Juneau Hydropower, Inc.; Notice of Subsequent Draft License Application (DLA) and Draft Preliminary Draft Environmental Assessment (PDEA) and Request for Preliminary Terms and Conditions, 64493-64494 [2013-25437]

Download as PDF Federal Register / Vol. 78, No. 209 / Tuesday, October 29, 2013 / Notices DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket Nos. EL14–5–000; ER13–2428–000 (Not consolidated)] mstockstill on DSK4VPTVN1PROD with NOTICES Notice of Complaint; Frankfort Electric and Water Plant Board; Cities of Barbourville, Bardstown, Bardwell, Benham, Berea, Corbin, Falmouth, Madisonville, Nicholasville, Paris, and Providence, Kentucky v. Kentucky Utilities Company Take notice that on October 17, 2013, pursuant to section 206 of the Federal Power Act (FPA) and Rule 206 of the Federal Energy Regulatory Commission’s (Commission) Rules of Practice and Procedure, 18 CFR 385.206, Frankfort Electric and Water Plant Board and the Cities of Barbourville, Bardstown, Bardwell, Benham, Berea, Corbin, Falmouth, Madisonville, Nicholasville, Paris, and Providence, Kentucky (Complainants or Kentucky Municipals) filed a formal complaint against the Kentucky Utilities Company, (Respondents), seeking an investigation and refund effective date under FPA section 206 and ask that the proceeding be consolidated with Docket no. ER13– 2428–000. The Kentucky Municipals certify that copies of the complaint were served on the contacts for the Respondent as listed on the Commission’s list of Corporate Officials. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. The Respondent’s answer and all interventions, or protests must be filed on or before the comment date. The Respondent’s answer, motions to intervene, and protests must be served on the Complainants. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 5 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the VerDate Mar<15>2010 18:15 Oct 28, 2013 Jkt 232001 ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5:00 p.m. Eastern Time on November 6, 2013. Dated: October 21, 2013. Kimberly D. Bose, Secretary. [FR Doc. 2013–25441 Filed 10–28–13; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [ Project No. 13563–001] Juneau Hydropower, Inc.; Notice of Subsequent Draft License Application (DLA) and Draft Preliminary Draft Environmental Assessment (PDEA) and Request for Preliminary Terms and Conditions Take notice that the following Draft License Application (DLA) and draft Preliminary Draft Environmental Assessment (PDEA) have been filed with the Commission and are available for public inspection. a. Type of Application: Major Unconstructed Project. b. Project No.: 13563–001. c. Date Filed: October 15, 2013. d. Applicant: Juneau Hydropower, Inc. e. Name of Project: Sweetheart Lake Hydroelectric Project. f. Location: At the confluence of Sweetheart Lake and Gilbert Bay, in the City and Borough of Juneau, Alaska. The project would occupy 1,886.76 acres of federal lands within the Tongass National Forest, administered by the US Forest Service. g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)–825(r). h. Applicant Contact: Duff Mitchell, Business Manager, Juneau Hydropower, Inc., P.O. Box 22775, Juneau, AK 99802; 907–789–2775, email: duff.mitchell@ juneauhydro.com. i. FERC Contact: John Matkowski, 202–502–8576, john.matkowski@ ferc.gov. j. Status of Project: With this notice the Commission is soliciting (1) preliminary terms, conditions, and PO 00000 Frm 00027 Fmt 4703 Sfmt 4703 64493 recommendations on the draft PDEA, and (2) comments on the DLA. k. Deadline for filing: 90 days from the issuance of this notice. All comments on the draft PDEA and DLA should be sent to the addresses noted above in Item (h), and filed with the Commission. The Commission strongly encourages electronic filing. Please file comments using the Commission’s eFiling system at https://www.ferc.gov/docs-filing/ efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, please send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. The first page of any filing should include docket number P–13563–001. All comments must bear the heading Preliminary Comments, Preliminary Recommendations, Preliminary Terms and Conditions, or Preliminary Prescriptions. l. A copy of the application is available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s Web site at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support. You may also register online at https://www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support. Juneau Hydropower, Inc. has mailed a copy of the draft PDEA and DLA to interested entities and parties. Copies of these documents are available for review at the Juneau Public Library, 292 Marine Way, Juneau, Alaska 99801, or at the Juneau Hydropower, Inc. Web site, https://www.juneauhydro.com. m. With this notice, we are initiating consultation with the Alaska State Historic Preservation Officer, as required by section 106, National Historic Preservation Act, and the regulations of the Advisory Council on Historic Preservation, 36 CFR 800.4. E:\FR\FM\29OCN1.SGM 29OCN1 64494 Federal Register / Vol. 78, No. 209 / Tuesday, October 29, 2013 / Notices Dated: October 22, 2013. Kimberly D. Bose, Secretary. Online service, please email FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5:00 p.m. Eastern Time on November 4, 2013. [FR Doc. 2013–25437 Filed 10–28–13; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Dated: October 18, 2013. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2013–25535 Filed 10–28–13; 8:45 am] BILLING CODE 6717–01–P [Docket No. EF14–1–000] ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5:00 p.m. Eastern time on November 4, 2013. mstockstill on DSK4VPTVN1PROD with NOTICES Southwestern Power Administration; Notice of Filing DEPARTMENT OF ENERGY Take notice that on October 3, 2013, the Deputy Secretary of the Department of Energy, pursuant to the authority vested by sections 301(b), 302(a), 402(e), 641, 642, 643, and 644, of the Department of Energy Organization Act (Pub. L. 95–91), and by Delegation Order Nos. 00–037.00 (December 6, 2001) and 00–001.00E (June 6, 2013), confirmed, approved, and placed in effect on an interim basis in Rate Order SWPA–66, Southwestern Power Administration Integrated System Rates for the period October 1, 2013 through September 30, 2017. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. On or before the comment date, it is not necessary to serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 5 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Federal Energy Regulatory Commission Dated: October 18, 2013. Nathaniel J. Davis, Sr., Deputy Secretary. [Docket No. EF14–2–000] [FR Doc. 2013–25536 Filed 10–28–13; 8:45 am] VerDate Mar<15>2010 18:15 Oct 28, 2013 Jkt 232001 BILLING CODE 6717–01–P Southwestern Power Administration; Notice of Filing Take notice that on October 3, 2013, the Deputy Secretary of the Department of Energy, pursuant to the authority vested by sections 301(b), 302(a), 402(e), 641, 642, 643, and 644, of the Department of Energy Organization Act (Pub. L. 95–91), and by Delegation Order Nos. 00–037.00 (December 6, 2001) and 00–001.00E (June 6, 2013), confirmed, approved, and placed in effect on an interim basis in Rate Order SWPA–67, Southwestern Power Administration annual rate for the sale of power and energy from the Rayburn Project to the Sam Rayburn Dam Electric Cooperative, Inc. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. On or before the comment date, it is not necessary to serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 5 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the PO 00000 Frm 00028 Fmt 4703 Sfmt 4703 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13579–002; Project No. 14491– 000] FFP Qualified Hydro 14, LLC, Western Minnesota Municipal Power Agency; Notice Announcing Filing Priority for Preliminary Permit Applications On October 21, 2013, the Commission held a drawing to determine priority between competing preliminary permit applications with identical filing times. In the event that the Commission concludes that neither of the applicants’ plans is better adapted than the other to develop, conserve, and utilize in the public interest the water resources of the region at issue, the priority established by this drawing will serve as the tiebreaker. Based on the drawing, the order of priority is as follows: 1. FFP Qualified Hydro 14, LLC— Project No. 13579–002 2. Western Minnesota Municipal Power Agency—Project No. 14491–000 Dated: October 23, 2013. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2013–25527 Filed 10–28–13; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [ Docket No. RM98–1–000] Records Governing Off-the-Record Communications; Public Notice This constitutes notice, in accordance with 18 CFR 385.2201(b), of the receipt E:\FR\FM\29OCN1.SGM 29OCN1

Agencies

[Federal Register Volume 78, Number 209 (Tuesday, October 29, 2013)]
[Notices]
[Pages 64493-64494]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-25437]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[ Project No. 13563-001]


Juneau Hydropower, Inc.; Notice of Subsequent Draft License 
Application (DLA) and Draft Preliminary Draft Environmental Assessment 
(PDEA) and Request for Preliminary Terms and Conditions

    Take notice that the following Draft License Application (DLA) and 
draft Preliminary Draft Environmental Assessment (PDEA) have been filed 
with the Commission and are available for public inspection.
    a. Type of Application: Major Unconstructed Project.
    b. Project No.: 13563-001.
    c. Date Filed: October 15, 2013.
    d. Applicant: Juneau Hydropower, Inc.
    e. Name of Project: Sweetheart Lake Hydroelectric Project.
    f. Location: At the confluence of Sweetheart Lake and Gilbert Bay, 
in the City and Borough of Juneau, Alaska. The project would occupy 
1,886.76 acres of federal lands within the Tongass National Forest, 
administered by the US Forest Service.
    g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)-825(r).
    h. Applicant Contact: Duff Mitchell, Business Manager, Juneau 
Hydropower, Inc., P.O. Box 22775, Juneau, AK 99802; 907-789-2775, 
email: duff.mitchell@juneauhydro.com.
    i. FERC Contact: John Matkowski, 202-502-8576, 
john.matkowski@ferc.gov.
    j. Status of Project: With this notice the Commission is soliciting 
(1) preliminary terms, conditions, and recommendations on the draft 
PDEA, and (2) comments on the DLA.
    k. Deadline for filing: 90 days from the issuance of this notice.
    All comments on the draft PDEA and DLA should be sent to the 
addresses noted above in Item (h), and filed with the Commission.
    The Commission strongly encourages electronic filing. Please file 
comments using the Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 
6,000 characters, without prior registration, using the eComment system 
at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your 
name and contact information at the end of your comments. For 
assistance, please contact FERC Online Support at 
FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to: 
Secretary, Federal Energy Regulatory Commission, 888 First Street NE., 
Washington, DC 20426. The first page of any filing should include 
docket number P-13563-001.
    All comments must bear the heading Preliminary Comments, 
Preliminary Recommendations, Preliminary Terms and Conditions, or 
Preliminary Prescriptions.
    l. A copy of the application is available for review at the 
Commission in the Public Reference Room or may be viewed on the 
Commission's Web site at https://www.ferc.gov using the ``eLibrary'' 
link. Enter the docket number excluding the last three digits in the 
docket number field to access the document. For assistance, contact 
FERC Online Support.
    You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances 
related to this or other pending projects. For assistance, contact FERC 
Online Support.
    Juneau Hydropower, Inc. has mailed a copy of the draft PDEA and DLA 
to interested entities and parties. Copies of these documents are 
available for review at the Juneau Public Library, 292 Marine Way, 
Juneau, Alaska 99801, or at the Juneau Hydropower, Inc. Web site, 
https://www.juneauhydro.com.
    m. With this notice, we are initiating consultation with the Alaska 
State Historic Preservation Officer, as required by section 106, 
National Historic Preservation Act, and the regulations of the Advisory 
Council on Historic Preservation, 36 CFR 800.4.


[[Page 64494]]


    Dated: October 22, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013-25437 Filed 10-28-13; 8:45 am]
BILLING CODE 6717-01-P