Download as PDF Federal Register / Vol. 78, No. 202 / Friday, October 18, 2013 / Notices to seek court review of the Commission’s final order. The Commission strongly encourages electronic filings of comments, protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https:// www.ferc.gov. Persons unable to file electronically should submit an original and 5 copies of the protest or intervention to the Federal Energy regulatory Commission, 888 First Street NE., Washington, DC 20426. Comment Date: 5:00 p.m. Eastern Time on October 31, 2013. Dated: October 10, 2013. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2013–24487 Filed 10–17–13; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2305–000] ehiers on DSK2VPTVN1PROD with NOTICES Sabine River Authority of Texas; Sabine River Authority, State of Louisiana; Notice of Authorization for Continued Project Operation On September 30 2011, the Sabine River Authority of Texas and Sabine River Authority, State of Louisiana (Sabine River Authorities), licensee(s) for the Toledo Bend Hydroelectric Project, filed an Application for a New License pursuant to the Federal Power Act (FPA) and the Commission’s regulations thereunder. The Toledo Bend Hydroelectric Project affects lands and waters in Panola, Shelby, Sabine, and Newton Counties, Texas, and Desoto, Sabine, and Vernon Parishes, Louisiana. The license for Project No. 2305 was issued for a period ending September 30, 2013. Section 15(a)(1) of the FPA, 16 U.S.C. 808(a)(1), requires the Commission, at the expiration of a license term, to issue from year-to-year an annual license to the then licensee under the terms and conditions of the prior license until a new license is issued, or the project is otherwise disposed of as provided in section 15 or any other applicable section of the FPA. If the project’s prior license waived the applicability of section 15 of the FPA, then, based on section 9(b) of the Administrative Procedure Act, 5 U.S.C. 558(c), and as set forth at 18 CFR 16.21(a), if the licensee of such project has filed an application for a subsequent license, the licensee may continue to operate the project in accordance with the terms and conditions of the license VerDate Mar<15>2010 10:03 Oct 17, 2013 Jkt 232001 after the minor or minor part license expires, until the Commission acts on its application. If the licensee of such a project has not filed an application for a subsequent license, then it may be required, pursuant to 18 CFR 16.21(b), to continue project operations until the Commission issues someone else a license for the project or otherwise orders disposition of the project. If the project is subject to section 15 of the FPA, notice is hereby given that an annual license for Project No. 2305 is issued to the licensee for a period effective October 1, 2013 through September 30, 2014 or until the issuance of a new license for the project or other disposition under the FPA, whichever comes first. If issuance of a new license (or other disposition) does not take place on or before September 30, 2014, notice is hereby given that, pursuant to 18 CFR 16.18(c), an annual license under section 15(a)(1) of the FPA is renewed automatically without further order or notice by the Commission, unless the Commission orders otherwise. If the project is not subject to section 15 of the FPA, notice is hereby given that the licensee(s), Sabine River Authorities, are authorized to continue operation of the Toledo Bend Hydroelectric Project, until such time as the Commission acts on its application for a subsequent license. Dated: October 9, 2013. Kimberly D. Bose, Secretary. [FR Doc. 2013–24507 Filed 10–17–13; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings #2 Take notice that the Commission received the following exempt wholesale generator filings: Docket Numbers: EG14–3–000. Applicants: Miami Wind I LLC. Description: Notice of SelfCertification of Exempt Wholesale Generator Status of Miami Wind I LLC. Filed Date: 10/9/13. Accession Number: 20131009–5053. Comments Due: 5 p.m. ET 10/30/13. Take notice that the Commission received the following electric rate filings: Docket Numbers: ER10–2835–002. Applicants: Google Energy LLC. Description: Supplement to August 9, 2013 Notice of Change in Status of Google Energy LLC. PO 00000 Frm 00003 Fmt 4703 Sfmt 4703 62345 Filed Date: 10/2/13. Accession Number: 20131002–5016. Comments Due: 5 p.m. ET 10/23/13. Docket Numbers: ER13–1914–001. Applicants: Southwest Power Pool, Inc. Description: Southwest Power Pool, Inc. submits Amendment of Creditable Upgrades Filing ER13–1914 to be effective 9/8/2013. Filed Date: 10/9/13. Accession Number: 20131009–5129. Comments Due: 5 p.m. ET 10/30/13. Docket Numbers: ER14–62–000. Applicants: Southern California Edison Company. Description: GIA and Distribution Service Agreement with SunEdison Utility Solutions, LLC to be effective 10/10/2013. Filed Date: 10/9/13. Accession Number: 20131009–5004. Comments Due: 5 p.m. ET 10/30/13. Docket Numbers: ER14–63–000. Applicants: Bangor Hydro Electric Company, ISO New England Inc. Description: Oakfield Wind Farm Amended and Restated LGIA to be effective 10/11/2013. Filed Date: 10/9/13. Accession Number: 20131009–5044. Comments Due: 5 p.m. ET 10/30/13. Docket Numbers: ER14–64–000. Applicants: ITC Midwest LLC. Description: Filing of Executed Agreement in Compliance with Docket No. ER12–2144 to be effective 12/9/ 2013. Filed Date: 10/9/13. Accession Number: 20131009–5069. Comments Due: 5 p.m. ET 10/30/13. Docket Numbers: ER14–65–000. Applicants: Midcontinent Independent System Operator, Inc. Description: 10–09–2013 AmerenPrairie Power Rate Sch 37 JPZ Agr to be effective 6/1/2013. Filed Date: 10/9/13. Accession Number: 20131009–5096. Comments Due: 5 p.m. ET 10/30/13. Docket Numbers: ER14–66–000. Applicants: Midcontinent Independent System Operator, Inc. Description: 10–09–2013 Rate Sch 36 Southern Co Emer Energy Service Sch Agr to be effective 12/19/2013. Filed Date: 10/9/13. Accession Number: 20131009–5099. Comments Due: 5 p.m. ET 10/30/13. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s E:\FR\FM\18OCN1.SGM 18OCN1 62346 Federal Register / Vol. 78, No. 202 / Friday, October 18, 2013 / Notices Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: October 9, 2013. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2013–24485 Filed 10–17–13; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission ehiers on DSK2VPTVN1PROD with NOTICES Combined Notice of Filings #1 Take notice that the Commission received the following electric rate filings: Docket Numbers: ER10–2881–010; ER10–2882–010; ER10–2883–010; ER10–2884–010; ER10–2885–010; ER10–2641–010; ER10–2663–010; ER10–2886–010; ER13–1101–005; ER13–1541–004. Applicants: Alabama Power Company, Southern Power Company, Mississippi Power Company, Georgia Power Company, Gulf Power Company, Oleander Power Project, Limited Partnership, Southern Company— Florida LLC, Southern Turner Cimarron I, LLC, Spectrum Nevada Solar, LLC, Camp Verde Solar, LLC. Description: Notice of Change in Status of Alabama Power Company, et al. Filed Date: 10/7/13. Accession Number: 20131007–5167. Comments Due: 5 p.m. ET 10/28/13. Docket Numbers: ER11–4643–000. Applicants: Portland General Electric Company. Description: Portland General Electric Company Average System Cost Filing to be effective N/A. Filed Date: 8/14/13. Accession Number: 20130814–5139. Comments Due: 5 p.m. ET 10/10/13. Docket Numbers: ER13–1914–000. Applicants: Southwest Power Pool, Inc. Description: Response to Request for Additional Information of Southwest Power Pool, Inc. Filed Date: 10/7/13. VerDate Mar<15>2010 10:03 Oct 17, 2013 Jkt 232001 Accession Number: 20131007–5174. Comments Due: 5 p.m. ET 10/28/13. Docket Numbers: ER13–1925–000. Applicants: Public Service Company of Colorado. Description: 2013–10–07_PSCoTSGT-Refund Report-333 to be effective N/A. Filed Date: 10/7/13. Accession Number: 20131007–5135. Comments Due: 5 p.m. ET 10/28/13. Docket Numbers: ER14–47–000. Applicants: AEP Texas North Company. Description: TNC-Taylor EC-Golden Spread EC IA Amend #1 to be effective 9/10/2013. Filed Date: 10/7/13. Accession Number: 20131007–5119. Comments Due: 5 p.m. ET 10/28/13. Docket Numbers: ER14–48–000. Applicants: AEP Texas North Company. Description: TNC–SWTEC Amd #3 to Restated & Amended IA to be effective 9/10/2013. Filed Date: 10/7/13. Accession Number: 20131007–5128. Comments Due: 5 p.m. ET 10/28/13. Docket Numbers: ER14–49–000. Applicants: PJM Interconnection, L.L.C. Description: Notice of Cancellation Notice of PJM Interconnection, L.L.C. Interconnection Service Agreement No. 1598. Filed Date: 10/7/13. Accession Number: 20131007–5170. Comments Due: 5 p.m. ET 10/28/13. Docket Numbers: ER14–50–000. Applicants: Public Service Company of Colorado. Description: 2013–10–8_PSC-FacConFacAgmt–350–0.0.0 to be effective 12/7/2013. Filed Date: 10/8/13. Accession Number: 20131008–5015. Comments Due: 5 p.m. ET 10/29/13. Docket Numbers: ER14–51–000. Applicants: Southwest Power Pool, Inc. Description: 2564 City of Chanute and Westar Energy Meter Agent Agreement to be effective 10/1/2013. Filed Date: 10/8/13. Accession Number: 20131008–5034. Comments Due: 5 p.m. ET 10/29/13. Docket Numbers: ER14–52–000. Applicants: Georgia Power Company. Description: 2013 PBOP Filing to be effective 1/1/2013. Filed Date: 10/8/13. Accession Number: 20131008–5046. Comments Due: 5 p.m. ET 10/29/13. Docket Numbers: ER14–53–000. Applicants: Mississippi Power Company. PO 00000 Frm 00004 Fmt 4703 Sfmt 4703 Description: PBOP 2013 Filing to be effective 1/1/2013. Filed Date: 10/8/13. Accession Number: 20131008–5048. Comments Due: 5 p.m. ET 10/29/13. Docket Numbers: ER14–54–000. Applicants: Southern Electric Generating Company. Description: SEGCO 2013 PBOP Filing to be effective 1/1/2013. Filed Date: 10/8/13. Accession Number: 20131008–5049. Comments Due: 5 p.m. ET 10/29/13. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: October 8, 2013. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2013–24478 Filed 10–17–13; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings #1 Take notice that the Commission received the following electric rate filings: Docket Numbers: ER13–1352–000. Applicants: Massachusetts Electric Company. Description: Refund Report Regarding Interconnection Agreement with Ameresco Northampton to be effective N/A. Filed Date: 10/8/13. Accession Number: 20131008–5125. Comments Due: 5 p.m. ET 10/29/13. Docket Numbers: ER13–2169–000. Applicants: Goal Line L.P. Description: Supplement to Application for Market-Based Rate Authorization of Goal Line L.P. Filed Date: 10/1/13. E:\FR\FM\18OCN1.SGM 18OCN1

Agencies

[Federal Register Volume 78, Number 202 (Friday, October 18, 2013)]
[Notices]
[Pages 62345-62346]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-24485]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Combined Notice of Filings 2

    Take notice that the Commission received the following exempt 
wholesale generator filings:
    Docket Numbers: EG14-3-000.
    Applicants: Miami Wind I LLC.
    Description: Notice of Self-Certification of Exempt Wholesale 
Generator Status of Miami Wind I LLC.
    Filed Date: 10/9/13.
    Accession Number: 20131009-5053.
    Comments Due: 5 p.m. ET 10/30/13.

    Take notice that the Commission received the following electric 
rate filings:

    Docket Numbers: ER10-2835-002.
    Applicants: Google Energy LLC.
    Description: Supplement to August 9, 2013 Notice of Change in 
Status of Google Energy LLC.
    Filed Date: 10/2/13.
    Accession Number: 20131002-5016.
    Comments Due: 5 p.m. ET 10/23/13.

    Docket Numbers: ER13-1914-001.
    Applicants: Southwest Power Pool, Inc.
    Description: Southwest Power Pool, Inc. submits Amendment of 
Creditable Upgrades Filing ER13-1914 to be effective 9/8/2013.
    Filed Date: 10/9/13.
    Accession Number: 20131009-5129.
    Comments Due: 5 p.m. ET 10/30/13.

    Docket Numbers: ER14-62-000.
    Applicants: Southern California Edison Company.
    Description: GIA and Distribution Service Agreement with SunEdison 
Utility Solutions, LLC to be effective 10/10/2013.
    Filed Date: 10/9/13.
    Accession Number: 20131009-5004.
    Comments Due: 5 p.m. ET 10/30/13.

    Docket Numbers: ER14-63-000.
    Applicants: Bangor Hydro Electric Company, ISO New England Inc.
    Description: Oakfield Wind Farm Amended and Restated LGIA to be 
effective 10/11/2013.
    Filed Date: 10/9/13.
    Accession Number: 20131009-5044.
    Comments Due: 5 p.m. ET 10/30/13.

    Docket Numbers: ER14-64-000.
    Applicants: ITC Midwest LLC.
    Description: Filing of Executed Agreement in Compliance with Docket 
No. ER12-2144 to be effective 12/9/2013.
    Filed Date: 10/9/13.
    Accession Number: 20131009-5069.
    Comments Due: 5 p.m. ET 10/30/13.

    Docket Numbers: ER14-65-000.
    Applicants: Midcontinent Independent System Operator, Inc.
    Description: 10-09-2013 Ameren-Prairie Power Rate Sch 37 JPZ Agr to 
be effective 6/1/2013.
    Filed Date: 10/9/13.
    Accession Number: 20131009-5096.
    Comments Due: 5 p.m. ET 10/30/13.

    Docket Numbers: ER14-66-000.
    Applicants: Midcontinent Independent System Operator, Inc.
    Description: 10-09-2013 Rate Sch 36 Southern Co Emer Energy Service 
Sch Agr to be effective 12/19/2013.
    Filed Date: 10/9/13.
    Accession Number: 20131009-5099.
    Comments Due: 5 p.m. ET 10/30/13.

    The filings are accessible in the Commission's eLibrary system by 
clicking on the links or querying the docket number.
    Any person desiring to intervene or protest in any of the above 
proceedings must file in accordance with Rules 211 and 214 of the 
Commission's

[[Page 62346]]

Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern 
time on the specified comment date. Protests may be considered, but 
intervention is necessary to become a party to the proceeding.
    eFiling is encouraged. More detailed information relating to filing 
requirements, interventions, protests, service, and qualifying 
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676 
(toll free). For TTY, call (202) 502-8659.

    Dated: October 9, 2013.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2013-24485 Filed 10-17-13; 8:45 am]