Exelon Generation Company, LLC; Peach Bottom Atomic Power Station, Units 2 and 3; Proposed License Amendment To Increase the Maximum Reactor Power Level, 63506-63516 [2013-24902]
Download as PDF
63506
Federal Register / Vol. 78, No. 206 / Thursday, October 24, 2013 / Notices
the type of valve used as the air return
check valve from a check valve to a
SOV; redesigns the PSS insidecontainment header; and adds a PSS
containment penetration.
The Commission has determined for
these amendments that the application
complies with the standards and
requirements of the Atomic Energy Act
of 1954, as amended (the Act), and the
Commission’s rules and regulations.
The Commission has made appropriate
findings as required by the Act and the
Commission’s rules and regulations in
10 CFR Chapter I, which are set forth in
the license amendment.
A notice of consideration of issuance
of amendment to facility operating
license or combined license, as
applicable, proposed no significant
hazards consideration determination,
and opportunity for a hearing in
connection with these actions, was
published in the Federal Register on
March 4, 2013 (78 FR 14126). No
comments were received during the 60day comment period.
The Commission has determined that
these amendments satisfy the criteria for
categorical exclusion in accordance
with 10 CFR 51.22. Therefore, pursuant
to 10 CFR 51.22(b), no environmental
impact statement or environmental
assessment need be prepared for these
amendments.
IV. Conclusion
Using the reasons set forth in the
combined safety evaluation, the staff
granted the exemption and issued the
amendment that the licensee requested
on February 7, 2013, and supplemented
by letter dated July 11, 2013. The
exemption and amendment were issued
on August 22, 2013 as part of a
combined package to the licensee.
(ADAMS Accession No. ML13212A108).
Dated at Rockville, Maryland, this 7th day
of October 2013.
For the Nuclear Regulatory Commission.
Denise McGovern,
Senior Project Manager, Licensing Branch 4,
Division of New Reactor Licensing, Office of
New Reactors.
[FR Doc. 2013–24886 Filed 10–23–13; 8:45 am]
mstockstill on DSK4VPTVN1PROD with NOTICES
BILLING CODE 7590–01–P
VerDate Mar<15>2010
17:25 Oct 23, 2013
Jkt 232001
FOR FURTHER INFORMATION CONTACT:
NUCLEAR REGULATORY
COMMISSION
[Docket Nos. 50–277 and 50–278; NRC–
2013–0232]
Exelon Generation Company, LLC;
Peach Bottom Atomic Power Station,
Units 2 and 3; Proposed License
Amendment To Increase the Maximum
Reactor Power Level
Nuclear Regulatory
Commission.
ACTION: Draft environmental assessment
and draft finding of no significant
Impact; opportunity to comment.
AGENCY:
The U.S. Nuclear Regulatory
Commission (NRC) is considering
issuance of amendments to Renewed
Facility Operating License Nos. DPR–44
and DPR–56, issued to Exelon
Generation Company, LLC (Exelon, the
licensee), for operation of the Peach
Bottom Atomic Power Station (PBAPS),
Units 2 and 3, located in York and
Lancaster Counties, Pennsylvania. The
proposed amendments would authorize
an increase in the maximum reactor
power level from 3514 megawatts
thermal (MWt) to 3951 MWt.
DATES: Comments must be filed by
November 25, 2013. Any potential party
as defined in Section 2.4 of Title 10 of
the Code of Federal Regulations (10
CFR), who believe access to Sensitive
Unclassified Non-Safeguards
Information (SUNSI) is necessary to
respond to this notice must request
document access by November 4, 2013.
ADDRESSES: You may submit comment
by any of the following methods (unless
this document describes a different
method for submitting comments on a
specific subject):
• Federal Rulemaking Web site: Go to
https://www.regulations.gov and search
for Docket ID NRC–2013–0232. Address
questions about NRC dockets to Carol
Gallagher; telephone: 301–287–3422;
email: Carol.Gallagher@nrc.gov. For
technical questions, contact the
individual(s) listed in the FOR FURTHER
INFORMATION CONTACT section of this
document.
• Mail comments to: Cindy Bladey,
Chief, Rules, Announcements, and
Directives Branch (RADB), Office of
Administration, Mail Stop: 3WFN, 06–
44M, U.S. Nuclear Regulatory
Commission, Washington, DC 20555–
0001.
For additional direction on accessing
information and submitting comments,
see ‘‘Accessing Information and
Submitting Comments’’ in the
SUPPLEMENTARY INFORMATION section of
this document.
SUMMARY:
PO 00000
Frm 00059
Fmt 4703
Sfmt 4703
Richard B. Ennis, Office of Nuclear
Reactor Regulation, U.S. Nuclear
Regulatory Commission, Washington,
DC 20555; telephone: 301–415–1420;
email: Rick.Ennis@nrc.gov.
SUPPLEMENTARY INFORMATION:
I. Accessing Information and
Submitting Comments
A. Accessing Information
Please refer to Docket ID NRC–2013–
0232 when contacting the NRC about
the availability of information regarding
this document. You may access
publicly-available information related to
this action by the following methods:
• Federal Rulemaking Web site: Go to
https://www.regulations.gov and search
for Docket ID NRC–2013–0232.
• NRC’s Agencywide Documents
Access and Management System
(ADAMS): You may access publiclyavailable documents online in the NRC
Library at https://www.nrc.gov/readingrm/adams.html. To begin the search,
select ‘‘ADAMS Public Documents’’ and
then select ‘‘Begin Web-based ADAMS
Search.’’ For problems with ADAMS,
please contact the NRC’s Public
Document Room (PDR) reference staff at
1–800–397–4209, 301–415–4737, or by
email to pdr.resource@nrc.gov. The
ADAMS accession number for each
document referenced in this notice (if
that document is available in ADAMS)
is provided the first time that a
document is referenced. The application
for amendment is dated September 28,
2012, and is supplemented by letters
dated February 15, 2013, May 7, 2013,
May 24, 2013, June 4, 2013, June 27,
2013, July 30, 2013, July 31, 2013,
August 5, 2013, August 22, 2013,
August 29, 2013, and September 13,
2013 (ADAMS Accession Nos.
ML122860201, ML13051A032,
ML13129A143, ML13149A145,
ML13156A368, ML13182A025,
ML13211A457, ML13213A285,
ML13217A431, ML13240A002,
ML13241A418, and ML13260A076,
respectively). The application and some
of the supplements contain SUNSI
(proprietary information) and,
accordingly, the proprietary information
has been withheld from public
disclosure. Redacted versions of the
documents containing proprietary
information have been made publicly
available and can be accessed via the
applicable ADAMS accession numbers
listed above.
• NRC’s PDR: You may examine and
purchase copies of public documents at
the NRC’s PDR, Room O1–F21, One
White Flint North, 11555 Rockville
Pike, Rockville, Maryland 20852.
E:\FR\FM\24OCN1.SGM
24OCN1
Federal Register / Vol. 78, No. 206 / Thursday, October 24, 2013 / Notices
B. Submitting Comments
Please include Docket ID NRC–2013–
0232 in the subject line of your
comment submission, in order to ensure
that the NRC is able to make your
comment submission available to the
public in this docket.
The NRC cautions you not to include
identifying or contact information that
you do not want to be publicly
disclosed in your comment submission.
The NRC posts all comment
submissions at https://
www.regulations.gov as well as entering
the comment submissions into ADAMS.
The NRC does not routinely edit
comment submissions to remove
identifying or contact information.
If you are requesting or aggregating
comments from other persons for
submission to the NRC, then you should
inform those persons not to include
identifying or contact information that
they do not want to be publicly
disclosed in their comment submission.
Your request should state that the NRC
does not routinely edit comment
submissions to remove such information
before making the comment
submissions available to the public or
entering the comment submissions into
ADAMS.
II. Introduction
The NRC has prepared this draft
Environmental Assessment (EA), in
accordance with 10 CFR 51.21, and this
draft Finding of No Significant Impact
(FONSI), in accordance with 10 CFR
51.33, for the proposed license
amendments. The draft EA and draft
FONSI are being published in the
Federal Register with a 30-day public
comment period ending November 25,
2013. Publishing these documents as
draft for comment, with a 30-day
comment period, is in accordance with
the NRC guidance for this type of
license amendment, RS–001, ‘‘Review
Standard for Extended Power Uprates,’’
dated December 2003 (ADAMS
Accession No. ML033640024).
mstockstill on DSK4VPTVN1PROD with NOTICES
III. Draft Environmental Assessment
Plant Site and Environs
PBAPS consists of Units 1, 2, and 3
located on approximately 620 acres of
land in Peach Bottom Township, York
County, Pennsylvania on the west bank
of the Susquehanna River. The site is
approximately 38 miles north of
Baltimore, Maryland; 19 miles
southwest of Lancaster, Pennsylvania;
and 30 miles southeast of York,
Pennsylvania. The area within 6 miles
of the site includes parts of York and
Lancaster Counties in Pennsylvania and
parts of Harford and Cecil Counties in
VerDate Mar<15>2010
17:25 Oct 23, 2013
Jkt 232001
Maryland. The property around the site
is predominantly rural, characterized by
farmland and woods.
Units 2 and 3 are General Electric
Type 4, Mark I boiling-water reactors. In
addition to Units 2 and 3, the site
contains turbine buildings, intake and
discharge canals, auxiliary buildings,
switchyards, an interim spent fuel
storage installation, a training center, a
public boat ramp, a picnic area, and the
retired Unit 1 reactor. Unit 1 is located
adjacent to Units 2 and 3. It was a
prototype, high-temperature, gas-cooled
reactor which operated from 1966 to
1974. Unit 1 is permanently shut down,
defueled, and is maintained in a safe
storage, surveillance, security, and
maintenance condition. It is not part of
this application and will be
decommissioned in the future.
Units 2 and 3 at PBAPS have a
common once-through heat dissipation
system that draws water from and
discharges to the Conowingo Pond. The
Conowingo Pond is a reservoir on the
Susquehanna River formed by the
Conowingo Dam (located approximately
8.5 miles downstream of the PBAPS
site) and the Holtwood Dam (located
approximately 6 miles upstream of the
PBAPS site). The Conowingo and
Holtwood Dams each provide
hydroelectric generation.
The Conowingo Pond has a surface
area of approximately 9,000 acres with
35 miles of shoreline. It has a width that
varies from 0.5 to 1.3 miles and a
maximum depth of 98 feet (ft). In
addition to providing cooling water for
PBAPS, Conowingo Pond is used as a
fish and wildlife resource, for
recreation, and as a source of public
water.
Units 2 and 3 use six circulating water
pumps (three per unit), each rated at
250,000 gallons per minute (gpm),
which draw water from Conowingo
Pond at a rate of 1.5 million gpm when
all six pumps are running. Water drawn
from Conowingo Pond passes through a
series of intake structures before it is
circulated through two main
condensers. From these condensers,
water passes through a series of
discharge structures and then flows to
Conowingo Pond where the heat is
dissipated to the environment. Exelon
also maintains three mechanical draft
helper cooling towers that have the
capacity to handle approximately 60
percent of the cooling water circulating
through Units 2 and 3. Water drawn
from Conowingo Pond flows into a
487 ft long outer intake structure along
the west bank of Conowingo Pond.
Trash racks protect 32 outer intake
openings and prevent large floating
debris and ice floes from reaching 24
PO 00000
Frm 00060
Fmt 4703
Sfmt 4703
63507
traveling screens. This cooling water
intake structure is designed to reduce
impingement by preventing fish and
small debris from entering the system.
The intake structure allows fish to avoid
the screens by having a low approach
velocity. The screens are made of 3/8inch square mesh and are placed
approximately 40 ft behind the outer
trash racks in the outer intake structure.
From the outer intake structure, water
enters two, 700 ft-long and 200 ft-wide,
intake basins. The cooling water for the
condensers is drawn from these two
intake basins.
Cooling water discharges from the
condensers into a 700 ft-long and 400 ftwide discharge basin where the heated
cooling water then flows through a 4700
ft-long discharge canal. Three adjustable
discharge gates at the end of the
discharge canal control the flow to
Conowingo Pond and maintain a
discharge velocity between 5 and
8 ft/second.
Identification of the Proposed Action
The proposed action is the issuance of
amendments to the licenses PBAPS,
Units 2 and 3, which would increase the
maximum licensed thermal power level,
for each reactor, from 3,514 MWt to
3,951 MWt. This change, referred to as
an extended power uprate (EPU),
represents an increase of approximately
12.4 percent above the current licensed
thermal power level. This change is
considered an EPU by the NRC because
it exceeds the typical 7 percent power
increase that can be accommodated with
only minor plant changes. An EPU
usually requires significant
modifications to major plant equipment.
The proposed EPU for PBAPS, Units 2
and 3, will require significant
modifications as discussed in
Attachment 9 to the licensee’s
application dated September 28, 2012
(ADAMS Accession No. ML12286A011).
If approved, these amendments would
allow the heat output of each reactor to
increase, which would increase the flow
of steam to the turbines. This would
increase the production of electricity,
increase the amount of waste heat
delivered to the condensers, and slightly
raise the temperature of the water
discharged into Conowingo Pond.
Plant modifications to implement the
EPU are expected to occur during
normal refueling outages that occur for
each reactor once every 24 months and
typically last for 30 to 40 days. If the
EPU is approved, Unit 2 and 3 are
expected to begin operating at the EPU
core power level of 3,951 MWt in 2014
and 2015, respectively.
E:\FR\FM\24OCN1.SGM
24OCN1
63508
Federal Register / Vol. 78, No. 206 / Thursday, October 24, 2013 / Notices
The Need for the Proposed Action
The current licenses for PBAPS, Units
2 and 3, contain a maximum authorized
thermal power level for each reactor.
The licensee desires to increase this
power level in order to increase the
electrical output of the plant without
the need to site and construct new
facilities. To allow this to occur, the
NRC must amend the licenses for each
unit to authorize the proposed new
maximum thermal power level.
Environmental Impacts of the Proposed
Action
At the time of issuance of the
operating license for PBAPS, Units 2
and 3, the NRC staff noted that any
activity authorized by the license would
be encompassed by the overall action
evaluated in the Final Environmental
Impact Statement (FEIS) for the
operation of the PBAPS reactors. This
FEIS was issued in 1973, by the U.S.
Atomic Energy Commission
(predecessor agency to the NRC). The
NRC revisited and updated the FEIS in
January 2003, when the NRC published
Supplement 10 to NUREG–1437,
‘‘Generic Environmental Impact
Statement for the License Renewal of
Nuclear Power Plants,’’ that addressed
the license renewal of PBAPS, Units 2
and 3 (ADAMS Accession No.
ML030270059).
The radiological and non-radiological
impacts on the environment that may
result from the proposed EPU are
summarized below.
mstockstill on DSK4VPTVN1PROD with NOTICES
Non-Radiological Impacts
Land Use and Aesthetic Impacts
Potential land use and aesthetic
impacts for the proposed action include
impacts from construction and plant
modifications. All plant modifications
will be implemented within existing
buildings. No new construction will
occur outside of existing plant areas,
and no expansion of buildings, roads,
parking lots, equipment lay-down areas,
or storage areas will be required to
support the proposed EPU. Exelon will
use existing parking lots, road access,
equipment lay-down areas, offices,
workshops, warehouses, and restrooms
during plant modifications. Therefore,
land use conditions and visual
aesthetics would not change
significantly at PBAPS from EPU plant
modifications. The EPU plant
modifications are discussed in
Attachment 9 to the licensee’s
application dated September 28, 2012
(ADAMS Accession No. ML12286A011).
The plant cooling towers are not
‘‘routinely used’’ (see ‘‘Aquatic
Resource Impacts’’) and are not planned
VerDate Mar<15>2010
17:25 Oct 23, 2013
Jkt 232001
to be ‘‘routinely used’’ during and after
implementation of the EPU. Therefore,
consistent with the discussion in
NUREG–1437, Supplement 10, Section
2.2.8.4, ‘‘Visual Aesthetics and Noise,’’
there should not be any significant
impacts from the EPU, such as icing,
fogging, plume, or noise impacts from
the operation of cooling towers. No
significant impacts should occur to land
use and aesthetic resources in the
vicinity of PBAPS from EPU plant
modifications.
Non-Radioactive Waste Impacts
As described in NUREG–1437,
Supplement 10, Section 2.1.5,
‘‘Nonradioactive Waste Systems,’’ the
principal non-radioactive effluents from
PBAPS, Units 2 and 3, consists of
hazardous (chemical) wastes,
lubrication oil wastes, and sanitary
wastes. The PBAPS site is a small
quantity hazardous material generator.
Lubrication oils are normally injected
into the auxiliary boiler fuel feed with
a small quantity sent offsite for disposal.
Spent batteries and discarded
fluorescent lights are recycled. Sanitary
waste is sent to the onsite sewage
treatment plant. Implementation of the
EPU will likely result in a short-term
temporary increase in construction
related solid waste and sanitary waste.
The proposed EPU is not expected to
cause a significant impact from the
generation of nonradioactive waste.
Air Quality Impacts
Major air pollution emission sources
at the PBAPS site are regulated by the
Pennsylvania Department of
Environmental Protection (PADEP).
Nonradioactive emission sources at
PBAPS result primarily from diesel
generators that are routinely tested and
used when needed to supply backup
power. The other major source is from
boilers used for space heating and to
help with unit startups. Emissions from
these sources are regulated by
Pennsylvania’s Permit Operating
Program under Title V State permit
number 67–05020. There will be no
changes to the emissions from these
sources as a result of the EPU. However,
some minor and short duration air
quality impacts would occur during
implementation of the EPU. The main
source of air emissions would come
from the vehicles driven by outage
workers needed to implement the EPU.
This source will be short-term and
temporary. Therefore, the proposed EPU
is not expected to cause a significant
impact on air quality.
PO 00000
Frm 00061
Fmt 4703
Sfmt 4703
Water Use Impacts
The facility is authorized by the
Susquehanna River Basin Commission
to draw up to 2,363.62 million gallons/
day of water from Conowingo Pond and
to consume up to 49 million gallons/
day. Consumptive water use at PBAPS
consists of two key components:
Evaporation and drift in the helper
cooling towers when the towers are in
operation; and in-stream evaporation
from Conowingo Pond due to the
additional thermal loading from the
plant. The PADEP National Pollutant
Discharge Elimination System (NPDES)
permit issued to PBAPS (PA 0009733)
requires that cooling towers must be
available to prevent unwanted
discharges of high-temperature water. If
the three helper cooling towers are
operated, water would be lost by
evaporation at an approximate rate 5.5
to 22 ft3/sec. This evaporative loss
represents less than 2 percent of the
minimum monthly average river flow.
Once the EPU has been implemented,
water consumption for plant cooling
will not significantly change from preEPU operation.
The PBAPS site also uses Conowingo
Pond as a source of potable water for the
PBAPS site. During the planned outages
and modifications, the consumption of
potable water will increase to support
the temporary workforce. After the EPU
has been implemented, there should not
be any significant increase in the
consumption of potable water. Since
groundwater is not used as a source of
water, there should not be any
consumptive use of groundwater as a
result of the EPU.
The proposed EPU would not
significantly increase water
consumption. Therefore, the proposed
EPU is not expected to cause a
significant impact on water use.
Water Quality Impacts
Since plant modifications will take
place inside of existing buildings,
construction activities should not result
in groundwater or surface water
pollution. The intake of water from
Conowingo Pond for cooling will not
increase as a result of the proposed EPU.
Therefore, the discharge rates to
Conowingo Pond should not increase. In
turn, there should not be any changes to
Conowingo Pond from increased
turbidity, scouring, erosion, or
sedimentation as a result of cooling
water discharge. All plant wastewaters
are managed in accordance with the
NPDES permit issued by the PADEP.
Plant wastewaters include discharges
from the water treatment wastewater
settling basin, auxiliary boiler
E:\FR\FM\24OCN1.SGM
24OCN1
Federal Register / Vol. 78, No. 206 / Thursday, October 24, 2013 / Notices
mstockstill on DSK4VPTVN1PROD with NOTICES
blowdown, dredging/rehandling basin,
and sewage treatment plant. The volume
of discharge from the sewage treatment
plant may temporarily increase during
construction, but will remain within
permitted levels. Implementation of the
proposed EPU will not alter the quality
or quantity of plant waste water
discharges. The proposed EPU would
not increase the impacts to Conowingo
Pond water quality. Therefore, the
proposed EPU is not expected to cause
a significant impact to water quality.
Aquatic Resource Impacts
The potential impacts to aquatic
resources from the proposed action
could include impingement of aquatic
life on barrier nets, trash racks, and
traveling screens; entrainment of aquatic
life through the cooling water intake
structures and into the cooling water
systems; and effects from the discharge
of chemicals and heated water.
However, the proposed EPU would not
affect aquatic resources in a manner or
to a degree that exceeds the analysis of
effects in NUREG–1437, Supplement 10.
The NRC staff concluded in NUREG–
1437, Supplement 10, Section 4.1.3,
‘‘Impingement of Fish and Shellfish,’’
that, during the continued operation of
PBAPS, the potential impacts caused by
the impingement of fish and shellfish on
the debris screens of the cooling water
intake system would be small (i.e., not
detectable or so minor that they will
neither destabilize nor noticeably alter
any important attribute of the resource)
and that impingement losses would not
be great enough to adversely affect
Susquehanna River aquatic populations.
The NRC staff also concluded in
NUREG–1437, Supplement 10, Section
4.1.3, that, in the early life stages in the
cooling water system, the potential
impacts of entrainment of fish and
shellfish would be small, and that there
are no demonstrated, significant effects
to the aquatic environment related to
entrainment. Regarding the potential
impacts of thermal discharges, in
NUREG–1437, Supplement 10, Section
4.1.4, ‘‘Heat Shock,’’ the NRC staff
concluded that the impacts are small
and that the heated water discharged to
Conowingo Pond does not change the
temperature enough to adversely impact
balanced, indigenous populations of
fish and wildlife. Additionally, the NRC
has generically determined that the
effects from discharge of chlorine or
other biocides, as well as accumulation
of contaminants in sediments or biota,
would be small for continued operations
during a renewed license period at all
plants as discussed in Section 4.5.1.1,
‘‘Surface Water Resources, Discharge of
Biocides, Sanitary Wastes, and Minor
VerDate Mar<15>2010
17:25 Oct 23, 2013
Jkt 232001
Chemical Spills,’’ of the ‘‘Generic
Environmental Impact Statement for
License Renewal of Nuclear Plants,’’
NUREG–1437, Volume 1, Revision 1,
dated June 2013 (ADAMS Accession No.
ML13106A241).
The proposed EPU would not increase
the volume or rate of water that is
drawn from Conowingo Pond, and water
withdrawals and consumptive use
would continue to be regulated by the
Susquehanna River Basin Commission
with no changes to the current
withdrawal authorizations. PBAPS’s
cooling water intake structure
(described previously under ‘‘Plant Site
and Environs’’) is designed to reduce
impingement and entrainment of
aquatic organisms, and the proposed
EPU would not require any
modifications to the current cooling
system design. Thus, NRC staff
concludes that compared to current
operations, the proposed EPU would not
change the impingement or entrainment
rate of fish, shellfish, or other aquatic
organisms.
Chemical effluents discharged from
PBAPS would not change in type or
quantity under EPU conditions, and
effluent discharges to Conowingo Pond
will continue to be regulated by PADEP
under the site’s NPDES permit. Thus,
NRC staff concludes that compared to
current operations, the proposed EPU
would not change the type or
concentration of chemical effluents that
could impact aquatic resources.
The proposed EPU would increase the
temperature of discharged water. Under
current operating conditions, cooling
water passing through the condensers
can increase by as much as 22 °F. Under
the proposed EPU conditions, Exelon
estimates that cooling water
temperatures would increase by
approximately 3 °F, which would result
in an increase of up to 25 °F as water
passes through the condensers. The
NPDES permit for PBAPS limits the
instantaneous maximum effluent
temperature in the discharge canal
(Outfall 001) to 110 °F. Heated effluent
water released into the discharge canal
travels 4,700 ft south to a spillway, at
which point it enters Conowingo Pond.
A thermal study at PBAPS, conducted
from June through October of 1999
under zero cooling tower operation
conditions, reported the daily average
water temperatures at the discharge
canal outfall ranged from 66.7 °F to
106.5 °F.
Prior to the current NPDES permit
(effective January 1, 2011), helper
cooling towers at PBAPS were used only
during extreme low flow and high
temperature conditions in Conowingo
Pond. The current NPDES permit
PO 00000
Frm 00062
Fmt 4703
Sfmt 4703
63509
requires PBAPS to operate one to three
of its cooling towers from June 15 to
September 15 as part of the permit’s
thermal and biological sampling
requirements. Exelon began the required
sampling in 2010 and will continue the
sampling through 2013. The study will,
among other things, evaluate the
changes in the thermal plume during
helper cooling tower operation and
create a model of these changes that
takes into account proposed EPU
conditions and other environmental
influences to Conowingo Pond.
In NUREG–1437, Supplement 10,
Section 4.1.4, ‘‘Heat Shock,’’ the NRC
staff concluded that for the continued
operation of Units 2 and 3, the impacts
from thermal effluents would be small.
However, this conclusion was made
assuming station conditions under the
previous NPDES permit. As discussed
on page 4 of Attachment 1 to the
licensee’s letter dated February 17,
2011, which transmitted the current
NPDES permit and an evaluation of the
modifications to the permit to the NRC
(ADAMS Accession No. ML110490533),
the previous permit did not require an
instantaneous maximum effluent
temperature action level. However, the
current technical specifications in the
NRC operating licenses for PBAPS,
Units 2 and 3, require that plants be
shut down when the instantaneous
intake temperature exceeds 92 °F. As
discussed in Attachment 1 to the
licensee’s letter, in this circumstance,
and based on the condenser maximum
temperature rise of 21.66 °F, the
discharge canal should not exceed a
maximum of 113.66 °F. Thus, the
current NPDES permit, which stipulates
an instantaneous maximum effluent
temperature action level of 110 °F, is
inherently more protective of the
environment. The previous NPDES
permit did not require the operation of
helper cooling towers. Use of helper
cooling towers in the summer months
has likely reduced this already small
impact. Once completed, the thermal
and biological studies will determine to
what degree the helper cooling towers
mitigate effluent temperatures and the
character of the thermal plume. After
the study is completed and based on the
study results, Exelon will submit to
PADEP an application to modify the
NPDES permit. These modifications
may include actions to manage the
thermal discharge under EPU
conditions. For any such future
modifications, the PADEP must, in
accordance with Section 316(a) of the
Clean Water Act, ensure thermal
effluent limitations assure the
protection and propagation of a
E:\FR\FM\24OCN1.SGM
24OCN1
63510
Federal Register / Vol. 78, No. 206 / Thursday, October 24, 2013 / Notices
mstockstill on DSK4VPTVN1PROD with NOTICES
balanced, indigenous community of
shellfish, fish, and wildlife in and on
Conowingo Pond.
In NUREG–1437, Supplement 10,
Section 4.1.5, ‘‘Microbiological
Organisms (Public Health),’’ the NRC
staff concluded that the potential effects
of microbiological organisms on human
health from the operation of the plant’s
cooling water discharge to the aquatic
environment on or in the vicinity of the
site are small. As discussed in NUREG–
1437, Supplement 10, Section 4.1.5,
discharge temperatures from Units 2
and 3 do not exceed 110 °F in late
summer. This is below the temperatures
known to be conducive to growth and
survival of thermophilic pathogens. The
ongoing disinfection of the sewage
effluent from PBAPS reduces the
likelihood that a seed source or
inoculants would be introduced to the
station’s heated discharge or to
Conowingo Pond. As previously
discussed, the current NPDES permit
will continue to assure that there will
not be any significant impacts on
human health from microbiological
organisms.
The current NPDES permit includes
thermal limitations and operating
conditions that are more protective than
the previous NPDES permit (considered
in Section 4.1.4. ‘‘Heat Shock,’’ of
NUREG–1437, Supplement 10). The
PADEP will continue to regulate and
enforce PBAPS thermal discharges in a
manner that will assure the protection
and propagation of a balanced,
indigenous community of shellfish, fish,
and wildlife in and on Conowingo
Pond. Therefore, the increase in thermal
effluent under proposed EPU conditions
would not result in a significant impact
to aquatic resources.
Terrestrial Resource Impacts
During EPU-related upgrades and
plant modifications, impacts that could
potentially affect terrestrial resources
could come from noise, lighting, and
other disturbances to wildlife. However,
noise and lighting would not impact
terrestrial species beyond what would
be experienced during normal
operations. This is because EPU-related
upgrades and plant modifications would
take place during normally planned
outage periods, which are already
periods of heightened activity. Habitat
loss or fragmentation would not occur,
because the proposed EPU would not
involve any new construction outside of
the existing facility footprint (discussed
previously under ‘‘Land Use and
Aesthetic Impacts’’) and would not
require transmission system upgrades or
modifications. No changes in
transmission line maintenance and
VerDate Mar<15>2010
17:25 Oct 23, 2013
Jkt 232001
vegetation removal are anticipated. The
EPU will increase electric current
flowing through the transmission
system. This will increase the strength
of the electromagnetic field around the
transmission lines. However, as
discussed on pages 4–21 and 4–24 of
Supplement 10 NUREG–1437, the NRC
has determined that a scientific
consensus has not been reached on the
chronic effects of the electromagnetic
field on humans, and that significant
impacts to the terrestrial biota have not
been identified. Sediment transport and
erosion is not a concern because EPUrelated activities would only take place
on previously developed land.
Therefore, the proposed EPU is not
expected to cause a significant impact
on terrestrial resources.
Threatened and Endangered Species
Impacts
Under Section 7 of the Endangered
Species Act of 1973, as amended (ESA),
Federal agencies, in consultation with
the U.S. Fish and Wildlife Service
(FWS) or the National Marine Fisheries
Service (as appropriate), must ensure
that actions the agency authorizes,
funds, or carries out are not likely to
jeopardize the continued existence of
any listed species or result in the
destruction or adverse modification of
critical habitat.
The NRC staff has identified two
federally listed species that occur in
York County, Pennsylvania: The bog
turtle (Glyptemys muhlenbergii) and the
Indiana bat (Myotis sodalis), which are
discussed below. The NRC staff also
considered the possibility of the
shortnose (Acipenser brevirostrum) and
Atlantic (Acipenser oxyrinchus
oxyrinchus) sturgeons to occur above
Conowingo Dam in Conowingo Pond
because, historically, sturgeon likely
inhabited the Susquehanna River
upstream of the location of the
Conowingo Dam prior to its
construction. Currently, sturgeons are
known to occur in the lower
Susquehanna River and the Maryland
Department of Natural Resources has
noted the occurrence of sturgeon at
Conowingo Dam. However, given the
size of the dam and the fact that
shortnose and Atlantic sturgeon
typically do not use fish lifts that were
designed for other species (Conowingo
Dam’s fish lift was designed for the
passage of American shad (Alosa
sapidissima)), the NRC reasonably
concludes that neither the shortnose nor
Atlantic sturgeon occur in Conowingo
Pond.
The FWS listed the northern
population of the bog turtle as
threatened under the ESA in 1997 (62
PO 00000
Frm 00063
Fmt 4703
Sfmt 4703
FR 59605). The FWS has not designated
critical habitat for this species. Bog
turtles inhabit early to mid-successional
wetlands fed by groundwater or
associated with the headwaters of
streams and dominated by emergent
vegetation. Pennsylvania counties
identified by the FWS as containing
extant bog turtle populations occur in
the southeastern part of the state, and
many occur within the Delaware River
and Susquehanna River watersheds. In
2000, Exelon commissioned bog turtle
habitat (Phase 1) surveys in the vicinity
of PBAPS, but no areas of suitable
habitat were identified during the
surveys. The potential for adverse
effects at the PBAPS site and along
transmission line corridors to bog turtles
was evaluated in Section 2.2.6,
‘‘Terrestrial Resources,’’ of NUREG–
1437, Supplement 10. The NRC staff
concluded in Section 4.6.2, ‘‘Terrestrial
Species,’’ that continued operations
during the license renewal term would
have no effect on bog turtles due to the
lack of suitable habitat. The NRC staff
requested the FWS’s concurrence with
this determination in a letter, dated
January 17, 2002 (ADAMS Accession
No. ML020180445). The FWS concurred
with this determination in a letter, dated
April 17, 2002 (ADAMS Accession No.
ML021510200). The PBAPS site
continues to lack suitable habitat for bog
turtles, and the proposed EPU would
not involve any habitat loss or
fragmentation or any other significant
impacts to the terrestrial environment.
Therefore, the proposed EPU would
have no effect on the bog turtle.
The FWS listed the Indiana bat as
endangered wherever found in 1967
under the ESA’s predecessor, the
Endangered Species Preservation Act of
1966 (32 FR 4001). The FWS has not
designated critical habitat for the
species in Pennsylvania (41 FR 41914).
Areas of the PBAPS site that could serve
as potential Indiana bat habitat include
forested areas, forest edges, and riparian
areas. The Pennsylvania Game
Commission (PGC) reports that Indiana
bats use habitat within York County
during the summer. However, no
hibernation or maternity sites occur in
the county. The Supplemental
Environmental Impact Statement did
not consider the effects of continued
operation of PBAPS during the license
renewal term on Indiana bats. The
proposed EPU would not disturb or alter
any natural habitats on the PBAPS site
or along any transmission line corridors,
and other impacts such as noise and
lighting during EPU-related upgrades.
Furthermore, plant modifications would
not result in a significant impact on the
E:\FR\FM\24OCN1.SGM
24OCN1
Federal Register / Vol. 78, No. 206 / Thursday, October 24, 2013 / Notices
review from this agency was required.
The PNDI Environmental Review
indicated three terrestrial plant species
under the PDCNR’s purview could
occur in the vicinity of PBAPS: The
lobed spleenwort (Asplenia
pinnatifidum), the harbinger-of-spring
(Erigenia bulbosa), and the American
holly (Ilex opaca). The PNDI
Environmental Review also included
recommended conservation measures
from the PDCNR, which included
practices that could avoid the
introduction of invasive species. Exelon
Essential Fish Habitat
contacted the PDCNR directly via a
Section 305(b) of the Magnusonletter dated January 23, 2012, requesting
Stevens Fishery Conservation and
that the PDCNR confirm Exelon’s
Management Act (MSA) includes
conclusion that the proposed EPU
requirements for Federal agencies to
would not adversely affect any
consider the impact of Federal actions
Commonwealth-listed threatened or
on essential fish habitat (EFH) and to
endangered species. In their response,
consult with the National Marine
dated February 21, 2012, the PDCNR
Fisheries Service (NMFS) if any
indicated that the proposed EPU would
activities may adversely affect EFH.
not result in impacts to species under its
According to the EFH Mapper and the
jurisdiction. For species under the
NMFS’s ‘‘Guide to Essential Fish
PFBC’s purview, the PNDI
Habitat Designations in the Northeastern Environmental Review indicated that
United States,’’ NMFS has not
further review was required to
designated any EFH under the MSA
determine potential impacts. Exelon
within the affected water bodies. Thus,
contacted the PFBC in a letter, dated
the proposed EPU would have no effect
January 23, 2012. Subsequently, the
on designated essential fish habitat.
PFBC indicated in a letter, dated
Species Protected by the Commonwealth February 24, 2012, that no adverse
impacts are expected to species under
of Pennsylvania
its jurisdiction from the proposed EPU.
Within the Commonwealth of
Each of the letters referenced in this
Pennsylvania, the PGC, the
paragraph are included in Exelon’s
Pennsylvania Fish and Boat
supplemental environmental report,
Commission (PFBC), and the
which was submitted as Attachment 8
Pennsylvania Department of
to the EPU application.
Conservation and Natural Resources
The NRC staff reviewed the
(PDCNR) oversee the protection of
information discussed above in Exelon’s
Commonwealth-listed species under the EPU application concerning
Pennsylvania Endangered Species
Commonwealth-listed species. The
Program. The PGC, PFBC, and PDCNR
appropriate Pennsylvania agencies have
manage the recovery efforts for wild
confirmed the proposed EPU would not
birds and mammals (34 Pa. Code 133);
affect any species under their purview
fish, amphibians, reptiles, and aquatic
and NRC staff has not identified any
organisms (30 Pa. Code 75); and native
impacts to the terrestrial or aquatic
plants (17 Pa. Code 45), respectively.
environment beyond those previously
As part of preparing its EPU
considered by each Pennsylvania
application, Exelon performed a
agency in their reviews. Therefore, the
Pennsylvania Natural Diversity
proposed EPU would have no
Inventory (PNDI) Environmental Review significant impacts to Commonwealththrough the Pennsylvania Natural
listed species.
Heritage Program’s Web site. The survey
Socioeconomics
results indicated no known impacts to
Currently, approximately 900
species of concern within the oversight
permanent workers and 200 contract
of the PGC and FWS. No further review
workers are employed at PBAPS. Exelon
by these two agencies was required.
EPU-related plant modifications would
Exelon also directly contacted some of
occur during normally scheduled
the Pennsylvania agencies listed above
refueling outages and are estimated to
to determine potential impacts to
last between 30 to 40 days for each
Commonwealth-listed species that
reactor. During normal refueling
could result from the proposed EPU.
outages, approximately 800 temporary
Exelon’s PNDI Environmental Review
indicated that there would be no impact workers are added to the normal
workforce of 1,100 permanent and
to species under the PDCNR’s
contract workers. The first phase of EPU
jurisdiction and that no further project
mstockstill on DSK4VPTVN1PROD with NOTICES
terrestrial environment. Therefore, the
proposed EPU would have no effect on
the Indiana bat.
The NRC did not identify any
designated critical habitat that could be
affected by the proposed EPU, nor has
the FWS proposed the listing or
designation of any new species or
critical habitat that could be affected by
the proposed EPU. Therefore, the
proposed EPU would have no effect on
designated critical habitat, proposed
species, or proposed critical habitat.
VerDate Mar<15>2010
17:25 Oct 23, 2013
Jkt 232001
PO 00000
Frm 00064
Fmt 4703
Sfmt 4703
63511
modifications is planned to be
implemented during the 2014 outage.
During that outage, approximately 1,300
additional temporary workers will be
added to the normal outage workforce,
with the total workforce at PBAPS
peaking at approximately 3,200 workers
over the modification period. Once
EPU-related plant modifications have
been completed, the size of workforce at
PBAPS would return to normal levels.
The PBAPS workforce will remain
similar to pre-EPU levels, as will the
temporary workforce needed for future
refueling outages. The size of the
workforce will be unaffected by
implementation of the proposed EPU.
The NRC expects most outage and
EPU plant modification workers to
relocate temporarily to communities in
Lancaster or York County, resulting in
short-term increases in the local
population along with increased
demands for public services and
housing. As modification work would
be temporary, most workers would
likely stay in rental homes, apartments,
mobile homes, and camper-trailers. The
2011 American Community Survey 1year estimate for vacant housing units
reported 11,509 units in Lancaster
County and 12,192 units in York County
that could potentially ease the demand
for local rental housing. Therefore,
while a short duration temporary
increase in plant employment would
occur, this increase would have little or
no noticeable effect on the availability
of housing in the region.
The additional number of workers,
truck material, and equipment
deliveries needed to support EPUrelated plant modifications would likely
cause short-term level of service impacts
(restricted traffic flow and higher
incident rates) on secondary roads in
the immediate vicinity of PBAPS.
Increased traffic volumes would be
necessary to support implementation of
EPU-related modifications during the
refueling outage. As EPU-related plant
modifications would occur during a
normal refueling outage, there could be
noticeable short-term (during certain
hours of the day), level-of-service traffic
impacts beyond what is experienced
during normal outages. During periods
of high traffic volume (i.e., morning and
afternoon shift changes), work
schedules could be staggered and
employees and/or local police officials
could be used to direct traffic entering
and leaving PBAPS to minimize levelof-service impacts.
PBAPS currently pays property taxes
and payments in lieu of property taxes
to York County, Peach Bottom
Township, and the South Eastern
School District. The amount of future
E:\FR\FM\24OCN1.SGM
24OCN1
63512
Federal Register / Vol. 78, No. 206 / Thursday, October 24, 2013 / Notices
mstockstill on DSK4VPTVN1PROD with NOTICES
property taxes and payments in lieu of
property taxes paid by PBAPS could be
affected by the increased value of
PBAPS as a result of the EPU and
increased power generation. Due to the
short duration of EPU-related plant
modification activities, there would be
little or no noticeable effect on local tax
revenues generated by temporary
workers residing in Lancaster and York
counties.
Therefore, based on the information
presented above, no significant
socioeconomic impacts are expected
from EPU-related plant modifications
and operations under EPU conditions in
the vicinity of PBAPS.
Environmental Justice Impacts
An environmental justice impact
analysis evaluates the potential for
disproportionately high and adverse
human health and environmental effects
on minority and low-income
populations that could result from
activities associated with the proposed
EPU at PBAPS. Such effects may
include biological, cultural, economic,
or social impacts. Minority and lowincome populations are subsets of the
general public residing in the vicinity of
PBAPS, and all are exposed to the same
health and environmental effects
generated from activities at PBPAS.
The NRC considered the demographic
composition of the area within a 50-mile
radius of PBAPS to determine whether
minority populations may be affected by
the proposed action. The NRC examined
the distribution of minority populations
within 50 miles of PBAPS using the U.S.
Census Bureau (USCB) data for 2010.
According to the 2010 Census data,
approximately 5 million people live
within a 50-mile radius of PBPAS.
Minority populations within 50 miles
compose 35.6 percent (approximately
1.8 million persons) of the total
population. The largest minority group
was Black or African-American
(approximately, 1.2 million persons or
23.1 percent), followed by Hispanic or
Latino (of any race) (approximately
315,000 persons or 6.3 percent).
According to 2011 American
Community Survey 1-Year Estimates,
minority populations within Lancaster
County comprise 10.2 percent of the
total population with the largest
minority group being Hispanic or Latino
(of any race) at 8.9 percent. Minority
populations within York County
comprise 12.2 percent of the total
population with the largest minority
group being Black or African-American
at 6 percent.
According to 2011 American
Community Survey 1-Year Estimates
census data for Lancaster and York
VerDate Mar<15>2010
17:25 Oct 23, 2013
Jkt 232001
counties, approximately 10.9 percent of
the population residing within
Lancaster County and 11.0 percent of
the population residing in York County
were determined to be living below the
2011 federal poverty threshold. In
addition, approximately 7.9 percent of
families residing within Lancaster
County and 8.2 percent of the families
in York County were determined to be
living below the Federal poverty
threshold. The 2011 federal poverty
threshold was $22,350 for a family of
four and $10,890 for an individual. The
median household income for Lancaster
County was approximately $64,566 and
for York County was approximately
$66,053. Lancaster County median
household income is 28.5 percent
higher than the median household
income (approximately $50,228) for
Pennsylvania, while York County is 31
percent higher.
Potential impacts to minority and
low-income populations would mostly
consist of human health, environmental,
and socioeconomic effects (e.g., noise,
dust, traffic, employment, and housing
impacts). Radiation doses from plant
operations after the EPU are expected to
continue to remain well below
regulatory limits.
Noise and dust impacts would be
temporary and limited to onsite
activities. Minority and low-income
populations residing along site access
roads could experience increased
commuter vehicle traffic during outage
shift changes. Increased demand for
inexpensive rental housing during the
EPU-related plant modifications could
disproportionately affect low-income
populations; however, due to the
availability of housing, impacts would
be of short duration (approximately 30
to 40 days) and limited. Furthermore,
according to the 2011 American
Community Survey 1-year estimate,
there were 11,509 vacant housing units
in Lancaster County and 12,192 vacant
housing units in York County available
to help alleviate any short-term
increased demand.
Based on this information and the
analysis of human health and
environmental impacts presented in this
environmental assessment, the proposed
EPU would not have disproportionately
high and adverse human health and
environmental effects on minority and
low-income populations residing in the
PBAPS vicinity.
Historic and Cultural Resources Impacts
There are no records of historic and
cultural resources being found on
PBAPS property. However, there is the
potential to find historic and cultural
resources at the PBAPS site as the
PO 00000
Frm 00065
Fmt 4703
Sfmt 4703
majority of recorded archaeological sites
in the region are found within the first
terraces above the Susquehanna River.
The likelihood of these resources being
present at PBAPS has diminished as the
terraces near PBAPS were flooded by
the formation of Conowingo Pond.
Nevertheless, there are nine historic
properties listed on the National
Register of Historic Places within 6
miles of PBAPS.
As previously discussed, all EPUrelated plant modifications would take
place within existing buildings and
facilities at PBAPS, including replacing
two electrical transformers on an
existing pad. Since no ground
disturbance or construction-related
activities would occur outside of
previously disturbed areas and existing
electrical transmission facilities, there
would be no significant impact from
EPU-related plant modifications on
historic and archaeological resources,
should they be found on or in the
vicinity of PBAPS.
Non-Radiological Cumulative Impacts
The NRC staff considered potential
cumulative impacts on the environment
resulting from the incremental impact of
the proposed EPU when added to other
past, present, and reasonably
foreseeable future actions in the vicinity
of PBAPS. For the purposes of this
analysis, past actions are related to the
construction and licensing of PBAPS,
present actions are related to current
operations, and future actions are those
that are reasonably foreseeable through
the end of station operations including
operations under the EPU.
There will not be significant
cumulative impacts to the resource
areas of air quality, groundwater,
threatened and endangered species, or
historic and cultural resources in the
vicinity of PBAPS, because the
contributory effect of ongoing actions
within a region are regulated and
monitored through a permitting process
under State or Federal authority (e.g.
NPDES and 401/404 permits under the
Clean Water Act). In these cases,
impacts are managed as long as these
actions are in compliance with their
respective permits and conditions of
certification.
Surface water and aquatic resources
were examined for potential cumulative
impacts. The geographic boundary for
potential cumulative impacts is the area
of the post-EPU thermal mixing zone in
Conowingo Pond. If the proposed EPU
is approved and is implemented, PBAPS
is predicted to have a slightly larger and
hotter mixing zone than pre-uprate
conditions during full flow and
capacity. The NRC staff anticipates that
E:\FR\FM\24OCN1.SGM
24OCN1
Federal Register / Vol. 78, No. 206 / Thursday, October 24, 2013 / Notices
PBAPS will continue to operate postEPU in full compliance with the
requirements of the PADEP. The PADEP
would evaluate PBAPS compliance with
its individual wastewater facility
permit.
Land use, and aesthetics impacts from
the EPU are not expected to contribute
to cumulative impacts as there will be
no construction of new transmission
facilities on site, transmission
maintenance and vegetation practices
will not change, and all plant
modifications will be implemented
within existing buildings.
As discussed in the aquatic biology
section, the abundance of aquatic
organisms as a source of food for
terrestrial organisms should not change.
During the construction of the EPU,
only minor temporary changes in air
emissions from additional workers and
construction equipment are expected.
No changes to air emission from
implementation of the EPU are
expected. There will not be any
increases to surface water or air that
would increase the impact to terrestrial
biota as a result of the EPU. Therefore,
the NRC staff concludes that impacts to
terrestrial biota are not expected to
contribute to cumulative impacts to
terrestrial resources as a result of the
proposed action.
The greatest socioeconomic impacts
from the proposed EPU and continued
operation of PBAPS would occur during
the 2014 outage. The increase in EPU-
63513
related construction workforces would
have a temporary effect on
socioeconomic conditions in local
communities from the increased
demand for temporary housing, public
services (e.g., public schools), and
increased traffic, but would not
contribute to cumulative impacts. No
significant cumulative impacts are
expected as a result of the proposed
EPU.
Non-Radiological Impacts Summary
As discussed above, the proposed
EPU would not result in any significant
non-radiological impacts. Table 1
summarizes the non-radiological
environmental impacts of the proposed
EPU at PBAPS.
TABLE 1—SUMMARY OF NON-RADIOLOGICAL ENVIRONMENTAL IMPACTS
Land Use and Aesthetic .......................................
Non-Radioactive Waste ........................................
Air Quality .............................................................
Water Use .............................................................
Water Quality ........................................................
Aquatic Resources ................................................
Terrestrial Resources ...........................................
Threatened and Endangered Species ..................
Socioeconomics ....................................................
Environmental Justice ...........................................
Historic and Cultural Resources ...........................
Non-Radiological Cumulative ...............................
Radiological Impacts
Radioactive Gaseous, Liquid Effluents
and Solid Waste
mstockstill on DSK4VPTVN1PROD with NOTICES
Units 2 and 3 use waste treatment
systems to collect, process, recycle, and
dispose of gaseous, liquid, and solid
wastes that contain radioactive material
in a safe and controlled manner within
NRC and Environmental Protection
Agency (EPA) radiation safety
standards. The licensee’s evaluation of
plant operation at the proposed EPU
conditions shows that no physical
changes would be needed to the
radioactive gaseous, liquid, or solid
waste systems.
Radioactive Gaseous Effluents
The gaseous waste management
system manages radioactive gases
generated during the nuclear fission
process. Radioactive gaseous wastes are
composed of activation gases and
radioactive noble gases from the reactor
VerDate Mar<15>2010
17:25 Oct 23, 2013
Jkt 232001
The proposed EPU is not expected to cause a significant impact on land use conditions and
aesthetic resources.
The proposed EPU is not expected to cause a significant impact from the generation of nonradioactive waste.
The proposed EPU is not expected to cause a significant impact on air quality.
The proposed EPU is not expected to cause a significant impact on water use.
The proposed EPU is not expected to cause a significant impact on water quality.
The proposed EPU is not expected to cause a significant impact on aquatic resources.
The proposed EPU is not expected to cause a significant impact on terrestrial resources.
The proposed EPU would have no effect on any species or habitats protected under the Endangered Species Act or on designated essential fish habitat protected under the Magnuson-Stevens Fishery Conservation and Management Act. Additionally, the proposed EPU
would have no significant impacts on any Pennsylvania-listed species.
No significant socioeconomic impacts are expected as a result of the proposed EPU.
The proposed EPU is not expected to cause any disproportionately high and adverse human
health and environmental effects on minority and low-income populations residing in the
PBAPS vicinity.
The proposed EPU is not expected to cause any significant impact to historic and cultural resources.
No significant non-radiological cumulative impacts are expected as a result of the proposed
EPU.
coolant system, gases from the charcoal
treatment system, and gases collected
during venting of plant piping. The
licensee’s evaluation determined that
implementation of the proposed EPU
would not significantly increase the
volume of gases processed in the
gaseous waste management system,
since plant system functions are not
changing and the volume of gases from
the plant systems are not expected to
change. The analysis also showed the
proposed increase in power level would
increase the total amount of
radioactivity in the gaseous waste
management system. However, the
licensee’s evaluation concluded that the
increased radioactivity would not
require any changes to the gaseous
waste management system. The system
would continue to safely control and
process the waste in accordance with
plant procedures to maintain
radioactive gaseous releases within the
dose limits of 10 CFR 20.1301 and the
PO 00000
Frm 00066
Fmt 4703
Sfmt 4703
as low as is reasonably achievable
(ALARA) dose objectives in appendix I
to 10 CFR part 50 and EPA’s 40 CFR
part 190.
Radioactive Liquid Effluents
The liquid waste management system
collects, processes, and prepares
radioactive liquid waste for disposal.
Radioactive liquid wastes include
liquids from plant systems containing
reactor coolant and liquids that became
contaminated from contact with plant
systems containing radioactive liquids.
The licensee’s evaluation shows that the
proposed EPU would not significantly
increase the inventory of liquid
normally processed by the liquid waste
management system. This is because the
system functions are not changing and
the volume inputs remain
approximately the same. The licensee’s
evaluation showed the proposed EPU
would increase the total amount of
radioactivity in the liquid waste
E:\FR\FM\24OCN1.SGM
24OCN1
63514
Federal Register / Vol. 78, No. 206 / Thursday, October 24, 2013 / Notices
mstockstill on DSK4VPTVN1PROD with NOTICES
management system. However, since the
composition of the radioactive material
in the waste and the volume of
radioactive material processed through
the system are not expected to
significantly change, the licensee’s
evaluation concluded that no changes
are needed to the system’s design or
operation. The existing equipment and
plant procedures will continue to
control radioactive liquid releases to the
environment within the NRC’s dose
limits in 10 CFR 20.1301 and ALARA
dose standards in appendix I to 10 CFR
part 50 and EPA’s 40 CFR part 190.
Public Radiation Doses at EPU
Conditions
The primary sources of offsite dose to
members of the public from Units 2 and
3 are radioactive gaseous and liquid
effluents. As discussed in the
radioactive gaseous and liquid effluent
sections above, operation at the
proposed EPU conditions will not
change the radioactive gaseous and
liquid waste management systems’
abilities to perform its intended
functions to safely control and process
the waste. There would be no change to
the radiation monitoring system and
procedures used to control the release of
radioactive effluents in accordance with
NRC radiation protection standards for
the public in 10 CFR 20.1301 and
appendix I to 10 CFR part 50 and EPA’s
40 CFR part 190.
The licensee evaluated the projected
dose to members of the public from
radioactive effluents at the proposed
EPU by using actual dose data reported
for the period from 2005 through 2008
and recalculated the dose based on the
proposed EPU. The following bullets
summarize the projected maximum dose
to a member of the public located
outside the PBAPS site boundary from
radioactive gaseous and liquid effluents
from the proposed EPU:
• The maximum whole body dose to
an offsite member of the public from the
combined radioactive liquid effluents
from Units 2 and 3 is 1.52 x 10¥2
millirem (mrem)/year, which is well
below the 6 mrem/year dose criterion in
appendix I to 10 CFR art 50 for two
reactor units.
• The maximum organ dose to an
offsite member of the public from the
combined radioactive liquid effluents
from Units 2 and 3 is 1.98 x 10¥2 mrem/
year, which is well below the 20 mrem/
year dose criterion in appendix I to 10
CFR part 50 for two reactor units.
• The maximum air dose at the site
boundary from gamma radiation from
the combined gaseous effluents from
Units 2 and 3 is 7.27 x 10¥1 millirad
(mrad)/year, which is well below the 20
VerDate Mar<15>2010
17:25 Oct 23, 2013
Jkt 232001
mrad/year dose criterion in appendix I
to 10 CFR part 50 for two reactor Units.
• The maximum air dose at the site
boundary from beta radiation in the
combined gaseous effluents from Units
2 and 3 is 1.42 x 10¥1 mrad/year, which
is well below the 40 mrad/year dose
criterion in appendix I to 10 CFR part
50 for two reactor units.
• The maximum organ (thyroid) dose
to an offsite member of the public from
radioactive iodine and radioactive
material in particulate form from Units
2 and 3 is 5.12 mrem/year, which is
well below the 30 mrem/year dose
criterion in appendix I to 10 CFR part
50 for two reactor units.
• Based on the projected annual EPU
doses from radioactive gaseous and
liquid effluents from Units 2 and 3
being well within the dose criteria in
appendix I to 10 CFR part 50 and the
projected negligible direct shine dose
contribution from components within
the facilities, including the independent
spent fuel storage installation, the total
dose will be well within the 40 CFR 190
annual whole body dose standard of 25
mrem/year.
Based on the above, the projected
radiation doses to members of the
public from the proposed EPU are
expected to be within Federal regulatory
limits and therefore, would not be
significant.
Occupational Radiation Doses at EPU
Conditions
The licensee’s evaluation determined
that the radioactivity levels in plant
systems are expected to increase with
the proposed EPU. Permanent shielding
to reduce radiation levels is used
throughout the two reactor units to
protect workers. The licensee’s
evaluation of the current shielding
design determined that it is adequate to
continue to protect the workers from the
projected increased radiation levels. In
addition to the permanent shielding, the
licensee’s radiation protection program,
through the use of training, protective
clothing and equipment, temporary
shielding, monitoring radiation levels,
and direct oversight by radiation
protection personnel at individual job
sites, will ensure that radiation
exposures to workers will be ALARA, as
required by 10 CFR 20.1101. Based on
the above information, the NRC staff
concludes that the proposed EPU is not
expected to significantly affect radiation
levels within the plant and would not
be a significant radiological impact to
the workers.
Radioactive Solid Wastes
Radioactive solid wastes include
solids recovered from the reactor
PO 00000
Frm 00067
Fmt 4703
Sfmt 4703
coolant systems, solids that come into
contact with the radioactive liquids or
gases, and solids used in the reactor
coolant process system. The licensee
evaluated the potential effects of the
proposed EPU on the solid waste
management system. The results of the
evaluation indicate that the proposed
EPU will increase the volume and
activity of radioactive solid waste by
approximately 14 percent. The largest
volume of radioactive solid waste
generated at Units 2 and 3 is low-level
radioactive waste which includes used
resins, filters, dry compressible waste,
irradiated components, and waste oil
and ash.
As stated by the licensee, the
proposed EPU would not have a
significant effect on the radioactive
solid waste system. The proposed EPU
would not generate a new type of waste
or create a new waste stream. No
changes are needed to the system to
accommodate the projected additional
volume and activity. The equipment
used to process the solid waste is
designed and operated to ensure that
hazards to the workers and the
environment are minimized. Waste
processing areas are monitored for
radiation as part of the radiation
protection program to ensure that
radiation exposure to workers is
maintained within NRC dose limits in
10 CFR 20.1201.
Based on the above, the licensee is
expected to continue to safely control
and process radioactive solid waste
from the proposed EPU in accordance
with NRC requirements. Therefore, the
impacts from solid waste would not be
significant.
Spent Nuclear Fuel
Spent fuel from Units 2 and 3 is
stored in the plant’s spent fuel pool and
in dry casks in the independent spent
fuel storage installation (ISFSI). Spent
fuel generated after implementation of
the proposed EPU will also be stored in
the spent fuel pool and the ISFSI. Units
2 and 3 are licensed to use uraniumdioxide fuel up to a maximum
enrichment of 5 percent by weight
uranium-235. The typical average
enrichment is approximately 4.2 percent
by weight of uranium-235. The average
fuel assembly discharge burnup for the
proposed EPU is expected to be
approximately 51,000 megawatt days
per metric ton uranium (MWd/MTU)
with no fuel pins exceeding the
maximum fuel rod burnup limit of
62,000 MWd/MTU. The licensee will
maintain these fuel characteristics
during the proposed EPU. There will be
no change to the fuel design or the
current 24-month refueling cycle. The
E:\FR\FM\24OCN1.SGM
24OCN1
Federal Register / Vol. 78, No. 206 / Thursday, October 24, 2013 / Notices
fuel characteristics for enrichment and
burnup presented above, will ensure
that environmental impacts associated
with the spent fuel will remain within
the impact values contained in: (1) 10
CFR 51.51, Table S–3, ‘‘Table of
Uranium Fuel Cycle Environmental
Data’’; (2) 10 CFR 51.52, Table S–4,
‘‘Environmental Impact of
Transportation of Fuel and Waste to and
from One Light-Water-Cooled Nuclear
Power Reactor’’; as supplemented by (3)
NUREG–1437, Volume 1, Addendum 1,
‘‘Generic Environmental Impact
Statement for License Renewal of
Nuclear Plants, Main Report, Section
6.3—Transportation, Table 9.1,
Summary of findings on NEPA
[National Environmental Policy Act]
issues for license renewal of nuclear
power plants’’ (ADAMS Accession No.
ML040690720).
Therefore, there would be no
significant impacts resulting from spent
nuclear fuel.
Design-Basis Accidents
Design-basis accidents (DBAs) are
evaluated by both the licensee and the
NRC staff to ensure that Units 2 and 3
can withstand a spectrum of postulated
accidents without undue hazard to the
health and safety of the public.
Separate from the NRC staff’s
environmental assessment in this
document, the NRC staff is evaluating
the licensee’s DBA analyses of the
potential radiological consequences that
may result from the proposed EPU. The
results of the NRC staff’s safety
evaluation and conclusion will be
documented in a Safety Evaluation (SE)
that will be made publically available.
If the NRC staff concludes in the SE that
the radiological consequences of DBAs
at the proposed EPU power levels are
within NRC requirements, then the
proposed EPU will not have a
significant impact with respect to the
radiological consequences of DBAs.
Radiological Cumulative Impacts
The radiological dose limits for
protection of the public and plant
workers have been developed by the
NRC and EPA to address the cumulative
impact of acute and long-term exposure
to radiation and radioactive material.
These dose limits are codified in 10 CFR
part 20 and 40 CFR part 190.
The cumulative radiation doses are
required to be within the limits set forth
in the regulations cited above. The
public dose limit of 25 mrem/year in 40
CFR part 190 applies to all reactors that
may be on a site and also includes any
other nearby nuclear facilities.
Currently, there are no other operating
nuclear power reactors located near
Units 2 and 3. As discussed in the
public radiation dose section, the NRC
staff reviewed the licensee’s projected
post-EPU radiation dose data and
concluded that the projected dose to
63515
members of the public would be well
within the limits of 10 CFR part 20 and
40 CFR part 190. The NRC staff expects
continued compliance with NRC’s and
EPA’s public dose limits during
operation at the proposed EPU power
level. Therefore, the NRC staff
concludes that there would not be a
significant cumulative radiological
impact to members of the public from
radioactive effluents from Units 2 and 3
at the proposed EPU operation.
As previously discussed, the licensee
has a radiation protection program that
maintains worker doses within the dose
limits in 10 CFR 20.1201. The NRC staff
expects continued compliance with
NRC’s occupational dose limits during
operation at the proposed EPU power
level.
Radiological Impacts Summary
Based on the radiological evaluations
discussed above, with the exception of
the impacts associated with DBAs
which the NRC staff is evaluating
separately from this EA, the proposed
EPU would not result in any significant
radiological impacts. If the NRC staff
concludes in its SE that the DBAs
associated with the proposed EPU meet
NRC requirements, then the
environmental impacts will not be
significant. Table 2 summarizes the
radiological environmental impacts of
the proposed EPU at the PBNP.
TABLE 2—SUMMARY OF RADIOLOGICAL ENVIRONMENTAL IMPACTS
Radioactive Gaseous Effluents .................
Radioactive Liquid Effluents ......................
Public Radiation Doses at EPU Conditions.
Occupational Radiation Doses at EPU
Conditions.
Radioactive Solid Wastes .........................
Spent Nuclear Fuel ...................................
Design-Basis Accidents .............................
Radiological Cumulative Impacts ..............
Radioactive gaseous effluents are expected to be adequately handled by the existing radwaste system.
Radioactive liquid effluents are expected to be adequately handled by the existing radwaste system.
Radiation doses to members of the public from radioactive effluents are expected to remain below
NRC (10 CFR 20.1301 and appendix I) and EPA radiation protection standards (40 CFR part
190).
Radiation doses to workers are expected to remain within NRC dose limits (10 CFR 20.1201).
Radioactive solid waste is expected to be adequately handled by the existing radwaste system.
The spent fuel characteristics will remain within the bounding criteria used in the impact analysis in
10 CFR part 51, Table S–3.
If the NRC staff concludes in the SE that the radiological consequences of DBAs at the proposed
EPU power levels are within NRC requirements, then DBAs will not have a significant radiological
consequence.
Radiation doses to the public and plant workers would remain below NRC (10 CFR part 20) and
EPA (40 CFR part 190) radiation protection standards.
mstockstill on DSK4VPTVN1PROD with NOTICES
Environmental Impacts of the
Alternatives to the Proposed Action
As an alternative to the proposed
action, the NRC staff considered denial
of the proposed EPU (i.e., the ‘‘noaction’’ alternative) for PBAPS, Units 2
and 3. Denial of the application would
result in no change in the current
environmental impacts. However, if the
EPU were not approved, other agencies
and electric power organizations might
VerDate Mar<15>2010
17:25 Oct 23, 2013
Jkt 232001
be required to pursue other means of
providing electric generation capacity,
such as fossil fuel or alternative fuel
power generation, to offset future
demand. Construction and operation of
such a fossil-fueled or alternative-fueled
plant may create impacts in air quality,
land use, and waste management
significantly greater than those
identified for the proposed EPU.
PO 00000
Frm 00068
Fmt 4703
Sfmt 4703
Alternative Use of Resources
This action does not involve the use
of any different resources (water, air,
land, nuclear fuel) not previously
considered in NUREG–1437,
Supplement 10.
Agencies and Persons Consulted
In accordance with its stated policy,
on September 6, 2013, the staff
consulted with the Pennsylvania State
E:\FR\FM\24OCN1.SGM
24OCN1
63516
Federal Register / Vol. 78, No. 206 / Thursday, October 24, 2013 / Notices
mstockstill on DSK4VPTVN1PROD with NOTICES
official, Mr. Brad Fuller of the
Pennsylvania Department of
Environmental Protection, regarding the
environmental impact of the proposed
action. The State official had no
comments.
IV. Draft Finding of No Significant
Impact
The NRC is proposing to amend
Renewed Facility Operating License
Nos. DPR–44 and DPR–56 for PBAPS,
Units 2 and 3. The proposed
amendments would authorize an
increase in the maximum reactor power
level from 3514 MWt to 3951 MWt.
The NRC has determined not to
prepare an Environmental Impact
Statement for the proposed action. The
proposed action will not have a
significant effect on the quality of the
human environment because, amending
the licenses with the higher maximum
reactor power level, will not result in
any significant radiological or nonradiological impacts. Accordingly, the
NRC has determined that a draft Finding
of No Significant Impact (FONSI) is
appropriate. The NRC’s draft
Environmental Assessment (EA),
included in Section III above, is
incorporated by reference into this
finding.
The NRC’s draft FONSI and the
related environmental documents listed
below are available for public
inspection and may be inspected online
through the NRC’s Agencywide
Documents Access and Management
System (ADAMS) at https://
www.nrc.gov/reading-rm/adams.html.
You may also inspect these documents
at the NRC’s Public Document Room as
discussed in Section I, ‘‘Accessing
Information and Submitting
Comments,’’ above.
The NRC’s draft FONSI and the
associated draft EA are available in
ADAMS at Accession No.
ML13202A081. Related environmental
documents supporting the NRC’s draft
FONSI are as follows: (1) Attachment 8,
‘‘Supplemental Environmental Report,’’
to Exelon’s EPU amendment request
dated September 28, 2012 (ADAMS
Accession No. ML12286A011); (2)
NUREG–1437, Volume 1, Addendum 1,
‘‘Generic Environmental Impact
Statement for License Renewal of
Nuclear Plants, Main Report, Section
6.3—Transportation, Table 9.1,
Summary of findings on NEPA issues
for license renewal of nuclear power
plants,’’ dated August 1999 (ADAMS
Accession No. ML040690720); (3)
Supplement 10 to NUREG–1437,
‘‘Generic Environmental Impact
Statement for the License Renewal of
Nuclear Power Plants, Regarding Peach
VerDate Mar<15>2010
17:25 Oct 23, 2013
Jkt 232001
Bottom Atomic Power Station, Units 2
and 3,’’ dated January 2003 (ADAMS
Accession No. ML030270059); and (4)
‘‘Generic Environmental Impact
Statement for License Renewal of
Nuclear Plants,’’ NUREG–1437, Volume
1, Revision 1, dated June 2013 (ADAMS
Accession No. ML13106A241).
Dated at Rockville, Maryland, this 1st day
of October 2013.
For the Nuclear Regulatory Commission.
Veronica Rodriguez,
Acting Chief, Plant Licensing Branch I–2,
Division of Operating Reactor Licensing,
Office of Nuclear Reactor Regulation.
[FR Doc. 2013–24902 Filed 10–23–13; 8:45 am]
BILLING CODE 7590–01–P
NUCLEAR REGULATORY
COMMISSION
[NRC–2012–0134]
Initial Test Program of Emergency
Core Cooling Systems for New BoilingWater Reactors
Nuclear Regulatory
Commission.
ACTION: Regulatory guide; issuance.
AGENCY:
The U.S. Nuclear Regulatory
Commission (NRC) is issuing a new
regulatory guide (RG), 1.79.1, ‘‘Initial
Test Program of Emergency Core
Cooling Systems for New Boiling-Water
Reactors.’’ This RG describes testing
methods the NRC staff considers
acceptable for demonstrating the
operability of emergency core cooling
systems (ECCSs) for boiling-water
reactors (BWRs) whose licenses are
issued after the date of issuance of this
RG (new BWRs).
ADDRESSES: Please refer to Docket ID
NRC–2012–0134 when contacting the
NRC about the availability of
information regarding this document.
You may access publicly-available
information related to this action by the
following methods:
• Federal Rulemaking Web site: Go to
https://www.regulations.gov and search
for Docket ID NRC–2012–0134. Address
questions about NRC dockets to Carol
Gallagher; telephone: 301–287–3422;
email: Carol.Gallagher@nrc.gov. For
technical questions, contact the
individual listed in the FOR FURTHER
INFORMATION CONTACT section of this
document.
• NRC’s Agencywide Documents
Access and Management System
(ADAMS): You may access publicly
available documents online in the NRC
Library at https://www.nrc.gov/readingrm/adams.html. To begin the search,
select ‘‘ADAMS Public Documents’’ and
SUMMARY:
PO 00000
Frm 00069
Fmt 4703
Sfmt 4703
then select ‘‘Begin Web-based ADAMS
Search.’’ For problems with ADAMS,
please contact the NRC’s Public
Document Room (PDR) reference staff at
1–800–397–4209, 301–415–4737, or by
email to pdr.resource@nrc.gov. The
ADAMS accession number for each
document referenced in this notice (if
that document is available in ADAMS)
is provided the first time that a
document is referenced. Revision 0 of
Regulatory Guide 1.79.1, is available in
ADAMS under Accession No.
ML12300A329. The regulatory analysis
for Draft Regulatory Guide (DG)–1277
may be found in ADAMS under
Accession No. ML12300A328.
• NRC’s PDR: You may examine and
purchase copies of public documents at
the NRC’s PDR, Room O1–F21, One
White Flint North, 11555 Rockville
Pike, Rockville, Maryland 20852.
Regulatory guides are not
copyrighted, and NRC approval is not
required to reproduce them.
FOR FURTHER INFORMATION CONTACT:
Frank X. Talbot, Office of New Reactors;
telephone: 301–415–4146, email:
Frank.Talbot@nrc.gov, or Mark P. Orr,
Office of Nuclear Regulatory Research;
telephone: 301–251–7495, email:
Mark.Orr@nrc.gov, U.S. Nuclear
Regulatory Commission, Washington,
DC 20555–0001.
SUPPLEMENTARY INFORMATION:
I. Introduction
The NRC is issuing a new guide in the
NRC’s ‘‘Regulatory Guide’’ series. This
series was developed to describe and
make available to the public information
such as methods that are acceptable to
the NRC staff for implementing specific
parts of the agency’s regulations,
techniques that the staff uses in
evaluating specific problems or
postulated accidents, and data that the
staff needs in its review of applications
for permits and licenses.
This new guide describes methods
that the staff of the NRC considers
acceptable for demonstrating
compliance with the NRC regulations as
they relate to preoperational, low
power, and power ascension testing
features of the ECCS for new BWRs.
This RG also describes methods that the
NRC staff finds acceptable for initial
plant testing of ECCS structures,
systems, and components (SSCs).
Additionally, this RG describes methods
the NRC staff finds acceptable for testing
of the Isolation Condenser System (ICS)
and the Reactor Core Isolation Cooling
(RCIC) System, which support functions
for alternate water injection during
station blackout.
E:\FR\FM\24OCN1.SGM
24OCN1
Agencies
[Federal Register Volume 78, Number 206 (Thursday, October 24, 2013)]
[Notices]
[Pages 63506-63516]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-24902]
-----------------------------------------------------------------------
NUCLEAR REGULATORY COMMISSION
[Docket Nos. 50-277 and 50-278; NRC-2013-0232]
Exelon Generation Company, LLC; Peach Bottom Atomic Power
Station, Units 2 and 3; Proposed License Amendment To Increase the
Maximum Reactor Power Level
AGENCY: Nuclear Regulatory Commission.
ACTION: Draft environmental assessment and draft finding of no
significant Impact; opportunity to comment.
-----------------------------------------------------------------------
SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) is considering
issuance of amendments to Renewed Facility Operating License Nos. DPR-
44 and DPR-56, issued to Exelon Generation Company, LLC (Exelon, the
licensee), for operation of the Peach Bottom Atomic Power Station
(PBAPS), Units 2 and 3, located in York and Lancaster Counties,
Pennsylvania. The proposed amendments would authorize an increase in
the maximum reactor power level from 3514 megawatts thermal (MWt) to
3951 MWt.
DATES: Comments must be filed by November 25, 2013. Any potential party
as defined in Section 2.4 of Title 10 of the Code of Federal
Regulations (10 CFR), who believe access to Sensitive Unclassified Non-
Safeguards Information (SUNSI) is necessary to respond to this notice
must request document access by November 4, 2013.
ADDRESSES: You may submit comment by any of the following methods
(unless this document describes a different method for submitting
comments on a specific subject):
Federal Rulemaking Web site: Go to https://www.regulations.gov and search for Docket ID NRC-2013-0232. Address
questions about NRC dockets to Carol Gallagher; telephone: 301-287-
3422; email: Carol.Gallagher@nrc.gov. For technical questions, contact
the individual(s) listed in the FOR FURTHER INFORMATION CONTACT section
of this document.
Mail comments to: Cindy Bladey, Chief, Rules,
Announcements, and Directives Branch (RADB), Office of Administration,
Mail Stop: 3WFN, 06-44M, U.S. Nuclear Regulatory Commission,
Washington, DC 20555-0001.
For additional direction on accessing information and submitting
comments, see ``Accessing Information and Submitting Comments'' in the
SUPPLEMENTARY INFORMATION section of this document.
FOR FURTHER INFORMATION CONTACT: Richard B. Ennis, Office of Nuclear
Reactor Regulation, U.S. Nuclear Regulatory Commission, Washington, DC
20555; telephone: 301-415-1420; email: Rick.Ennis@nrc.gov.
SUPPLEMENTARY INFORMATION:
I. Accessing Information and Submitting Comments
A. Accessing Information
Please refer to Docket ID NRC-2013-0232 when contacting the NRC
about the availability of information regarding this document. You may
access publicly-available information related to this action by the
following methods:
Federal Rulemaking Web site: Go to https://www.regulations.gov and search for Docket ID NRC-2013-0232.
NRC's Agencywide Documents Access and Management System
(ADAMS): You may access publicly-available documents online in the NRC
Library at https://www.nrc.gov/reading-rm/adams.html. To begin the
search, select ``ADAMS Public Documents'' and then select ``Begin Web-
based ADAMS Search.'' For problems with ADAMS, please contact the NRC's
Public Document Room (PDR) reference staff at 1-800-397-4209, 301-415-
4737, or by email to pdr.resource@nrc.gov. The ADAMS accession number
for each document referenced in this notice (if that document is
available in ADAMS) is provided the first time that a document is
referenced. The application for amendment is dated September 28, 2012,
and is supplemented by letters dated February 15, 2013, May 7, 2013,
May 24, 2013, June 4, 2013, June 27, 2013, July 30, 2013, July 31,
2013, August 5, 2013, August 22, 2013, August 29, 2013, and September
13, 2013 (ADAMS Accession Nos. ML122860201, ML13051A032, ML13129A143,
ML13149A145, ML13156A368, ML13182A025, ML13211A457, ML13213A285,
ML13217A431, ML13240A002, ML13241A418, and ML13260A076, respectively).
The application and some of the supplements contain SUNSI (proprietary
information) and, accordingly, the proprietary information has been
withheld from public disclosure. Redacted versions of the documents
containing proprietary information have been made publicly available
and can be accessed via the applicable ADAMS accession numbers listed
above.
NRC's PDR: You may examine and purchase copies of public
documents at the NRC's PDR, Room O1-F21, One White Flint North, 11555
Rockville Pike, Rockville, Maryland 20852.
[[Page 63507]]
B. Submitting Comments
Please include Docket ID NRC-2013-0232 in the subject line of your
comment submission, in order to ensure that the NRC is able to make
your comment submission available to the public in this docket.
The NRC cautions you not to include identifying or contact
information that you do not want to be publicly disclosed in your
comment submission. The NRC posts all comment submissions at https://www.regulations.gov as well as entering the comment submissions into
ADAMS. The NRC does not routinely edit comment submissions to remove
identifying or contact information.
If you are requesting or aggregating comments from other persons
for submission to the NRC, then you should inform those persons not to
include identifying or contact information that they do not want to be
publicly disclosed in their comment submission. Your request should
state that the NRC does not routinely edit comment submissions to
remove such information before making the comment submissions available
to the public or entering the comment submissions into ADAMS.
II. Introduction
The NRC has prepared this draft Environmental Assessment (EA), in
accordance with 10 CFR 51.21, and this draft Finding of No Significant
Impact (FONSI), in accordance with 10 CFR 51.33, for the proposed
license amendments. The draft EA and draft FONSI are being published in
the Federal Register with a 30-day public comment period ending
November 25, 2013. Publishing these documents as draft for comment,
with a 30-day comment period, is in accordance with the NRC guidance
for this type of license amendment, RS-001, ``Review Standard for
Extended Power Uprates,'' dated December 2003 (ADAMS Accession No.
ML033640024).
III. Draft Environmental Assessment
Plant Site and Environs
PBAPS consists of Units 1, 2, and 3 located on approximately 620
acres of land in Peach Bottom Township, York County, Pennsylvania on
the west bank of the Susquehanna River. The site is approximately 38
miles north of Baltimore, Maryland; 19 miles southwest of Lancaster,
Pennsylvania; and 30 miles southeast of York, Pennsylvania. The area
within 6 miles of the site includes parts of York and Lancaster
Counties in Pennsylvania and parts of Harford and Cecil Counties in
Maryland. The property around the site is predominantly rural,
characterized by farmland and woods.
Units 2 and 3 are General Electric Type 4, Mark I boiling-water
reactors. In addition to Units 2 and 3, the site contains turbine
buildings, intake and discharge canals, auxiliary buildings,
switchyards, an interim spent fuel storage installation, a training
center, a public boat ramp, a picnic area, and the retired Unit 1
reactor. Unit 1 is located adjacent to Units 2 and 3. It was a
prototype, high-temperature, gas-cooled reactor which operated from
1966 to 1974. Unit 1 is permanently shut down, defueled, and is
maintained in a safe storage, surveillance, security, and maintenance
condition. It is not part of this application and will be
decommissioned in the future.
Units 2 and 3 at PBAPS have a common once-through heat dissipation
system that draws water from and discharges to the Conowingo Pond. The
Conowingo Pond is a reservoir on the Susquehanna River formed by the
Conowingo Dam (located approximately 8.5 miles downstream of the PBAPS
site) and the Holtwood Dam (located approximately 6 miles upstream of
the PBAPS site). The Conowingo and Holtwood Dams each provide
hydroelectric generation.
The Conowingo Pond has a surface area of approximately 9,000 acres
with 35 miles of shoreline. It has a width that varies from 0.5 to 1.3
miles and a maximum depth of 98 feet (ft). In addition to providing
cooling water for PBAPS, Conowingo Pond is used as a fish and wildlife
resource, for recreation, and as a source of public water.
Units 2 and 3 use six circulating water pumps (three per unit),
each rated at 250,000 gallons per minute (gpm), which draw water from
Conowingo Pond at a rate of 1.5 million gpm when all six pumps are
running. Water drawn from Conowingo Pond passes through a series of
intake structures before it is circulated through two main condensers.
From these condensers, water passes through a series of discharge
structures and then flows to Conowingo Pond where the heat is
dissipated to the environment. Exelon also maintains three mechanical
draft helper cooling towers that have the capacity to handle
approximately 60 percent of the cooling water circulating through Units
2 and 3. Water drawn from Conowingo Pond flows into a 487 ft long outer
intake structure along the west bank of Conowingo Pond. Trash racks
protect 32 outer intake openings and prevent large floating debris and
ice floes from reaching 24 traveling screens. This cooling water intake
structure is designed to reduce impingement by preventing fish and
small debris from entering the system. The intake structure allows fish
to avoid the screens by having a low approach velocity. The screens are
made of 3/8-inch square mesh and are placed approximately 40 ft behind
the outer trash racks in the outer intake structure. From the outer
intake structure, water enters two, 700 ft-long and 200 ft-wide, intake
basins. The cooling water for the condensers is drawn from these two
intake basins.
Cooling water discharges from the condensers into a 700 ft-long and
400 ft-wide discharge basin where the heated cooling water then flows
through a 4700 ft-long discharge canal. Three adjustable discharge
gates at the end of the discharge canal control the flow to Conowingo
Pond and maintain a discharge velocity between 5 and 8 ft/second.
Identification of the Proposed Action
The proposed action is the issuance of amendments to the licenses
PBAPS, Units 2 and 3, which would increase the maximum licensed thermal
power level, for each reactor, from 3,514 MWt to 3,951 MWt. This
change, referred to as an extended power uprate (EPU), represents an
increase of approximately 12.4 percent above the current licensed
thermal power level. This change is considered an EPU by the NRC
because it exceeds the typical 7 percent power increase that can be
accommodated with only minor plant changes. An EPU usually requires
significant modifications to major plant equipment. The proposed EPU
for PBAPS, Units 2 and 3, will require significant modifications as
discussed in Attachment 9 to the licensee's application dated September
28, 2012 (ADAMS Accession No. ML12286A011).
If approved, these amendments would allow the heat output of each
reactor to increase, which would increase the flow of steam to the
turbines. This would increase the production of electricity, increase
the amount of waste heat delivered to the condensers, and slightly
raise the temperature of the water discharged into Conowingo Pond.
Plant modifications to implement the EPU are expected to occur
during normal refueling outages that occur for each reactor once every
24 months and typically last for 30 to 40 days. If the EPU is approved,
Unit 2 and 3 are expected to begin operating at the EPU core power
level of 3,951 MWt in 2014 and 2015, respectively.
[[Page 63508]]
The Need for the Proposed Action
The current licenses for PBAPS, Units 2 and 3, contain a maximum
authorized thermal power level for each reactor. The licensee desires
to increase this power level in order to increase the electrical output
of the plant without the need to site and construct new facilities. To
allow this to occur, the NRC must amend the licenses for each unit to
authorize the proposed new maximum thermal power level.
Environmental Impacts of the Proposed Action
At the time of issuance of the operating license for PBAPS, Units 2
and 3, the NRC staff noted that any activity authorized by the license
would be encompassed by the overall action evaluated in the Final
Environmental Impact Statement (FEIS) for the operation of the PBAPS
reactors. This FEIS was issued in 1973, by the U.S. Atomic Energy
Commission (predecessor agency to the NRC). The NRC revisited and
updated the FEIS in January 2003, when the NRC published Supplement 10
to NUREG-1437, ``Generic Environmental Impact Statement for the License
Renewal of Nuclear Power Plants,'' that addressed the license renewal
of PBAPS, Units 2 and 3 (ADAMS Accession No. ML030270059).
The radiological and non-radiological impacts on the environment
that may result from the proposed EPU are summarized below.
Non-Radiological Impacts
Land Use and Aesthetic Impacts
Potential land use and aesthetic impacts for the proposed action
include impacts from construction and plant modifications. All plant
modifications will be implemented within existing buildings. No new
construction will occur outside of existing plant areas, and no
expansion of buildings, roads, parking lots, equipment lay-down areas,
or storage areas will be required to support the proposed EPU. Exelon
will use existing parking lots, road access, equipment lay-down areas,
offices, workshops, warehouses, and restrooms during plant
modifications. Therefore, land use conditions and visual aesthetics
would not change significantly at PBAPS from EPU plant modifications.
The EPU plant modifications are discussed in Attachment 9 to the
licensee's application dated September 28, 2012 (ADAMS Accession No.
ML12286A011).
The plant cooling towers are not ``routinely used'' (see ``Aquatic
Resource Impacts'') and are not planned to be ``routinely used'' during
and after implementation of the EPU. Therefore, consistent with the
discussion in NUREG-1437, Supplement 10, Section 2.2.8.4, ``Visual
Aesthetics and Noise,'' there should not be any significant impacts
from the EPU, such as icing, fogging, plume, or noise impacts from the
operation of cooling towers. No significant impacts should occur to
land use and aesthetic resources in the vicinity of PBAPS from EPU
plant modifications.
Non-Radioactive Waste Impacts
As described in NUREG-1437, Supplement 10, Section 2.1.5,
``Nonradioactive Waste Systems,'' the principal non-radioactive
effluents from PBAPS, Units 2 and 3, consists of hazardous (chemical)
wastes, lubrication oil wastes, and sanitary wastes. The PBAPS site is
a small quantity hazardous material generator. Lubrication oils are
normally injected into the auxiliary boiler fuel feed with a small
quantity sent offsite for disposal. Spent batteries and discarded
fluorescent lights are recycled. Sanitary waste is sent to the onsite
sewage treatment plant. Implementation of the EPU will likely result in
a short-term temporary increase in construction related solid waste and
sanitary waste. The proposed EPU is not expected to cause a significant
impact from the generation of nonradioactive waste.
Air Quality Impacts
Major air pollution emission sources at the PBAPS site are
regulated by the Pennsylvania Department of Environmental Protection
(PADEP). Nonradioactive emission sources at PBAPS result primarily from
diesel generators that are routinely tested and used when needed to
supply backup power. The other major source is from boilers used for
space heating and to help with unit startups. Emissions from these
sources are regulated by Pennsylvania's Permit Operating Program under
Title V State permit number 67-05020. There will be no changes to the
emissions from these sources as a result of the EPU. However, some
minor and short duration air quality impacts would occur during
implementation of the EPU. The main source of air emissions would come
from the vehicles driven by outage workers needed to implement the EPU.
This source will be short-term and temporary. Therefore, the proposed
EPU is not expected to cause a significant impact on air quality.
Water Use Impacts
The facility is authorized by the Susquehanna River Basin
Commission to draw up to 2,363.62 million gallons/day of water from
Conowingo Pond and to consume up to 49 million gallons/day. Consumptive
water use at PBAPS consists of two key components: Evaporation and
drift in the helper cooling towers when the towers are in operation;
and in-stream evaporation from Conowingo Pond due to the additional
thermal loading from the plant. The PADEP National Pollutant Discharge
Elimination System (NPDES) permit issued to PBAPS (PA 0009733) requires
that cooling towers must be available to prevent unwanted discharges of
high-temperature water. If the three helper cooling towers are
operated, water would be lost by evaporation at an approximate rate 5.5
to 22 ft\3\/sec. This evaporative loss represents less than 2 percent
of the minimum monthly average river flow. Once the EPU has been
implemented, water consumption for plant cooling will not significantly
change from pre-EPU operation.
The PBAPS site also uses Conowingo Pond as a source of potable
water for the PBAPS site. During the planned outages and modifications,
the consumption of potable water will increase to support the temporary
workforce. After the EPU has been implemented, there should not be any
significant increase in the consumption of potable water. Since
groundwater is not used as a source of water, there should not be any
consumptive use of groundwater as a result of the EPU.
The proposed EPU would not significantly increase water
consumption. Therefore, the proposed EPU is not expected to cause a
significant impact on water use.
Water Quality Impacts
Since plant modifications will take place inside of existing
buildings, construction activities should not result in groundwater or
surface water pollution. The intake of water from Conowingo Pond for
cooling will not increase as a result of the proposed EPU. Therefore,
the discharge rates to Conowingo Pond should not increase. In turn,
there should not be any changes to Conowingo Pond from increased
turbidity, scouring, erosion, or sedimentation as a result of cooling
water discharge. All plant wastewaters are managed in accordance with
the NPDES permit issued by the PADEP. Plant wastewaters include
discharges from the water treatment wastewater settling basin,
auxiliary boiler
[[Page 63509]]
blowdown, dredging/rehandling basin, and sewage treatment plant. The
volume of discharge from the sewage treatment plant may temporarily
increase during construction, but will remain within permitted levels.
Implementation of the proposed EPU will not alter the quality or
quantity of plant waste water discharges. The proposed EPU would not
increase the impacts to Conowingo Pond water quality. Therefore, the
proposed EPU is not expected to cause a significant impact to water
quality.
Aquatic Resource Impacts
The potential impacts to aquatic resources from the proposed action
could include impingement of aquatic life on barrier nets, trash racks,
and traveling screens; entrainment of aquatic life through the cooling
water intake structures and into the cooling water systems; and effects
from the discharge of chemicals and heated water. However, the proposed
EPU would not affect aquatic resources in a manner or to a degree that
exceeds the analysis of effects in NUREG-1437, Supplement 10.
The NRC staff concluded in NUREG-1437, Supplement 10, Section
4.1.3, ``Impingement of Fish and Shellfish,'' that, during the
continued operation of PBAPS, the potential impacts caused by the
impingement of fish and shellfish on the debris screens of the cooling
water intake system would be small (i.e., not detectable or so minor
that they will neither destabilize nor noticeably alter any important
attribute of the resource) and that impingement losses would not be
great enough to adversely affect Susquehanna River aquatic populations.
The NRC staff also concluded in NUREG-1437, Supplement 10, Section
4.1.3, that, in the early life stages in the cooling water system, the
potential impacts of entrainment of fish and shellfish would be small,
and that there are no demonstrated, significant effects to the aquatic
environment related to entrainment. Regarding the potential impacts of
thermal discharges, in NUREG-1437, Supplement 10, Section 4.1.4, ``Heat
Shock,'' the NRC staff concluded that the impacts are small and that
the heated water discharged to Conowingo Pond does not change the
temperature enough to adversely impact balanced, indigenous populations
of fish and wildlife. Additionally, the NRC has generically determined
that the effects from discharge of chlorine or other biocides, as well
as accumulation of contaminants in sediments or biota, would be small
for continued operations during a renewed license period at all plants
as discussed in Section 4.5.1.1, ``Surface Water Resources, Discharge
of Biocides, Sanitary Wastes, and Minor Chemical Spills,'' of the
``Generic Environmental Impact Statement for License Renewal of Nuclear
Plants,'' NUREG-1437, Volume 1, Revision 1, dated June 2013 (ADAMS
Accession No. ML13106A241).
The proposed EPU would not increase the volume or rate of water
that is drawn from Conowingo Pond, and water withdrawals and
consumptive use would continue to be regulated by the Susquehanna River
Basin Commission with no changes to the current withdrawal
authorizations. PBAPS's cooling water intake structure (described
previously under ``Plant Site and Environs'') is designed to reduce
impingement and entrainment of aquatic organisms, and the proposed EPU
would not require any modifications to the current cooling system
design. Thus, NRC staff concludes that compared to current operations,
the proposed EPU would not change the impingement or entrainment rate
of fish, shellfish, or other aquatic organisms.
Chemical effluents discharged from PBAPS would not change in type
or quantity under EPU conditions, and effluent discharges to Conowingo
Pond will continue to be regulated by PADEP under the site's NPDES
permit. Thus, NRC staff concludes that compared to current operations,
the proposed EPU would not change the type or concentration of chemical
effluents that could impact aquatic resources.
The proposed EPU would increase the temperature of discharged
water. Under current operating conditions, cooling water passing
through the condensers can increase by as much as 22 [deg]F. Under the
proposed EPU conditions, Exelon estimates that cooling water
temperatures would increase by approximately 3 [deg]F, which would
result in an increase of up to 25 [deg]F as water passes through the
condensers. The NPDES permit for PBAPS limits the instantaneous maximum
effluent temperature in the discharge canal (Outfall 001) to 110
[deg]F. Heated effluent water released into the discharge canal travels
4,700 ft south to a spillway, at which point it enters Conowingo Pond.
A thermal study at PBAPS, conducted from June through October of 1999
under zero cooling tower operation conditions, reported the daily
average water temperatures at the discharge canal outfall ranged from
66.7 [deg]F to 106.5[emsp14] [deg]F.
Prior to the current NPDES permit (effective January 1, 2011),
helper cooling towers at PBAPS were used only during extreme low flow
and high temperature conditions in Conowingo Pond. The current NPDES
permit requires PBAPS to operate one to three of its cooling towers
from June 15 to September 15 as part of the permit's thermal and
biological sampling requirements. Exelon began the required sampling in
2010 and will continue the sampling through 2013. The study will, among
other things, evaluate the changes in the thermal plume during helper
cooling tower operation and create a model of these changes that takes
into account proposed EPU conditions and other environmental influences
to Conowingo Pond.
In NUREG-1437, Supplement 10, Section 4.1.4, ``Heat Shock,'' the
NRC staff concluded that for the continued operation of Units 2 and 3,
the impacts from thermal effluents would be small. However, this
conclusion was made assuming station conditions under the previous
NPDES permit. As discussed on page 4 of Attachment 1 to the licensee's
letter dated February 17, 2011, which transmitted the current NPDES
permit and an evaluation of the modifications to the permit to the NRC
(ADAMS Accession No. ML110490533), the previous permit did not require
an instantaneous maximum effluent temperature action level. However,
the current technical specifications in the NRC operating licenses for
PBAPS, Units 2 and 3, require that plants be shut down when the
instantaneous intake temperature exceeds 92[emsp14] [deg]F. As
discussed in Attachment 1 to the licensee's letter, in this
circumstance, and based on the condenser maximum temperature rise of
21.66 [deg]F, the discharge canal should not exceed a maximum of 113.66
[deg]F. Thus, the current NPDES permit, which stipulates an
instantaneous maximum effluent temperature action level of 110 [deg]F,
is inherently more protective of the environment. The previous NPDES
permit did not require the operation of helper cooling towers. Use of
helper cooling towers in the summer months has likely reduced this
already small impact. Once completed, the thermal and biological
studies will determine to what degree the helper cooling towers
mitigate effluent temperatures and the character of the thermal plume.
After the study is completed and based on the study results, Exelon
will submit to PADEP an application to modify the NPDES permit. These
modifications may include actions to manage the thermal discharge under
EPU conditions. For any such future modifications, the PADEP must, in
accordance with Section 316(a) of the Clean Water Act, ensure thermal
effluent limitations assure the protection and propagation of a
[[Page 63510]]
balanced, indigenous community of shellfish, fish, and wildlife in and
on Conowingo Pond.
In NUREG-1437, Supplement 10, Section 4.1.5, ``Microbiological
Organisms (Public Health),'' the NRC staff concluded that the potential
effects of microbiological organisms on human health from the operation
of the plant's cooling water discharge to the aquatic environment on or
in the vicinity of the site are small. As discussed in NUREG-1437,
Supplement 10, Section 4.1.5, discharge temperatures from Units 2 and 3
do not exceed 110 [deg]F in late summer. This is below the temperatures
known to be conducive to growth and survival of thermophilic pathogens.
The ongoing disinfection of the sewage effluent from PBAPS reduces the
likelihood that a seed source or inoculants would be introduced to the
station's heated discharge or to Conowingo Pond. As previously
discussed, the current NPDES permit will continue to assure that there
will not be any significant impacts on human health from
microbiological organisms.
The current NPDES permit includes thermal limitations and operating
conditions that are more protective than the previous NPDES permit
(considered in Section 4.1.4. ``Heat Shock,'' of NUREG-1437, Supplement
10). The PADEP will continue to regulate and enforce PBAPS thermal
discharges in a manner that will assure the protection and propagation
of a balanced, indigenous community of shellfish, fish, and wildlife in
and on Conowingo Pond. Therefore, the increase in thermal effluent
under proposed EPU conditions would not result in a significant impact
to aquatic resources.
Terrestrial Resource Impacts
During EPU-related upgrades and plant modifications, impacts that
could potentially affect terrestrial resources could come from noise,
lighting, and other disturbances to wildlife. However, noise and
lighting would not impact terrestrial species beyond what would be
experienced during normal operations. This is because EPU-related
upgrades and plant modifications would take place during normally
planned outage periods, which are already periods of heightened
activity. Habitat loss or fragmentation would not occur, because the
proposed EPU would not involve any new construction outside of the
existing facility footprint (discussed previously under ``Land Use and
Aesthetic Impacts'') and would not require transmission system upgrades
or modifications. No changes in transmission line maintenance and
vegetation removal are anticipated. The EPU will increase electric
current flowing through the transmission system. This will increase the
strength of the electromagnetic field around the transmission lines.
However, as discussed on pages 4-21 and 4-24 of Supplement 10 NUREG-
1437, the NRC has determined that a scientific consensus has not been
reached on the chronic effects of the electromagnetic field on humans,
and that significant impacts to the terrestrial biota have not been
identified. Sediment transport and erosion is not a concern because
EPU-related activities would only take place on previously developed
land. Therefore, the proposed EPU is not expected to cause a
significant impact on terrestrial resources.
Threatened and Endangered Species Impacts
Under Section 7 of the Endangered Species Act of 1973, as amended
(ESA), Federal agencies, in consultation with the U.S. Fish and
Wildlife Service (FWS) or the National Marine Fisheries Service (as
appropriate), must ensure that actions the agency authorizes, funds, or
carries out are not likely to jeopardize the continued existence of any
listed species or result in the destruction or adverse modification of
critical habitat.
The NRC staff has identified two federally listed species that
occur in York County, Pennsylvania: The bog turtle (Glyptemys
muhlenbergii) and the Indiana bat (Myotis sodalis), which are discussed
below. The NRC staff also considered the possibility of the shortnose
(Acipenser brevirostrum) and Atlantic (Acipenser oxyrinchus oxyrinchus)
sturgeons to occur above Conowingo Dam in Conowingo Pond because,
historically, sturgeon likely inhabited the Susquehanna River upstream
of the location of the Conowingo Dam prior to its construction.
Currently, sturgeons are known to occur in the lower Susquehanna River
and the Maryland Department of Natural Resources has noted the
occurrence of sturgeon at Conowingo Dam. However, given the size of the
dam and the fact that shortnose and Atlantic sturgeon typically do not
use fish lifts that were designed for other species (Conowingo Dam's
fish lift was designed for the passage of American shad (Alosa
sapidissima)), the NRC reasonably concludes that neither the shortnose
nor Atlantic sturgeon occur in Conowingo Pond.
The FWS listed the northern population of the bog turtle as
threatened under the ESA in 1997 (62 FR 59605). The FWS has not
designated critical habitat for this species. Bog turtles inhabit early
to mid-successional wetlands fed by groundwater or associated with the
headwaters of streams and dominated by emergent vegetation.
Pennsylvania counties identified by the FWS as containing extant bog
turtle populations occur in the southeastern part of the state, and
many occur within the Delaware River and Susquehanna River watersheds.
In 2000, Exelon commissioned bog turtle habitat (Phase 1) surveys in
the vicinity of PBAPS, but no areas of suitable habitat were identified
during the surveys. The potential for adverse effects at the PBAPS site
and along transmission line corridors to bog turtles was evaluated in
Section 2.2.6, ``Terrestrial Resources,'' of NUREG-1437, Supplement 10.
The NRC staff concluded in Section 4.6.2, ``Terrestrial Species,'' that
continued operations during the license renewal term would have no
effect on bog turtles due to the lack of suitable habitat. The NRC
staff requested the FWS's concurrence with this determination in a
letter, dated January 17, 2002 (ADAMS Accession No. ML020180445). The
FWS concurred with this determination in a letter, dated April 17, 2002
(ADAMS Accession No. ML021510200). The PBAPS site continues to lack
suitable habitat for bog turtles, and the proposed EPU would not
involve any habitat loss or fragmentation or any other significant
impacts to the terrestrial environment. Therefore, the proposed EPU
would have no effect on the bog turtle.
The FWS listed the Indiana bat as endangered wherever found in 1967
under the ESA's predecessor, the Endangered Species Preservation Act of
1966 (32 FR 4001). The FWS has not designated critical habitat for the
species in Pennsylvania (41 FR 41914). Areas of the PBAPS site that
could serve as potential Indiana bat habitat include forested areas,
forest edges, and riparian areas. The Pennsylvania Game Commission
(PGC) reports that Indiana bats use habitat within York County during
the summer. However, no hibernation or maternity sites occur in the
county. The Supplemental Environmental Impact Statement did not
consider the effects of continued operation of PBAPS during the license
renewal term on Indiana bats. The proposed EPU would not disturb or
alter any natural habitats on the PBAPS site or along any transmission
line corridors, and other impacts such as noise and lighting during
EPU-related upgrades. Furthermore, plant modifications would not result
in a significant impact on the
[[Page 63511]]
terrestrial environment. Therefore, the proposed EPU would have no
effect on the Indiana bat.
The NRC did not identify any designated critical habitat that could
be affected by the proposed EPU, nor has the FWS proposed the listing
or designation of any new species or critical habitat that could be
affected by the proposed EPU. Therefore, the proposed EPU would have no
effect on designated critical habitat, proposed species, or proposed
critical habitat.
Essential Fish Habitat
Section 305(b) of the Magnuson-Stevens Fishery Conservation and
Management Act (MSA) includes requirements for Federal agencies to
consider the impact of Federal actions on essential fish habitat (EFH)
and to consult with the National Marine Fisheries Service (NMFS) if any
activities may adversely affect EFH. According to the EFH Mapper and
the NMFS's ``Guide to Essential Fish Habitat Designations in the
Northeastern United States,'' NMFS has not designated any EFH under the
MSA within the affected water bodies. Thus, the proposed EPU would have
no effect on designated essential fish habitat.
Species Protected by the Commonwealth of Pennsylvania
Within the Commonwealth of Pennsylvania, the PGC, the Pennsylvania
Fish and Boat Commission (PFBC), and the Pennsylvania Department of
Conservation and Natural Resources (PDCNR) oversee the protection of
Commonwealth-listed species under the Pennsylvania Endangered Species
Program. The PGC, PFBC, and PDCNR manage the recovery efforts for wild
birds and mammals (34 Pa. Code 133); fish, amphibians, reptiles, and
aquatic organisms (30 Pa. Code 75); and native plants (17 Pa. Code 45),
respectively.
As part of preparing its EPU application, Exelon performed a
Pennsylvania Natural Diversity Inventory (PNDI) Environmental Review
through the Pennsylvania Natural Heritage Program's Web site. The
survey results indicated no known impacts to species of concern within
the oversight of the PGC and FWS. No further review by these two
agencies was required. Exelon also directly contacted some of the
Pennsylvania agencies listed above to determine potential impacts to
Commonwealth-listed species that could result from the proposed EPU.
Exelon's PNDI Environmental Review indicated that there would be no
impact to species under the PDCNR's jurisdiction and that no further
project review from this agency was required. The PNDI Environmental
Review indicated three terrestrial plant species under the PDCNR's
purview could occur in the vicinity of PBAPS: The lobed spleenwort
(Asplenia pinnatifidum), the harbinger-of-spring (Erigenia bulbosa),
and the American holly (Ilex opaca). The PNDI Environmental Review also
included recommended conservation measures from the PDCNR, which
included practices that could avoid the introduction of invasive
species. Exelon contacted the PDCNR directly via a letter dated January
23, 2012, requesting that the PDCNR confirm Exelon's conclusion that
the proposed EPU would not adversely affect any Commonwealth-listed
threatened or endangered species. In their response, dated February 21,
2012, the PDCNR indicated that the proposed EPU would not result in
impacts to species under its jurisdiction. For species under the PFBC's
purview, the PNDI Environmental Review indicated that further review
was required to determine potential impacts. Exelon contacted the PFBC
in a letter, dated January 23, 2012. Subsequently, the PFBC indicated
in a letter, dated February 24, 2012, that no adverse impacts are
expected to species under its jurisdiction from the proposed EPU. Each
of the letters referenced in this paragraph are included in Exelon's
supplemental environmental report, which was submitted as Attachment 8
to the EPU application.
The NRC staff reviewed the information discussed above in Exelon's
EPU application concerning Commonwealth-listed species. The appropriate
Pennsylvania agencies have confirmed the proposed EPU would not affect
any species under their purview and NRC staff has not identified any
impacts to the terrestrial or aquatic environment beyond those
previously considered by each Pennsylvania agency in their reviews.
Therefore, the proposed EPU would have no significant impacts to
Commonwealth-listed species.
Socioeconomics
Currently, approximately 900 permanent workers and 200 contract
workers are employed at PBAPS. Exelon EPU-related plant modifications
would occur during normally scheduled refueling outages and are
estimated to last between 30 to 40 days for each reactor. During normal
refueling outages, approximately 800 temporary workers are added to the
normal workforce of 1,100 permanent and contract workers. The first
phase of EPU modifications is planned to be implemented during the 2014
outage. During that outage, approximately 1,300 additional temporary
workers will be added to the normal outage workforce, with the total
workforce at PBAPS peaking at approximately 3,200 workers over the
modification period. Once EPU-related plant modifications have been
completed, the size of workforce at PBAPS would return to normal
levels. The PBAPS workforce will remain similar to pre-EPU levels, as
will the temporary workforce needed for future refueling outages. The
size of the workforce will be unaffected by implementation of the
proposed EPU.
The NRC expects most outage and EPU plant modification workers to
relocate temporarily to communities in Lancaster or York County,
resulting in short-term increases in the local population along with
increased demands for public services and housing. As modification work
would be temporary, most workers would likely stay in rental homes,
apartments, mobile homes, and camper-trailers. The 2011 American
Community Survey 1-year estimate for vacant housing units reported
11,509 units in Lancaster County and 12,192 units in York County that
could potentially ease the demand for local rental housing. Therefore,
while a short duration temporary increase in plant employment would
occur, this increase would have little or no noticeable effect on the
availability of housing in the region.
The additional number of workers, truck material, and equipment
deliveries needed to support EPU-related plant modifications would
likely cause short-term level of service impacts (restricted traffic
flow and higher incident rates) on secondary roads in the immediate
vicinity of PBAPS. Increased traffic volumes would be necessary to
support implementation of EPU-related modifications during the
refueling outage. As EPU-related plant modifications would occur during
a normal refueling outage, there could be noticeable short-term (during
certain hours of the day), level-of-service traffic impacts beyond what
is experienced during normal outages. During periods of high traffic
volume (i.e., morning and afternoon shift changes), work schedules
could be staggered and employees and/or local police officials could be
used to direct traffic entering and leaving PBAPS to minimize level-of-
service impacts.
PBAPS currently pays property taxes and payments in lieu of
property taxes to York County, Peach Bottom Township, and the South
Eastern School District. The amount of future
[[Page 63512]]
property taxes and payments in lieu of property taxes paid by PBAPS
could be affected by the increased value of PBAPS as a result of the
EPU and increased power generation. Due to the short duration of EPU-
related plant modification activities, there would be little or no
noticeable effect on local tax revenues generated by temporary workers
residing in Lancaster and York counties.
Therefore, based on the information presented above, no significant
socioeconomic impacts are expected from EPU-related plant modifications
and operations under EPU conditions in the vicinity of PBAPS.
Environmental Justice Impacts
An environmental justice impact analysis evaluates the potential
for disproportionately high and adverse human health and environmental
effects on minority and low-income populations that could result from
activities associated with the proposed EPU at PBAPS. Such effects may
include biological, cultural, economic, or social impacts. Minority and
low-income populations are subsets of the general public residing in
the vicinity of PBAPS, and all are exposed to the same health and
environmental effects generated from activities at PBPAS.
The NRC considered the demographic composition of the area within a
50-mile radius of PBAPS to determine whether minority populations may
be affected by the proposed action. The NRC examined the distribution
of minority populations within 50 miles of PBAPS using the U.S. Census
Bureau (USCB) data for 2010.
According to the 2010 Census data, approximately 5 million people
live within a 50-mile radius of PBPAS. Minority populations within 50
miles compose 35.6 percent (approximately 1.8 million persons) of the
total population. The largest minority group was Black or African-
American (approximately, 1.2 million persons or 23.1 percent), followed
by Hispanic or Latino (of any race) (approximately 315,000 persons or
6.3 percent). According to 2011 American Community Survey 1-Year
Estimates, minority populations within Lancaster County comprise 10.2
percent of the total population with the largest minority group being
Hispanic or Latino (of any race) at 8.9 percent. Minority populations
within York County comprise 12.2 percent of the total population with
the largest minority group being Black or African-American at 6
percent.
According to 2011 American Community Survey 1-Year Estimates census
data for Lancaster and York counties, approximately 10.9 percent of the
population residing within Lancaster County and 11.0 percent of the
population residing in York County were determined to be living below
the 2011 federal poverty threshold. In addition, approximately 7.9
percent of families residing within Lancaster County and 8.2 percent of
the families in York County were determined to be living below the
Federal poverty threshold. The 2011 federal poverty threshold was
$22,350 for a family of four and $10,890 for an individual. The median
household income for Lancaster County was approximately $64,566 and for
York County was approximately $66,053. Lancaster County median
household income is 28.5 percent higher than the median household
income (approximately $50,228) for Pennsylvania, while York County is
31 percent higher.
Potential impacts to minority and low-income populations would
mostly consist of human health, environmental, and socioeconomic
effects (e.g., noise, dust, traffic, employment, and housing impacts).
Radiation doses from plant operations after the EPU are expected to
continue to remain well below regulatory limits.
Noise and dust impacts would be temporary and limited to onsite
activities. Minority and low-income populations residing along site
access roads could experience increased commuter vehicle traffic during
outage shift changes. Increased demand for inexpensive rental housing
during the EPU-related plant modifications could disproportionately
affect low-income populations; however, due to the availability of
housing, impacts would be of short duration (approximately 30 to 40
days) and limited. Furthermore, according to the 2011 American
Community Survey 1-year estimate, there were 11,509 vacant housing
units in Lancaster County and 12,192 vacant housing units in York
County available to help alleviate any short-term increased demand.
Based on this information and the analysis of human health and
environmental impacts presented in this environmental assessment, the
proposed EPU would not have disproportionately high and adverse human
health and environmental effects on minority and low-income populations
residing in the PBAPS vicinity.
Historic and Cultural Resources Impacts
There are no records of historic and cultural resources being found
on PBAPS property. However, there is the potential to find historic and
cultural resources at the PBAPS site as the majority of recorded
archaeological sites in the region are found within the first terraces
above the Susquehanna River. The likelihood of these resources being
present at PBAPS has diminished as the terraces near PBAPS were flooded
by the formation of Conowingo Pond. Nevertheless, there are nine
historic properties listed on the National Register of Historic Places
within 6 miles of PBAPS.
As previously discussed, all EPU-related plant modifications would
take place within existing buildings and facilities at PBAPS, including
replacing two electrical transformers on an existing pad. Since no
ground disturbance or construction-related activities would occur
outside of previously disturbed areas and existing electrical
transmission facilities, there would be no significant impact from EPU-
related plant modifications on historic and archaeological resources,
should they be found on or in the vicinity of PBAPS.
Non-Radiological Cumulative Impacts
The NRC staff considered potential cumulative impacts on the
environment resulting from the incremental impact of the proposed EPU
when added to other past, present, and reasonably foreseeable future
actions in the vicinity of PBAPS. For the purposes of this analysis,
past actions are related to the construction and licensing of PBAPS,
present actions are related to current operations, and future actions
are those that are reasonably foreseeable through the end of station
operations including operations under the EPU.
There will not be significant cumulative impacts to the resource
areas of air quality, groundwater, threatened and endangered species,
or historic and cultural resources in the vicinity of PBAPS, because
the contributory effect of ongoing actions within a region are
regulated and monitored through a permitting process under State or
Federal authority (e.g. NPDES and 401/404 permits under the Clean Water
Act). In these cases, impacts are managed as long as these actions are
in compliance with their respective permits and conditions of
certification.
Surface water and aquatic resources were examined for potential
cumulative impacts. The geographic boundary for potential cumulative
impacts is the area of the post-EPU thermal mixing zone in Conowingo
Pond. If the proposed EPU is approved and is implemented, PBAPS is
predicted to have a slightly larger and hotter mixing zone than pre-
uprate conditions during full flow and capacity. The NRC staff
anticipates that
[[Page 63513]]
PBAPS will continue to operate post-EPU in full compliance with the
requirements of the PADEP. The PADEP would evaluate PBAPS compliance
with its individual wastewater facility permit.
Land use, and aesthetics impacts from the EPU are not expected to
contribute to cumulative impacts as there will be no construction of
new transmission facilities on site, transmission maintenance and
vegetation practices will not change, and all plant modifications will
be implemented within existing buildings.
As discussed in the aquatic biology section, the abundance of
aquatic organisms as a source of food for terrestrial organisms should
not change. During the construction of the EPU, only minor temporary
changes in air emissions from additional workers and construction
equipment are expected. No changes to air emission from implementation
of the EPU are expected. There will not be any increases to surface
water or air that would increase the impact to terrestrial biota as a
result of the EPU. Therefore, the NRC staff concludes that impacts to
terrestrial biota are not expected to contribute to cumulative impacts
to terrestrial resources as a result of the proposed action.
The greatest socioeconomic impacts from the proposed EPU and
continued operation of PBAPS would occur during the 2014 outage. The
increase in EPU-related construction workforces would have a temporary
effect on socioeconomic conditions in local communities from the
increased demand for temporary housing, public services (e.g., public
schools), and increased traffic, but would not contribute to cumulative
impacts. No significant cumulative impacts are expected as a result of
the proposed EPU.
Non-Radiological Impacts Summary
As discussed above, the proposed EPU would not result in any
significant non-radiological impacts. Table 1 summarizes the non-
radiological environmental impacts of the proposed EPU at PBAPS.
Table 1--Summary of Non-Radiological Environmental Impacts
------------------------------------------------------------------------
------------------------------------------------------------------------
Land Use and Aesthetic................ The proposed EPU is not expected
to cause a significant impact
on land use conditions and
aesthetic resources.
Non-Radioactive Waste................. The proposed EPU is not expected
to cause a significant impact
from the generation of
nonradioactive waste.
Air Quality........................... The proposed EPU is not expected
to cause a significant impact
on air quality.
Water Use............................. The proposed EPU is not expected
to cause a significant impact
on water use.
Water Quality......................... The proposed EPU is not expected
to cause a significant impact
on water quality.
Aquatic Resources..................... The proposed EPU is not expected
to cause a significant impact
on aquatic resources.
Terrestrial Resources................. The proposed EPU is not expected
to cause a significant impact
on terrestrial resources.
Threatened and Endangered Species..... The proposed EPU would have no
effect on any species or
habitats protected under the
Endangered Species Act or on
designated essential fish
habitat protected under the
Magnuson-Stevens Fishery
Conservation and Management
Act. Additionally, the proposed
EPU would have no significant
impacts on any Pennsylvania-
listed species.
Socioeconomics........................ No significant socioeconomic
impacts are expected as a
result of the proposed EPU.
Environmental Justice................. The proposed EPU is not expected
to cause any disproportionately
high and adverse human health
and environmental effects on
minority and low-income
populations residing in the
PBAPS vicinity.
Historic and Cultural Resources....... The proposed EPU is not expected
to cause any significant impact
to historic and cultural
resources.
Non-Radiological Cumulative........... No significant non-radiological
cumulative impacts are expected
as a result of the proposed
EPU.
------------------------------------------------------------------------
Radiological Impacts
Radioactive Gaseous, Liquid Effluents and Solid Waste
Units 2 and 3 use waste treatment systems to collect, process,
recycle, and dispose of gaseous, liquid, and solid wastes that contain
radioactive material in a safe and controlled manner within NRC and
Environmental Protection Agency (EPA) radiation safety standards. The
licensee's evaluation of plant operation at the proposed EPU conditions
shows that no physical changes would be needed to the radioactive
gaseous, liquid, or solid waste systems.
Radioactive Gaseous Effluents
The gaseous waste management system manages radioactive gases
generated during the nuclear fission process. Radioactive gaseous
wastes are composed of activation gases and radioactive noble gases
from the reactor coolant system, gases from the charcoal treatment
system, and gases collected during venting of plant piping. The
licensee's evaluation determined that implementation of the proposed
EPU would not significantly increase the volume of gases processed in
the gaseous waste management system, since plant system functions are
not changing and the volume of gases from the plant systems are not
expected to change. The analysis also showed the proposed increase in
power level would increase the total amount of radioactivity in the
gaseous waste management system. However, the licensee's evaluation
concluded that the increased radioactivity would not require any
changes to the gaseous waste management system. The system would
continue to safely control and process the waste in accordance with
plant procedures to maintain radioactive gaseous releases within the
dose limits of 10 CFR 20.1301 and the as low as is reasonably
achievable (ALARA) dose objectives in appendix I to 10 CFR part 50 and
EPA's 40 CFR part 190.
Radioactive Liquid Effluents
The liquid waste management system collects, processes, and
prepares radioactive liquid waste for disposal. Radioactive liquid
wastes include liquids from plant systems containing reactor coolant
and liquids that became contaminated from contact with plant systems
containing radioactive liquids. The licensee's evaluation shows that
the proposed EPU would not significantly increase the inventory of
liquid normally processed by the liquid waste management system. This
is because the system functions are not changing and the volume inputs
remain approximately the same. The licensee's evaluation showed the
proposed EPU would increase the total amount of radioactivity in the
liquid waste
[[Page 63514]]
management system. However, since the composition of the radioactive
material in the waste and the volume of radioactive material processed
through the system are not expected to significantly change, the
licensee's evaluation concluded that no changes are needed to the
system's design or operation. The existing equipment and plant
procedures will continue to control radioactive liquid releases to the
environment within the NRC's dose limits in 10 CFR 20.1301 and ALARA
dose standards in appendix I to 10 CFR part 50 and EPA's 40 CFR part
190.
Public Radiation Doses at EPU Conditions
The primary sources of offsite dose to members of the public from
Units 2 and 3 are radioactive gaseous and liquid effluents. As
discussed in the radioactive gaseous and liquid effluent sections
above, operation at the proposed EPU conditions will not change the
radioactive gaseous and liquid waste management systems' abilities to
perform its intended functions to safely control and process the waste.
There would be no change to the radiation monitoring system and
procedures used to control the release of radioactive effluents in
accordance with NRC radiation protection standards for the public in 10
CFR 20.1301 and appendix I to 10 CFR part 50 and EPA's 40 CFR part 190.
The licensee evaluated the projected dose to members of the public
from radioactive effluents at the proposed EPU by using actual dose
data reported for the period from 2005 through 2008 and recalculated
the dose based on the proposed EPU. The following bullets summarize the
projected maximum dose to a member of the public located outside the
PBAPS site boundary from radioactive gaseous and liquid effluents from
the proposed EPU:
The maximum whole body dose to an offsite member of the
public from the combined radioactive liquid effluents from Units 2 and
3 is 1.52 x 10-2 millirem (mrem)/year, which is well below
the 6 mrem/year dose criterion in appendix I to 10 CFR art 50 for two
reactor units.
The maximum organ dose to an offsite member of the public
from the combined radioactive liquid effluents from Units 2 and 3 is
1.98 x 10-2 mrem/year, which is well below the 20 mrem/year
dose criterion in appendix I to 10 CFR part 50 for two reactor units.
The maximum air dose at the site boundary from gamma
radiation from the combined gaseous effluents from Units 2 and 3 is
7.27 x 10-1 millirad (mrad)/year, which is well below the 20
mrad/year dose criterion in appendix I to 10 CFR part 50 for two
reactor Units.
The maximum air dose at the site boundary from beta
radiation in the combined gaseous effluents from Units 2 and 3 is 1.42
x 10-1 mrad/year, which is well below the 40 mrad/year dose
criterion in appendix I to 10 CFR part 50 for two reactor units.
The maximum organ (thyroid) dose to an offsite member of
the public from radioactive iodine and radioactive material in
particulate form from Units 2 and 3 is 5.12 mrem/year, which is well
below the 30 mrem/year dose criterion in appendix I to 10 CFR part 50
for two reactor units.
Based on the projected annual EPU doses from radioactive
gaseous and liquid effluents from Units 2 and 3 being well within the
dose criteria in appendix I to 10 CFR part 50 and the projected
negligible direct shine dose contribution from components within the
facilities, including the independent spent fuel storage installation,
the total dose will be well within the 40 CFR 190 annual whole body
dose standard of 25 mrem/year.
Based on the above, the projected radiation doses to members of the
public from the proposed EPU are expected to be within Federal
regulatory limits and therefore, would not be significant.
Occupational Radiation Doses at EPU Conditions
The licensee's evaluation determined that the radioactivity levels
in plant systems are expected to increase with the proposed EPU.
Permanent shielding to reduce radiation levels is used throughout the
two reactor units to protect workers. The licensee's evaluation of the
current shielding design determined that it is adequate to continue to
protect the workers from the projected increased radiation levels. In
addition to the permanent shielding, the licensee's radiation
protection program, through the use of training, protective clothing
and equipment, temporary shielding, monitoring radiation levels, and
direct oversight by radiation protection personnel at individual job
sites, will ensure that radiation exposures to workers will be ALARA,
as required by 10 CFR 20.1101. Based on the above information, the NRC
staff concludes that the proposed EPU is not expected to significantly
affect radiation levels within the plant and would not be a significant
radiological impact to the workers.
Radioactive Solid Wastes
Radioactive solid wastes include solids recovered from the reactor
coolant systems, solids that come into contact with the radioactive
liquids or gases, and solids used in the reactor coolant process
system. The licensee evaluated the potential effects of the proposed
EPU on the solid waste management system. The results of the evaluation
indicate that the proposed EPU will increase the volume and activity of
radioactive solid waste by approximately 14 percent. The largest volume
of radioactive solid waste generated at Units 2 and 3 is low-level
radioactive waste which includes used resins, filters, dry compressible
waste, irradiated components, and waste oil and ash.
As stated by the licensee, the proposed EPU would not have a
significant effect on the radioactive solid waste system. The proposed
EPU would not generate a new type of waste or create a new waste
stream. No changes are needed to the system to accommodate the
projected additional volume and activity. The equipment used to process
the solid waste is designed and operated to ensure that hazards to the
workers and the environment are minimized. Waste processing areas are
monitored for radiation as part of the radiation protection program to
ensure that radiation exposure to workers is maintained within NRC dose
limits in 10 CFR 20.1201.
Based on the above, the licensee is expected to continue to safely
control and process radioactive solid waste from the proposed EPU in
accordance with NRC requirements. Therefore, the impacts from solid
waste would not be significant.
Spent Nuclear Fuel
Spent fuel from Units 2 and 3 is stored in the plant's spent fuel
pool and in dry casks in the independent spent fuel storage
installation (ISFSI). Spent fuel generated after implementation of the
proposed EPU will also be stored in the spent fuel pool and the ISFSI.
Units 2 and 3 are licensed to use uranium-dioxide fuel up to a maximum
enrichment of 5 percent by weight uranium-235. The typical average
enrichment is approximately 4.2 percent by weight of uranium-235. The
average fuel assembly discharge burnup for the proposed EPU is expected
to be approximately 51,000 megawatt days per metric ton uranium (MWd/
MTU) with no fuel pins exceeding the maximum fuel rod burnup limit of
62,000 MWd/MTU. The licensee will maintain these fuel characteristics
during the proposed EPU. There will be no change to the fuel design or
the current 24-month refueling cycle. The
[[Page 63515]]
fuel characteristics for enrichment and burnup presented above, will
ensure that environmental impacts associated with the spent fuel will
remain within the impact values contained in: (1) 10 CFR 51.51, Table
S-3, ``Table of Uranium Fuel Cycle Environmental Data''; (2) 10 CFR
51.52, Table S-4, ``Environmental Impact of Transportation of Fuel and
Waste to and from One Light-Water-Cooled Nuclear Power Reactor''; as
supplemented by (3) NUREG-1437, Volume 1, Addendum 1, ``Generic
Environmental Impact Statement for License Renewal of Nuclear Plants,
Main Report, Section 6.3--Transportation, Table 9.1, Summary of
findings on NEPA [National Environmental Policy Act] issues for license
renewal of nuclear power plants'' (ADAMS Accession No. ML040690720).
Therefore, there would be no significant impacts resulting from
spent nuclear fuel.
Design-Basis Accidents
Design-basis accidents (DBAs) are evaluated by both the licensee
and the NRC staff to ensure that Units 2 and 3 can withstand a spectrum
of postulated accidents without undue hazard to the health and safety
of the public.
Separate from the NRC staff's environmental assessment in this
document, the NRC staff is evaluating the licensee's DBA analyses of
the potential radiological consequences that may result from the
proposed EPU. The results of the NRC staff's safety evaluation and
conclusion will be documented in a Safety Evaluation (SE) that will be
made publically available. If the NRC staff concludes in the SE that
the radiological consequences of DBAs at the proposed EPU power levels
are within NRC requirements, then the proposed EPU will not have a
significant impact with respect to the radiological consequences of
DBAs.
Radiological Cumulative Impacts
The radiological dose limits for protection of the public and plant
workers have been developed by the NRC and EPA to address the
cumulative impact of acute and long-term exposure to radiation and
radioactive material. These dose limits are codified in 10 CFR part 20
and 40 CFR part 190.
The cumulative radiation doses are required to be within the limits
set forth in the regulations cited above. The public dose limit of 25
mrem/year in 40 CFR part 190 applies to all reactors that may be on a
site and also includes any other nearby nuclear facilities. Currently,
there are no other operating nuclear power reactors located near Units
2 and 3. As discussed in the public radiation dose section, the NRC
staff reviewed the licensee's projected post-EPU radiation dose data
and concluded that the projected dose to members of the public would be
well within the limits of 10 CFR part 20 and 40 CFR part 190. The NRC
staff expects continued compliance with NRC's and EPA's public dose
limits during operation at the proposed EPU power level. Therefore, the
NRC staff concludes that there would not be a significant cumulative
radiological impact to members of the public from radioactive effluents
from Units 2 and 3 at the proposed EPU operation.
As previously discussed, the licensee has a radiation protection
program that maintains worker doses within the dose limits in 10 CFR
20.1201. The NRC staff expects continued compliance with NRC's
occupational dose limits during operation at the proposed EPU power
level.
Radiological Impacts Summary
Based on the radiological evaluations discussed above, with the
exception of the impacts associated with DBAs which the NRC staff is
evaluating separately from this EA, the proposed EPU would not result
in any significant radiological impacts. If the NRC staff concludes in
its SE that the DBAs associated with the proposed EPU meet NRC
requirements, then the environmental impacts will not be significant.
Table 2 summarizes the radiological environmental impacts of the
proposed EPU at the PBNP.
Table 2--Summary of Radiological Environmental Impacts
----------------------------------------------------------------------------------------------------------------
----------------------------------------------------------------------------------------------------------------
Radioactive Gaseous Effluents........................................ Radioactive gaseous effluents are
expected to be adequately handled by the
existing radwaste system.
Radioactive Liquid Effluents......................................... Radioactive liquid effluents are expected
to be adequately handled by the existing
radwaste system.
Public Radiation Doses at EPU Conditions............................. Radiation doses to members of the public
from radioactive effluents are expected
to remain below NRC (10 CFR 20.1301 and
appendix I) and EPA radiation protection
standards (40 CFR part 190).
Occupational Radiation Doses at EPU Conditions....................... Radiation doses to workers are expected
to remain within NRC dose limits (10 CFR
20.1201).
Radioactive Solid Wastes............................................. Radioactive solid waste is expected to be
adequately handled by the existing
radwaste system.
Spent Nuclear Fuel................................................... The spent fuel characteristics will
remain within the bounding criteria used
in the impact analysis in 10 CFR part
51, Table S-3.
Design-Basis Accidents............................................... If the NRC staff concludes in the SE that
the radiological consequences of DBAs at
the proposed EPU power levels are within
NRC requirements, then DBAs will not
have a significant radiological
consequence.
Radiological Cumulative Impacts...................................... Radiation doses to the public and plant
workers would remain below NRC (10 CFR
part 20) and EPA (40 CFR part 190)
radiation protection standards.
----------------------------------------------------------------------------------------------------------------
Environmental Impacts of the Alternatives to the Proposed Action
As an alternative to the proposed action, the NRC staff considered
denial of the proposed EPU (i.e., the ``no-action'' alternative) for
PBAPS, Units 2 and 3. Denial of the application would result in no
change in the current environmental impacts. However, if the EPU were
not approved, other agencies and electric power organizations might be
required to pursue other means of providing electric generation
capacity, such as fossil fuel or alternative fuel power generation, to
offset future demand. Construction and operation of such a fossil-
fueled or alternative-fueled plant may create impacts in air quality,
land use, and waste management significantly greater than those
identified for the proposed EPU.
Alternative Use of Resources
This action does not involve the use of any different resources
(water, air, land, nuclear fuel) not previously considered in NUREG-
1437, Supplement 10.
Agencies and Persons Consulted
In accordance with its stated policy, on September 6, 2013, the
staff consulted with the Pennsylvania State
[[Page 63516]]
official, Mr. Brad Fuller of the Pennsylvania Department of
Environmental Protection, regarding the environmental impact of the
proposed action. The State official had no comments.
IV. Draft Finding of No Significant Impact
The NRC is proposing to amend Renewed Facility Operating License
Nos. DPR-44 and DPR-56 for PBAPS, Units 2 and 3. The proposed
amendments would authorize an increase in the maximum reactor power
level from 3514 MWt to 3951 MWt.
The NRC has determined not to prepare an Environmental Impact
Statement for the proposed action. The proposed action will not have a
significant effect on the quality of the human environment because,
amending the licenses with the higher maximum reactor power level, will
not result in any significant radiological or non-radiological impacts.
Accordingly, the NRC has determined that a draft Finding of No
Significant Impact (FONSI) is appropriate. The NRC's draft
Environmental Assessment (EA), included in Section III above, is
incorporated by reference into this finding.
The NRC's draft FONSI and the related environmental documents
listed below are available for public inspection and may be inspected
online through the NRC's Agencywide Documents Access and Management
System (ADAMS) at https://www.nrc.gov/reading-rm/adams.html. You may
also inspect these documents at the NRC's Public Document Room as
discussed in Section I, ``Accessing Information and Submitting
Comments,'' above.
The NRC's draft FONSI and the associated draft EA are available in
ADAMS at Accession No. ML13202A081. Related environmental documents
supporting the NRC's draft FONSI are as follows: (1) Attachment 8,
``Supplemental Environmental Report,'' to Exelon's EPU amendment
request dated September 28, 2012 (ADAMS Accession No. ML12286A011); (2)
NUREG-1437, Volume 1, Addendum 1, ``Generic Environmental Impact
Statement for License Renewal of Nuclear Plants, Main Report, Section
6.3--Transportation, Table 9.1, Summary of findings on NEPA issues for
license renewal of nuclear power plants,'' dated August 1999 (ADAMS
Accession No. ML040690720); (3) Supplement 10 to NUREG-1437, ``Generic
Environmental Impact Statement for the License Renewal of Nuclear Power
Plants, Regarding Peach Bottom Atomic Power Station, Units 2 and 3,''
dated January 2003 (ADAMS Accession No. ML030270059); and (4) ``Generic
Environmental Impact Statement for License Renewal of Nuclear Plants,''
NUREG-1437, Volume 1, Revision 1, dated June 2013 (ADAMS Accession No.
ML13106A241).
Dated at Rockville, Maryland, this 1st day of October 2013.
For the Nuclear Regulatory Commission.
Veronica Rodriguez,
Acting Chief, Plant Licensing Branch I-2, Division of Operating Reactor
Licensing, Office of Nuclear Reactor Regulation.