North Side Canal Company; Notice of Preliminary Determination of a Qualifying Conduit Hydropower Facility and Soliciting Comments and Motions To Intervene, 62351-62352 [2013-24483]
Download as PDF
Federal Register / Vol. 78, No. 202 / Friday, October 18, 2013 / Notices
The drawing is open to the public and
will be held in room 2C, the
Commission Meeting Room, located at
888 First Street NE., Washington, DC
20426. The Secretary will issue a
subsequent notice announcing the
results of the drawing.
Dated: October 10, 2013.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2013–24481 Filed 10–17–13; 8:45 am]
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CD14–1–000]
North Side Canal Company; Notice of
Preliminary Determination of a
Qualifying Conduit Hydropower
Facility and Soliciting Comments and
Motions To Intervene
On October 3, 2013, North Side Canal
Company, filed a notice of intent to
construct a qualifying conduit
hydropower facility, pursuant to section
30 of the Federal Power Act, as
amended by section 4 of the
Hydropower Regulatory Efficiency Act
of 2013 (HREA). The U Canal Hydro #2
Project would be located along North
Side Canal Company’s irrigation system
on the U Canal in Jerome County, Idaho.
Applicant Contact: Alan W. Hansten,
Manager, North Side Canal Company,
BILLING CODE 6717–01–P
62351
Ltd., 921 North Lincoln, Jerome, ID
83338, Phone No. (208) 324–2319.
FERC Contact: Christopher Chaney,
Phone No. (202) 502–6778, email:
christopher.chaney@ferc.gov.
Qualifying Conduit Hydropower
Facility Description: The proposed
project would consist of: (1) A proposed
1,500-foot-long, 15-foot- diameter
penstock receiving water from a 1,600foot-long realigned section of the U
Canal; (2) a proposed 48-foot-wide by
105-foot-long powerhouse, containing
one 4,800-kilowatt generating unit; (3) a
proposed tailrace returning flows to the
U Canal; and (4) appurtenant facilities.
The proposed project would have an
estimated annual generating capacity of
16,215 megawatt-hours.
A qualifying conduit hydropower
facility is one that is determined or
deemed to meet all of the criteria shown
in the table below.
TABLE 1—CRITERIA FOR QUALIFYING CONDUIT HYDROPOWER FACILITY
Statutory provision
Description
Satisfies
(Y/N)
FPA 30(a)(3)(A), as amended by HREA ..............
The conduit the facility uses is a tunnel, canal, pipeline, aqueduct, flume, ditch,
or similar manmade water conveyance that is operated for the distribution of
water for agricultural, municipal, or industrial consumption and not primarily for
the generation of electricity.
The facility is constructed, operated, or maintained for the generation of electric
power and uses for such generation only the hydroelectric potential of a nonfederally owned conduit.
The facility has an installed capacity that does not exceed 5 megawatts ..............
On or before August 9, 2013, the facility is not licensed, or exempted from the licensing requirements of Part I of the FPA.
Y
FPA 30(a)(3)(C)(i), as amended by HREA ..........
ehiers on DSK2VPTVN1PROD with NOTICES
FPA 30(a)(3)(C)(ii), as amended by HREA .........
FPA 30(a)(3)(C)(iii), as amended by HREA .........
Preliminary Determination: Based
upon the above criteria, Commission
staff preliminarily determines that the
proposal satisfies the requirements for a
qualifying conduit hydropower facility
not required to be licensed or exempted
from licensing.
Comments and Motions To Intervene:
Deadline for filing comments contesting
whether the facility meets the qualifying
criteria is 45 days from the issuance
date of this notice.
Deadline for filing motions to
intervene is 30 days from the issuance
date of this notice.
Anyone may submit comments or a
motion to intervene in accordance with
the requirements of Rules of Practice
and Procedure, 18 CFR 385.210 and
385.214. Any motions to intervene must
be received on or before the specified
deadline date for the particular
proceeding.
Filing and Service of Responsive
Documents: All filings must (1) bear in
all capital letters the ‘‘COMMENTS
CONTESTING QUALIFICATION FOR A
VerDate Mar<15>2010
10:03 Oct 17, 2013
Jkt 232001
CONDUIT HYDROPOWER FACILITY’’
or ‘‘MOTION TO INTERVENE,’’ as
applicable; (2) state in the heading the
name of the applicant and the project
number of the application to which the
filing responds; (3) state the name,
address, and telephone number of the
person filing; and (4) otherwise comply
with the requirements of sections
385.2001 through 385.2005 of the
Commission’s regulations.1 All
comments contesting Commission staff’s
preliminary determination that the
facility meets the qualifying criteria
must set forth their evidentiary basis.
The Commission strongly encourages
electronic filing. Please file motions to
intervene and comments using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
1 18
PO 00000
CFR 385.2001–2005 (2013).
Frm 00009
Fmt 4703
Sfmt 4703
Y
Y
Y
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
A copy of all other filings in reference
to this application must be accompanied
by proof of service on all persons listed
in the service list prepared by the
Commission in this proceeding, in
accordance with 18 CFR 4.34(b) and
385.2010.
Locations of Notice of Intent: Copies
of the notice of intent can be obtained
directly from the applicant or such
copies can be viewed and reproduced at
the Commission in its Public Reference
Room, Room 2A, 888 First Street NE.,
Washington, DC 20426. The filing may
also be viewed on the web at https://
www.ferc.gov/docs-filing/elibrary.asp
using the ‘‘eLibrary’’ link. Enter the
docket number (e.g., CD14–1) in the
E:\FR\FM\18OCN1.SGM
18OCN1
62352
Federal Register / Vol. 78, No. 202 / Friday, October 18, 2013 / Notices
docket number field to access the
document. For assistance, call toll-free
1–866–208–3676 or email
FERCOnlineSupport@ferc.gov. For TTY,
call (202) 502–8659.
Dated: October 10, 2013.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2013–24483 Filed 10–17–13; 8:45 am]
BILLING CODE 6717–01–P
FEDERAL RESERVE SYSTEM
Proposed Agency Information
Collection Activities; Comment
Request
Board of Governors of the
Federal Reserve System.
SUMMARY: On June 15, 1984, the Office
of Management and Budget (OMB)
delegated to the Board of Governors of
the Federal Reserve System (Board) its
approval authority under the Paperwork
Reduction Act (PRA), pursuant to 5 CFR
1320.16, to approve of and assign OMB
control numbers to collection of
information requests and requirements
conducted or sponsored by the Board
under conditions set forth in 5 CFR Part
1320, Appendix A.1. Board-approved
collections of information are
incorporated into the official OMB
inventory of currently approved
collections of information. Copies of the
Paperwork Reduction Act Submission,
supporting statements and approved
collection of information instruments
are placed into OMB’s public docket
files. The Federal Reserve may not
conduct or sponsor, and the respondent
is not required to respond to, an
information collection that has been
extended, revised, or implemented on or
after October 1, 1995, unless it displays
a currently valid OMB control number.
DATES: Comments must be submitted on
or before December 17, 2013.
ADDRESSES: You may submit comments,
identified by FR 3064a and FR 3064b,
by any of the following methods:
• Agency Web site: https://
www.federalreserve.gov. Follow the
instructions for submitting comments at
https://www.federalreserve.gov/apps/
foia/proposedregs.aspx.
• Federal eRulemaking Portal: https://
www.regulations.gov. Follow the
instructions for submitting comments.
• Email: regs.comments@
federalreserve.gov. Include OMB
number in the subject line of the
message.
• FAX: (202) 452–3819 or (202) 452–
3102.
• Mail: Robert deV. Frierson,
Secretary, Board of Governors of the
ehiers on DSK2VPTVN1PROD with NOTICES
AGENCY:
VerDate Mar<15>2010
10:03 Oct 17, 2013
Jkt 232001
Federal Reserve System, 20th Street and
Constitution Avenue NW., Washington,
DC 20551.
All public comments are available
from the Board’s Web site at https://
www.federalreserve.gov/apps/foia/
proposedregs.aspx as submitted, unless
modified for technical reasons.
Accordingly, your comments will not be
edited to remove any identifying or
contact information. Public comments
may also be viewed electronically or in
paper form in Room MP–500 of the
Board’s Martin Building (20th and C
Streets NW.) between 9:00 a.m. and 5:00
p.m. on weekdays.
Additionally, commenters may send a
copy of their comments to the OMB
Desk Officer—Shagufta Ahmed—Office
of Information and Regulatory Affairs,
Office of Management and Budget, New
Executive Office Building, Room 10235
725 17th Street NW., Washington, DC
20503 or by fax to (202) 395–6974.
FOR FURTHER INFORMATION CONTACT: A
copy of the PRA OMB submission,
including the proposed reporting form
and instructions, supporting statement,
and other documentation will be placed
into OMB’s public docket files, once
approved. These documents will also be
made available on the Federal Reserve
Board’s public Web site at: https://
www.federalreserve.gov/apps/
reportforms/review.aspx or may be
requested from the agency clearance
officer, whose name appears below.
Federal Reserve Board Clearance
Officer—Cynthia Ayouch—Office of the
Chief Data Officer, Board of Governors
of the Federal Reserve System,
Washington, DC 20551 (202) 452–3829.
Telecommunications Device for the Deaf
(TDD) users may contact (202) 263–
4869, Board of Governors of the Federal
Reserve System, Washington, DC 20551.
SUPPLEMENTARY INFORMATION:
Request for Comment on Information
Collection Proposal
The following information collection,
which is being handled under this
delegated authority, has received initial
Board approval and is hereby published
for comment. At the end of the comment
period, the proposed information
collection, along with an analysis of
comments and recommendations
received, will be submitted to the Board
for final approval under OMB delegated
authority. Comments are invited on the
following:
a. Whether the proposed collection of
information is necessary for the proper
performance of the Federal Reserve’s
functions; including whether the
information has practical utility;
b. The accuracy of the Federal
Reserve’s estimate of the burden of the
PO 00000
Frm 00010
Fmt 4703
Sfmt 4703
proposed information collection,
including the validity of the
methodology and assumptions used;
c. Ways to enhance the quality,
utility, and clarity of the information to
be collected;
d. Ways to minimize the burden of
information collection on respondents,
including through the use of automated
collection techniques or other forms of
information technology; and
e. Estimates of capital or start up costs
and costs of operation, maintenance,
and purchase of services to provide
information.
Proposal to approve under OMB
delegated authority the extension, with
revision, of the following report:
Report title: Interchange Transaction
Fees Surveys.1
Agency form numbers: FR 3064a and
FR 3064b.
OMB control number: 7100–0344.
Frequency: FR 3064a—Biennial; FR
3064b—Annual.
Reporters: Issuers of debit cards (FR
3064a) and payment card networks (FR
3064b).
Estimated annual reporting hours: FR
3064a: 111,600 hours; FR 3064b: 1,350
hours. Estimated average hours per
response FR 3064a: 200 hours; FR
3064b: 75 hours.
Number of respondents: FR 3064a:
558; FR 3064b: 18.
General description of report: This
information collection is authorized by
subsection 920(a) of the Electronic Fund
Transfer Act, which was amended by
section 1075(a) of the Dodd-Frank Act.
15 U.S.C. 1693o–2. This subsection
requires the Board to disclose (on a
biennial basis) aggregate or summary
information concerning the costs
incurred, and interchange transaction
fees charged or received, by issuers or
payment card networks in connection
with the authorization, clearance or
settlement of electronic debit
transaction as the Board considers
appropriate and in the public interest.
15 U.S.C. 1693o–2(a)(3)(B). It also
provides the Board with authority to
require issuers and payment card
networks to provide information to
enable the Board to carry out the
provisions of the subsection. Response
to these surveys is mandatory.
In accordance with the statutory
requirement, the Board currently
releases aggregate or summary
information from the survey responses,
and, average interchange fees at the
network level. In addition, the Board
1 The proposed debit card issuer and payment
card network surveys, supporting statement, and
other documentation are available on the Board’s
public Web site at: https://www.federalreserve.gov/
apps/reportforms/review.aspx.
E:\FR\FM\18OCN1.SGM
18OCN1
Agencies
[Federal Register Volume 78, Number 202 (Friday, October 18, 2013)]
[Notices]
[Pages 62351-62352]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-24483]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CD14-1-000]
North Side Canal Company; Notice of Preliminary Determination of
a Qualifying Conduit Hydropower Facility and Soliciting Comments and
Motions To Intervene
On October 3, 2013, North Side Canal Company, filed a notice of
intent to construct a qualifying conduit hydropower facility, pursuant
to section 30 of the Federal Power Act, as amended by section 4 of the
Hydropower Regulatory Efficiency Act of 2013 (HREA). The U Canal Hydro
2 Project would be located along North Side Canal Company's
irrigation system on the U Canal in Jerome County, Idaho.
Applicant Contact: Alan W. Hansten, Manager, North Side Canal
Company, Ltd., 921 North Lincoln, Jerome, ID 83338, Phone No. (208)
324-2319.
FERC Contact: Christopher Chaney, Phone No. (202) 502-6778, email:
christopher.chaney@ferc.gov.
Qualifying Conduit Hydropower Facility Description: The proposed
project would consist of: (1) A proposed 1,500-foot-long, 15-foot-
diameter penstock receiving water from a 1,600-foot-long realigned
section of the U Canal; (2) a proposed 48-foot-wide by 105-foot-long
powerhouse, containing one 4,800-kilowatt generating unit; (3) a
proposed tailrace returning flows to the U Canal; and (4) appurtenant
facilities. The proposed project would have an estimated annual
generating capacity of 16,215 megawatt-hours.
A qualifying conduit hydropower facility is one that is determined
or deemed to meet all of the criteria shown in the table below.
Table 1--Criteria for Qualifying Conduit Hydropower Facility
------------------------------------------------------------------------
Satisfies
Statutory provision Description (Y/N)
------------------------------------------------------------------------
FPA 30(a)(3)(A), as amended by The conduit the facility Y
HREA. uses is a tunnel, canal,
pipeline, aqueduct,
flume, ditch, or similar
manmade water conveyance
that is operated for the
distribution of water
for agricultural,
municipal, or industrial
consumption and not
primarily for the
generation of
electricity.
FPA 30(a)(3)(C)(i), as amended by The facility is Y
HREA. constructed, operated,
or maintained for the
generation of electric
power and uses for such
generation only the
hydroelectric potential
of a non-federally owned
conduit.
FPA 30(a)(3)(C)(ii), as amended The facility has an Y
by HREA. installed capacity that
does not exceed 5
megawatts.
FPA 30(a)(3)(C)(iii), as amended On or before August 9, Y
by HREA. 2013, the facility is
not licensed, or
exempted from the
licensing requirements
of Part I of the FPA.
------------------------------------------------------------------------
Preliminary Determination: Based upon the above criteria,
Commission staff preliminarily determines that the proposal satisfies
the requirements for a qualifying conduit hydropower facility not
required to be licensed or exempted from licensing.
Comments and Motions To Intervene: Deadline for filing comments
contesting whether the facility meets the qualifying criteria is 45
days from the issuance date of this notice.
Deadline for filing motions to intervene is 30 days from the
issuance date of this notice.
Anyone may submit comments or a motion to intervene in accordance
with the requirements of Rules of Practice and Procedure, 18 CFR
385.210 and 385.214. Any motions to intervene must be received on or
before the specified deadline date for the particular proceeding.
Filing and Service of Responsive Documents: All filings must (1)
bear in all capital letters the ``COMMENTS CONTESTING QUALIFICATION FOR
A CONDUIT HYDROPOWER FACILITY'' or ``MOTION TO INTERVENE,'' as
applicable; (2) state in the heading the name of the applicant and the
project number of the application to which the filing responds; (3)
state the name, address, and telephone number of the person filing; and
(4) otherwise comply with the requirements of sections 385.2001 through
385.2005 of the Commission's regulations.\1\ All comments contesting
Commission staff's preliminary determination that the facility meets
the qualifying criteria must set forth their evidentiary basis.
---------------------------------------------------------------------------
\1\ 18 CFR 385.2001-2005 (2013).
---------------------------------------------------------------------------
The Commission strongly encourages electronic filing. Please file
motions to intervene and comments using the Commission's eFiling system
at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit
brief comments up to 6,000 characters, without prior registration,
using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information at the
end of your comments. For assistance, please contact FERC Online
Support at FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or
(202) 502-8659 (TTY). In lieu of electronic filing, please send a paper
copy to: Secretary, Federal Energy Regulatory Commission, 888 First
Street NE., Washington, DC 20426. A copy of all other filings in
reference to this application must be accompanied by proof of service
on all persons listed in the service list prepared by the Commission in
this proceeding, in accordance with 18 CFR 4.34(b) and 385.2010.
Locations of Notice of Intent: Copies of the notice of intent can
be obtained directly from the applicant or such copies can be viewed
and reproduced at the Commission in its Public Reference Room, Room 2A,
888 First Street NE., Washington, DC 20426. The filing may also be
viewed on the web at https://www.ferc.gov/docs-filing/elibrary.asp using
the ``eLibrary'' link. Enter the docket number (e.g., CD14-1) in the
[[Page 62352]]
docket number field to access the document. For assistance, call toll-
free 1-866-208-3676 or email FERCOnlineSupport@ferc.gov. For TTY, call
(202) 502-8659.
Dated: October 10, 2013.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2013-24483 Filed 10-17-13; 8:45 am]
BILLING CODE 6717-01-P