Erie Boulevard Hydropower L.P.; Notice of Application Tendered for Filing With the Commission and Establishing Procedural Schedule for Licensing and Deadline for Submission of Final Amendments, 62348 [2013-24504]
Download as PDF
62348
Federal Register / Vol. 78, No. 202 / Friday, October 18, 2013 / Notices
Dated: October 9, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013–24505 Filed 10–17–13; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 7518–015]
Erie Boulevard Hydropower L.P.;
Notice of Application Tendered for
Filing With the Commission and
Establishing Procedural Schedule for
Licensing and Deadline for
Submission of Final Amendments
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: Subsequent
License.
b. Project No.: 7518–015.
c. Date Filed: September 30, 2013.
d. Applicant: Erie Boulevard
Hydropower L.P.
e. Name of Project: Hogansburg
Hydroelectric Project.
f. Location: On the St. Regis River in
Franklin County, New York. The project
does not occupy any federal lands.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791(a)–825(r).
h. Applicant Contact: Steven Murphy,
Brookfield Renewable Power, 33 West
1st Street South, Fulton, New York (315)
598–6130 or email at steven.murphy@
brookfieldpower.com.
i. FERC Contact: John Mudre at (202)
502–8902 or email at john.mudre@
ferc.gov.
j. This application is not ready for
environmental analysis at this time.
k. Project Description: The existing
Hogansburg Project consists of: (1) A
reservoir having a surface area of about
18.6 acres and a maximum storage
capacity of approximately 112 acre-feet;
(2) a 247-foot-long, 11.5-foot-high
concrete gravity dam with a spillway
crest elevation of 165.2 feet above mean
sea level; (3) a 34-foot-long, 22-foot-high
stoplog gate structure; (4) a 45-foot by
48-foot integrated intake/powerhouse
structure at the dam’s right abutment;
(5) a single S. Morgan Smith vertical
propeller generating unit having a rated
capacity of 485 kilowatts; (6) a 600-footlong tailrace having varying widths
between 24 feet and 100 feet; and (7)
2.4-kilovolt (kV) generator leads
extending about 25 feet to an adjacent
electrical substation containing a 2.4/
4.8-kV, 600-kilovolt-amperes, step-up
transformer bank. A transmission line
owned and operated by National Grid
Corporation connects directly to the
substation. Power generated at the
project interconnects with the electrical
grid at the substation.
At the time the Commission issued
the original license for the Hogansburg
Project (1985), the Commission’s
regulations did not require minor
projects occupying non-federal lands to
have an established project boundary.
Therefore, the boundary for the project
is being established through this
relicensing process.
l. Locations of the Application: A
copy of the application is available for
review at the Commission in the Public
Reference Room or may be viewed on
the Commission’s Web site at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC Online
Support at FERCOnlineSupport@
ferc.gov or toll-free at 1–866–208–3676,
or for TTY, (202) 502–8659. A copy is
also available for inspection and
reproduction at the address in item (h)
above.
m. You may also register online at
https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
n. Procedural Schedule:
The application will be processed
according to the following preliminary
Hydro Licensing Schedule. Revisions to
the schedule may be made as
appropriate.
Milestone
Target date
Notice of Acceptance/Notice of Ready for Environmental Analysis .....................................................................................
Filing of recommendations, preliminary terms and conditions, and fishway prescriptions ...................................................
Commission issues Draft EA .................................................................................................................................................
Comments on Draft EA .........................................................................................................................................................
Modified Terms and Conditions ............................................................................................................................................
Commission Issues Final EA ................................................................................................................................................
o. Final amendments to the
application must be filed with the
Commission no later than 30 days from
the issuance date of the notice of ready
for environmental analysis.
DEPARTMENT OF ENERGY
Dated: October 9, 2013.
Kimberly D. Bose,
Secretary.
[Project No. 7320–042]
[FR Doc. 2013–24504 Filed 10–17–13; 8:45 am]
ehiers on DSK2VPTVN1PROD with NOTICES
BILLING CODE 6717–01–P
Federal Energy Regulatory
Commission
Erie Boulevard Hydropower, L.P.;
Notice of Application Accepted for
Filing and Soliciting Motions To
Intervene and Protests
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: New Major
License.
b. Project No.: 7320–042.
c. Date filed: July 1, 2013.
VerDate Mar<15>2010
10:03 Oct 17, 2013
Jkt 232001
PO 00000
Frm 00006
Fmt 4703
Sfmt 4703
December 2013.
February 2014.
August 2014.
September 2014.
November 2014.
February 2015.
d. Applicant: Erie Boulevard
Hydropower, L.P.
e. Name of Project: Chasm
Hydroelectric Project.
f. Location: On the Salmon River, in
Franklin County, New York. No federal
lands are occupied by the project works
or located within the project boundary.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791(a)–825(r).
h. Applicant Contact: Steven Murphy,
Compliance Specialist, Brookfield
Renewable Power—New York West
Operations, 33 West 1st Street South,
Fulton, NY 13069; (315) 589–6130;
email—steven.murphy@
brookfieldpower.com.
i. FERC Contact: John Mudre at (202)
502–8902; or email at john.mudre@
ferc.gov.
E:\FR\FM\18OCN1.SGM
18OCN1
Agencies
[Federal Register Volume 78, Number 202 (Friday, October 18, 2013)]
[Notices]
[Page 62348]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-24504]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 7518-015]
Erie Boulevard Hydropower L.P.; Notice of Application Tendered
for Filing With the Commission and Establishing Procedural Schedule for
Licensing and Deadline for Submission of Final Amendments
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: Subsequent License.
b. Project No.: 7518-015.
c. Date Filed: September 30, 2013.
d. Applicant: Erie Boulevard Hydropower L.P.
e. Name of Project: Hogansburg Hydroelectric Project.
f. Location: On the St. Regis River in Franklin County, New York.
The project does not occupy any federal lands.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r).
h. Applicant Contact: Steven Murphy, Brookfield Renewable Power, 33
West 1st Street South, Fulton, New York (315) 598-6130 or email at
steven.murphy@brookfieldpower.com.
i. FERC Contact: John Mudre at (202) 502-8902 or email at
john.mudre@ferc.gov.
j. This application is not ready for environmental analysis at this
time.
k. Project Description: The existing Hogansburg Project consists
of: (1) A reservoir having a surface area of about 18.6 acres and a
maximum storage capacity of approximately 112 acre-feet; (2) a 247-
foot-long, 11.5-foot-high concrete gravity dam with a spillway crest
elevation of 165.2 feet above mean sea level; (3) a 34-foot-long, 22-
foot-high stoplog gate structure; (4) a 45-foot by 48-foot integrated
intake/powerhouse structure at the dam's right abutment; (5) a single
S. Morgan Smith vertical propeller generating unit having a rated
capacity of 485 kilowatts; (6) a 600-foot-long tailrace having varying
widths between 24 feet and 100 feet; and (7) 2.4-kilovolt (kV)
generator leads extending about 25 feet to an adjacent electrical
substation containing a 2.4/4.8-kV, 600-kilovolt-amperes, step-up
transformer bank. A transmission line owned and operated by National
Grid Corporation connects directly to the substation. Power generated
at the project interconnects with the electrical grid at the
substation.
At the time the Commission issued the original license for the
Hogansburg Project (1985), the Commission's regulations did not require
minor projects occupying non-federal lands to have an established
project boundary. Therefore, the boundary for the project is being
established through this relicensing process.
l. Locations of the Application: A copy of the application is
available for review at the Commission in the Public Reference Room or
may be viewed on the Commission's Web site at https://www.ferc.gov using
the ``eLibrary'' link. Enter the docket number excluding the last three
digits in the docket number field to access the document. For
assistance, contact FERC Online Support at FERCOnlineSupport@ferc.gov
or toll-free at 1-866-208-3676, or for TTY, (202) 502-8659. A copy is
also available for inspection and reproduction at the address in item
(h) above.
m. You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
n. Procedural Schedule:
The application will be processed according to the following
preliminary Hydro Licensing Schedule. Revisions to the schedule may be
made as appropriate.
------------------------------------------------------------------------
Milestone Target date
------------------------------------------------------------------------
Notice of Acceptance/Notice of Ready December 2013.
for Environmental Analysis.
Filing of recommendations, February 2014.
preliminary terms and conditions,
and fishway prescriptions.
Commission issues Draft EA.......... August 2014.
Comments on Draft EA................ September 2014.
Modified Terms and Conditions....... November 2014.
Commission Issues Final EA.......... February 2015.
------------------------------------------------------------------------
o. Final amendments to the application must be filed with the
Commission no later than 30 days from the issuance date of the notice
of ready for environmental analysis.
Dated: October 9, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013-24504 Filed 10-17-13; 8:45 am]