Federal Register / Vol. 78, No. 214 / Tuesday, November 5, 2013 / Rules and Regulations
PART 558—NEW ANIMAL DRUGS FOR
USE IN ANIMAL FEEDS
9. The authority citation for 21 CFR
part 558 continues to read as follows:
■
Authority: 21 U.S.C. 360b, 371.
§ 558.355
10. In § 558.355, in the introductory
text in paragraph (f)(3)(iii), remove
‘‘Monensin, 25 to 400 grams’’ and in its
place add ‘‘Monensin, 15 to 400 grams’’.
■
Dated: October 31, 2013.
Bernadette Dunham,
Director, Center for Veterinary Medicine.
[FR Doc. 2013–26473 Filed 11–4–13; 8:45 am]
BILLING CODE 4160–01–P
DEPARTMENT OF HOMELAND
SECURITY
Coast Guard
33 CFR Part 117
[USCG–2013–0901]
Drawbridge Operation Regulations;
Reynolds Channel, Lawrence, NY
Coast Guard, DHS.
Notice of temporary deviation
from regulations.
AGENCY:
ACTION:
The Commander, First Coast
Guard District, has issued a temporary
deviation from the regulations
governing the operation of the Atlantic
Beach Bridge, mile 0.4, across Reynolds
Channel, at Lawrence, New York. This
temporary deviation authorizes the
Atlantic Beach Bridge to operate under
an alternate schedule for 29 days, to
complete bridge rehabilitation.
DATES: This deviation is effective from
December 2, 2013 through December 31,
2013.
ADDRESSES: Documents mentioned in
this preamble as being available in the
docket are part of docket USCG–2013–
0901 and are available online at
www.regulations.gov, inserting USCG–
2013–0901 in the ‘‘Keyword’’ and then
clicking ‘‘Search’’. They are also
available for inspection or copying at
the Docket Management Facility (M–30),
U.S. Department of Transportation,
West Building Ground Floor, Room
W12–140, 1200 New Jersey Avenue SE.,
Washington, DC 20590, between 9 a.m.
and 5 p.m., Monday through Friday,
except Federal holidays.
FOR FURTHER INFORMATION CONTACT: If
you have questions on this rule, call or
email Ms. Judy Leung-Yee, Project
Officer, First Coast Guard District,
telephone (212) 668–7165, email
wreier-aviles on DSK5TPTVN1PROD with RULES
VerDate Mar<15>2010
14:54 Nov 04, 2013
Jkt 232001
The
Atlantic Beach Bridge, across Reynolds
Channel, mile 0.4, at Lawrence, New
York, has a vertical clearance in the
closed position of 25 feet at mean high
water and 30 feet at mean low water.
The existing drawbridge operation
regulations are listed at 33 CFR
117.799(e).
A temporary deviation for the
drawbridge operations (78 FR 56610) is
currently in effect. During ongoing
rehabilitation of the bridge the
contractor discovered more severe
damage than originally anticipated,
resulting from Super Storm Sandy in
2012. The owner of the bridge, Nassau
County Bridge Authority, is requesting
additional bridge closures in order to
complete the bridge rehabilitation.
The waterway has commercial and
seasonal recreational vessels of various
sizes.
Under this temporary deviation the
draw of the Atlantic Beach Bridge at
mile 0.4, across Reynolds Channel shall
operate as follows:
From December 2, 2013 through
December 31, 2013, the bridge shall
operate a single span on signal at 6 a.m.,
12 p.m., 4 p.m., and 8 p.m. and at any
time between 8 p.m. and 6 a.m. The
draw shall open both spans at all times
for commercial vessel traffic after at
least a 48 hour advance notice is given
by calling the number posted at the
bridge. The draw may remain in the
closed position between 12 a.m. and 5
a.m. on December 3, and December 4,
2013.
The Coast Guard contacted all known
commercial waterway users regarding
this deviation and no objections were
received.
In accordance with 33 CFR 117.35(e),
the bridge must return to its regular
operating schedule immediately at the
end of the designated time period. This
deviation from the operating regulations
is authorized under 33 CFR 117.35.
SUPPLEMENTARY INFORMATION:
[Amended]
SUMMARY:
judy.k.leung-yee@uscg.mil. If you have
questions on viewing the docket, call
Barbara Hairston, Program Manager,
Docket Operations, telephone 202–366–
9826.
Dated: October 21, 2013.
Gary Kassof,
Bridge Program Manager, First Coast Guard
District.
[FR Doc. 2013–26517 Filed 11–4–13; 8:45 am]
BILLING CODE 9110–04–P
PO 00000
Frm 00017
Fmt 4700
Sfmt 4700
66265
DEPARTMENT OF HOMELAND
SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG–2013–0910]
Drawbridge Operation Regulation;
Elizabeth River, Eastern Branch,
Norfolk, VA
Coast Guard, DHS.
Notice of deviation from
drawbridge regulation.
AGENCY:
ACTION:
The Coast Guard has issued a
temporary deviation from the operating
schedule that governs the draw of the
Norfolk Southern #5 Railroad Bridge,
across the Elizabeth River Eastern
Branch, mile 1.1, at Norfolk, VA. This
deviation is necessary to facilitate
replacing the broken tread plates and
milling the top of the plates and webs
to create a flat surface on the Norfolk
Southern #5 Railroad drawbridge. The
final phase of repairs is shimming the
tread plates into place. This temporary
deviation allows the drawbridge to
remain in the closed to navigation
position.
DATES: This deviation is effective from
November 5, 2013 through December 8,
2013, and has been enforced with actual
notice since November 4, 2013.
ADDRESSES: The docket for this
deviation, [USCG–2013–0910] is
available at https://www.regulations.gov.
Type the docket number in the
‘‘SEARCH’’ box and click ‘‘SEARCH.’’
Click on Open Docket Folder on the line
associated with this deviation. You may
also visit the Docket Management
Facility in Room W12–140 on the
ground floor of the Department of
Transportation West Building, 1200
New Jersey Avenue SE., Washington,
DC 20590, between 9 a.m. and 5 p.m.,
Monday through Friday, except Federal
holidays.
FOR FURTHER INFORMATION CONTACT: If
you have questions on this temporary
deviation, call or email Mrs. Kashanda
Booker, Bridge Administration Branch
Fifth District, Coast Guard; telephone
(757) 398–6227, email
Kashanda.l.booker@uscg.mil. If you
have questions on reviewing the docket,
call Barbara Hairston, Program Manager,
Docket Operations, 202–366–9826.
SUPPLEMENTARY INFORMATION: The
Norfolk Southern Corporation, who
owns and operates this drawbridge, has
requested a temporary deviation from
the current operating regulation set out
in 33 CFR 117.5 to facilitate thermite
welding on the rails.
SUMMARY:
E:\FR\FM\05NOR1.SGM
05NOR1
66266
Federal Register / Vol. 78, No. 214 / Tuesday, November 5, 2013 / Rules and Regulations
Under the regular operating schedule,
the Norfolk Southern #5 Railroad
Bridge, mile 1.1, in Norfolk, VA, the
draw must open promptly and fully for
the passage of vessels when a request or
signal to open is given. The draw
normally is open and only closes for
train crossings or periodic maintenance.
The Norfolk Southern #5 railroad
Bridge, at mile 1.1, across the Elizabeth
River (Eastern Branch) in Norfolk, VA,
has a vertical clearance in the closed
position to vessels of 6 feet above mean
high water.
Under this temporary deviation, the
drawbridge will be maintained in the
closed to navigation position each day,
from 7 a.m. to 5 p.m., on November 4,
2013 until December 8, 2013 the bridge
will operate under normal operating
schedule at all other times. The bridge
normally is maintained in the open-tonavigation position with several vessels
transiting a week and only closes when
trains transit. Emergency openings
cannot be provided. There are no
alternate routes for vessels transiting
this section of the Elizabeth River
Eastern Branch but vessels may pass
before 7 a.m. and after 5 p.m.
The Elizabeth River Eastern Branch is
used by a variety of vessels including
military, tug, commercial, and
recreational vessels. The Coast Guard
has carefully coordinated the
restrictions with these waterway users.
The Coast Guard will also inform
additional waterway users through our
Local and Broadcast Notices to Mariners
of the closure periods for the bridge so
that vessels can arrange their transits to
minimize any impacts caused by the
temporary deviation. Mariners able to
pass under the bridge in the closed
position may do so at any time and are
advised to proceed with caution.
In accordance with 33 CFR 117.35(e),
the drawbridge must return to its regular
operating schedule immediately at the
end of the designated time period. This
deviation from the operating regulations
is authorized under 33 CFR 117.35.
wreier-aviles on DSK5TPTVN1PROD with RULES
Dated: October 21, 2013.
Waverly W. Gregory, Jr.,
Bridge Program Manager, Fifth Coast Guard
District.
[FR Doc. 2013–26533 Filed 11–4–13; 8:45 am]
BILLING CODE 9110–04–P
VerDate Mar<15>2010
14:54 Nov 04, 2013
Jkt 232001
DEPARTMENT OF HOMELAND
SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG–2013–0909]
Drawbridge Operation Regulation;
Atlantic Intracoastal Waterway (AIWW),
Chesapeake, VA
Coast Guard, DHS.
Notice of deviation from
drawbridge regulations.
AGENCY:
ACTION:
The Coast Guard has issued a
temporary deviation from the operating
schedule that governs the I64 Bridge
across the Atlantic Intracoastal
Waterway, South Branch of the
Elizabeth River, mile 7.1, at Chesapeake,
VA. This deviation is necessary to
facilitate maintenance work on the
rotary span limit switches. This
temporary deviation allows the
drawbridge to remain in the closed to
navigation position.
DATES: This deviation is effective from
7 a.m. on November 15, 2013 to 12 p.m.
November 17, 2013.
ADDRESSES: The docket for this
deviation, [USCG–2013–0909] is
available at https://www.regulations.gov.
Type the docket number in the
‘‘SEARCH’’ box and click ‘‘SEARCH.’’
Click on Open Docket Folder on the line
associated with this deviation. You may
also visit the Docket Management
Facility in Room W12–140 on the
ground floor of the Department of
Transportation West Building, 1200
New Jersey Avenue SE., Washington,
DC 20590, between 9 a.m. and 5 p.m.,
Monday through Friday, except Federal
holidays.
FOR FURTHER INFORMATION CONTACT: If
you have questions on this temporary
deviation, call or email Mrs. Kashanda
Booker, Bridge Administration Branch
Fifth District, Coast Guard; telephone
(757) 398–6227, email
Kashanda.l.booker@uscg.mil. If you
have questions on reviewing the docket,
call Barbara Hairston, Program Manager,
Docket Operations, (202) 366–9826.
SUPPLEMENTARY INFORMATION: The
Virginia Department of Transportation,
who owns and operates this drawbridge,
has requested a temporary deviation
from the current operating regulation set
out in 33 CFR 117.997(e), to facilitate
maintenance of the moveable spans on
the structure.
The current operating schedule for the
drawbridge is set out in 33 CFR
117.997(e) which requires the
drawbridge open on signal if at least 24
SUMMARY:
PO 00000
Frm 00018
Fmt 4700
Sfmt 4700
hours notice is given. The I64 Bridge
has a vertical clearance in the closed
position of 65 feet above mean high
water.
Under this temporary deviation, the
drawbridge will be closed to navigation
from 7 a.m., on Friday, November 15,
2013 to 12 p.m., on Sunday, November
17, 2013.
Vessels able to pass under the
drawbridge in the closed position may
do so at anytime and are advised to
proceed with caution. The drawbridge
will not be able to open for emergencies.
The Coast Guard will also inform
additional waterway users through our
Local and Broadcast Notices to Mariners
of the closure periods for the
drawbridge so that vessels can arrange
their transits to minimize any impacts
caused by the temporary deviation.
In accordance with 33 CFR 117.35(e),
the drawbridge must return to its regular
operating schedule immediately at the
end of the effective period of this
temporary deviation. This deviation
from the operating regulations is
authorized under 33 CFR 117.35.
Dated: October 21, 2013.
Waverly W. Gregory, Jr.,
Bridge Program Manager, Fifth Coast Guard
District.
[FR Doc. 2013–26534 Filed 11–4–13; 8:45 am]
BILLING CODE 9110–04–P
DEPARTMENT OF HOMELAND
SECURITY
Coast Guard
33 CFR Part 117
[USCG–2013–0880]
Drawbridge Operation Regulations;
Hackensack River, Jersey City, NJ
Coast Guard, DHS.
Notice of temporary deviation
from regulations.
AGENCY:
ACTION:
The Commander, First Coast
Guard District, has issued a temporary
deviation from the regulations
governing the operation of the Path
(Railroad) Bridge across the Hackensack
River, mile 3.0, at Jersey City, New
Jersey. Under this temporary deviation,
the bridge may remain in the closed
position for 26 consecutive weekends to
facilitate bridge repairs.
DATES: This deviation is effective on
weekends from 12:01 a.m. Saturday
November 23, 2013 through 12:01
Monday May 19, 2014.
ADDRESSES: The docket for this
deviation, [USCG–2013–0880] is
available at https://www.regulations.gov.
SUMMARY:
E:\FR\FM\05NOR1.SGM
05NOR1
Agencies
[Federal Register Volume 78, Number 214 (Tuesday, November 5, 2013)]
[Rules and Regulations]
[Pages 66265-66266]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-26533]
-----------------------------------------------------------------------
DEPARTMENT OF HOMELAND SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG-2013-0910]
Drawbridge Operation Regulation; Elizabeth River, Eastern Branch,
Norfolk, VA
AGENCY: Coast Guard, DHS.
ACTION: Notice of deviation from drawbridge regulation.
-----------------------------------------------------------------------
SUMMARY: The Coast Guard has issued a temporary deviation from the
operating schedule that governs the draw of the Norfolk Southern
5 Railroad Bridge, across the Elizabeth River Eastern Branch,
mile 1.1, at Norfolk, VA. This deviation is necessary to facilitate
replacing the broken tread plates and milling the top of the plates and
webs to create a flat surface on the Norfolk Southern 5
Railroad drawbridge. The final phase of repairs is shimming the tread
plates into place. This temporary deviation allows the drawbridge to
remain in the closed to navigation position.
DATES: This deviation is effective from November 5, 2013 through
December 8, 2013, and has been enforced with actual notice since
November 4, 2013.
ADDRESSES: The docket for this deviation, [USCG-2013-0910] is available
at https://www.regulations.gov. Type the docket number in the ``SEARCH''
box and click ``SEARCH.'' Click on Open Docket Folder on the line
associated with this deviation. You may also visit the Docket
Management Facility in Room W12-140 on the ground floor of the
Department of Transportation West Building, 1200 New Jersey Avenue SE.,
Washington, DC 20590, between 9 a.m. and 5 p.m., Monday through Friday,
except Federal holidays.
FOR FURTHER INFORMATION CONTACT: If you have questions on this
temporary deviation, call or email Mrs. Kashanda Booker, Bridge
Administration Branch Fifth District, Coast Guard; telephone (757) 398-
6227, email Kashanda.l.booker@uscg.mil. If you have questions on
reviewing the docket, call Barbara Hairston, Program Manager, Docket
Operations, 202-366-9826.
SUPPLEMENTARY INFORMATION: The Norfolk Southern Corporation, who owns
and operates this drawbridge, has requested a temporary deviation from
the current operating regulation set out in 33 CFR 117.5 to facilitate
thermite welding on the rails.
[[Page 66266]]
Under the regular operating schedule, the Norfolk Southern
5 Railroad Bridge, mile 1.1, in Norfolk, VA, the draw must
open promptly and fully for the passage of vessels when a request or
signal to open is given. The draw normally is open and only closes for
train crossings or periodic maintenance. The Norfolk Southern
5 railroad Bridge, at mile 1.1, across the Elizabeth River
(Eastern Branch) in Norfolk, VA, has a vertical clearance in the closed
position to vessels of 6 feet above mean high water.
Under this temporary deviation, the drawbridge will be maintained
in the closed to navigation position each day, from 7 a.m. to 5 p.m.,
on November 4, 2013 until December 8, 2013 the bridge will operate
under normal operating schedule at all other times. The bridge normally
is maintained in the open-to-navigation position with several vessels
transiting a week and only closes when trains transit. Emergency
openings cannot be provided. There are no alternate routes for vessels
transiting this section of the Elizabeth River Eastern Branch but
vessels may pass before 7 a.m. and after 5 p.m.
The Elizabeth River Eastern Branch is used by a variety of vessels
including military, tug, commercial, and recreational vessels. The
Coast Guard has carefully coordinated the restrictions with these
waterway users. The Coast Guard will also inform additional waterway
users through our Local and Broadcast Notices to Mariners of the
closure periods for the bridge so that vessels can arrange their
transits to minimize any impacts caused by the temporary deviation.
Mariners able to pass under the bridge in the closed position may do so
at any time and are advised to proceed with caution.
In accordance with 33 CFR 117.35(e), the drawbridge must return to
its regular operating schedule immediately at the end of the designated
time period. This deviation from the operating regulations is
authorized under 33 CFR 117.35.
Dated: October 21, 2013.
Waverly W. Gregory, Jr.,
Bridge Program Manager, Fifth Coast Guard District.
[FR Doc. 2013-26533 Filed 11-4-13; 8:45 am]
BILLING CODE 9110-04-P