65640
Federal Register / Vol. 78, No. 212 / Friday, November 1, 2013 / Notices
Commission’s Web site (www.ferc.gov)
under the ‘‘e-Filing’’ link. Persons
unable to file electronically should
submit an original and 5 copies of the
protest or intervention to the Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
Dated: October 25, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013–26031 Filed 10–31–13; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP14–8–000]
emcdonald on DSK67QTVN1PROD with NOTICES
Transwestern Pipeline Company, LLC;
Notice of Request Under Blanket
Authorization
Take notice that on October 16, 2013,
Transwestern Pipeline Company, LLC
(Transwestern), 1300 Main Street,
Houston TX 77002, filed in Docket No.
CP14–8–000, a prior notice request
pursuant to sections 157.205 and
157.208 and 157.210 of the
Commission’s regulations under the
Natural Gas Act (NGA). Transwestern
seeks authorization to construct, own,
operate, and maintain one refurbished
11,750 horsepower (hp) site-rated
turbine, compressor, and ancillary
facilities, including yard piping, at a
new compressor station to be located in
Maricopa County, Arizona. The
proposed project will increase mainline
capacity on Transwestern’s Phoenix
Lateral by 160 million cubic feet per day
(MMcf/day). Transwestern proposes to
perform these activities under its
blanket certificate issued in Docket No.
CP82–534–000 [21 FERC ¶ 62,190
(1982)] all as more fully set forth in the
application, which is open to the public
for inspection. The filing may also be
viewed on the web at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (866) 208–3676 or TTY, (202)
502–8659.
Any questions regarding this
application should be directed to Mr.
Kelly Allen, Manager of Certificates and
Reporting, Transwestern Pipeline
Company, LLC, 1300 Main Street,
Houston TX 77002, or by calling (713)–
989–2606 (telephone) or (713)–989–
1205 (fax) or by email Kelly.Allen@
energytransfer.com.
VerDate Mar<15>2010
17:40 Oct 31, 2013
Jkt 232001
Any person may, within 60 days after
the issuance of the instant notice by the
Commission, file pursuant to Rule 214
of the Commission’s Procedural Rules
(18 CFR 385.214) a motion to intervene
or notice of intervention. Any person
filing to intervene or the Commission’s
staff may, pursuant to section 157.205 of
the Commission’s Regulations under the
NGA (18 CFR 157.205) file a protest to
the request. If no protest is filed within
the time allowed therefore, the proposed
activity shall be deemed to be
authorized effective the day after the
time allowed for protest. If a protest is
filed and not withdrawn within 30 days
after the time allowed for filing a
protest, the instant request shall be
treated as an application for
authorization pursuant to section 7 of
the NGA.
Pursuant to section 157.9 of the
Commission’s rules, 18 CFR 157.9,
within 90 days of this Notice the
Commission staff will either: Complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding; or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or EA for this proposal. The filing of the
EA in the Commission’s public record
for this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s FEIS or EA.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commentors will be
placed on the Commission’s
environmental mailing list, will receive
copies of the environmental documents,
and will be notified of meetings
associated with the Commission’s
environmental review process.
Environmental commentors will not be
required to serve copies of filed
documents on all other parties.
However, the non-party commentors
will not receive copies of all documents
filed by other parties or issued by the
Commission (except for the mailing of
environmental documents issued by the
Commission) and will not have the right
to seek court review of the
Commission’s final order.
PO 00000
Frm 00036
Fmt 4703
Sfmt 4703
The Commission strongly encourages
electronic filings of comments, protests,
and interventions via the internet in lieu
of paper. See 18 CFR 385.2001(a)(1)(iii)
and the instructions on the
Commission’s Web site (www.ferc.gov)
under the ‘‘e-Filing’’ link. Persons
unable to file electronically should
submit an original and 5 copies of the
protest or intervention to the Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
Dated: October 25, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013–26027 Filed 10–31–13; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Commissioner and Staff
Attendance at North American Electric
Reliability Corporation Meetings
The Federal Energy Regulatory
Commission hereby gives notice that
members of the Commission and/or
Commission staff may attend the
following meetings:
North American Electric Reliability
Corporation
Member Representatives Committee
and Board of Trustees Meetings
Board of Trustees Corporate
Governance and Human Resources
Committee, Compliance Committee,
and Standards Oversight and
Technology Committee Meetings
The Westin Buckhead Atlanta, 3391
Peachtree Road NE., Atlanta, GA 30326.
November 6 (7:00 a.m.–5:30 p.m.) and
November 7 (8:00 a.m.–1:00 p.m.), 2013.
Further information regarding these
meetings may be found at: https://
www.nerc.com/Pages/Calendar.aspx.
The discussions at the meetings,
which are open to the public, may
address matters at issue in the following
Commission proceedings:
Docket No. RC13–4, North American
Electric Reliability Corporation
Docket No. RR13–9, North American
Electric Reliability Corporation
Docket No. RR13–11, North American
Electric Reliability Corporation
Docket No. RD13–9, North American
Electric Reliability Corporation
Docket No. RD13–11, North American
Electric Reliability Corporation
Docket No. RD13–12, North American
Electric Reliability Corporation
For further information, please
contact Jonathan First, 202–502–8529,
or jonathan.first@ferc.gov.
E:\FR\FM\01NON1.SGM
01NON1
Agencies
[Federal Register Volume 78, Number 212 (Friday, November 1, 2013)]
[Notices]
[Page 65640]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-26027]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP14-8-000]
Transwestern Pipeline Company, LLC; Notice of Request Under
Blanket Authorization
Take notice that on October 16, 2013, Transwestern Pipeline
Company, LLC (Transwestern), 1300 Main Street, Houston TX 77002, filed
in Docket No. CP14-8-000, a prior notice request pursuant to sections
157.205 and 157.208 and 157.210 of the Commission's regulations under
the Natural Gas Act (NGA). Transwestern seeks authorization to
construct, own, operate, and maintain one refurbished 11,750 horsepower
(hp) site-rated turbine, compressor, and ancillary facilities,
including yard piping, at a new compressor station to be located in
Maricopa County, Arizona. The proposed project will increase mainline
capacity on Transwestern's Phoenix Lateral by 160 million cubic feet
per day (MMcf/day). Transwestern proposes to perform these activities
under its blanket certificate issued in Docket No. CP82-534-000 [21
FERC ] 62,190 (1982)] all as more fully set forth in the application,
which is open to the public for inspection. The filing may also be
viewed on the web at https://www.ferc.gov using the ``eLibrary'' link.
Enter the docket number excluding the last three digits in the docket
number field to access the document. For assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call toll-free, (866) 208-3676 or TTY,
(202) 502-8659.
Any questions regarding this application should be directed to Mr.
Kelly Allen, Manager of Certificates and Reporting, Transwestern
Pipeline Company, LLC, 1300 Main Street, Houston TX 77002, or by
calling (713)-989-2606 (telephone) or (713)-989-1205 (fax) or by email
Kelly.Allen@energytransfer.com.
Any person may, within 60 days after the issuance of the instant
notice by the Commission, file pursuant to Rule 214 of the Commission's
Procedural Rules (18 CFR 385.214) a motion to intervene or notice of
intervention. Any person filing to intervene or the Commission's staff
may, pursuant to section 157.205 of the Commission's Regulations under
the NGA (18 CFR 157.205) file a protest to the request. If no protest
is filed within the time allowed therefore, the proposed activity shall
be deemed to be authorized effective the day after the time allowed for
protest. If a protest is filed and not withdrawn within 30 days after
the time allowed for filing a protest, the instant request shall be
treated as an application for authorization pursuant to section 7 of
the NGA.
Pursuant to section 157.9 of the Commission's rules, 18 CFR 157.9,
within 90 days of this Notice the Commission staff will either:
Complete its environmental assessment (EA) and place it into the
Commission's public record (eLibrary) for this proceeding; or issue a
Notice of Schedule for Environmental Review. If a Notice of Schedule
for Environmental Review is issued, it will indicate, among other
milestones, the anticipated date for the Commission staff's issuance of
the final environmental impact statement (FEIS) or EA for this
proposal. The filing of the EA in the Commission's public record for
this proceeding or the issuance of a Notice of Schedule for
Environmental Review will serve to notify federal and state agencies of
the timing for the completion of all necessary reviews, and the
subsequent need to complete all federal authorizations within 90 days
of the date of issuance of the Commission staff's FEIS or EA.
Persons who wish to comment only on the environmental review of
this project should submit an original and two copies of their comments
to the Secretary of the Commission. Environmental commentors will be
placed on the Commission's environmental mailing list, will receive
copies of the environmental documents, and will be notified of meetings
associated with the Commission's environmental review process.
Environmental commentors will not be required to serve copies of filed
documents on all other parties. However, the non-party commentors will
not receive copies of all documents filed by other parties or issued by
the Commission (except for the mailing of environmental documents
issued by the Commission) and will not have the right to seek court
review of the Commission's final order.
The Commission strongly encourages electronic filings of comments,
protests, and interventions via the internet in lieu of paper. See 18
CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web
site (www.ferc.gov) under the ``e-Filing'' link. Persons unable to file
electronically should submit an original and 5 copies of the protest or
intervention to the Federal Energy Regulatory Commission, 888 First
Street NE., Washington, DC 20426.
Dated: October 25, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013-26027 Filed 10-31-13; 8:45 am]
BILLING CODE 6717-01-P