Drawbridge Operation Regulations; Reynolds Channel, Lawrence, NY, 66265 [2013-26517]
Download as PDF
Federal Register / Vol. 78, No. 214 / Tuesday, November 5, 2013 / Rules and Regulations
PART 558—NEW ANIMAL DRUGS FOR
USE IN ANIMAL FEEDS
9. The authority citation for 21 CFR
part 558 continues to read as follows:
■
Authority: 21 U.S.C. 360b, 371.
§ 558.355
10. In § 558.355, in the introductory
text in paragraph (f)(3)(iii), remove
‘‘Monensin, 25 to 400 grams’’ and in its
place add ‘‘Monensin, 15 to 400 grams’’.
■
Dated: October 31, 2013.
Bernadette Dunham,
Director, Center for Veterinary Medicine.
[FR Doc. 2013–26473 Filed 11–4–13; 8:45 am]
BILLING CODE 4160–01–P
DEPARTMENT OF HOMELAND
SECURITY
Coast Guard
33 CFR Part 117
[USCG–2013–0901]
Drawbridge Operation Regulations;
Reynolds Channel, Lawrence, NY
Coast Guard, DHS.
Notice of temporary deviation
from regulations.
AGENCY:
ACTION:
The Commander, First Coast
Guard District, has issued a temporary
deviation from the regulations
governing the operation of the Atlantic
Beach Bridge, mile 0.4, across Reynolds
Channel, at Lawrence, New York. This
temporary deviation authorizes the
Atlantic Beach Bridge to operate under
an alternate schedule for 29 days, to
complete bridge rehabilitation.
DATES: This deviation is effective from
December 2, 2013 through December 31,
2013.
ADDRESSES: Documents mentioned in
this preamble as being available in the
docket are part of docket USCG–2013–
0901 and are available online at
www.regulations.gov, inserting USCG–
2013–0901 in the ‘‘Keyword’’ and then
clicking ‘‘Search’’. They are also
available for inspection or copying at
the Docket Management Facility (M–30),
U.S. Department of Transportation,
West Building Ground Floor, Room
W12–140, 1200 New Jersey Avenue SE.,
Washington, DC 20590, between 9 a.m.
and 5 p.m., Monday through Friday,
except Federal holidays.
FOR FURTHER INFORMATION CONTACT: If
you have questions on this rule, call or
email Ms. Judy Leung-Yee, Project
Officer, First Coast Guard District,
telephone (212) 668–7165, email
wreier-aviles on DSK5TPTVN1PROD with RULES
VerDate Mar<15>2010
14:54 Nov 04, 2013
Jkt 232001
The
Atlantic Beach Bridge, across Reynolds
Channel, mile 0.4, at Lawrence, New
York, has a vertical clearance in the
closed position of 25 feet at mean high
water and 30 feet at mean low water.
The existing drawbridge operation
regulations are listed at 33 CFR
117.799(e).
A temporary deviation for the
drawbridge operations (78 FR 56610) is
currently in effect. During ongoing
rehabilitation of the bridge the
contractor discovered more severe
damage than originally anticipated,
resulting from Super Storm Sandy in
2012. The owner of the bridge, Nassau
County Bridge Authority, is requesting
additional bridge closures in order to
complete the bridge rehabilitation.
The waterway has commercial and
seasonal recreational vessels of various
sizes.
Under this temporary deviation the
draw of the Atlantic Beach Bridge at
mile 0.4, across Reynolds Channel shall
operate as follows:
From December 2, 2013 through
December 31, 2013, the bridge shall
operate a single span on signal at 6 a.m.,
12 p.m., 4 p.m., and 8 p.m. and at any
time between 8 p.m. and 6 a.m. The
draw shall open both spans at all times
for commercial vessel traffic after at
least a 48 hour advance notice is given
by calling the number posted at the
bridge. The draw may remain in the
closed position between 12 a.m. and 5
a.m. on December 3, and December 4,
2013.
The Coast Guard contacted all known
commercial waterway users regarding
this deviation and no objections were
received.
In accordance with 33 CFR 117.35(e),
the bridge must return to its regular
operating schedule immediately at the
end of the designated time period. This
deviation from the operating regulations
is authorized under 33 CFR 117.35.
SUPPLEMENTARY INFORMATION:
[Amended]
SUMMARY:
judy.k.leung-yee@uscg.mil. If you have
questions on viewing the docket, call
Barbara Hairston, Program Manager,
Docket Operations, telephone 202–366–
9826.
Dated: October 21, 2013.
Gary Kassof,
Bridge Program Manager, First Coast Guard
District.
[FR Doc. 2013–26517 Filed 11–4–13; 8:45 am]
BILLING CODE 9110–04–P
PO 00000
Frm 00017
Fmt 4700
Sfmt 4700
66265
DEPARTMENT OF HOMELAND
SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG–2013–0910]
Drawbridge Operation Regulation;
Elizabeth River, Eastern Branch,
Norfolk, VA
Coast Guard, DHS.
Notice of deviation from
drawbridge regulation.
AGENCY:
ACTION:
The Coast Guard has issued a
temporary deviation from the operating
schedule that governs the draw of the
Norfolk Southern #5 Railroad Bridge,
across the Elizabeth River Eastern
Branch, mile 1.1, at Norfolk, VA. This
deviation is necessary to facilitate
replacing the broken tread plates and
milling the top of the plates and webs
to create a flat surface on the Norfolk
Southern #5 Railroad drawbridge. The
final phase of repairs is shimming the
tread plates into place. This temporary
deviation allows the drawbridge to
remain in the closed to navigation
position.
DATES: This deviation is effective from
November 5, 2013 through December 8,
2013, and has been enforced with actual
notice since November 4, 2013.
ADDRESSES: The docket for this
deviation, [USCG–2013–0910] is
available at https://www.regulations.gov.
Type the docket number in the
‘‘SEARCH’’ box and click ‘‘SEARCH.’’
Click on Open Docket Folder on the line
associated with this deviation. You may
also visit the Docket Management
Facility in Room W12–140 on the
ground floor of the Department of
Transportation West Building, 1200
New Jersey Avenue SE., Washington,
DC 20590, between 9 a.m. and 5 p.m.,
Monday through Friday, except Federal
holidays.
FOR FURTHER INFORMATION CONTACT: If
you have questions on this temporary
deviation, call or email Mrs. Kashanda
Booker, Bridge Administration Branch
Fifth District, Coast Guard; telephone
(757) 398–6227, email
Kashanda.l.booker@uscg.mil. If you
have questions on reviewing the docket,
call Barbara Hairston, Program Manager,
Docket Operations, 202–366–9826.
SUPPLEMENTARY INFORMATION: The
Norfolk Southern Corporation, who
owns and operates this drawbridge, has
requested a temporary deviation from
the current operating regulation set out
in 33 CFR 117.5 to facilitate thermite
welding on the rails.
SUMMARY:
E:\FR\FM\05NOR1.SGM
05NOR1
Agencies
[Federal Register Volume 78, Number 214 (Tuesday, November 5, 2013)]
[Rules and Regulations]
[Page 66265]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-26517]
=======================================================================
-----------------------------------------------------------------------
DEPARTMENT OF HOMELAND SECURITY
Coast Guard
33 CFR Part 117
[USCG-2013-0901]
Drawbridge Operation Regulations; Reynolds Channel, Lawrence, NY
AGENCY: Coast Guard, DHS.
ACTION: Notice of temporary deviation from regulations.
-----------------------------------------------------------------------
SUMMARY: The Commander, First Coast Guard District, has issued a
temporary deviation from the regulations governing the operation of the
Atlantic Beach Bridge, mile 0.4, across Reynolds Channel, at Lawrence,
New York. This temporary deviation authorizes the Atlantic Beach Bridge
to operate under an alternate schedule for 29 days, to complete bridge
rehabilitation.
DATES: This deviation is effective from December 2, 2013 through
December 31, 2013.
ADDRESSES: Documents mentioned in this preamble as being available in
the docket are part of docket USCG-2013-0901 and are available online
at www.regulations.gov, inserting USCG-2013-0901 in the ``Keyword'' and
then clicking ``Search''. They are also available for inspection or
copying at the Docket Management Facility (M-30), U.S. Department of
Transportation, West Building Ground Floor, Room W12-140, 1200 New
Jersey Avenue SE., Washington, DC 20590, between 9 a.m. and 5 p.m.,
Monday through Friday, except Federal holidays.
FOR FURTHER INFORMATION CONTACT: If you have questions on this rule,
call or email Ms. Judy Leung-Yee, Project Officer, First Coast Guard
District, telephone (212) 668-7165, email judy.k.leung-yee@uscg.mil. If
you have questions on viewing the docket, call Barbara Hairston,
Program Manager, Docket Operations, telephone 202-366-9826.
SUPPLEMENTARY INFORMATION: The Atlantic Beach Bridge, across Reynolds
Channel, mile 0.4, at Lawrence, New York, has a vertical clearance in
the closed position of 25 feet at mean high water and 30 feet at mean
low water. The existing drawbridge operation regulations are listed at
33 CFR 117.799(e).
A temporary deviation for the drawbridge operations (78 FR 56610)
is currently in effect. During ongoing rehabilitation of the bridge the
contractor discovered more severe damage than originally anticipated,
resulting from Super Storm Sandy in 2012. The owner of the bridge,
Nassau County Bridge Authority, is requesting additional bridge
closures in order to complete the bridge rehabilitation.
The waterway has commercial and seasonal recreational vessels of
various sizes.
Under this temporary deviation the draw of the Atlantic Beach
Bridge at mile 0.4, across Reynolds Channel shall operate as follows:
From December 2, 2013 through December 31, 2013, the bridge shall
operate a single span on signal at 6 a.m., 12 p.m., 4 p.m., and 8 p.m.
and at any time between 8 p.m. and 6 a.m. The draw shall open both
spans at all times for commercial vessel traffic after at least a 48
hour advance notice is given by calling the number posted at the
bridge. The draw may remain in the closed position between 12 a.m. and
5 a.m. on December 3, and December 4, 2013.
The Coast Guard contacted all known commercial waterway users
regarding this deviation and no objections were received.
In accordance with 33 CFR 117.35(e), the bridge must return to its
regular operating schedule immediately at the end of the designated
time period. This deviation from the operating regulations is
authorized under 33 CFR 117.35.
Dated: October 21, 2013.
Gary Kassof,
Bridge Program Manager, First Coast Guard District.
[FR Doc. 2013-26517 Filed 11-4-13; 8:45 am]
BILLING CODE 9110-04-P