Download as PDF 65640 Federal Register / Vol. 78, No. 212 / Friday, November 1, 2013 / Notices Commission’s Web site (www.ferc.gov) under the ‘‘e-Filing’’ link. Persons unable to file electronically should submit an original and 5 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. Dated: October 25, 2013. Kimberly D. Bose, Secretary. [FR Doc. 2013–26031 Filed 10–31–13; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP14–8–000] emcdonald on DSK67QTVN1PROD with NOTICES Transwestern Pipeline Company, LLC; Notice of Request Under Blanket Authorization Take notice that on October 16, 2013, Transwestern Pipeline Company, LLC (Transwestern), 1300 Main Street, Houston TX 77002, filed in Docket No. CP14–8–000, a prior notice request pursuant to sections 157.205 and 157.208 and 157.210 of the Commission’s regulations under the Natural Gas Act (NGA). Transwestern seeks authorization to construct, own, operate, and maintain one refurbished 11,750 horsepower (hp) site-rated turbine, compressor, and ancillary facilities, including yard piping, at a new compressor station to be located in Maricopa County, Arizona. The proposed project will increase mainline capacity on Transwestern’s Phoenix Lateral by 160 million cubic feet per day (MMcf/day). Transwestern proposes to perform these activities under its blanket certificate issued in Docket No. CP82–534–000 [21 FERC ¶ 62,190 (1982)] all as more fully set forth in the application, which is open to the public for inspection. The filing may also be viewed on the web at https:// www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC at FERCOnlineSupport@ferc.gov or call toll-free, (866) 208–3676 or TTY, (202) 502–8659. Any questions regarding this application should be directed to Mr. Kelly Allen, Manager of Certificates and Reporting, Transwestern Pipeline Company, LLC, 1300 Main Street, Houston TX 77002, or by calling (713)– 989–2606 (telephone) or (713)–989– 1205 (fax) or by email Kelly.Allen@ energytransfer.com. VerDate Mar<15>2010 17:40 Oct 31, 2013 Jkt 232001 Any person may, within 60 days after the issuance of the instant notice by the Commission, file pursuant to Rule 214 of the Commission’s Procedural Rules (18 CFR 385.214) a motion to intervene or notice of intervention. Any person filing to intervene or the Commission’s staff may, pursuant to section 157.205 of the Commission’s Regulations under the NGA (18 CFR 157.205) file a protest to the request. If no protest is filed within the time allowed therefore, the proposed activity shall be deemed to be authorized effective the day after the time allowed for protest. If a protest is filed and not withdrawn within 30 days after the time allowed for filing a protest, the instant request shall be treated as an application for authorization pursuant to section 7 of the NGA. Pursuant to section 157.9 of the Commission’s rules, 18 CFR 157.9, within 90 days of this Notice the Commission staff will either: Complete its environmental assessment (EA) and place it into the Commission’s public record (eLibrary) for this proceeding; or issue a Notice of Schedule for Environmental Review. If a Notice of Schedule for Environmental Review is issued, it will indicate, among other milestones, the anticipated date for the Commission staff’s issuance of the final environmental impact statement (FEIS) or EA for this proposal. The filing of the EA in the Commission’s public record for this proceeding or the issuance of a Notice of Schedule for Environmental Review will serve to notify federal and state agencies of the timing for the completion of all necessary reviews, and the subsequent need to complete all federal authorizations within 90 days of the date of issuance of the Commission staff’s FEIS or EA. Persons who wish to comment only on the environmental review of this project should submit an original and two copies of their comments to the Secretary of the Commission. Environmental commentors will be placed on the Commission’s environmental mailing list, will receive copies of the environmental documents, and will be notified of meetings associated with the Commission’s environmental review process. Environmental commentors will not be required to serve copies of filed documents on all other parties. However, the non-party commentors will not receive copies of all documents filed by other parties or issued by the Commission (except for the mailing of environmental documents issued by the Commission) and will not have the right to seek court review of the Commission’s final order. PO 00000 Frm 00036 Fmt 4703 Sfmt 4703 The Commission strongly encourages electronic filings of comments, protests, and interventions via the internet in lieu of paper. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site (www.ferc.gov) under the ‘‘e-Filing’’ link. Persons unable to file electronically should submit an original and 5 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. Dated: October 25, 2013. Kimberly D. Bose, Secretary. [FR Doc. 2013–26027 Filed 10–31–13; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Commissioner and Staff Attendance at North American Electric Reliability Corporation Meetings The Federal Energy Regulatory Commission hereby gives notice that members of the Commission and/or Commission staff may attend the following meetings: North American Electric Reliability Corporation Member Representatives Committee and Board of Trustees Meetings Board of Trustees Corporate Governance and Human Resources Committee, Compliance Committee, and Standards Oversight and Technology Committee Meetings The Westin Buckhead Atlanta, 3391 Peachtree Road NE., Atlanta, GA 30326. November 6 (7:00 a.m.–5:30 p.m.) and November 7 (8:00 a.m.–1:00 p.m.), 2013. Further information regarding these meetings may be found at: https:// www.nerc.com/Pages/Calendar.aspx. The discussions at the meetings, which are open to the public, may address matters at issue in the following Commission proceedings: Docket No. RC13–4, North American Electric Reliability Corporation Docket No. RR13–9, North American Electric Reliability Corporation Docket No. RR13–11, North American Electric Reliability Corporation Docket No. RD13–9, North American Electric Reliability Corporation Docket No. RD13–11, North American Electric Reliability Corporation Docket No. RD13–12, North American Electric Reliability Corporation For further information, please contact Jonathan First, 202–502–8529, or jonathan.first@ferc.gov. E:\FR\FM\01NON1.SGM 01NON1

Agencies

[Federal Register Volume 78, Number 212 (Friday, November 1, 2013)]
[Notices]
[Page 65640]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-26027]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP14-8-000]


Transwestern Pipeline Company, LLC; Notice of Request Under 
Blanket Authorization

    Take notice that on October 16, 2013, Transwestern Pipeline 
Company, LLC (Transwestern), 1300 Main Street, Houston TX 77002, filed 
in Docket No. CP14-8-000, a prior notice request pursuant to sections 
157.205 and 157.208 and 157.210 of the Commission's regulations under 
the Natural Gas Act (NGA). Transwestern seeks authorization to 
construct, own, operate, and maintain one refurbished 11,750 horsepower 
(hp) site-rated turbine, compressor, and ancillary facilities, 
including yard piping, at a new compressor station to be located in 
Maricopa County, Arizona. The proposed project will increase mainline 
capacity on Transwestern's Phoenix Lateral by 160 million cubic feet 
per day (MMcf/day). Transwestern proposes to perform these activities 
under its blanket certificate issued in Docket No. CP82-534-000 [21 
FERC ] 62,190 (1982)] all as more fully set forth in the application, 
which is open to the public for inspection. The filing may also be 
viewed on the web at https://www.ferc.gov using the ``eLibrary'' link. 
Enter the docket number excluding the last three digits in the docket 
number field to access the document. For assistance, contact FERC at 
FERCOnlineSupport@ferc.gov or call toll-free, (866) 208-3676 or TTY, 
(202) 502-8659.
    Any questions regarding this application should be directed to Mr. 
Kelly Allen, Manager of Certificates and Reporting, Transwestern 
Pipeline Company, LLC, 1300 Main Street, Houston TX 77002, or by 
calling (713)-989-2606 (telephone) or (713)-989-1205 (fax) or by email 
Kelly.Allen@energytransfer.com.
    Any person may, within 60 days after the issuance of the instant 
notice by the Commission, file pursuant to Rule 214 of the Commission's 
Procedural Rules (18 CFR 385.214) a motion to intervene or notice of 
intervention. Any person filing to intervene or the Commission's staff 
may, pursuant to section 157.205 of the Commission's Regulations under 
the NGA (18 CFR 157.205) file a protest to the request. If no protest 
is filed within the time allowed therefore, the proposed activity shall 
be deemed to be authorized effective the day after the time allowed for 
protest. If a protest is filed and not withdrawn within 30 days after 
the time allowed for filing a protest, the instant request shall be 
treated as an application for authorization pursuant to section 7 of 
the NGA.
    Pursuant to section 157.9 of the Commission's rules, 18 CFR 157.9, 
within 90 days of this Notice the Commission staff will either: 
Complete its environmental assessment (EA) and place it into the 
Commission's public record (eLibrary) for this proceeding; or issue a 
Notice of Schedule for Environmental Review. If a Notice of Schedule 
for Environmental Review is issued, it will indicate, among other 
milestones, the anticipated date for the Commission staff's issuance of 
the final environmental impact statement (FEIS) or EA for this 
proposal. The filing of the EA in the Commission's public record for 
this proceeding or the issuance of a Notice of Schedule for 
Environmental Review will serve to notify federal and state agencies of 
the timing for the completion of all necessary reviews, and the 
subsequent need to complete all federal authorizations within 90 days 
of the date of issuance of the Commission staff's FEIS or EA.
    Persons who wish to comment only on the environmental review of 
this project should submit an original and two copies of their comments 
to the Secretary of the Commission. Environmental commentors will be 
placed on the Commission's environmental mailing list, will receive 
copies of the environmental documents, and will be notified of meetings 
associated with the Commission's environmental review process. 
Environmental commentors will not be required to serve copies of filed 
documents on all other parties. However, the non-party commentors will 
not receive copies of all documents filed by other parties or issued by 
the Commission (except for the mailing of environmental documents 
issued by the Commission) and will not have the right to seek court 
review of the Commission's final order.
    The Commission strongly encourages electronic filings of comments, 
protests, and interventions via the internet in lieu of paper. See 18 
CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web 
site (www.ferc.gov) under the ``e-Filing'' link. Persons unable to file 
electronically should submit an original and 5 copies of the protest or 
intervention to the Federal Energy Regulatory Commission, 888 First 
Street NE., Washington, DC 20426.

    Dated: October 25, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013-26027 Filed 10-31-13; 8:45 am]
BILLING CODE 6717-01-P