No. 221 / Friday, November 15, 2013 / Notices not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. On or before the comment date, it is not necessary to serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 5 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5:00 p.m. Eastern Time on November 27, 2013. Dated: November 7, 2013. Kimberly D. Bose, Secretary. [FR Doc. 2013–27291 Filed 11–14–13; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP14–15–000] emcdonald on DSK67QTVN1PROD with NOTICES Southern Star Central Gas Pipeline, Inc.; Notice of Request Under Blanket Authorization Take notice that on October 31, 2013, Southern Star Central Gas Pipeline, Inc. (Southern Star), 4700 Highway 56, Owensboro, Kentucky 42301, filed in Docket No. CP14–15–000, a prior notice request pursuant to sections 157.205 and 157.208 of the Commission’s Regulations under the Natural Gas Act (NGA). Southern Star seeks authorization to increase the Maximum Operating Pressure (MOP) of its Waynoka gas supply lateral, located in Woods County, Oklahoma, from 765 pounds per square inch gauge (psig) to 930 psig. Southern Star proposes to VerDate Mar<15>2010 16:58 Nov 14, 2013 Jkt 232001 perform these activities under its blanket certificate issued in Docket No. CP82–479–000, all as more fully set forth in the application which is on file with the Commission and open to public inspection. The filing may also be viewed on the web at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov or toll free at (866) 208–3676, or TTY, contact (202) 502–8659. Any questions concerning this application may be directed to David N. Roberts, Analyst Staff, Regulatory Compliance, Southern Star Central Gas Pipeline, Inc., 4700 Highway 56, Owensboro, Kentucky 42301, or by calling (270) 852–4654, fax (270)852– 5010 or david.n.roberts@sscgp.com. Any person or the Commission’s staff may, within 60 days after issuance of the instant notice by the Commission, file pursuant to Rule 214 of the Commission’s Procedural Rules (18 CFR 385.214) a motion to intervene or notice of intervention and pursuant to Section 157.205 of the regulations under the NGA (18 CFR 157.205), a protest to the request. If no protest is filed within the time allowed therefore, the proposed activity shall be deemed to be authorized effective the day after the time allowed for filing a protest. If a protest is filed and not withdrawn within 30 days after the allowed time for filing a protest, the instant request shall be treated as an application for authorization pursuant to Section 7 of the NGA. Pursuant to Section 157.9 of the Commission’s rules, 18 CFR 157.9, within 90 days of this Notice the Commission staff will either: complete its environmental assessment (EA) and place it into the Commission’s public record (eLibrary) for this proceeding, or issue a Notice of Schedule for Environmental Review. If a Notice of Schedule for Environmental Review is issued, it will indicate, among other milestones, the anticipated date for the Commission staff’s issuance of the final environmental impact statement (FEIS) or EA for this proposal. The filing of the EA in the Commission’s public record for this proceeding or the issuance of a Notice of Schedule for Environmental Review will serve to notify federal and state agencies of the timing for the completion of all necessary reviews, and the subsequent need to complete all federal authorizations within 90 days of the date of issuance of the Commission staff’s FEIS or EA. PO 00000 Frm 00026 Fmt 4703 Sfmt 4703 68835 Persons who wish to comment only on the environmental review of this project should submit an original and two copies of their comments to the Secretary of the Commission. Environmental commenter’s will be placed on the Commission’s environmental mailing list, will receive copies of the environmental documents, and will be notified of meetings associated with the Commission’s environmental review process. Environmental commenter’s will not be required to serve copies of filed documents on all other parties. However, the non-party commentary, will not receive copies of all documents filed by other parties or issued by the Commission (except for the mailing of environmental documents issued by the Commission) and will not have the right to seek court review of the Commission’s final order. The Commission strongly encourages electronic filings of comments, protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https:// www.ferc.gov. Persons unable to file electronically should submit an original and 5 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. Dated: November 7, 2013. Kimberly D. Bose, Secretary. [FR Doc. 2013–27290 Filed 11–14–13; 8:45 am] BILLING CODE 6717–01–P ENVIRONMENTAL PROTECTION AGENCY [ER–FRL–9012–1] Initiation of Scoping for an Environmental Assessment (EA) Environmental Protection Agency (EPA). ACTION: Initiation of scoping. AGENCY: Pursuant to the National Environmental Policy Act (NEPA) (42 U.S.C. 4321–4307h), the Council on Environmental Quality’s NEPA regulations (40 CFR Part 1500–1508), and EPA’s regulations for implementing NEPA (40 CFR Part 6), EPA will prepare an Environmental Assessment (EA) to analyze the potential environmental impacts related to the reissuance of the National Pollutant Discharge Elimination System (NPDES) General Permit for Discharges from Industrial Activities, also referred to as the MultiSector General Permit. The EA will evaluate the potential environmental impacts from the discharge of pollutants SUMMARY: E:\FR\FM\15NON1.SGM 15NON1

Agencies

[Federal Register Volume 78, Number 221 (Friday, November 15, 2013)]
[Notices]
[Page 68835]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-27290]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP14-15-000]


Southern Star Central Gas Pipeline, Inc.; Notice of Request Under 
Blanket Authorization

    Take notice that on October 31, 2013, Southern Star Central Gas 
Pipeline, Inc. (Southern Star), 4700 Highway 56, Owensboro, Kentucky 
42301, filed in Docket No. CP14-15-000, a prior notice request pursuant 
to sections 157.205 and 157.208 of the Commission's Regulations under 
the Natural Gas Act (NGA). Southern Star seeks authorization to 
increase the Maximum Operating Pressure (MOP) of its Waynoka gas supply 
lateral, located in Woods County, Oklahoma, from 765 pounds per square 
inch gauge (psig) to 930 psig. Southern Star proposes to perform these 
activities under its blanket certificate issued in Docket No. CP82-479-
000, all as more fully set forth in the application which is on file 
with the Commission and open to public inspection.
    The filing may also be viewed on the web at https://www.ferc.gov 
using the ``eLibrary'' link. Enter the docket number excluding the last 
three digits in the docket number field to access the document. For 
assistance, please contact FERC Online Support at 
FERCOnlineSupport@ferc.gov or toll free at (866) 208-3676, or TTY, 
contact (202) 502-8659.
    Any questions concerning this application may be directed to David 
N. Roberts, Analyst Staff, Regulatory Compliance, Southern Star Central 
Gas Pipeline, Inc., 4700 Highway 56, Owensboro, Kentucky 42301, or by 
calling (270) 852-4654, fax (270)852-5010 or david.n.roberts@sscgp.com.
    Any person or the Commission's staff may, within 60 days after 
issuance of the instant notice by the Commission, file pursuant to Rule 
214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to 
intervene or notice of intervention and pursuant to Section 157.205 of 
the regulations under the NGA (18 CFR 157.205), a protest to the 
request. If no protest is filed within the time allowed therefore, the 
proposed activity shall be deemed to be authorized effective the day 
after the time allowed for filing a protest. If a protest is filed and 
not withdrawn within 30 days after the allowed time for filing a 
protest, the instant request shall be treated as an application for 
authorization pursuant to Section 7 of the NGA.
    Pursuant to Section 157.9 of the Commission's rules, 18 CFR 157.9, 
within 90 days of this Notice the Commission staff will either: 
complete its environmental assessment (EA) and place it into the 
Commission's public record (eLibrary) for this proceeding, or issue a 
Notice of Schedule for Environmental Review. If a Notice of Schedule 
for Environmental Review is issued, it will indicate, among other 
milestones, the anticipated date for the Commission staff's issuance of 
the final environmental impact statement (FEIS) or EA for this 
proposal. The filing of the EA in the Commission's public record for 
this proceeding or the issuance of a Notice of Schedule for 
Environmental Review will serve to notify federal and state agencies of 
the timing for the completion of all necessary reviews, and the 
subsequent need to complete all federal authorizations within 90 days 
of the date of issuance of the Commission staff's FEIS or EA.
    Persons who wish to comment only on the environmental review of 
this project should submit an original and two copies of their comments 
to the Secretary of the Commission. Environmental commenter's will be 
placed on the Commission's environmental mailing list, will receive 
copies of the environmental documents, and will be notified of meetings 
associated with the Commission's environmental review process. 
Environmental commenter's will not be required to serve copies of filed 
documents on all other parties. However, the non-party commentary, will 
not receive copies of all documents filed by other parties or issued by 
the Commission (except for the mailing of environmental documents 
issued by the Commission) and will not have the right to seek court 
review of the Commission's final order.
    The Commission strongly encourages electronic filings of comments, 
protests and interventions in lieu of paper using the ``eFiling'' link 
at https://www.ferc.gov. Persons unable to file electronically should 
submit an original and 5 copies of the protest or intervention to the 
Federal Energy Regulatory Commission, 888 First Street NE., Washington, 
DC 20426.

    Dated: November 7, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013-27290 Filed 11-14-13; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.