Combined Notice of Filings #1, 63175-63176 [2013-24825]

Download as PDF Federal Register / Vol. 78, No. 205 / Wednesday, October 23, 2013 / Notices Filed Date: 10/16/13. Accession Number: 20131016–5089. Comments Due: 5 p.m. ET 11/6/13. Docket Numbers: ER14–105–000. Applicants: Southern California Edison Company. Description: Southern California Edison Company Cancels Three Rate Schedules Related to the Four Corners Project (RS Nos. 47, 48, and 461). Filed Date: 10/16/13. Accession Number: 20131016–5107. Comments Due: 5 p.m. ET 11/6/13. Docket Numbers: ER14–106–000. Applicants: Midcontinent Independent System Operator, Inc. Description: Midcontinent Independent System Operator, Inc. submits tariff filing per 35.13(a)(2)(iii: 2013–10–15 RSG Day Ahead Gaming Filing to be effective 10/17/2013. Filed Date: 10/16/13. Accession Number: 20131016–5111. Comments Due: 5 p.m. ET 11/6/13. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: October 16, 2013. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2013–24826 Filed 10–22–13; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission emcdonald on DSK67QTVN1PROD with NOTICES Combined Notice of Filings #1 Take notice that the Commission received the following electric corporate filings: Docket Numbers: EC14–7–000. Applicants: Astoria Energy II LLC. Description: Application for Authorization to Dispose of Jurisdictional Facilities and Request for Expedited Treatment and Privileged VerDate Mar<15>2010 18:13 Oct 22, 2013 Jkt 232001 Treatment of Exhibit I of Astoria Energy II LLC. Filed Date: 10/16/13. Accession Number: 20131016–5023. Comments Due: 5 p.m. ET 11/6/13. Docket Numbers: EC14–8–000. Applicants: Gilroy Energy Center, LLC, Creed Energy Center, LLC, Goose Haven Energy Center, LLC, Calpine Peaker Holdings, LLC, Peaker Holdings I, LLC,GEC Holdings, LLC. Description: Joint Application for Authorization under Section 203 of the Federal Power Act of Gilroy Energy Center, LLC, et al. Filed Date: 10/16/13. Accession Number: 20131016–5025. Comments Due: 5 p.m. ET 11/6/13. Take notice that the Commission received the following electric rate filings: Docket Numbers: ER12–2399–004. Applicants: American Transmission Systems, Incorporation, PJM Interconnection, L.L.C. Description: American Transmission Systems, Incorporated submits FirstEnergy submits compliance filing per 9/27/2013 Order in ER12–2399–001, 002 to be effective 9/27/2013. Filed Date: 10/15/13. Accession Number: 20131015–5376. Comments Due: 5 p.m. ET 11/5/13. Docket Numbers: ER13–102–002. Applicants: New York Independent System Operator, Inc. Description: New York Independent System Operator, Inc. submits NYISO Order No. 1000 Regional Planning Compliance Filing to be effective 1/1/ 2014. Filed Date: 10/15/13. Accession Number: 20131015–5427. Comments Due: 5 p.m. ET 11/14/13. Docket Numbers: ER13–107–004. Applicants: South Carolina Electric & Gas Company. Description: South Carolina Electric & Gas Company submits Order No. 1000 to be effective 1/1/2014. Filed Date: 10/15/13. Accession Number: 20131016–5000. Comments Due: 5 p.m. ET 11/14/13. Docket Numbers: ER13–1851–004. Applicants: New England Power Pool Participants Committee, ISO New England Inc. Description: New England Power Pool Participants Committee submits Winter Reliability Compliance Filing to be effective 9/6/2013. Filed Date: 10/15/13. Accession Number: 20131015–5377. Comments Due: 5 p.m. ET 11/5/13. Docket Numbers: ER13–2266–001. Applicants: ISO New England Inc. Description: Winter Reliability Bid Results Compliance Filing of ISO New England Inc. PO 00000 Frm 00018 Fmt 4703 Sfmt 4703 63175 Filed Date: 10/15/13. Accession Number: 20131015–5367. Comments Due: 5 p.m. ET 11/5/13. Docket Numbers: ER14–96–000. Applicants: Healthy Planet Partners Energy Company, LLC. Description: Healthy Planet Partners Energy Company, LLC submits HPP MBRA Application to be effective 1/15/ 2014. Filed Date: 10/15/13. Accession Number: 20131015–5390. Comments Due: 5 p.m. ET 11/5/13. Docket Numbers: ER14–97–000. Applicants: Midcontinent Independent System Operator, Inc. Description: Midcontinent Independent System Operator, Inc. submits tariff filing per 35.13(a)(2)(iii: 10–15–13 Attach FF–4 to be effective 12/19/2013. Filed Date: 10/15/13. Accession Number: 20131015–5413. Comments Due: 5 p.m. ET 11/5/13. Docket Numbers: ER14–98–000. Applicants: Entergy Services, Inc., Midcontinent Independent System Operator, Inc. Description: Entergy Services, Inc. submits 2013–10–15 Rate Schedule 38 to be effective 12/19/2013. Filed Date: 10/15/13. Accession Number: 20131015–5418. Comments Due: 5 p.m. ET 11/5/13. Docket Numbers: ER14–99–000. Applicants: Public Service Company of Colorado. Description: Public Service Company of Colorado submits 2013–10–15–PSCo– TSGT–NOC of 329, 341, & 333 to be effective 12/14/2013. Filed Date: 10/15/13. Accession Number: 20131015–5426. Comments Due: 5 p.m. ET 11/5/13. Docket Numbers: ER14–100–000. Applicants: Midcontinent Independent System Operator, Inc., Entergy Services, Inc. Description: Midcontinent Independent System Operator, Inc. submits tariff filing per 35.13(a)(2)(iii: 2013–10–15 Rate Schedule 40 EMI– SMEPA to be effective 12/19/2013. Filed Date: 10/15/13. Accession Number: 20131016–5001. Comments Due: 5 p.m. ET 11/5/13. Docket Numbers: ER14–101–000. Applicants: Southern California Edison Company. Description: Southern California Edison Company submits Amended LGIA with NextEra Desert Center Blythe, LLC to be effective 11/1/2013. Filed Date: 10/16/13. Accession Number: 20131016–5004. Comments Due: 5 p.m. ET 11/6/13. Docket Numbers: ER14–102–000. E:\FR\FM\23OCN1.SGM 23OCN1 63176 Federal Register / Vol. 78, No. 205 / Wednesday, October 23, 2013 / Notices Applicants: Midcontinent Independent System Operator, Inc., Dairyland Power Cooperative. Description: Midcontinent Independent System Operator, Inc. submits 2013–10–16 Dairyland Attachment O and GG filing to be effective 1/1/2014. Filed Date: 10/16/13. Accession Number: 20131016–5031. Comments Due: 5 p.m. ET 11/6/13. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: October 16, 2013.. Nathaniel J. Davis, Sr., Deputy Secretary. Chehalis Power Generating, L.P., Docket No. ER05–1056–007 clarifying its policy related to jurisdictional reactive power rate schedules.1 In that order, the Commission finds that, on a prospective basis, for any jurisdictional reactive power service (including within-thedeadband reactive power service) provided by both new and existing generators, the rates, terms, and conditions for such service must be pursuant to a rate schedule on file with the Commission, even when that rate schedule provides no compensation for such service. As set forth in that order, the Commission directed staff to conduct a workshop, in a generic proceeding, to explore the mechanics of public utilities filing reactive power rate schedules for which there is no compensation. Take notice that the Commission intends to hold a staff-led workshop open to the public at a time and date to be announced to explore the process for filing reactive power rate schedules for which there is no compensation. A subsequent notice will be issued in this docket setting forth the details of the workshop. Dated: October 17, 2013. Kimberly D. Bose, Secretary. [FR Doc. 2013–24740 Filed 10–22–13; 8:45 am] BILLING CODE 6717–01–P [FR Doc. 2013–24825 Filed 10–22–13; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CD14–2–000] Federal Energy Regulatory Commission Notice Announcing Workshop; Zero Rate Reactive Power Rate Schedules Notice of Preliminary Determination of a Qualifying Conduit Hydropower Facility and Soliciting Comments and Motions To Intervene; Orchard City, Colorado Concurrent with this notice, the Commission is issuing an order in intent to construct a qualifying conduit hydropower facility, pursuant to section 30 of the Federal Power Act, as amended by section 4 of the Hydropower Regulatory Efficiency Act of 2013 (HREA). The 22 kW Orchard City Water Treatment Plant Hydroelectric Project would utilize Orchard City’s water intake pipeline that delivers water to its water treatment plant, and it would be located in Delta County, Colorado. Applicant Contact: Mike Morgan, Orchard City Public Work, 9661 2100 Austin Road, Austin, CO 81410, Phone No. (970) 314–1515. FERC Contact: Robert Bell, Phone No. (202) 502–6062, email: robert.bell@ ferc.gov. Qualifying Conduit Hydropower Facility Description: The proposed project would consist of: (1) A new ‘‘y’’ pipe intake off the existing 10-inch diameter water supply pipeline; (2) a new 12-foot-long, 10-inch diameter intake pipe; (3) a new powerhouse containing one new 22-kilowatt generating unit; (4) a new, 6-foot-long, 10-inch diameter exit pipeline discharging water into an existing 10inch water supply pipeline; and (5) appurtenant facilities. The proposed project would have an estimated annual generating capacity of 190 megawatthours. A qualifying conduit hydropower facility is one that is determined or deemed to meet all of the criteria shown in the table below. On October 7, 2013, Orchard City, Colorado (Orchard City) filed a notice of [Docket No. AD14–1–000] TABLE 1—CRITERIA FOR QUALIFYING CONDUIT HYDROPOWER FACILITY Description Satisfies (Y/N) FPA 30(a)(3)(A), as amended by HREA ... emcdonald on DSK67QTVN1PROD with NOTICES Statutory provision The conduit the facility uses is a tunnel, canal, pipeline, aqueduct, flume, ditch, or similar manmade water conveyance that is operated for the distribution of water for agricultural, municipal, or industrial consumption and not primarily for the generation of electricity. The facility is constructed, operated, or maintained for the generation of electric power and uses for such generation only the hydroelectric potential of a non-federally owned conduit. The facility has an installed capacity that does not exceed 5 megawatts ..................... On or before August 9, 2013, the facility is not licensed, or exempted from the licensing requirements of Part I of the FPA. Y FPA 30(a)(3)(C)(i), as amended by HREA FPA 30(a)(3)(C)(ii), as amended by HREA FPA 30(a)(3)(C)(iii), as amended by HREA. 1 Chehalis Power Generating, L.P., 145 FERC ¶ 61,052 (2013). VerDate Mar<15>2010 18:13 Oct 22, 2013 Jkt 232001 PO 00000 Frm 00019 Fmt 4703 Sfmt 4703 E:\FR\FM\23OCN1.SGM 23OCN1 Y Y Y

Agencies

[Federal Register Volume 78, Number 205 (Wednesday, October 23, 2013)]
[Notices]
[Pages 63175-63176]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-24825]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Combined Notice of Filings 1

    Take notice that the Commission received the following electric 
corporate filings:
    Docket Numbers: EC14-7-000.
    Applicants: Astoria Energy II LLC.
    Description: Application for Authorization to Dispose of 
Jurisdictional Facilities and Request for Expedited Treatment and 
Privileged Treatment of Exhibit I of Astoria Energy II LLC.
    Filed Date: 10/16/13.
    Accession Number: 20131016-5023.
    Comments Due: 5 p.m. ET 11/6/13.

    Docket Numbers: EC14-8-000.
    Applicants: Gilroy Energy Center, LLC, Creed Energy Center, LLC, 
Goose Haven Energy Center, LLC, Calpine Peaker Holdings, LLC, Peaker 
Holdings I, LLC,GEC Holdings, LLC.
    Description: Joint Application for Authorization under Section 203 
of the Federal Power Act of Gilroy Energy Center, LLC, et al.
    Filed Date: 10/16/13.
    Accession Number: 20131016-5025.
    Comments Due: 5 p.m. ET 11/6/13.

    Take notice that the Commission received the following electric 
rate filings:

    Docket Numbers: ER12-2399-004.
    Applicants: American Transmission Systems, Incorporation, PJM 
Interconnection, L.L.C.
    Description: American Transmission Systems, Incorporated submits 
FirstEnergy submits compliance filing per 9/27/2013 Order in ER12-2399-
001, 002 to be effective 9/27/2013.
    Filed Date: 10/15/13.
    Accession Number: 20131015-5376.
    Comments Due: 5 p.m. ET 11/5/13.

    Docket Numbers: ER13-102-002.
    Applicants: New York Independent System Operator, Inc.
    Description: New York Independent System Operator, Inc. submits 
NYISO Order No. 1000 Regional Planning Compliance Filing to be 
effective 1/1/2014.
    Filed Date: 10/15/13.
    Accession Number: 20131015-5427.
    Comments Due: 5 p.m. ET 11/14/13.

    Docket Numbers: ER13-107-004.
    Applicants: South Carolina Electric & Gas Company.
    Description: South Carolina Electric & Gas Company submits Order 
No. 1000 to be effective 1/1/2014.
    Filed Date: 10/15/13.
    Accession Number: 20131016-5000.
    Comments Due: 5 p.m. ET 11/14/13.

    Docket Numbers: ER13-1851-004.
    Applicants: New England Power Pool Participants Committee, ISO New 
England Inc.
    Description: New England Power Pool Participants Committee submits 
Winter Reliability Compliance Filing to be effective 9/6/2013.
    Filed Date: 10/15/13.
    Accession Number: 20131015-5377.
    Comments Due: 5 p.m. ET 11/5/13.

    Docket Numbers: ER13-2266-001.
    Applicants: ISO New England Inc.
    Description: Winter Reliability Bid Results Compliance Filing of 
ISO New England Inc.
    Filed Date: 10/15/13.
    Accession Number: 20131015-5367.
    Comments Due: 5 p.m. ET 11/5/13.

    Docket Numbers: ER14-96-000.
    Applicants: Healthy Planet Partners Energy Company, LLC.
    Description: Healthy Planet Partners Energy Company, LLC submits 
HPP MBRA Application to be effective 1/15/2014.
    Filed Date: 10/15/13.
    Accession Number: 20131015-5390.
    Comments Due: 5 p.m. ET 11/5/13.

    Docket Numbers: ER14-97-000.
    Applicants: Midcontinent Independent System Operator, Inc.
    Description: Midcontinent Independent System Operator, Inc. submits 
tariff filing per 35.13(a)(2)(iii: 10-15-13 Attach FF-4 to be effective 
12/19/2013.
    Filed Date: 10/15/13.
    Accession Number: 20131015-5413.
    Comments Due: 5 p.m. ET 11/5/13.

    Docket Numbers: ER14-98-000.
    Applicants: Entergy Services, Inc., Midcontinent Independent System 
Operator, Inc.
    Description: Entergy Services, Inc. submits 2013-10-15 Rate 
Schedule 38 to be effective 12/19/2013.
    Filed Date: 10/15/13.
    Accession Number: 20131015-5418.
    Comments Due: 5 p.m. ET 11/5/13.

    Docket Numbers: ER14-99-000.
    Applicants: Public Service Company of Colorado.
    Description: Public Service Company of Colorado submits 2013-10-15-
PSCo-TSGT-NOC of 329, 341, & 333 to be effective 12/14/2013.
    Filed Date: 10/15/13.
    Accession Number: 20131015-5426.
    Comments Due: 5 p.m. ET 11/5/13.

    Docket Numbers: ER14-100-000.
    Applicants: Midcontinent Independent System Operator, Inc., Entergy 
Services, Inc.
    Description: Midcontinent Independent System Operator, Inc. submits 
tariff filing per 35.13(a)(2)(iii: 2013-10-15 Rate Schedule 40 EMI-
SMEPA to be effective 12/19/2013.
    Filed Date: 10/15/13.
    Accession Number: 20131016-5001.
    Comments Due: 5 p.m. ET 11/5/13.

    Docket Numbers: ER14-101-000.
    Applicants: Southern California Edison Company.
    Description: Southern California Edison Company submits Amended 
LGIA with NextEra Desert Center Blythe, LLC to be effective 11/1/2013.
    Filed Date: 10/16/13.
    Accession Number: 20131016-5004.
    Comments Due: 5 p.m. ET 11/6/13.

    Docket Numbers: ER14-102-000.

[[Page 63176]]

    Applicants: Midcontinent Independent System Operator, Inc., 
Dairyland Power Cooperative.
    Description: Midcontinent Independent System Operator, Inc. submits 
2013-10-16 Dairyland Attachment O and GG filing to be effective 1/1/
2014.
    Filed Date: 10/16/13.
    Accession Number: 20131016-5031.
    Comments Due: 5 p.m. ET 11/6/13.
    The filings are accessible in the Commission's eLibrary system by 
clicking on the links or querying the docket number.
    Any person desiring to intervene or protest in any of the above 
proceedings must file in accordance with Rules 211 and 214 of the 
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00 
p.m. Eastern time on the specified comment date. Protests may be 
considered, but intervention is necessary to become a party to the 
proceeding.
    eFiling is encouraged. More detailed information relating to filing 
requirements, interventions, protests, service, and qualifying 
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676 
(toll free). For TTY, call (202) 502-8659.

    Dated: October 16, 2013..
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2013-24825 Filed 10-22-13; 8:45 am]
BILLING CODE 6717-01-P