up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
The first page of any filing should
include docket number P–485–065.
The Commission’s Rules of Practice
require all intervenors filing documents
with the Commission to serve a copy of
that document on each person on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
k. This application has been accepted
for filing and is now ready for
environmental analysis.
l. Project Description: The project
consists of a 2,052-foot-long dam, two
powerhouses, and a 5,850-acre reservoir
(Bartletts Ferry Reservoir or Lake
Harding) at a normal water surface
elevation of 520.16 feet mean sea level
(msl; or 521.0 Plant Datum).
The west side of the project, from
west to east, consists of: (1) A 1,230foot-long, 11.25-foot-high, 22-bay
auxiliary labyrinth spillway; (2) a 286foot-long, 35-foot-high, earth-fill
embankment dam; (3) a 92-foot-long by
94-foot-high concrete gravity intake
structure, equipped with four vertical
lift steel intake gates, connected to the
west powerhouse by four 15-foot
diameter penstocks; (4) a powerhouse
containing three vertical Francis
turbines rated at 15 megawatts (MW)
each and a fourth vertical Francis
turbine rated at 20 MW, with a total
installed capacity of 65 MW; and (5) a
634-foot-long concrete gravity spillway
with nineteen 21-foot-high by 25-footwide radial gates, two 9-foot-high by 11foot-wide vertical lift trash gates, and
four abandoned siphons in two spillway
bays.
The east side of the project, from west
to east, consists of: (1) A 915-foot-long,
125-foot-high, earth-fill embankment
dam; (2) a 650-foot-long intake canal
leading to a 177-foot-long concrete
gravity intake structure; (3) two
penstocks; and (4) a powerhouse with
two vertical Francis turbines rated at 54
MW each, with a total installed capacity
of 108 MW.
VerDate Mar<15>2010
08:53 Oct 18, 2013
Jkt 232001
The project is operated in a peaking
mode, and is coordinated with the
peaking operations at the U.S. Army
Corps of Engineers’ upstream West
Point Dam. The project is normally
operated between elevations 518.16 and
520.16 feet msl (or 519.0 and 521.0
Plant Datum), with normal daily average
fluctuations of about 3⁄4; foot. The
project has an average annual generation
of approximately 395,577 megawatthours.
m. A copy of the application is
available for review at the Commission
in the Public Reference Room, or may be
viewed on the Commission’s Web site at
https://www.ferc.gov, using the
‘‘eLibrary’’ link. Enter the docket
number, excluding the last three digits
in the docket number field to access the
document. For assistance, contact FERC
Online Support. A copy is also available
for inspection and reproduction at the
address in item h above.
Register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
n. Anyone may submit comments, a
protest, or a motion to intervene in
accordance with the requirements of
Rules of Practice and Procedure, 18 CFR
385.210, .211, and .214. In determining
the appropriate action to take, the
Commission will consider all protests or
other comments filed, but only those
who file a motion to intervene in
accordance with the Commission’s
Rules may become a party to the
proceeding. Any comments, protests, or
motions to intervene must be received
on or before the specified comment date
for the particular application.
All filings must: (1) Bear in all capital
letters the title ‘‘PROTEST,’’ ‘‘MOTION
TO INTERVENE,’’ ‘‘COMMENTS,’’
‘‘REPLY COMMENTS,’’
‘‘RECOMMENDATIONS,’’
‘‘PRELIMINARY TERMS AND
CONDITIONS,’’ or ‘‘PRELIMINARY
FISHWAY PRESCRIPTIONS;’’ (2) set
forth in the heading the name of the
applicant and the project number of the
application to which the filing
responds; (3) furnish the name, address,
and telephone number of the person
protesting or intervening; and (4)
otherwise comply with the requirements
of 18 CFR 385.2001 through 385.2005.
All comments, recommendations, terms
and conditions or prescriptions must set
forth their evidentiary basis and
otherwise comply with the requirements
of 18 CFR 4.34(b). Agencies may obtain
copies of the application directly from
the applicant. A copy of any protest or
PO 00000
Frm 00002
Fmt 4703
Sfmt 4703
motion to intervene must be served
upon each representative of the
applicant specified in the particular
application. A copy of all other filings
in reference to this application must be
accompanied by proof of service on all
persons listed in the service list
prepared by the Commission in this
proceeding, in accordance with 18 CFR
4.34(b) and 385.2010.
o. Procedural Schedule:
The application will be processed
according to the following revised
Hydro Licensing Schedule. Revisions to
the schedule may be made as
appropriate.
Milestone
Filing of recommendations,
preliminary terms and
conditions, and preliminary fishway prescriptions.
Commission issues EA .......
Comments on EA ................
Modified terms and conditions.
Target date
December
2013.
April 2014.
May 2014.
July 2014.
p. Final amendments to the
application must be filed with the
Commission no later than 30 days from
the issuance date of this notice.
q. A license applicant must file no
later than 60 days following the date of
issuance of the notice of acceptance and
ready for environmental analysis
provided for in § 5.22: (1) A copy of the
water quality certification; (2) a copy of
the request for certification, including
proof of the date on which the certifying
agency received the request; or (3)
evidence of waiver of water quality
certification.
Dated: October 11, 2013.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2013–24517 Filed 10–18–13; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER11–3697–000,
ER11–3697–005.
Applicants: Southern California
Edison Company.
Description: Correction to August 26,
2013 Offer of Settlement of Southern
California Edison Company.
Filed Date: 10/9/13.
Accession Number: 20131009–5160.
Comments Due: 5 p.m. ET 10/15/13.
E:\FR\FM\21OCN1.SGM
21OCN1
Federal Register / Vol. 78, No. 203 / Monday, October 21, 2013 / Notices
Docket Numbers: ER14–67–000.
Applicants: Southwest Power Pool,
Inc.
Description: 1148R16 American
Electric Power NITSA and NOAs to be
effective 10/1/2013.
Filed Date: 10/9/13.
Accession Number: 20131009–5140.
Comments Due: 5 p.m. ET 10/30/13.
Docket Numbers: ER14–68–000.
Applicants: California Independent
System Operator Corporation.
Description: Petition for Approval of
Disposition of Proceeds of Penalty
Assessments of the California
Independent System Operator
Corporation.
Filed Date: 10/9/13.
Accession Number: 20131009–5161.
Comments Due: 5 p.m. ET 10/30/13.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: October 10, 2013.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2013–24519 Filed 10–18–13; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Accession Number: 20131004–5051.
Comments Due: 5 p.m. ET 10/25/13.
Docket Numbers: RP14–30–000.
Applicants: Texas Gas Transmission,
LLC.
Description: Amendment to Neg Rate
Agmt (Cross Timbers 29061–4) to be
effective 10/8/2013.
Filed Date: 10/8/13.
Accession Number: 20131008–5060.
Comments Due: 5 p.m. ET 10/21/13.
Docket Numbers: RP14–31–000.
Applicants: Northwest Pipeline LLC.
Description: South Seattle Lateral
Compliance Filing to be effective 11/1/
2013.
Filed Date: 10/8/13.
Accession Number: 20131008–5097.
Comments Due: 5 p.m. ET 10/21/13.
Docket Numbers: RP14–32–000.
Applicants: Dominion Transmission,
Inc.
Description: DTI—October 9, 2013
Negotiated Rate Agreement to be
effective 10/10/2013.
Filed Date: 10/9/13.
Accession Number: 20131009–5106.
Comments Due: 5 p.m. ET 10/21/13.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: October 10, 2013.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
Federal Energy Regulatory
Commission
[FR Doc. 2013–24512 Filed 10–18–13; 8:45 am]
BILLING CODE 6717–01–P
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
DEPARTMENT OF ENERGY
Filings Instituting Proceedings
pmangrum on DSK3VPTVN1PROD with NOTICES
Combined Notice of Filings
Federal Energy Regulatory
Commission
Docket Numbers: PR14–2–000.
Applicants: Washington 10 Storage
Corporation.
Description: Tariff filing per 284.123/
.224: Revised SOC Applicable to
Transportation Services to be effective
8/16/2013.
Filed Date: 10/4/13.
VerDate Mar<15>2010
08:53 Oct 18, 2013
Jkt 232001
[Project No. 13160–004]
Red River Hydro LLC; Notice of
Availability of Final Environmental
Assessment
In accordance with the National
Environmental Policy Act of 1969 and
PO 00000
Frm 00003
Fmt 4703
Sfmt 4703
62359
the Federal Energy Regulatory
Commission’s (Commission or FERC)
regulations, 18 Code of Federal
Regulations (CFR) Part 380 (Order No.
486, 52 FR 47897), the Office of Energy
Projects has reviewed Red River Hydro
LLC’s application for an original license
for the Overton Lock and Dam
Hydroelectric Project (FERC Project No.
13160–004) and prepared a final
environmental assessment (EA). The
project would be located on the Red
River in Rapides Parish, Louisiana, at an
existing lock and dam operated by the
U.S. Army Corps of Engineers. The
project, if licensed, would occupy a
total of 38.7 acres of federal land.
In the EA, Commission staff analyzes
the potential environmental effects of
licensing the project and concludes that
licensing the project, with appropriate
environmental protective measures,
would not constitute a major federal
action that would significantly affect the
quality of the human environment.
A copy of the EA is available for
review at the Commission in the Public
Reference Room or may be viewed on
the Commission’s Web site at
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC Online
Support at FERCOnlineSupport@
ferc.gov or toll-free at 1–866–208–3676,
or for TTY, 202–502–8659.
You may also register online at
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
Any comments should be filed within
30 days from the date of this notice.
Comments may be filed electronically
via the Internet. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site at
https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support.
Although the Commission strongly
encourages electronic filing, documents
may also be paper-filed. To paper-file,
mail an original and five copies to:
Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
Please affix, ‘‘Overton Lock and Dam
E:\FR\FM\21OCN1.SGM
21OCN1
Agencies
[Federal Register Volume 78, Number 203 (Monday, October 21, 2013)]
[Notices]
[Pages 62358-62359]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-24519]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings 1
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER11-3697-000, ER11-3697-005.
Applicants: Southern California Edison Company.
Description: Correction to August 26, 2013 Offer of Settlement of
Southern California Edison Company.
Filed Date: 10/9/13.
Accession Number: 20131009-5160.
Comments Due: 5 p.m. ET 10/15/13.
[[Page 62359]]
Docket Numbers: ER14-67-000.
Applicants: Southwest Power Pool, Inc.
Description: 1148R16 American Electric Power NITSA and NOAs to be
effective 10/1/2013.
Filed Date: 10/9/13.
Accession Number: 20131009-5140.
Comments Due: 5 p.m. ET 10/30/13.
Docket Numbers: ER14-68-000.
Applicants: California Independent System Operator Corporation.
Description: Petition for Approval of Disposition of Proceeds of
Penalty Assessments of the California Independent System Operator
Corporation.
Filed Date: 10/9/13.
Accession Number: 20131009-5161.
Comments Due: 5 p.m. ET 10/30/13.
The filings are accessible in the Commission's eLibrary system by
clicking on the links or querying the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: October 10, 2013.
Nathaniel J. Davis, Sr.,
Deputy Secretary.