In the Matter of Exelon Generation Company, LLC; Dresden Nuclear Power Station Confirmatory Order Modifying License, 66965-66967 [2013-26757]
Download as PDF
Federal Register / Vol. 78, No. 216 / Thursday, November 7, 2013 / Notices
Ms.
P. Diane Rausch, Executive Director,
NASA Advisory Council, Advisory
Committee Management Division, Office
of International and Interagency
Relations, NASA Headquarters,
Washington, DC 20546; phone: 202–
358–4510; email:
diane.rausch@nasa.gov.
FOR FURTHER INFORMATION CONTACT:
Patricia D. Rausch,
Advisory Committee Management Officer,
National Aeronautics and Space
Administration.
[FR Doc. 2013–26713 Filed 11–6–13; 8:45 am]
BILLING CODE 7510–13–P
NUCLEAR REGULATORY
COMMISSION
[Docket Nos. 50–237; 50–249; License Nos.
DPR–19; DPR–25; EA–13–068; NRC–2013–
0245]
In the Matter of Exelon Generation
Company, LLC; Dresden Nuclear
Power Station Confirmatory Order
Modifying License
I
Exelon Generation Company, LLC
(Exelon or the licensee) is the holder of
Reactor Operating License Nos. DPR–19
and DPR–25 issued by the Nuclear
Regulatory Commission (NRC or
Commission) pursuant to Title 10 of the
Code of Federal Regulations (10 CFR)
Part 50 on February 20, 1991, for Unit
2 and on January 12, 1971, for Unit 3.
Both licenses were renewed on October
28, 2004. The licenses authorize the
operation of the Dresden Nuclear Power
Station (Dresden Station) in accordance
with conditions specified therein.
This Confirmatory Order is the result
of an agreement reached during an
alternative dispute resolution (ADR)
mediation session conducted on
September 18, 2013.
tkelley on DSK3SPTVN1PROD with NOTICES
II
On June 6, 2012, the U.S. Nuclear
Regulatory Commission’s Office of
Investigations (OI), Region III Field
Office, initiated an investigation to
determine if a Senior Reactor Operator
(SRO), an Equipment Operator (EO), or
any other personnel at the Dresden
Station knew that a SRO planned to
commit an off-site crime and failed to
report that SRO for aberrant behavior.
The investigation was completed on
March 29, 2013, and was documented in
the OI Report No. 3–2012–020. At the
time of this investigation, both the
SROs, who plotted the off-site crime and
the EO whom they were trying to
recruit, had their site access revoked
and all three employees were
VerDate Mar<15>2010
16:24 Nov 06, 2013
Jkt 232001
subsequently terminated by the
licensee. Based on the evidence
developed during its investigation, the
NRC identified an apparent violation of
NRC requirements in Title 10 of the
Code of Federal Regulations, Part 73,
Sections 56(a)(2), 56(f)(1), and 56(f)(3)
with multiple examples in that:
1. An EO, who had unescorted access
to the Dresden Station, failed to report
concerns to a supervisor regarding an
observed change in behavior of two
individuals who had unescorted access
to the Dresden Station when the other
individuals attempted to recruit him in
their plans to commit a violent crime
off-site.
2. A SRO, who had unescorted access
to the Dresden Station, failed to report
concerns to a supervisor regarding an
observed change in behavior of another
individual who had unescorted access
to the Dresden Station when the other
individual attempted to recruit him in
his plans to commit a violent crime offsite.
3. A SRO, who had unescorted access
to the Dresden Station, failed to report
concerns to a supervisor regarding an
observed change in behavior of another
individual who had unescorted access
to the Dresden Station when the other
individual went along with his plans to
commit a violent crime off-site.
4. An SRO, with unescorted access to
the Dresden Station, failed to promptly
contact a reviewing official upon
learning of questionable behavior when
the SRO was informed by two reactor
operators about the questionable
behavior of an EO.
On September 18, 2013, Exelon and
the NRC met in an ADR session
mediated by a professional mediator,
arranged through Cornell University’s
Institute on Conflict Resolution. ADR is
a process in which a neutral mediator
with no decision-making authority
assists the parties in reaching an
agreement on resolving any differences
regarding the dispute. This confirmatory
order is issued pursuant to the
agreement reached during the ADR
process.
Ill
In response to the NRC’s offer, Exelon
requested use of the NRC’s ADR process
to resolve differences it had with the
NRC. During that ADR session, a
preliminary settlement agreement was
reached. The elements of the agreement
consisted of the following:
A. The licensee stated that it has
completed the following actions, which
are hereby acknowledged in the
Confirmatory Order:
• Revised Exelon procedure SY–AA–
103–513, ‘‘Behavioral Observation
PO 00000
Frm 00076
Fmt 4703
Sfmt 4703
66965
Program’’ to indicate that the behavioral
observation program includes an
expectation to report offsite illegal
activity;
• Conducted an Exelon-wide briefing
of the issue and the expectation to
report unusual behavior observed either
on or offsite;
• Trained Dresden Station personnel
of the changes to the procedure and the
expectations for reporting aberrant
offsite activities; and
• Verified that Dresden Station
personnel understood the procedural
requirements and guidance.
In addition, the licensee stated that
the general employee training program,
which is used at Exelon and at other
reactor utilities, was revised to include
guidance on reporting offsite aberrant
activities.
B. Responsibility to Report Offsite
Aberrant Behavior or Credible
Information:
B.1. Within 90 days of the effective
date of the Confirmatory Order, revise
Exelon procedure SY–AA–103–513,
‘‘Behavioral Observation Program’’: (1)
to provide additional guidance on the
types of offsite activities, if observed, or
credible information that should be
reported to reviewing officials, and (2)
to ensure that procedural requirements
to pass information forward without
delay are clearly communicated.
B.2. Within 90 days of the revision to
the procedure described in B.1., provide
training to Exelon staff of the revision.
B.3. Within 18 months of the effective
date of the Confirmatory Order, develop
and conduct an effectiveness assessment
of its revised procedure and of the
general employee training to determine
if Exelon personnel remain aware of the
need to report observed offsite aberrant
behavior or credible information.
B.4. These terms and conditions apply
to the current Exelon fleet of operating
reactors existing as of the date of the
Confirmatory Order.
C. Recognition within Reactor
Community:
Within 90 days of the effective date of
the Confirmatory Order, Exelon will
develop and make a presentation based
on the facts and lessons learned from
the events that gave rise to the
Confirmatory Order. Exelon agrees to
make this presentation at an appropriate
industry forum and to submit an
operating experience summary to an
industry-wide organization. Exelon will
make the presentation materials
available to the onsite NRC resident
inspectors at the Dresden Station.
D. Informing NRC when Actions Are
Complete:
Unless otherwise specified, Exelon
will submit written notification to the
E:\FR\FM\07NON1.SGM
07NON1
66966
Federal Register / Vol. 78, No. 216 / Thursday, November 7, 2013 / Notices
U.S. NRC Region III Director of Reactor
Safety at one year from the date of the
Confirmatory Order, and annually
thereafter, as actions are completed
until total completion.
E. The resulting Confirmatory Order
will not be considered an escalated
enforcement action by the NRC for any
future assessment of the Dresden
Station.
F. In consideration of the
commitments above, the NRC agrees to
not issue a finding, a Notice of
Violation, a civil penalty, or to take any
further enforcement action in the matter
of EA–13–068 discussed in the NRC’s
letter to Exelon dated July 3, 2013.
On October 4, 2013, Exelon consented
to issuing this Order with the
commitments as described in Section V
below. Exelon further agreed that this
Order is to be effective upon issuance
and that the licensee has waived its
right to a hearing.
IV
Since the licensee has agreed to take
additional actions to address NRC
concerns, as set forth in Section III
above, the NRC has concluded that its
concerns can be resolved through
issuance of this Confirmatory Order.
I find that Exelon’s commitments as
set forth in Section V are acceptable and
necessary and conclude that with these
commitments the public health and
safety are reasonably assured. In view of
the foregoing, I have determined that
public health and safety require that
Exelon’s commitments be confirmed by
this Confirmatory Order. Based on the
above and Exelon’s consent, this
Confirmatory Order is effective upon
issuance.
tkelley on DSK3SPTVN1PROD with NOTICES
V
Accordingly, pursuant to Sections
104b, 161 b, 161i, 161o, 182, and 186 of
the Atomic Energy Act of 1954, as
amended, and the Commission’s
regulations in 10 CFR 2.202 and 10 CFR
Part 50, it is hereby ordered, that the
actions described below will be taken at
Dresden Nuclear Power Station and
other nuclear plants in Exelon’s fleet
and that License Nos. DPR–19 and DPR–
25 are modified as follows with respect
to the actions taken or to be taken at
Dresden Nuclear Power Station:
A. Responsibility to Report Offsite
Aberrant Behavior or Credible
Information:
A.1. Within 90 days of the effective
date of the Confirmatory Order, revise
Exelon procedure SY–AA–103–513,
‘‘Behavioral Observation Program’’: (1)
to provide additional guidance on the
types of offsite activities, if observed, or
credible information that should be
VerDate Mar<15>2010
16:24 Nov 06, 2013
Jkt 232001
reported to reviewing officials, and (2)
to ensure that procedural requirements
to pass information forward without
delay are clearly communicated.
A.2. Within 90 days of the revision to
the procedure described in A.1., provide
training to Exelon staff of the revision.
A.3. Within 18 months of the effective
date of the Confirmatory Order, develop
and conduct an effectiveness assessment
of its revised procedure and of the
general employee training to determine
if Exelon personnel remain aware of the
need to report observed offsite aberrant
behavior or credible information.
A.4. These terms and conditions
apply to the current Exelon fleet of
operating reactors existing as of the date
of the Confirmatory Order.
B. Recognition within Reactor
Community:
Within 90 days of the effective date of
the Confirmatory Order, Exelon will
develop and make a presentation based
on the facts and lessons learned from
the events that gave rise to the
Confirmatory Order. Exelon agrees to
make this presentation at an appropriate
industry forum and to submit an
operating experience summary to an
industry-wide organization. Exelon will
make the presentation materials
available to the onsite NRC resident
inspectors at the Dresden Station.
C. Informing NRC when Actions Are
Complete:
Unless otherwise specified, Exelon
will submit a written status of the
Confirmatory Order action items to the
U.S. NRC Region III Director of Reactor
Safety by October 31, 2014, and
annually thereafter, until all actions are
completed.
The Regional Administrator, Region
III, may, in writing, relax or rescind any
of the above conditions upon
demonstration by Exelon of good cause.
VI
Any person adversely affected by this
Confirmatory Order, other than Exelon
may request a hearing within 30 days of
the date of this Order. Where good cause
is shown, consideration will be given to
extending the time to request a hearing.
A request for extension of time must be
made in writing to the Director, Office
of Enforcement, U.S. Nuclear Regulatory
Commission, Washington, DC 20555,
and include a statement of good cause
for the extension.
All documents filed in NRC
adjudicatory proceedings, including a
request for hearing, a petition for leave
to intervene, any motion or other
document filed in the proceeding prior
to the submission of a request for
hearing or petition to intervene, and
documents filed by interested
PO 00000
Frm 00077
Fmt 4703
Sfmt 4703
governmental entities participating
under 10 CFR 2.315(c), must be filed in
accordance with the NRC E-Filing rule
(72 FR 49139; August 28, 2007). The EFiling process requires participants to
submit and serve all adjudicatory
documents over the internet, or in some
cases to mail copies on electronic
storage media. Participants may not
submit paper copies of their filings
unless they seek an exemption in
accordance with the procedures
described below.
To comply with the procedural
requirements of E-Filing, at least ten 10
days prior to the filing deadline, the
participant should contact the Office of
the Secretary by email at
hearing.docket@nrc.gov, or by telephone
at 301–415–1677, to request (1) a digital
identification (ID) certificate, which
allows the participant (or its counsel or
representative) to digitally sign
documents and access the E-Submittal
server for any proceeding in which it is
participating; and (2) advise the
Secretary that the participant will be
submitting a request or petition for
hearing (even in instances in which the
participant, or its counsel or
representative, already holds an NRCissued digital ID certificate). Based upon
this information, the Secretary will
establish an electronic docket for the
hearing in this proceeding if the
Secretary has not already established an
electronic docket.
Information about applying for a
digital ID certificate is available on the
NRC’s public Web site at https://
www.nrc.gov/site-help/e-submittals/
apply-certificates.html. System
requirements for accessing the ESubmittal server are detailed in the
NRC’s ‘‘Guidance for Electronic
Submission,’’ which is available on the
agency’s public Web site at https://
www.nrc.gov/site-help/esubmittals.html. Participants may
attempt to use other software not listed
on the Web site, but should note that the
NRC’s E-Filing system does not support
unlisted software, and the NRC Meta
System Help Desk will not be able to
offer assistance in using unlisted
software. If a participant is
electronically submitting a document to
the NRC in accordance with the E-Filing
rule, the participant must file the
document using the NRC’s online, Webbased submission form. In order to serve
documents through the Electronic
Information Exchange System, users
will be required to install a Web
browser plug-in from the NRC’s Web
site. Further information on the Webbased submission form, including the
installation of the Web browser plug-in,
is available on the NRC’s public Web
E:\FR\FM\07NON1.SGM
07NON1
tkelley on DSK3SPTVN1PROD with NOTICES
Federal Register / Vol. 78, No. 216 / Thursday, November 7, 2013 / Notices
site at https://www.nrc.gov/site-help/esubmittals.html.
Once a participant has obtained a
digital ID certificate and a docket has
been created, the participant can then
submit a request for hearing or petition
for leave to intervene. Submissions
should be in Portable Document Format
(PDF) in accordance with NRC guidance
available on the NRC’s public Web site
at https://www.nrc.gov/site-help/esubmittals.html. A filing is considered
complete at the time the documents are
submitted through the NRC’s E-Filing
system. To be timely, an electronic
filing must be submitted to the E-Filing
system no later than 11:59 p.m. Eastern
Time on the due date. Upon receipt of
a transmission, the E-Filing system
time-stamps the document and sends
the submitter an email notice
confirming receipt of the document. The
E-Filing system also distributes an email
notice that provides access to the
document to the NRC’s Office of the
General Counsel and any others who
have advised the Office of the Secretary
that they wish to participate in the
proceeding, so that the filer need not
serve the documents on those
participants separately. Therefore,
applicants and other participants (or
their counsel or representative) must
apply for and receive a digital ID
certificate before a hearing request/
petition to intervene is filed so that they
can obtain access to the document via
the E-Filing system.
A person filing electronically using
the NRC’s adjudicatory E-Filing system
may seek assistance by contacting the
NRC Meta System Help Desk through
the ‘‘Contact Us’’ link located on the
NRC’s public Web site at https://
www.nrc.gov/site-help/esubmittals.html, by email to
MSHD.Resource@nrc.gov, or by a tollfree call at 866–672–7640. The NRC
Meta System Help Desk is available
between 8 a.m. and 8 p.m., Eastern
Time, Monday through Friday,
excluding government holidays.
Participants who believe that they
have a good cause for not submitting
documents electronically must file an
exemption request, in accordance with
10 CFR 2.302(g), with their initial paper
filing requesting authorization to
continue to submit documents in paper
format. Such filings must be submitted
by: (1) first class mail addressed to the
Office of the Secretary of the
Commission, U.S. Nuclear Regulatory
Commission, Washington, DC 20555–
0001, Attention: Rulemaking and
Adjudications Staff; or (2) courier,
express mail, or expedited delivery
service to the Office of the Secretary,
Sixteenth Floor, One White Flint North,
VerDate Mar<15>2010
16:24 Nov 06, 2013
Jkt 232001
11555 Rockville Pike, Rockville,
Maryland, 20852, Attention:
Rulemaking and Adjudications Staff.
Participants filing a document in this
manner are responsible for serving the
document on all other participants.
Filing is considered complete by firstclass mail as of the time of deposit in
the mail, or by courier, express mail, or
expedited delivery service upon
depositing the document with the
provider of the service. A presiding
officer, having granted an exemption
request from using E-Filing, may require
a participant or party to use E-Filing if
the presiding officer subsequently
determines that the reason for granting
the exemption from use of E-Filing no
longer exists.
Documents submitted in adjudicatory
proceedings will appear in the NRC’s
electronic hearing docket which is
available to the public at https://
ehd1.nrc.gov/ehd/, unless excluded
pursuant to an order of the Commission,
or the presiding officer. Participants are
requested not to include personal
privacy information, such as social
security numbers, home addresses, or
home phone numbers in their filings,
unless an NRC regulation or other law
requires submission of such
information. However, a request to
intervene will require including
information on local residence in order
to demonstrate a proximity assertion of
interest in the proceeding. With respect
to copyrighted works, except for limited
excerpts that serve the purpose of the
adjudicatory filings and would
constitute a Fair Use application,
participants are requested not to include
copyrighted materials in their
submission.
If a person other than the licensee
requests a hearing, that person shall set
forth with particularity the manner in
which his interest is adversely affected
by this Confirmatory Order and shall
address the criteria set forth in 10 CFR
2.309(d) and (f).
If a hearing is requested by a person
whose interest is adversely affected, the
Commission will issue an order
designating the time and place of any
hearing. If a hearing is held, the issue to
be considered at such hearing shall be
whether this Confirmatory Order should
be sustained.
In the absence of any request for
hearing, or written approval of an
extension of time in which to request a
hearing, the provisions specified in
Section V above shall be final 30 days
from the date this Confirmatory Order
without further order or proceedings. If
an extension of time for requesting a
hearing has been approved, the
provisions specified in Section V shall
PO 00000
Frm 00078
Fmt 4703
Sfmt 4703
66967
be final when the extension expires if a
hearing request has not been received.
A request for hearing shall not stay
the effectiveness of this order.
Dated this 28th day of October 2013.
For the Nuclear Regulatory Commission.
Cynthia D. Pederson,
Regional Administrator, Region III.
[FR Doc. 2013–26757 Filed 11–6–13; 8:45 am]
BILLING CODE 7590–01–P
NUCLEAR REGULATORY
COMMISSION
Advisory Committee on Reactor
Safeguards (ACRS) Meeting of the
ACRS Subcommitte on Radiation
Protection and Nuclear Materials;
Notice of Meeting
The ACRS Subcommittee on
Radiation Protection and Nuclear
Materials will hold a meeting on
November 19, 2013, Room T–2B1,
11545 Rockville Pike, Rockville,
Maryland.
The meeting will be open to public
attendance.
The agenda for the subject meeting
shall be as follows:
Tuesday, November 19, 2013—1:00
p.m. Until 5:00 p.m.
The Subcommittee will review
proposed revisions to low-level waste
regulations (10 CFR Part 61). The
Subcommittee will hear presentations
by and hold discussions with staff of the
Department of Energy (DOE) and other
interested persons regarding this matter.
The Subcommittee will gather
information, analyze relevant issues and
facts, and formulate proposed positions
and actions, as appropriate, for
deliberation by the Full Committee.
Members of the public desiring to
provide oral statements and/or written
comments should notify the Designated
Federal Official (DFO), Derek Widmayer
(Telephone 301–415–7366 or Email:
Derek.Widmayer@nrc.gov) five days
prior to the meeting, if possible, so that
appropriate arrangements can be made.
Thirty-five hard copies of each
presentation or handout should be
provided to the DFO thirty minutes
before the meeting. In addition, one
electronic copy of each presentation
should be emailed to the DFO one day
before the meeting. If an electronic copy
cannot be provided within this
timeframe, presenters should provide
the DFO with a CD containing each
presentation at least thirty minutes
before the meeting. Electronic
recordings will be permitted only
during those portions of the meeting
that are open to the public. Detailed
E:\FR\FM\07NON1.SGM
07NON1
Agencies
[Federal Register Volume 78, Number 216 (Thursday, November 7, 2013)]
[Notices]
[Pages 66965-66967]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-26757]
=======================================================================
-----------------------------------------------------------------------
NUCLEAR REGULATORY COMMISSION
[Docket Nos. 50-237; 50-249; License Nos. DPR-19; DPR-25; EA-13-068;
NRC-2013-0245]
In the Matter of Exelon Generation Company, LLC; Dresden Nuclear
Power Station Confirmatory Order Modifying License
I
Exelon Generation Company, LLC (Exelon or the licensee) is the
holder of Reactor Operating License Nos. DPR-19 and DPR-25 issued by
the Nuclear Regulatory Commission (NRC or Commission) pursuant to Title
10 of the Code of Federal Regulations (10 CFR) Part 50 on February 20,
1991, for Unit 2 and on January 12, 1971, for Unit 3. Both licenses
were renewed on October 28, 2004. The licenses authorize the operation
of the Dresden Nuclear Power Station (Dresden Station) in accordance
with conditions specified therein.
This Confirmatory Order is the result of an agreement reached
during an alternative dispute resolution (ADR) mediation session
conducted on September 18, 2013.
II
On June 6, 2012, the U.S. Nuclear Regulatory Commission's Office of
Investigations (OI), Region III Field Office, initiated an
investigation to determine if a Senior Reactor Operator (SRO), an
Equipment Operator (EO), or any other personnel at the Dresden Station
knew that a SRO planned to commit an off-site crime and failed to
report that SRO for aberrant behavior. The investigation was completed
on March 29, 2013, and was documented in the OI Report No. 3-2012-020.
At the time of this investigation, both the SROs, who plotted the off-
site crime and the EO whom they were trying to recruit, had their site
access revoked and all three employees were subsequently terminated by
the licensee. Based on the evidence developed during its investigation,
the NRC identified an apparent violation of NRC requirements in Title
10 of the Code of Federal Regulations, Part 73, Sections 56(a)(2),
56(f)(1), and 56(f)(3) with multiple examples in that:
1. An EO, who had unescorted access to the Dresden Station, failed
to report concerns to a supervisor regarding an observed change in
behavior of two individuals who had unescorted access to the Dresden
Station when the other individuals attempted to recruit him in their
plans to commit a violent crime off-site.
2. A SRO, who had unescorted access to the Dresden Station, failed
to report concerns to a supervisor regarding an observed change in
behavior of another individual who had unescorted access to the Dresden
Station when the other individual attempted to recruit him in his plans
to commit a violent crime off-site.
3. A SRO, who had unescorted access to the Dresden Station, failed
to report concerns to a supervisor regarding an observed change in
behavior of another individual who had unescorted access to the Dresden
Station when the other individual went along with his plans to commit a
violent crime off-site.
4. An SRO, with unescorted access to the Dresden Station, failed to
promptly contact a reviewing official upon learning of questionable
behavior when the SRO was informed by two reactor operators about the
questionable behavior of an EO.
On September 18, 2013, Exelon and the NRC met in an ADR session
mediated by a professional mediator, arranged through Cornell
University's Institute on Conflict Resolution. ADR is a process in
which a neutral mediator with no decision-making authority assists the
parties in reaching an agreement on resolving any differences regarding
the dispute. This confirmatory order is issued pursuant to the
agreement reached during the ADR process.
Ill
In response to the NRC's offer, Exelon requested use of the NRC's
ADR process to resolve differences it had with the NRC. During that ADR
session, a preliminary settlement agreement was reached. The elements
of the agreement consisted of the following:
A. The licensee stated that it has completed the following actions,
which are hereby acknowledged in the Confirmatory Order:
Revised Exelon procedure SY-AA-103-513, ``Behavioral
Observation Program'' to indicate that the behavioral observation
program includes an expectation to report offsite illegal activity;
Conducted an Exelon-wide briefing of the issue and the
expectation to report unusual behavior observed either on or offsite;
Trained Dresden Station personnel of the changes to the
procedure and the expectations for reporting aberrant offsite
activities; and
Verified that Dresden Station personnel understood the
procedural requirements and guidance.
In addition, the licensee stated that the general employee training
program, which is used at Exelon and at other reactor utilities, was
revised to include guidance on reporting offsite aberrant activities.
B. Responsibility to Report Offsite Aberrant Behavior or Credible
Information:
B.1. Within 90 days of the effective date of the Confirmatory
Order, revise Exelon procedure SY-AA-103-513, ``Behavioral Observation
Program'': (1) to provide additional guidance on the types of offsite
activities, if observed, or credible information that should be
reported to reviewing officials, and (2) to ensure that procedural
requirements to pass information forward without delay are clearly
communicated.
B.2. Within 90 days of the revision to the procedure described in
B.1., provide training to Exelon staff of the revision.
B.3. Within 18 months of the effective date of the Confirmatory
Order, develop and conduct an effectiveness assessment of its revised
procedure and of the general employee training to determine if Exelon
personnel remain aware of the need to report observed offsite aberrant
behavior or credible information.
B.4. These terms and conditions apply to the current Exelon fleet
of operating reactors existing as of the date of the Confirmatory
Order.
C. Recognition within Reactor Community:
Within 90 days of the effective date of the Confirmatory Order,
Exelon will develop and make a presentation based on the facts and
lessons learned from the events that gave rise to the Confirmatory
Order. Exelon agrees to make this presentation at an appropriate
industry forum and to submit an operating experience summary to an
industry-wide organization. Exelon will make the presentation materials
available to the onsite NRC resident inspectors at the Dresden Station.
D. Informing NRC when Actions Are Complete:
Unless otherwise specified, Exelon will submit written notification
to the
[[Page 66966]]
U.S. NRC Region III Director of Reactor Safety at one year from the
date of the Confirmatory Order, and annually thereafter, as actions are
completed until total completion.
E. The resulting Confirmatory Order will not be considered an
escalated enforcement action by the NRC for any future assessment of
the Dresden Station.
F. In consideration of the commitments above, the NRC agrees to not
issue a finding, a Notice of Violation, a civil penalty, or to take any
further enforcement action in the matter of EA-13-068 discussed in the
NRC's letter to Exelon dated July 3, 2013.
On October 4, 2013, Exelon consented to issuing this Order with the
commitments as described in Section V below. Exelon further agreed that
this Order is to be effective upon issuance and that the licensee has
waived its right to a hearing.
IV
Since the licensee has agreed to take additional actions to address
NRC concerns, as set forth in Section III above, the NRC has concluded
that its concerns can be resolved through issuance of this Confirmatory
Order.
I find that Exelon's commitments as set forth in Section V are
acceptable and necessary and conclude that with these commitments the
public health and safety are reasonably assured. In view of the
foregoing, I have determined that public health and safety require that
Exelon's commitments be confirmed by this Confirmatory Order. Based on
the above and Exelon's consent, this Confirmatory Order is effective
upon issuance.
V
Accordingly, pursuant to Sections 104b, 161 b, 161i, 161o, 182, and
186 of the Atomic Energy Act of 1954, as amended, and the Commission's
regulations in 10 CFR 2.202 and 10 CFR Part 50, it is hereby ordered,
that the actions described below will be taken at Dresden Nuclear Power
Station and other nuclear plants in Exelon's fleet and that License
Nos. DPR-19 and DPR-25 are modified as follows with respect to the
actions taken or to be taken at Dresden Nuclear Power Station:
A. Responsibility to Report Offsite Aberrant Behavior or Credible
Information:
A.1. Within 90 days of the effective date of the Confirmatory
Order, revise Exelon procedure SY-AA-103-513, ``Behavioral Observation
Program'': (1) to provide additional guidance on the types of offsite
activities, if observed, or credible information that should be
reported to reviewing officials, and (2) to ensure that procedural
requirements to pass information forward without delay are clearly
communicated.
A.2. Within 90 days of the revision to the procedure described in
A.1., provide training to Exelon staff of the revision.
A.3. Within 18 months of the effective date of the Confirmatory
Order, develop and conduct an effectiveness assessment of its revised
procedure and of the general employee training to determine if Exelon
personnel remain aware of the need to report observed offsite aberrant
behavior or credible information.
A.4. These terms and conditions apply to the current Exelon fleet
of operating reactors existing as of the date of the Confirmatory
Order.
B. Recognition within Reactor Community:
Within 90 days of the effective date of the Confirmatory Order,
Exelon will develop and make a presentation based on the facts and
lessons learned from the events that gave rise to the Confirmatory
Order. Exelon agrees to make this presentation at an appropriate
industry forum and to submit an operating experience summary to an
industry-wide organization. Exelon will make the presentation materials
available to the onsite NRC resident inspectors at the Dresden Station.
C. Informing NRC when Actions Are Complete:
Unless otherwise specified, Exelon will submit a written status of
the Confirmatory Order action items to the U.S. NRC Region III Director
of Reactor Safety by October 31, 2014, and annually thereafter, until
all actions are completed.
The Regional Administrator, Region III, may, in writing, relax or
rescind any of the above conditions upon demonstration by Exelon of
good cause.
VI
Any person adversely affected by this Confirmatory Order, other
than Exelon may request a hearing within 30 days of the date of this
Order. Where good cause is shown, consideration will be given to
extending the time to request a hearing. A request for extension of
time must be made in writing to the Director, Office of Enforcement,
U.S. Nuclear Regulatory Commission, Washington, DC 20555, and include a
statement of good cause for the extension.
All documents filed in NRC adjudicatory proceedings, including a
request for hearing, a petition for leave to intervene, any motion or
other document filed in the proceeding prior to the submission of a
request for hearing or petition to intervene, and documents filed by
interested governmental entities participating under 10 CFR 2.315(c),
must be filed in accordance with the NRC E-Filing rule (72 FR 49139;
August 28, 2007). The E-Filing process requires participants to submit
and serve all adjudicatory documents over the internet, or in some
cases to mail copies on electronic storage media. Participants may not
submit paper copies of their filings unless they seek an exemption in
accordance with the procedures described below.
To comply with the procedural requirements of E-Filing, at least
ten 10 days prior to the filing deadline, the participant should
contact the Office of the Secretary by email at hearing.docket@nrc.gov,
or by telephone at 301-415-1677, to request (1) a digital
identification (ID) certificate, which allows the participant (or its
counsel or representative) to digitally sign documents and access the
E-Submittal server for any proceeding in which it is participating; and
(2) advise the Secretary that the participant will be submitting a
request or petition for hearing (even in instances in which the
participant, or its counsel or representative, already holds an NRC-
issued digital ID certificate). Based upon this information, the
Secretary will establish an electronic docket for the hearing in this
proceeding if the Secretary has not already established an electronic
docket.
Information about applying for a digital ID certificate is
available on the NRC's public Web site at https://www.nrc.gov/site-help/e-submittals/apply-certificates.html. System requirements for accessing
the E-Submittal server are detailed in the NRC's ``Guidance for
Electronic Submission,'' which is available on the agency's public Web
site at https://www.nrc.gov/site-help/e-submittals.html. Participants
may attempt to use other software not listed on the Web site, but
should note that the NRC's E-Filing system does not support unlisted
software, and the NRC Meta System Help Desk will not be able to offer
assistance in using unlisted software. If a participant is
electronically submitting a document to the NRC in accordance with the
E-Filing rule, the participant must file the document using the NRC's
online, Web-based submission form. In order to serve documents through
the Electronic Information Exchange System, users will be required to
install a Web browser plug-in from the NRC's Web site. Further
information on the Web-based submission form, including the
installation of the Web browser plug-in, is available on the NRC's
public Web
[[Page 66967]]
site at https://www.nrc.gov/site-help/e-submittals.html.
Once a participant has obtained a digital ID certificate and a
docket has been created, the participant can then submit a request for
hearing or petition for leave to intervene. Submissions should be in
Portable Document Format (PDF) in accordance with NRC guidance
available on the NRC's public Web site at https://www.nrc.gov/site-help/e-submittals.html. A filing is considered complete at the time the
documents are submitted through the NRC's E-Filing system. To be
timely, an electronic filing must be submitted to the E-Filing system
no later than 11:59 p.m. Eastern Time on the due date. Upon receipt of
a transmission, the E-Filing system time-stamps the document and sends
the submitter an email notice confirming receipt of the document. The
E-Filing system also distributes an email notice that provides access
to the document to the NRC's Office of the General Counsel and any
others who have advised the Office of the Secretary that they wish to
participate in the proceeding, so that the filer need not serve the
documents on those participants separately. Therefore, applicants and
other participants (or their counsel or representative) must apply for
and receive a digital ID certificate before a hearing request/petition
to intervene is filed so that they can obtain access to the document
via the E-Filing system.
A person filing electronically using the NRC's adjudicatory E-
Filing system may seek assistance by contacting the NRC Meta System
Help Desk through the ``Contact Us'' link located on the NRC's public
Web site at https://www.nrc.gov/site-help/e-submittals.html, by email to
MSHD.Resource@nrc.gov, or by a toll-free call at 866-672-7640. The NRC
Meta System Help Desk is available between 8 a.m. and 8 p.m., Eastern
Time, Monday through Friday, excluding government holidays.
Participants who believe that they have a good cause for not
submitting documents electronically must file an exemption request, in
accordance with 10 CFR 2.302(g), with their initial paper filing
requesting authorization to continue to submit documents in paper
format. Such filings must be submitted by: (1) first class mail
addressed to the Office of the Secretary of the Commission, U.S.
Nuclear Regulatory Commission, Washington, DC 20555-0001, Attention:
Rulemaking and Adjudications Staff; or (2) courier, express mail, or
expedited delivery service to the Office of the Secretary, Sixteenth
Floor, One White Flint North, 11555 Rockville Pike, Rockville,
Maryland, 20852, Attention: Rulemaking and Adjudications Staff.
Participants filing a document in this manner are responsible for
serving the document on all other participants. Filing is considered
complete by first-class mail as of the time of deposit in the mail, or
by courier, express mail, or expedited delivery service upon depositing
the document with the provider of the service. A presiding officer,
having granted an exemption request from using E-Filing, may require a
participant or party to use E-Filing if the presiding officer
subsequently determines that the reason for granting the exemption from
use of E-Filing no longer exists.
Documents submitted in adjudicatory proceedings will appear in the
NRC's electronic hearing docket which is available to the public at
https://ehd1.nrc.gov/ehd/, unless excluded pursuant to an order of the
Commission, or the presiding officer. Participants are requested not to
include personal privacy information, such as social security numbers,
home addresses, or home phone numbers in their filings, unless an NRC
regulation or other law requires submission of such information.
However, a request to intervene will require including information on
local residence in order to demonstrate a proximity assertion of
interest in the proceeding. With respect to copyrighted works, except
for limited excerpts that serve the purpose of the adjudicatory filings
and would constitute a Fair Use application, participants are requested
not to include copyrighted materials in their submission.
If a person other than the licensee requests a hearing, that person
shall set forth with particularity the manner in which his interest is
adversely affected by this Confirmatory Order and shall address the
criteria set forth in 10 CFR 2.309(d) and (f).
If a hearing is requested by a person whose interest is adversely
affected, the Commission will issue an order designating the time and
place of any hearing. If a hearing is held, the issue to be considered
at such hearing shall be whether this Confirmatory Order should be
sustained.
In the absence of any request for hearing, or written approval of
an extension of time in which to request a hearing, the provisions
specified in Section V above shall be final 30 days from the date this
Confirmatory Order without further order or proceedings. If an
extension of time for requesting a hearing has been approved, the
provisions specified in Section V shall be final when the extension
expires if a hearing request has not been received.
A request for hearing shall not stay the effectiveness of this
order.
Dated this 28th day of October 2013.
For the Nuclear Regulatory Commission.
Cynthia D. Pederson,
Regional Administrator, Region III.
[FR Doc. 2013-26757 Filed 11-6-13; 8:45 am]
BILLING CODE 7590-01-P