Download as PDF Federal Register / Vol. 78, No. 215 / Wednesday, November 6, 2013 / Notices Anthony P. Scardino, Chief Financial Officer, U.S. Patent and Trademark Office (Alternate). NATIONAL TRANSPORTATION SAFETY BOARD SES Performance Review Board AGENCY: National Transportation Safety Board. ACTION: Candi R. Bing, Federal Register Coordinator. [FR Doc. 2013–26588 Filed 11–5–13; 8:45 am] BILLING CODE P Notice; Correction. The NTSB published a document in the Federal Register on October 1, 2013, giving Notice of the appointment of members of the National Transportation Safety Board, Performance Review Board (PRB). This document contained incorrect names. NUCLEAR REGULATORY COMMISSION FOR FURTHER INFORMATION CONTACT: AGENCY: SUMMARY: Emily T. Carroll, Chief, Human Resources Division, Office of Administration, National Transportation Safety Board, 490 L’Enfant Plaza SW., Washington, DC 20594–0001, (202)314– 6233. Correction Section 4314(c)(1) through (5) of Title 5, United States Code requires each agency to establish, in accordance with regulations prescribed by the Office of Personnel Management, one or more SES Performance Review Boards. The board reviews and evaluates the initial appraisal of a senior executive’s performance by the supervisor and considers recommendations to the appointing authority regarding the performance of the senior executive. The following have been designated as members of the Performance Review Board of the National Transportation Safety Board: mstockstill on DSK4VPTVN1PROD with NOTICES SUPPLEMENTARY INFORMATION: The Honorable Christopher A. Hart, Member, National Transportation Safety Board; PRB Chair. The Honorable Robert L. Sumwalt, III; Member, National Transportation Safety Board. Steven E. Goldberg, Chief Financial Officer, National Transportation Safety Board. John Cavolowsky, Director, Airspace Systems Program Office, National Aeronautics and Space Administration. Jerold Gidner, Deputy Director, Office of Strategic Employee and Organizational Development, Department of the Interior. David L. Mayer, Managing Director, National Transportation Safety Board (substitute only for Mr. Goldberg’s rating review). VerDate Mar<15>2010 17:25 Nov 05, 2013 Jkt 232001 [Project No. 0782; NRC–2013–0244] Korea Hydro and Nuclear Power Co., Ltd., and Korea Electric Power Corporation Nuclear Regulatory Commission. ACTION: Notice of receipt; availability. The U.S. Nuclear Regulatory Commission (NRC) staff acknowledges receipt of the application for a standard design certification of the APR1400 Standard Plant Design submitted by Korea Hydro and Nuclear Power Co., Ltd. (KHNP) and Korea Electric Power Corporation (KEPCO). ADDRESSES: Please refer to Docket ID NRC–2013–0244 when contacting the NRC about the availability of information regarding this document. You may access publicly-available information related to this action by the following methods: • Federal Rulemaking Web site: Go to https://www.regulations.gov and search for Docket ID NRC–2013–0244. Address questions about NRC dockets to Carol Gallagher; telephone: 301–287–3422; email: Carol.Gallagher@nrc.gov. For technical questions, contact the individual listed in the FOR FURTHER INFORMATION CONTACT section of this document. • NRC’S Agencywide Documents Access and Management System (ADAMS): You may access publicly available documents online in the NRC Library at https://www.nrc.gov/readingrm/adams.html. To begin the search, select ‘‘ADAMS Public Documents’’ and then select ‘‘Begin Web-based ADAMS Search.’’ For problems with ADAMS, please contact the NRC’s Public Document Room (PDR) reference staff at 1–800–397–4209, 301–415–4737, or by email to pdr.resource@nrc.gov. The ADAMS accession number for each document referenced in this document (if that document is available in ADAMS) is provided the first time that the document is referenced. The application is available in ADAMS under Accession No. ML13281A699. • NRC’S PDR: You may examine and purchase copies of public documents at SUMMARY: PO 00000 Frm 00105 Fmt 4703 Sfmt 4703 66785 the NRC’s PDR, Room O1–F21, One White Flint North, 11555 Rockville Pike, Rockville, Maryland 20852. FOR FURTHER INFORMATION CONTACT: Jeffrey Ciocco, Office of New Reactors, U.S. Nuclear Regulatory Commission, Washington, DC 20555–0001; telephone: 301–415–6391; email: Jeff.Ciocco@ nrc.gov. SUPPLEMENTARY INFORMATION: By letter dated September 30, 2013, KHNP and KEPCO filed with the NRC, pursuant to Section 103 of the Atomic Energy Act and part 52 of Title 10 of the Code of Federal Regulations (10 CFR), an application for standard design certification of the APR1400 Standard Plant Design. The APR1400 stands for Advanced Power Reactor with a 1,400 megawatts electrical power and two-loop pressurized water reactor, developed in the Republic of Korea. Based on the selfreliant technologies and experiences from the design, construction, operation and maintenance of the Optimized Power Reactor 1000 (OPR1000), the APR1400 adopts advanced design features to enhance plant safety, economical efficiency, and convenience of operation and maintenance. The APR1400 application includes the entire power generation complex, except those elements and features considered sitespecific. The acceptability of the tendered application for docketing and other matters relating to the requested rulemaking pursuant to 10 CFR 52.51 for design certification, including provisions for participation of the public and other parties, will be the subject of subsequent Federal Register notices. Dated at Rockville, Maryland, this 30th day of October 2013. For the Nuclear Regulatory Commission. Jeffrey A. Ciocco, Senior Project Manager, Environmental Projects Branch 2, Division of New Reactor Licensing, Office of New Reactors. [FR Doc. 2013–26539 Filed 11–5–13; 8:45 am] BILLING CODE 7590–01–P NUCLEAR REGULATORY COMMISSION [Docket Nos. 52–034 and 52–035; NRC–2008–0594] Luminant Generation Company, LLC Nuclear Regulatory Commission. ACTION: Notice of receipt; availability. AGENCY: The U.S. Nuclear Regulatory Commission (NRC) is giving notice once each week for four consecutive weeks of SUMMARY: E:\FR\FM\06NON1.SGM 06NON1

Agencies

[Federal Register Volume 78, Number 215 (Wednesday, November 6, 2013)]
[Notices]
[Page 66785]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-26539]


=======================================================================
-----------------------------------------------------------------------

NUCLEAR REGULATORY COMMISSION

[Project No. 0782; NRC-2013-0244]


Korea Hydro and Nuclear Power Co., Ltd., and Korea Electric Power 
Corporation

AGENCY: Nuclear Regulatory Commission.

ACTION: Notice of receipt; availability.

-----------------------------------------------------------------------

SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) staff 
acknowledges receipt of the application for a standard design 
certification of the APR1400 Standard Plant Design submitted by Korea 
Hydro and Nuclear Power Co., Ltd. (KHNP) and Korea Electric Power 
Corporation (KEPCO).

ADDRESSES: Please refer to Docket ID NRC-2013-0244 when contacting the 
NRC about the availability of information regarding this document. You 
may access publicly-available information related to this action by the 
following methods:
     Federal Rulemaking Web site: Go to https://www.regulations.gov and search for Docket ID NRC-2013-0244. Address 
questions about NRC dockets to Carol Gallagher; telephone: 301-287-
3422; email: Carol.Gallagher@nrc.gov. For technical questions, contact 
the individual listed in the FOR FURTHER INFORMATION CONTACT section of 
this document.
     NRC'S Agencywide Documents Access and Management System 
(ADAMS): You may access publicly available documents online in the NRC 
Library at https://www.nrc.gov/reading-rm/adams.html. To begin the 
search, select ``ADAMS Public Documents'' and then select ``Begin Web-
based ADAMS Search.'' For problems with ADAMS, please contact the NRC's 
Public Document Room (PDR) reference staff at 1-800-397-4209, 301-415-
4737, or by email to pdr.resource@nrc.gov. The ADAMS accession number 
for each document referenced in this document (if that document is 
available in ADAMS) is provided the first time that the document is 
referenced. The application is available in ADAMS under Accession No. 
ML13281A699.
     NRC'S PDR: You may examine and purchase copies of public 
documents at the NRC's PDR, Room O1-F21, One White Flint North, 11555 
Rockville Pike, Rockville, Maryland 20852.

FOR FURTHER INFORMATION CONTACT: Jeffrey Ciocco, Office of New 
Reactors, U.S. Nuclear Regulatory Commission, Washington, DC 20555-
0001; telephone: 301-415-6391; email: Jeff.Ciocco@nrc.gov.

SUPPLEMENTARY INFORMATION: By letter dated September 30, 2013, KHNP and 
KEPCO filed with the NRC, pursuant to Section 103 of the Atomic Energy 
Act and part 52 of Title 10 of the Code of Federal Regulations (10 
CFR), an application for standard design certification of the APR1400 
Standard Plant Design.
    The APR1400 stands for Advanced Power Reactor with a 1,400 
megawatts electrical power and two-loop pressurized water reactor, 
developed in the Republic of Korea. Based on the self-reliant 
technologies and experiences from the design, construction, operation 
and maintenance of the Optimized Power Reactor 1000 (OPR1000), the 
APR1400 adopts advanced design features to enhance plant safety, 
economical efficiency, and convenience of operation and maintenance. 
The APR1400 application includes the entire power generation complex, 
except those elements and features considered site-specific. The 
acceptability of the tendered application for docketing and other 
matters relating to the requested rulemaking pursuant to 10 CFR 52.51 
for design certification, including provisions for participation of the 
public and other parties, will be the subject of subsequent Federal 
Register notices.

    Dated at Rockville, Maryland, this 30th day of October 2013.

    For the Nuclear Regulatory Commission.
Jeffrey A. Ciocco,
Senior Project Manager, Environmental Projects Branch 2, Division of 
New Reactor Licensing, Office of New Reactors.
[FR Doc. 2013-26539 Filed 11-5-13; 8:45 am]
BILLING CODE 7590-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.