Pleasant Grove City, UT; Notice of Preliminary Determination of a Qualifying Conduit Hydropower Facility and Soliciting Comments and Motions To Intervene, 66355-66356 [2013-26458]

Download as PDF Federal Register / Vol. 78, No. 214 / Tuesday, November 5, 2013 / Notices Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Competing applications and notices of intent must meet the requirements of 18 CFR 4.36. The Commission strongly encourages electronic filing. Please file comments, motions to intervene, notices of intent, and competing applications using the Commission’s eFiling system at https://www.ferc.gov/docs-filing/ efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, please send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. The first page of any filing should include docket number P–14532–000. More information about this project, including a copy of the application, can be viewed or printed on the ‘‘eLibrary’’ link of Commission’s Web site at www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number (P–14532) in the docket number field to access the document. For assistance, contact FERC Online Support. Dated: October 29, 2013. Kimberly D. Bose, Secretary. [FR Doc. 2013–26452 Filed 11–4–13; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CD14–4–000] Pleasant Grove City, UT; Notice of Preliminary Determination of a Qualifying Conduit Hydropower Facility and Soliciting Comments and Motions To Intervene On October 22, 2013, as supplemented October 23, 2013, Pleasant Grove City, Utah (Pleasant Grove) filed a notice of intent to construct a qualifying conduit hydropower facility, pursuant to section 30 of the Federal Power Act, as amended by section 4 of the Hydropower Regulatory Efficiency Act 66355 of 2013 (HREA). The 120 kW Battle Creek Microhydro Power Generation Project—Project Blue Energy would utilize Pleasant Grove’s water intake pipeline that delivers water to its water treatment plant, and it would be located in Utah County, Utah. Applicant Contact: Dean Lundell, Pleasant Grove City, Utah, 70 South 100 East, Pleasant Grove, UT 84062 Phone No. (801) 785–4075. FERC Contact: Robert Bell, Phone No. (202) 502–6062, email: robert.bell@ ferc.gov. Qualifying Conduit Hydropower Facility Description: The proposed project would consist of: (1) A new 40foot-long, 12-inch diameter intake pipe off the existing 12-inch diameter water supply pipeline; (2) a new powerhouse containing one new 120-kilowatt generating unit; (3) a new 50-foot-long, 12-inch diameter exit pipeline discharging water into an existing 12inch water supply pipeline; and (4) appurtenant facilities. The proposed project would have an estimated annual generating capacity of 327 megawatthours. A qualifying conduit hydropower facility is one that is determined or deemed to meet all of the criteria shown in the table below. TABLE 1—CRITERIA FOR QUALIFYING CONDUIT HYDROPOWER FACILITY Statutory provision Description Satisfies (Y/N) FPA 30(a)(3)(A), as amended by HREA ...................................... The conduit the facility uses is a tunnel, canal, pipeline, aqueduct, flume, ditch, or similar manmade water conveyance that is operated for the distribution of water for agricultural, municipal, or industrial consumption and not primarily for the generation of electricity. The facility is constructed, operated, or maintained for the generation of electric power and uses for such generation only the hydroelectric potential of a non-federally owned conduit. The facility has an installed capacity that does not exceed 5 megawatts. On or before August 9, 2013, the facility is not licensed, or exempted from the licensing requirements of Part I of the FPA. Y FPA 30(a)(3)(C)(i), as amended by HREA ................................... FPA 30(a)(3)(C)(ii), as amended by HREA .................................. wreier-aviles on DSK5TPTVN1PROD with NOTICES FPA 30(a)(3)(C)(iii), as amended by HREA ................................. Preliminary Determination: Based upon the above criteria, Commission staff preliminarily determines that the proposal satisfies the requirements for a qualifying conduit hydropower facility not required to be licensed or exempted from licensing. Comments and Motions to Intervene: Deadline for filing comments contesting whether the facility meets the qualifying criteria is 45 days from the issuance date of this notice. Deadline for filing motions to intervene is 30 days from the issuance date of this notice. VerDate Mar<15>2010 15:22 Nov 04, 2013 Jkt 232001 Anyone may submit comments or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210 and 385.214. Any motions to intervene must be received on or before the specified deadline date for the particular proceeding. Filing and Service of Responsive Documents: All filings must (1) bear in all capital letters the ‘‘COMMENTS CONTESTING QUALIFICATION FOR A CONDUIT HYDROPOWER FACILITY’’ or ‘‘MOTION TO INTERVENE,’’ as applicable; (2) state in the heading the name of the applicant and the project PO 00000 Frm 00027 Fmt 4703 Sfmt 4703 Y Y Y number of the application to which the filing responds; (3) state the name, address, and telephone number of the person filing; and (4) otherwise comply with the requirements of sections 385.2001 through 385.2005 of the Commission’s regulations.1 All comments contesting Commission staff’s preliminary determination that the facility meets the qualifying criteria must set forth their evidentiary basis. The Commission strongly encourages electronic filing. Please file motions to intervene and comments using the 1 18 E:\FR\FM\05NON1.SGM CFR 385.2001–2005 (2013). 05NON1 66356 Federal Register / Vol. 78, No. 214 / Tuesday, November 5, 2013 / Notices Commission’s eFiling system at https:// www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, please send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. A copy of all other filings in reference to this application must be accompanied by proof of service on all persons listed in the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 4.34(b) and 385.2010. Locations of Notice of Intent: Copies of the notice of intent can be obtained directly from the applicant or such copies can be viewed and reproduced at the Commission in its Public Reference Room, Room 2A, 888 First Street NE., Washington, DC 20426. The filing may also be viewed on the web at https:// www.ferc.gov/docs-filing/elibrary.asp using the ‘‘eLibrary’’ link. Enter the docket number (e.g., CD14–4–000) in the docket number field to access the document. For assistance, call toll-free 1–866–208–3676 or email FERCOnlineSupport@ferc.gov. For TTY, call (202) 502–8659. Dated: October 28, 2013. Kimberly D. Bose, Secretary. [FR Doc. 2013–26458 Filed 11–4–13; 8:45 am] BILLING CODE 6717–01–P ENVIRONMENTAL PROTECTION AGENCY [FRL–9902–51-Region 5] Notification of a Public Teleconference of the Great Lakes Advisory Board Environmental Protection Agency (EPA). ACTION: Notice. AGENCY: The Environmental Protection Agency (EPA) announces a public teleconference of the Great Lakes Advisory Board (GLAB). The purpose of the teleconference is to continue discussions that will inform the development of a draft Great Lakes Restoration Initiative FY 2015–2019 Action Plan. DATES: The public teleconference will be held on Wednesday, November 13, wreier-aviles on DSK5TPTVN1PROD with NOTICES SUMMARY: VerDate Mar<15>2010 15:22 Nov 04, 2013 Jkt 232001 2013 from 9:00 a.m. to 12 noon Central Time, 10 a.m. to 1 p.m. Eastern time. The teleconference number is: (877) 744–6030; Participant code: 91845630. Due to the recent lapse in federal operations, EPA has worked to provide, but cannot guarantee, 15 calendar days’ public notice. ADDRESSES: The public teleconference will take place by telephone only. FOR FURTHER INFORMATION CONTACT: Any member of the public wishing further information regarding this teleconference may contact Taylor Fiscus, Acting Designated Federal Officer (DFO), GLAB, by telephone at 312–353–6059 or email at Fiscus.Taylor@epa.gov. General information on the Great Lakes Restoration Initiative (GLRI) and the GLAB can be found on the GLRI Web site at https://www.glri.us. SUPPLEMENTARY INFORMATION: Background: The GLAB is a federal advisory committee chartered under the Federal Advisory Committee Act (FACA), Public Law 92–463. EPA established the GLAB in 2013 to provide independent advice to the EPA Administrator in her capacity as Chair of the federal Great Lakes Interagency Task Force. The GLAB conducts business in accordance with FACA and related regulations. The GLAB consists of 18 members appointed by EPA’s Administrator. Members serve as representatives of state, local and tribal government, environmental groups, agriculture, business, transportation, foundations, educational institutions and as technical experts. The GLAB held a teleconference and meeting on May 21–22, 2013 (as noticed in 78 FR 26636–26637) to discuss the development of a draft FY 2015–2019 GLRI Action Plan. The teleconference will provide opportunity for members of the public to submit oral comments in response to the charge questions for consideration by the GLAB. The charge questions are available at https://www.glri.us. Also, periodic opportunities for the public to provide input for the GLAB to consider will be provided after the November 13 teleconference. Availability of Teleconference Materials: The agenda and other materials in support of the teleconference will be available on the GLRI Web site at https://www.glri.us in advance of the teleconference. Procedures for Providing Public Input: Federal advisory committees provide independent advice to federal agencies. Members of the public can submit relevant comments for consideration by PO 00000 Frm 00028 Fmt 4703 Sfmt 4703 the GLAB. Input from the public to the GLAB will have the most impact if it provides specific information for the GLAB to consider. Members of the public wishing to provide comments should contact the DFO directly. Oral Statements: In general, individuals or groups requesting an oral presentation at this public teleconference will be limited to three minutes per speaker, subject to the number of people wanting to comment. Interested parties should contact the DFO in writing (preferably via email) at the contact information noted above by November 12, 2013 to be placed on the list of public speakers for the teleconference. Written Statements: Written statements must be received by November 12, 2013 so that the information may be made available to the GLAB for consideration. Written statements should be supplied to the DFO in the following formats: One hard copy with original signature and one electronic copy via email. Commenters are requested to provide two versions of each document submitted: one each with and without signatures because only documents without signatures may be published on the GLRI Web page. Accessibility: For information on access or services for individuals with disabilities, please contact the DFO at the phone number or email address noted above, preferably at least 10 days prior to the teleconference, to give EPA as much time as possible to process your request. Dated: October 28, 2013. Cameron Davis, Senior Advisor to the Administrator. [FR Doc. 2013–26510 Filed 11–4–13; 8:45 am] BILLING CODE 6560–50–P FEDERAL COMMUNICATIONS COMMISSION Information Collection Being Reviewed by the Federal Communications Commission Under Delegated Authority Federal Communications Commission. ACTION: Notice and request for comments. AGENCY: As part of its continuing effort to reduce paperwork burden and as required by the Paperwork Reduction Act (PRA) of 1995 (44 U.S.C. 3501– 3520), the Federal Communications Commission invites the general public and other Federal agencies to take this opportunity to comment on the SUMMARY: E:\FR\FM\05NON1.SGM 05NON1

Agencies

[Federal Register Volume 78, Number 214 (Tuesday, November 5, 2013)]
[Notices]
[Pages 66355-66356]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-26458]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CD14-4-000]


Pleasant Grove City, UT; Notice of Preliminary Determination of a 
Qualifying Conduit Hydropower Facility and Soliciting Comments and 
Motions To Intervene

    On October 22, 2013, as supplemented October 23, 2013, Pleasant 
Grove City, Utah (Pleasant Grove) filed a notice of intent to construct 
a qualifying conduit hydropower facility, pursuant to section 30 of the 
Federal Power Act, as amended by section 4 of the Hydropower Regulatory 
Efficiency Act of 2013 (HREA). The 120 kW Battle Creek Microhydro Power 
Generation Project--Project Blue Energy would utilize Pleasant Grove's 
water intake pipeline that delivers water to its water treatment plant, 
and it would be located in Utah County, Utah.
    Applicant Contact: Dean Lundell, Pleasant Grove City, Utah, 70 
South 100 East, Pleasant Grove, UT 84062 Phone No. (801) 785-4075.
    FERC Contact: Robert Bell, Phone No. (202) 502-6062, email: 
robert.bell@ferc.gov.
    Qualifying Conduit Hydropower Facility Description: The proposed 
project would consist of: (1) A new 40-foot-long, 12-inch diameter 
intake pipe off the existing 12-inch diameter water supply pipeline; 
(2) a new powerhouse containing one new 120-kilowatt generating unit; 
(3) a new 50-foot-long, 12-inch diameter exit pipeline discharging 
water into an existing 12-inch water supply pipeline; and (4) 
appurtenant facilities. The proposed project would have an estimated 
annual generating capacity of 327 megawatt-hours.
    A qualifying conduit hydropower facility is one that is determined 
or deemed to meet all of the criteria shown in the table below.

      Table 1--Criteria for Qualifying Conduit Hydropower Facility
------------------------------------------------------------------------
                                                              Satisfies
       Statutory provision               Description            (Y/N)
------------------------------------------------------------------------
FPA 30(a)(3)(A), as amended by    The conduit the facility            Y
 HREA.                             uses is a tunnel,
                                   canal, pipeline,
                                   aqueduct, flume, ditch,
                                   or similar manmade
                                   water conveyance that
                                   is operated for the
                                   distribution of water
                                   for agricultural,
                                   municipal, or
                                   industrial consumption
                                   and not primarily for
                                   the generation of
                                   electricity.
FPA 30(a)(3)(C)(i), as amended    The facility is                     Y
 by HREA.                          constructed, operated,
                                   or maintained for the
                                   generation of electric
                                   power and uses for such
                                   generation only the
                                   hydroelectric potential
                                   of a non-federally
                                   owned conduit.
FPA 30(a)(3)(C)(ii), as amended   The facility has an                 Y
 by HREA.                          installed capacity that
                                   does not exceed 5
                                   megawatts.
FPA 30(a)(3)(C)(iii), as amended  On or before August 9,              Y
 by HREA.                          2013, the facility is
                                   not licensed, or
                                   exempted from the
                                   licensing requirements
                                   of Part I of the FPA.
------------------------------------------------------------------------

    Preliminary Determination: Based upon the above criteria, 
Commission staff preliminarily determines that the proposal satisfies 
the requirements for a qualifying conduit hydropower facility not 
required to be licensed or exempted from licensing.
    Comments and Motions to Intervene: Deadline for filing comments 
contesting whether the facility meets the qualifying criteria is 45 
days from the issuance date of this notice.
    Deadline for filing motions to intervene is 30 days from the 
issuance date of this notice.
    Anyone may submit comments or a motion to intervene in accordance 
with the requirements of Rules of Practice and Procedure, 18 CFR 
385.210 and 385.214. Any motions to intervene must be received on or 
before the specified deadline date for the particular proceeding.
    Filing and Service of Responsive Documents: All filings must (1) 
bear in all capital letters the ``COMMENTS CONTESTING QUALIFICATION FOR 
A CONDUIT HYDROPOWER FACILITY'' or ``MOTION TO INTERVENE,'' as 
applicable; (2) state in the heading the name of the applicant and the 
project number of the application to which the filing responds; (3) 
state the name, address, and telephone number of the person filing; and 
(4) otherwise comply with the requirements of sections 385.2001 through 
385.2005 of the Commission's regulations.\1\ All comments contesting 
Commission staff's preliminary determination that the facility meets 
the qualifying criteria must set forth their evidentiary basis.
---------------------------------------------------------------------------

    \1\ 18 CFR 385.2001-2005 (2013).
---------------------------------------------------------------------------

    The Commission strongly encourages electronic filing. Please file 
motions to intervene and comments using the

[[Page 66356]]

Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 
characters, without prior registration, using the eComment system at 
https://www.ferc.gov/docs-filing/ecomment.asp. You must include your 
name and contact information at the end of your comments. For 
assistance, please contact FERC Online Support at 
FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to: 
Secretary, Federal Energy Regulatory Commission, 888 First Street NE., 
Washington, DC 20426. A copy of all other filings in reference to this 
application must be accompanied by proof of service on all persons 
listed in the service list prepared by the Commission in this 
proceeding, in accordance with 18 CFR 4.34(b) and 385.2010.
    Locations of Notice of Intent: Copies of the notice of intent can 
be obtained directly from the applicant or such copies can be viewed 
and reproduced at the Commission in its Public Reference Room, Room 2A, 
888 First Street NE., Washington, DC 20426. The filing may also be 
viewed on the web at https://www.ferc.gov/docs-filing/elibrary.asp using 
the ``eLibrary'' link. Enter the docket number (e.g., CD14-4-000) in 
the docket number field to access the document. For assistance, call 
toll-free 1-866-208-3676 or email FERCOnlineSupport@ferc.gov. For TTY, 
call (202) 502-8659.

    Dated: October 28, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013-26458 Filed 11-4-13; 8:45 am]
BILLING CODE 6717-01-P