Environmental Impacts Statements; Notice of Availability, 67140-67141 [2013-26870]

Download as PDF 67140 Federal Register / Vol. 78, No. 217 / Friday, November 8, 2013 / Notices Contract Number EP–W–09–033, ERG and its subcontractor required access to I. General Information CBI submitted to EPA under all sections of TSCA to perform successfully the A. Does this notice apply to me? duties specified under the contract. ERG This action is directed to the public in general. This action may, however, be and its subcontractor’s personnel were given access to information submitted to of interest to all who manufacture, EPA under all sections of TSCA. Some process, or distribute industrial chemicals. Since other entities may also of the information may be claimed or determined to be CBI. be interested, the Agency has not EPA is issuing this notice to inform attempted to describe all the specific all submitters of information under all entities that may be affected by this sections of TSCA that EPA has provided action. If you have any questions regarding the applicability of this action ERG and its subcontractor access to these CBI materials on a need-to-know to a particular entity, consult the basis only. All access to TSCA CBI technical person listed under FOR under this contract is taking place at FURTHER INFORMATION CONTACT. EPA Headquarters and ERG’s Chantilly, B. How can I get copies of this document VA, site in accordance with EPA’s TSCA and other related Information? CBI Protection Manual. Access to TSCA data, including CBI, EPA has established a docket for this will continue until September 30, 2014. action under docket identification (ID) If the contract is extended, this access number EPA–HQ–OPPT–2003–0004. will also continue for the duration of the All documents in the docket are listed extended contract without further in the docket index available at https:// www.regulations.gov. Although listed in notice. ERG and its subcontractor’s personnel the index, some information is not have signed nondisclosure agreements publicly available, e.g., CBI or other and were briefed on appropriate information whose disclosure is security procedures before they were restricted by statute. Certain other permitted access to TSCA CBI. material, such as copyrighted material, will be publicly available only in hard List of Subjects copy. Publicly available docket Environmental protection, materials are available electronically at Confidential business information. https://www.regulations.gov, or, if only Dated: October 21, 2013. available in hard copy, at the OPPT Docket. The OPPT Docket is located in Matthew G. Leopard, the EPA Docket Center (EPA/DC) at Rm. Director, Information Management Division, 3334, EPA West Bldg., 1301 Office of Pollution Prevention and Toxics. Constitution Ave. NW., Washington, [FR Doc. 2013–26763 Filed 11–7–13; 8:45 am] DC. The EPA/DC Public Reading Room BILLING CODE 6560–50–P hours of operation are 8:30 a.m. to 4:30 p.m., Monday through Friday, excluding legal holidays. The telephone number of ENVIRONMENTAL PROTECTION the EPA/DC Public Reading Room is AGENCY (202) 566–1744, and the telephone [FRL–9902–70–OEI] number for the OPPT Docket is (202) 566–0280. Docket visitors are required Office of Environmental Information; to show photographic identification, Pause the Development of the Draft pass through a metal detector, and sign Quality Standard for Environmental the EPA visitor log. All visitor bags are Data Collection, Production, and Use processed through an X-ray machine by Non-EPA (External) Organizations and subject to search. Visitors will be and Two Associated QA Handbooks provided an EPA/DC badge that must be AGENCY: Environmental Protection visible at all times in the building and Agency (EPA). returned upon departure. ACTION: Notice. II. What action is the Agency taking? TKELLEY on DSK3SPTVN1PROD with NOTICES SUPPLEMENTARY INFORMATION: Under EPA Contract Number EP–W– 09–033, contractor ERG of 14555 Avion Parkway, Suite 200 and Energy Services, Inc., of 1300 Metropolitan Blvd., Tallahassee, FL, are assisting EPA by reviewing technical documents and providing technical expertise in the natural gas pipeline industry. In accordance with 40 CFR 2.306(j), EPA has determined that under EPA VerDate Mar<15>2010 18:08 Nov 07, 2013 Jkt 232001 The Environmental Protection Agency published a document in the Federal Register of December 26, 2012, concerning request for comments for the Draft Quality Standard for Environmental Data Collection, Production, and Use by Non-EPA (External) Organizations and two associated QA Handbooks. EPA has decided to pause the development of the SUMMARY: PO 00000 Frm 00042 Fmt 4703 Sfmt 4703 draft Quality Standards for Data Collection, Production and Use. This decision was made after careful consideration of the comments received from external stakeholders and discussion with our internal stakeholders. This pause will allow the Agency to revise the existing EPA Quality Policy and Procedure to integrate the relevant sections of the EPA Order 5360.1, EPA Quality Manual and draft Quality Standards. At the conclusion of this revision, we will revise the draft Quality Standards to align with the revised Quality Policy and Procedure and integrate the relevant sections of our existing QA Requirements documents (R–2, R–5). Throughout the process, EPA plans to solicit input from both internal and external stakeholders and provide frequent status updates. We believe this approach will address many of the concerns raised by our stakeholders during the public comment period for the Quality Standard. FOR MORE INFORMATION CONTACT: Katherine Chalfant, Environmental Protection Agency; 1200 Pennsylvania Avenue, MC 2811T; Washington, DC 20460; Phone: 202–564–1511; email address: quality@epa.gov. Monica D. Jones, Director, Quality Staff. [FR Doc. 2013–26866 Filed 11–7–13; 8:45 am] BILLING CODE 6560–50–P ENVIRONMENTAL PROTECTION AGENCY [ER–FRL–9011–8] Environmental Impacts Statements; Notice of Availability Responsible Agency: Office of Federal Activities, General Information (202) 564–7146 or https://www.epa.gov/ compliance/nepa/. Weekly receipt of Environmental Impact Statements Filed 10/28/2013 Through 11/01/2013, Pursuant to 40 CFR 1506.9. Notice: Section 309(a) of the Clean Air Act requires that EPA make public its comments on EISs issued by other Federal agencies. EPA’s comment letters on EISs are available at: https:// www.epa.gov/compliance/nepa/ eisdata.html EIS No. 20130318, Final EIS, USFS, CA, Harris Vegetation Management Project, Review Period Ends: 12/23/ 2013, Contact: Emelia Barnum 530– 926–4511 EIS No. 20130319, Draft EIS, USFS, UT, High Uintas Wilderness Colorado E:\FR\FM\08NON1.SGM 08NON1 Federal Register / Vol. 78, No. 217 / Friday, November 8, 2013 / Notices TKELLEY on DSK3SPTVN1PROD with NOTICES River Cutthroat Trout (CRCT) Habitat Enhancement, Comment Period Ends: 12/23/2013, Contact: Ronald Brunson 435–781–5202 EIS No. 20130320, Final EIS, USACE, CA, Suncreek Specific Plan, Review Period Ends: 12/09/2013, Contact: Lisa M. Gibson 916–557–5288 EIS No. 20130321, Draft Supplement, USFS, AZ, Bill Williams Mountain Restoration Project, Comment Period Ends: 12/23/2013, Contact: Marcos Roybal 928–635–8210 EIS No. 20130322, Draft EIS, BLM, MT, Lewistown Field Office Greater SageGrouse Draft Resource Management Plan Amendment, Comment Period Ends: 02/05/2014, Contact: Adam Carr 406–538–1913 EIS No. 20130323, Draft EIS, USFS, OR, Malheur National Forest Site-Specific Invasive Plants Treatment Project, Comment Period Ends: 12/23/2013, Contact: Joseph H. Rausch 541–575– 3141 EIS No. 20130324, Final EIS, BLM, CA, Stateline Solar Farm Project, Proposed Final Plan Amendment, Review Period Ends: 02/05/2014, Contact: Jeffery Childers 951–807–6737 EIS No. 20130325, Draft EIS, NPS, MO, Ozark National Scenic Riverways Draft General Management Plan, Wilderness Study, Comment Period Ends: 12/30/2013, Contact: William Black 573–323–4236 EIS No. 20130326, Draft EIS, USFS, CA, California Pacific Electricity Company 625 and 650 Electrical Line Upgrade Project, Comment Period Ends: 01/07/ 2014, Contact: Robert Rodman, Jr. 530–543–2613 EIS No. 20130327, Draft EIS, NPS, CA, Channel Islands National Park Draft General Management Plan, Wilderness Study, Comment Period Ends: 01/09/2014, Contact: Greg Jarvis 303–969–2263 EIS No. 20130328, Final EIS, USACE, CA, Pier S Development and Back Channel Navigational Safety Improvements in the Port of Long Beach, Review Period Ends: 12/09/ 2013, Contact: John Markham 805– 585–2150 Amended Notices EIS No. 20130288, Final EIS, USACE, TX, Luce Bayou Interbasin Transfer Project, Review Period Ends: 11/18/ 2013, Contact: Jayson Hudson 409– 766–3108. Revision of FR Notice Published 10/04/2013; Extending Review Period from 11/04/2013 to 11/ 18/2013. EIS No. 20130297, Draft EIS, USACE, LA, Calcasieu Lock Louisiana Feasibility Study, Comment Period Ends: 12/02/2013, Contact: Timothy VerDate Mar<15>2010 18:08 Nov 07, 2013 Jkt 232001 K. George 314–331–8459. Revision to FR Notice Published 10/04/2013; Extending Comment Period from 11/ 18/2013 to 12/02/2013. EIS No. 20130303, Final Supplement, FTA, HI, Honolulu Rail Transit Project/Amended Record of Decision, Contact: Ted Matley 415–744–3133. Revision to FR Notice Published 10/ 25/2013; Under MAP–21 section 1319, FHWA has issued a FSEIS and Amended ROD. Therefore, the 30-day wait/review period under NEPA does not apply to this action. Dated: November 5, 2013. Cliff Rader, Director, NEPA Compliance Division, Office of Federal Activities. [FR Doc. 2013–26870 Filed 11–7–13; 8:45 am] BILLING CODE 6560–50–P 67141 the docket at https:// www.regulations.gov. FOR FURTHER INFORMATION CONTACT: For technical information contact: Stan Barone, Jr., Risk Assessment Division (7403M), Office of Pollution Prevention and Toxics, Environmental Protection Agency, 1200 Pennsylvania Ave. NW., Washington, DC 20460–0001; telephone number: (202) 564–1169; email address: barone.stan@epa.gov. For peer review meeting logistics contact: Susie Warner, the Scientific Consulting Group (SCG), Inc., 656 Quince Orchard Rd., Suite 210, Gaithersburg, MD 20878–1409; telephone number: (301) 670–4990, ext. 227; fax number: (301) 670–3815; email address: SWARNER@scgcorp.com. For details about the meetings regarding the peer review of EPA’s draft Toxic Substances Control Act (TSCA) chemical risk assessment, ‘‘TSCA Workplan Chemical Risk Assessment for ATO,’’ please see the announcement that published in the Federal Register of September 27, 2013 (78 FR 59679) (FRL–9400–5). However, due to the government shutdown, EPA has rescheduled the three peer review meetings and is announcing the rescheduled meetings in this notice. EPA is also extending the due date for public comments. To be sure your comments are contained in the peer review record and are available to the peer reviewers; please submit the comments on or before December 16, 2013. The first rescheduled peer review panel meeting on November 13, 2013, will be devoted to providing the peer review panel an overview of the assessment and its charge and providing an opportunity for public comment on the draft ATO TSCA risk assessment. The rescheduled second peer review panel meeting on December 6, 2013, will be devoted to deliberations of the draft ATO TSCA risk assessment by the peer review panel, guided by the charge questions to the peer review panel. The third and final peer review panel meeting on January 6, 2014, will focus on the peer review panel’s discussion of its draft ATO TSCA risk assessment recommendations to EPA, which will be posted on the contractor Web site prior to the final peer review meeting. SUPPLEMENTARY INFORMATION: ENVIRONMENTAL PROTECTION AGENCY [EPA–HQ–OPPT–2012–0724; FRL–9902–45] Antimony Trioxide (ATO) TSCA Chemical Risk Assessment; Notice of Public Meetings and Opportunity To Comment Environmental Protection Agency (EPA). ACTION: Notice. AGENCY: On September 27, 2013, EPA announced that it would be holding three peer review meetings by web connect and teleconference on October 16, 2013, October 31, 2013, and November 14, 2013, regarding EPA’s draft Toxic Substances Control Act (TSCA) chemical risk assessment, ‘‘TSCA Workplan Chemical Risk Assessment for ATO.’’ Due to the government shutdown, however, EPA has rescheduled the peer review meetings and is announcing the rescheduled meetings in this notice. EPA is also extending the due date for public comments. DATES: Meetings. The peer review meetings will be held on Wednesday, November 13, 2013, from 10 a.m. to noon EST; Friday, December 6, 2013, from 11:30 a.m. to 4:30 p.m. EST; and Monday, January 6, 2014, from 11 a.m. to 1 p.m. EST. Comments. Written comments on the assessment must be submitted on or before December 16, 2013. ADDRESSES: Submit your comments, identified by docket identification (ID) number EPA–HQ–OPPT–2012–0724, by one of the methods described in the September 27, 2013 Federal Register notice, a copy of which is available in SUMMARY: PO 00000 Frm 00043 Fmt 4703 Sfmt 4703 List of Subjects Environmental protection, ATO, Chemicals, Flame retardant synergist. Peer review, Risk assessments. E:\FR\FM\08NON1.SGM 08NON1

Agencies

[Federal Register Volume 78, Number 217 (Friday, November 8, 2013)]
[Notices]
[Pages 67140-67141]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-26870]


-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY

[ER-FRL-9011-8]


Environmental Impacts Statements; Notice of Availability

    Responsible Agency: Office of Federal Activities, General 
Information (202) 564-7146 or https://www.epa.gov/compliance/nepa/.

Weekly receipt of Environmental Impact Statements
Filed 10/28/2013 Through 11/01/2013,
Pursuant to 40 CFR 1506.9.

    Notice: Section 309(a) of the Clean Air Act requires that EPA make 
public its comments on EISs issued by other Federal agencies. EPA's 
comment letters on EISs are available at: https://www.epa.gov/compliance/nepa/eisdata.html

EIS No. 20130318, Final EIS, USFS, CA, Harris Vegetation Management 
Project, Review Period Ends: 12/23/2013, Contact: Emelia Barnum 530-
926-4511
EIS No. 20130319, Draft EIS, USFS, UT, High Uintas Wilderness Colorado

[[Page 67141]]

River Cutthroat Trout (CRCT) Habitat Enhancement, Comment Period Ends: 
12/23/2013, Contact: Ronald Brunson 435-781-5202
EIS No. 20130320, Final EIS, USACE, CA, Suncreek Specific Plan, Review 
Period Ends: 12/09/2013, Contact: Lisa M. Gibson 916-557-5288
EIS No. 20130321, Draft Supplement, USFS, AZ, Bill Williams Mountain 
Restoration Project, Comment Period Ends: 12/23/2013, Contact: Marcos 
Roybal 928-635-8210
EIS No. 20130322, Draft EIS, BLM, MT, Lewistown Field Office Greater 
Sage-Grouse Draft Resource Management Plan Amendment, Comment Period 
Ends: 02/05/2014, Contact: Adam Carr 406-538-1913
EIS No. 20130323, Draft EIS, USFS, OR, Malheur National Forest Site-
Specific Invasive Plants Treatment Project, Comment Period Ends: 12/23/
2013, Contact: Joseph H. Rausch 541-575-3141
EIS No. 20130324, Final EIS, BLM, CA, Stateline Solar Farm Project, 
Proposed Final Plan Amendment, Review Period Ends: 02/05/2014, Contact: 
Jeffery Childers 951-807-6737
EIS No. 20130325, Draft EIS, NPS, MO, Ozark National Scenic Riverways 
Draft General Management Plan, Wilderness Study, Comment Period Ends: 
12/30/2013, Contact: William Black 573-323-4236
EIS No. 20130326, Draft EIS, USFS, CA, California Pacific Electricity 
Company 625 and 650 Electrical Line Upgrade Project, Comment Period 
Ends: 01/07/2014, Contact: Robert Rodman, Jr. 530-543-2613
EIS No. 20130327, Draft EIS, NPS, CA, Channel Islands National Park 
Draft General Management Plan, Wilderness Study, Comment Period Ends: 
01/09/2014, Contact: Greg Jarvis 303-969-2263
EIS No. 20130328, Final EIS, USACE, CA, Pier S Development and Back 
Channel Navigational Safety Improvements in the Port of Long Beach, 
Review Period Ends: 12/09/2013, Contact: John Markham 805-585-2150

Amended Notices

EIS No. 20130288, Final EIS, USACE, TX, Luce Bayou Interbasin Transfer 
Project, Review Period Ends: 11/18/2013, Contact: Jayson Hudson 409-
766-3108. Revision of FR Notice Published 10/04/2013; Extending Review 
Period from 11/04/2013 to 11/18/2013.
EIS No. 20130297, Draft EIS, USACE, LA, Calcasieu Lock Louisiana 
Feasibility Study, Comment Period Ends: 12/02/2013, Contact: Timothy K. 
George 314-331-8459. Revision to FR Notice Published 10/04/2013; 
Extending Comment Period from 11/18/2013 to 12/02/2013.
EIS No. 20130303, Final Supplement, FTA, HI, Honolulu Rail Transit 
Project/Amended Record of Decision, Contact: Ted Matley 415-744-3133. 
Revision to FR Notice Published 10/25/2013; Under MAP-21 section 1319, 
FHWA has issued a FSEIS and Amended ROD. Therefore, the 30-day wait/
review period under NEPA does not apply to this action.

    Dated: November 5, 2013.
Cliff Rader,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. 2013-26870 Filed 11-7-13; 8:45 am]
BILLING CODE 6560-50-P