Town of Telluride, Colorado; Notice of Preliminary Determination of a Qualifying Conduit Hydropower Facility and Soliciting Comments and Motions To Intervene, 68052-68053 [2013-27043]
Download as PDF
68052
Federal Register / Vol. 78, No. 219 / Wednesday, November 13, 2013 / Notices
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: November 4, 2013.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2013–27064 Filed 11–12–13; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER14–221–000]
Dated: November 5, 2013.
Kimberly D. Bose,
Secretary.
sroberts on DSK5SPTVN1PROD with NOTICES
Covanta Haverhill Association, LP;
Supplemental Notice That Initial
Market-Based Rate Filing Includes
Request for Blanket Section 204
Authorization
[FR Doc. 2013–27044 Filed 11–12–13; 8:45 am]
BILLING CODE 6717–01–P
This is a supplemental notice in the
above-referenced proceeding, of Covanta
Haverhill Association, LP’s application
for market-based rate authority, with an
accompanying rate schedule, noting that
such application includes a request for
blanket authorization, under 18 CFR
part 34, of future issuances of securities
and assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability is November 25,
2013.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with Internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
VerDate Mar<15>2010
17:14 Nov 12, 2013
Jkt 232001
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 5 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
The filings in the above-referenced
proceeding(s) are accessible in the
Commission’s eLibrary system by
clicking on the appropriate link in the
above list. They are also available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an eSubscription link on the
Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov. or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Dated: November 5, 2013.
Kimberly D. Bose,
Secretary.
DEPARTMENT OF ENERGY
[FR Doc. 2013–27046 Filed 11–12–13; 8:45 am]
Federal Energy Regulatory
Commission
BILLING CODE 6717–01–P
[Docket No. EL14–9–000]
DEPARTMENT OF ENERGY
Gregory Swecker, Beverly Swecker;
Notice of Petition for Enforcement
Take notice that on November 4,
2013, pursuant to section 210(h) of the
Public Utility Regulatory Policies Act of
1978 (PURPA), 16 U.S.C. 824 and Rules
385.26 and 214 of the Rules of Practice
and Procedure of the Federal Energy
Regulatory Commission (Commission),
Gregory and Beverly Swecker filed a
Petition for Enforcement, requesting the
Commission initiate enforcement action
against Midland Power Cooperative to
ensure that PURPA regulations are
properly and lawfully implemented.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
PO 00000
Frm 00035
Fmt 4703
Sfmt 4703
protests must be filed on or before the
comment date. On or before the
comment date, it is not necessary to
serve motions to intervene or protests
on persons other than the Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 5 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
This filing is accessible online at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5:00 p.m. Eastern
Time on November 25, 2013.
Federal Energy Regulatory
Commission
[Docket No. CD14–5–000]
Town of Telluride, Colorado; Notice of
Preliminary Determination of a
Qualifying Conduit Hydropower
Facility and Soliciting Comments and
Motions To Intervene
On October 28, 2013, the Town of
Telluride, Colorado, filed a notice of
intent to construct a qualifying conduit
hydropower facility, pursuant to section
30 of the Federal Power Act, as
amended by section 4 of the
Hydropower Regulatory Efficiency Act
of 2013 (HREA). The Pandora Water
System Project would be located within
the Pandora Water Treatment Plant in
San Miguel County, Colorado.
Applicant Contact: Karen
Guglielmone, Public Works Project
Manager, P.O. Box 397, Telluride, CO
81435, Phone No. (970) 728–0190.
FERC Contact: Christopher Chaney,
Phone No. (202) 502–6778, email:
christopher.chaney@ferc.gov.
E:\FR\FM\13NON1.SGM
13NON1
68053
Federal Register / Vol. 78, No. 219 / Wednesday, November 13, 2013 / Notices
Qualifying Conduit Hydropower
Facility Description: The proposed
project would consist of: (1) A 10-inch
intake pipe branching off an existing 12inch raw water pipe; (2) an
approximately 20-foot-wide by 22-foot-
long powerhouse, containing one 320kilowatt, single nozzle Pelton turbine/
generating unit; and (3) appurtenant
facilities. The proposed project would
have an estimated annual generating
capacity of 2,135 megawatt-hours.
A qualifying conduit hydropower
facility is one that is determined or
deemed to meet all of the criteria shown
in the table below.
TABLE 1—CRITERIA FOR QUALIFYING CONDUIT HYDROPOWER FACILITY
Statutory provision
Description
Satisfies
(Y/N)
FPA 30(a)(3)(A), as amended by HREA ....................................
The conduit the facility uses is a tunnel, canal, pipeline, aqueduct, flume, ditch, or similar manmade water conveyance
that is operated for the distribution of water for agricultural,
municipal, or industrial consumption and not primarily for
the generation of electricity.
The facility is constructed, operated, or maintained for the
generation of electric power and uses for such generation
only the hydroelectric potential of a non-federally owned
conduit.
The facility has an installed capacity that does not exceed 5
megawatts.
On or before August 9, 2013, the facility is not licensed, or exempted from the licensing requirements of Part I of the FPA.
Y
FPA 30(a)(3)(C)(i), as amended by HREA .................................
FPA 30(a)(3)(C)(ii), as amended by HREA ................................
sroberts on DSK5SPTVN1PROD with NOTICES
FPA 30(a)(3)(C)(iii), as amended by HREA ...............................
Preliminary Determination: Based
upon the above criteria, Commission
staff preliminarily determines that the
proposal satisfies the requirements for a
qualifying conduit hydropower facility
not required to be licensed or exempted
from licensing.
Comments and Motions to Intervene:
Deadline for filing comments contesting
whether the facility meets the qualifying
criteria is 45 days from the issuance
date of this notice.
Deadline for filing motions to
intervene is 30 days from the issuance
date of this notice.
Anyone may submit comments or a
motion to intervene in accordance with
the requirements of Rules of Practice
and Procedure, 18 CFR 385.210 and
385.214. Any motions to intervene must
be received on or before the specified
deadline date for the particular
proceeding.
Filing and Service of Responsive
Documents: All filings must (1) bear in
all capital letters the ‘‘COMMENTS
CONTESTING QUALIFICATION FOR A
CONDUIT HYDROPOWER FACILITY’’
or ‘‘MOTION TO INTERVENE,’’ as
applicable; (2) state in the heading the
name of the applicant and the project
number of the application to which the
filing responds; (3) state the name,
address, and telephone number of the
person filing; and (4) otherwise comply
with the requirements of sections
385.2001 through 385.2005 of the
Commission’s regulations.1 All
comments contesting Commission staff’s
preliminary determination that the
1 18
CFR 385.2001–2005 (2013).
VerDate Mar<15>2010
17:14 Nov 12, 2013
Jkt 232001
facility meets the qualifying criteria
must set forth their evidentiary basis.
The Commission strongly encourages
electronic filing. Please file motions to
intervene and comments using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
A copy of all other filings in reference
to this application must be accompanied
by proof of service on all persons listed
in the service list prepared by the
Commission in this proceeding, in
accordance with 18 CFR 4.34(b) and
385.2010.
Locations of Notice of Intent: Copies
of the notice of intent can be obtained
directly from the applicant or such
copies can be viewed and reproduced at
the Commission in its Public Reference
Room, Room 2A, 888 First Street NE.,
Washington, DC 20426. The filing may
also be viewed on the web at https://
www.ferc.gov/docs-filing/elibrary.asp
using the ‘‘eLibrary’’ link. Enter the
docket number (e.g., CD14–5) in the
docket number field to access the
document. For assistance, call toll-free
1–866–208–3676 or email
PO 00000
Frm 00036
Fmt 4703
Sfmt 4703
Y
Y
Y
FERCOnlineSupport@ferc.gov. For TTY,
call (202) 502–8659.
Dated: November 5, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013–27043 Filed 11–12–13; 8:45 am]
BILLING CODE 6717–01–P
ENVIRONMENTAL PROTECTION
AGENCY
[FRL–9902–62–OEI]
Agency Information Collection
Activities OMB Responses
Environmental Protection
Agency (EPA).
AGENCY:
ACTION:
Notice.
This document announces the
Office of Management and Budget
(OMB) responses to Agency Clearance
requests, in compliance with the
Paperwork Reduction Act (44 U.S.C.
3501 et seq.). An agency may not
conduct or sponsor, and a person is not
required to respond to, a collection of
information unless it displays a
currently valid OMB control number.
The OMB control numbers for EPA
regulations are listed in 40 CFR part 9
and 48 CFR chapter 15.
SUMMARY:
Rick
Westlund (202) 566–1682, or email at
westlund.rick@epa.gov and please refer
to the appropriate EPA Information
Collection Request (ICR) Number.
FOR FURTHER INFORMATION CONTACT:
SUPPLEMENTARY INFORMATION:
E:\FR\FM\13NON1.SGM
13NON1
Agencies
[Federal Register Volume 78, Number 219 (Wednesday, November 13, 2013)]
[Notices]
[Pages 68052-68053]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-27043]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CD14-5-000]
Town of Telluride, Colorado; Notice of Preliminary Determination
of a Qualifying Conduit Hydropower Facility and Soliciting Comments and
Motions To Intervene
On October 28, 2013, the Town of Telluride, Colorado, filed a
notice of intent to construct a qualifying conduit hydropower facility,
pursuant to section 30 of the Federal Power Act, as amended by section
4 of the Hydropower Regulatory Efficiency Act of 2013 (HREA). The
Pandora Water System Project would be located within the Pandora Water
Treatment Plant in San Miguel County, Colorado.
Applicant Contact: Karen Guglielmone, Public Works Project Manager,
P.O. Box 397, Telluride, CO 81435, Phone No. (970) 728-0190.
FERC Contact: Christopher Chaney, Phone No. (202) 502-6778, email:
christopher.chaney@ferc.gov.
[[Page 68053]]
Qualifying Conduit Hydropower Facility Description: The proposed
project would consist of: (1) A 10-inch intake pipe branching off an
existing 12-inch raw water pipe; (2) an approximately 20-foot-wide by
22-foot-long powerhouse, containing one 320-kilowatt, single nozzle
Pelton turbine/generating unit; and (3) appurtenant facilities. The
proposed project would have an estimated annual generating capacity of
2,135 megawatt-hours.
A qualifying conduit hydropower facility is one that is determined
or deemed to meet all of the criteria shown in the table below.
Table 1--Criteria for Qualifying Conduit Hydropower Facility
------------------------------------------------------------------------
Satisfies (Y/
Statutory provision Description N)
------------------------------------------------------------------------
FPA 30(a)(3)(A), as amended by The conduit the Y
HREA. facility uses is a
tunnel, canal,
pipeline, aqueduct,
flume, ditch, or
similar manmade water
conveyance that is
operated for the
distribution of water
for agricultural,
municipal, or
industrial
consumption and not
primarily for the
generation of
electricity.
FPA 30(a)(3)(C)(i), as amended The facility is Y
by HREA. constructed,
operated, or
maintained for the
generation of
electric power and
uses for such
generation only the
hydroelectric
potential of a non-
federally owned
conduit.
FPA 30(a)(3)(C)(ii), as amended The facility has an Y
by HREA. installed capacity
that does not exceed
5 megawatts.
FPA 30(a)(3)(C)(iii), as On or before August 9, Y
amended by HREA. 2013, the facility is
not licensed, or
exempted from the
licensing
requirements of Part
I of the FPA.
------------------------------------------------------------------------
Preliminary Determination: Based upon the above criteria,
Commission staff preliminarily determines that the proposal satisfies
the requirements for a qualifying conduit hydropower facility not
required to be licensed or exempted from licensing.
Comments and Motions to Intervene: Deadline for filing comments
contesting whether the facility meets the qualifying criteria is 45
days from the issuance date of this notice.
Deadline for filing motions to intervene is 30 days from the
issuance date of this notice.
Anyone may submit comments or a motion to intervene in accordance
with the requirements of Rules of Practice and Procedure, 18 CFR
385.210 and 385.214. Any motions to intervene must be received on or
before the specified deadline date for the particular proceeding.
Filing and Service of Responsive Documents: All filings must (1)
bear in all capital letters the ``COMMENTS CONTESTING QUALIFICATION FOR
A CONDUIT HYDROPOWER FACILITY'' or ``MOTION TO INTERVENE,'' as
applicable; (2) state in the heading the name of the applicant and the
project number of the application to which the filing responds; (3)
state the name, address, and telephone number of the person filing; and
(4) otherwise comply with the requirements of sections 385.2001 through
385.2005 of the Commission's regulations.\1\ All comments contesting
Commission staff's preliminary determination that the facility meets
the qualifying criteria must set forth their evidentiary basis.
---------------------------------------------------------------------------
\1\ 18 CFR 385.2001-2005 (2013).
---------------------------------------------------------------------------
The Commission strongly encourages electronic filing. Please file
motions to intervene and comments using the Commission's eFiling system
at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit
brief comments up to 6,000 characters, without prior registration,
using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information at the
end of your comments. For assistance, please contact FERC Online
Support at FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or
(202) 502-8659 (TTY). In lieu of electronic filing, please send a paper
copy to: Secretary, Federal Energy Regulatory Commission, 888 First
Street NE., Washington, DC 20426. A copy of all other filings in
reference to this application must be accompanied by proof of service
on all persons listed in the service list prepared by the Commission in
this proceeding, in accordance with 18 CFR 4.34(b) and 385.2010.
Locations of Notice of Intent: Copies of the notice of intent can
be obtained directly from the applicant or such copies can be viewed
and reproduced at the Commission in its Public Reference Room, Room 2A,
888 First Street NE., Washington, DC 20426. The filing may also be
viewed on the web at https://www.ferc.gov/docs-filing/elibrary.asp using
the ``eLibrary'' link. Enter the docket number (e.g., CD14-5) in the
docket number field to access the document. For assistance, call toll-
free 1-866-208-3676 or email FERCOnlineSupport@ferc.gov. For TTY, call
(202) 502-8659.
Dated: November 5, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013-27043 Filed 11-12-13; 8:45 am]
BILLING CODE 6717-01-P