Village of Oak Lawn, Illinois; Notice of Preliminary Determination of a Qualifying Conduit Hydropower Facility and Soliciting Comments and Motions To Intervene, 62324-62325 [2013-24464]

Download as PDF 62324 Federal Register / Vol. 78, No. 200 / Wednesday, October 16, 2013 / Notices to intervene or protest must serve a copy of that document on the Petitioner. The Commission encourages electronic submission of protests and interventions in lieu of paper, using the FERC Online links at https:// www.ferc.gov. To facilitate electronic service, persons with Internet access who will eFile a document and/or be listed as a contact for an intervenor must create and validate an eRegistration account using the eRegistration link. Select the eFiling link to log on and submit the intervention or protests. Persons unable to file electronically should submit an original and 5 copies of the intervention or protest to the Federal Energy Regulatory Commission, 888 First St. NE., Washington, DC 20426. The filings in the above proceedings are accessible in the Commission’s eLibrary system by clicking on the appropriate link in the above list. They are also available for review in the Commission’s Public Reference Room in Washington, DC. There is an eSubscription link on the Web site that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5:00 p.m. Eastern time on November 5, 2013. Dated: October 8, 2013. Kimberly D. Bose, Secretary. [FR Doc. 2013–24467 Filed 10–15–13; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14557–000] pmangrum on DSK3VPTVN1PROD with NOTICES Mid-Atlantic Hydro, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On September 25, 2013, Mid-Atlantic Hydro, LLC, filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act (FPA), proposing to study the feasibility of the Button Rock Hydroelectric Project (or project) to be located near the town of Lyons, Boulder County, Colorado. The sole purpose of a preliminary permit, if issued, is to grant the permit holder VerDate Mar<15>2010 10:05 Oct 15, 2013 Jkt 232001 priority to file a license application during the permit term. A preliminary permit does not authorize the permit holder to perform any land-disturbing activities or otherwise enter upon lands or waters owned by others without the owners’ express permission. The proposed project would consist of the following: (1) A reservoir having a surface area of 248 acres and a storage capacity of 16,084 acre-feet; (2) a 925foot-long, 210-foot-high concrete-face earthen dam, with a crest width of 30 feet and a maximum base width of 1,030 feet; (3) an existing 54-inch outlet valve situated near the right abutment and passing through the dam near the valley floor; (4) a steel penstock connecting the outlet valve to the existing conduit and extending downstream for 100 feet; (5) a reinforced concrete powerhouse; (6) one 1.5-MW Francis turbine generating unit; and (7) a 2.3-kilovolt transmission line extending 1.75 miles from the proposed substation to an existing distribution line located at the Longmont Dam. The estimated annual generation of the Button Rock Hydroelectric Project would be 5,000 megawatt-hours. Applicant Contact: Ms. Kristina Johnson or Mr. John Collins, MidAtlantic Hydro, LLC, 5425 Wisconsin Avenue, Ste. 600, Chevy Chase, MD 20815; phone (301) 718–4432 or (301) 718–4431. FERC Contact: Jennifer Adams; phone: (202) 502–8087. Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Competing applications and notices of intent must meet the requirements of 18 CFR 4.36. The Commission strongly encourages electronic filing. Please file comments, motions to intervene, notices of intent, and competing applications using the Commission’s eFiling system at https:// www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, please send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. The first page of any filing should include docket number P–14557–000. PO 00000 Frm 00008 Fmt 4703 Sfmt 4703 More information about this project, including a copy of the application, can be viewed or printed on the ‘‘eLibrary’’ link of Commission’s Web site at https://www.ferc.gov/docs-filing/ elibrary.asp. Enter the docket number (P–14557) in the docket number field to access the document. For assistance, contact FERC Online Support. Dated: October 7, 2013. Kimberly D. Bose, Secretary. [FR Doc. 2013–24465 Filed 10–15–13; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CD13–8–000] Village of Oak Lawn, Illinois; Notice of Preliminary Determination of a Qualifying Conduit Hydropower Facility and Soliciting Comments and Motions To Intervene On September 30, 2013, Village of Oak Lawn, Illinois (Oak Lawn) filed a notice of intent to construct a qualifying conduit hydropower facility, pursuant to section 30 of the Federal Power Act, as amended by section 4 of the Hydropower Regulatory Efficiency Act of 2013 (HREA). The 250 kW Charles J. Reich Pumping Storage Complex Hydroelectric Turbine Installation Project would utilize Oak Lawn’s water distribution system, and it would be located in Cook County, Illinois. Applicant Contact: Kirk Hipps, CDM Smith, Inc, 125 South Wacker Drive, Suite 600, Chicago, IL 60453, Phone No. (708) 499–7743. FERC Contact: Robert Bell, Phone No. (202) 502–6062, email: robert.bell@ ferc.gov. Qualifying Conduit Hydropower Facility Description: The proposed project would consist of: (1) A new intake pipeline receiving water from an existing 26-inch conduit pipeline; (2) a new powerhouse containing one new 250-kilowatt generating unit; (3) a new, small pipeline discharging water into an existing 36-inch pipeline; and (4) appurtenant facilities. The proposed project would have an estimated annual generating capacity of 1,006 megawatthours. A qualifying conduit hydropower facility is one that is determined or deemed to meet all of the criteria shown in the table below. E:\FR\FM\16OCN1.SGM 16OCN1 Federal Register / Vol. 78, No. 200 / Wednesday, October 16, 2013 / Notices 62325 TABLE 1—CRITERIA FOR QUALIFYING CONDUIT HYDROPOWER FACILITY Statutory provision Description Satisfies (Y/N) FPA 30(a)(3)(A), as amended by HREA ..... The conduit the facility uses is a tunnel, canal, pipeline, aqueduct, flume, ditch, or similar manmade water conveyance that is operated for the distribution of water for agricultural, municipal, or industrial consumption and not primarily for the generation of electricity. The facility is constructed, operated, or maintained for the generation of electric power and uses for such generation only the hydroelectric potential of a non-federally owned conduit. The facility has an installed capacity that does not exceed 5 megawatts ....................... On or before August 9, 2013, the facility is not licensed, or exempted from the licensing requirements of Part I of the FPA. Y FPA 30(a)(3)(C)(i), as amended by HREA .. pmangrum on DSK3VPTVN1PROD with NOTICES FPA 30(a)(3)(C)(ii), as amended by HREA FPA 30(a)(3)(C)(iii), as amended by HREA Preliminary Determination: Based upon the above criteria, Commission staff preliminarily determines that the proposal satisfies the requirements for a qualifying conduit hydropower facility not required to be licensed or exempted from licensing. Comments and Motions to Intervene: Deadline for filing comments contesting whether the facility meets the qualifying criteria is 45 days from the issuance date of this notice. Deadline for filing motions to intervene is 30 days from the issuance date of this notice. Anyone may submit comments or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210 and 385.214. Any motions to intervene must be received on or before the specified deadline date for the particular proceeding. Filing and Service of Responsive Documents: All filings must (1) bear in all capital letters the ‘‘COMMENTS CONTESTING QUALIFICATION FOR A CONDUIT HYDROPOWER FACILITY’’ or ‘‘MOTION TO INTERVENE,’’ as applicable; (2) state in the heading the name of the applicant and the project number of the application to which the filing responds; (3) state the name, address, and telephone number of the person filing; and (4) otherwise comply with the requirements of sections 385.2001 through 385.2005 of the Commission’s regulations.1 All comments contesting Commission staff’s preliminary determination that the facility meets the qualifying criteria must set forth their evidentiary basis. The Commission strongly encourages electronic filing. Please file motions to intervene and comments using the Commission’s eFiling system at https:// www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ 1 18 ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, please send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. A copy of all other filings in reference to this application must be accompanied by proof of service on all persons listed in the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 4.34(b) and 385.2010. Locations of Notice of Intent: Copies of the notice of intent can be obtained directly from the applicant or such copies can be viewed and reproduced at the Commission in its Public Reference Room, Room 2A, 888 First Street NE., Washington, DC 20426. The filing may also be viewed on the web at https:// www.ferc.gov/docs-filing/elibrary.asp using the ‘‘eLibrary’’ link. Enter the docket number (e.g., CD13–8–000) in the docket number field to access the document. For assistance, call toll-free 1–866–208–3676 or email FERCOnline Support@ferc.gov. For TTY, call (202) 502–8659. Dated: October 7, 2013. Kimberly D. Bose, Secretary. [FR Doc. 2013–24464 Filed 10–15–13; 8:45 am] BILLING CODE 6717–01–P 10:05 Oct 15, 2013 Jkt 232001 PO 00000 Y Y DEPARTMENT OF HEALTH AND HUMAN SERVICES Centers for Medicare & Medicaid Services [Document Identifiers CMS–10466] Agency Information Collection Activities: Submission for OMB Review; Comment Request ACTION: Notice. The Centers for Medicare & Medicaid Services (CMS) is announcing an opportunity for the public to comment on CMS’ intention to collect information from the public. Under the Paperwork Reduction Act of 1995 (PRA), federal agencies are required to publish notice in the Federal Register concerning each proposed collection of information, including each proposed extension or reinstatement of an existing collection of information, and to allow a second opportunity for public comment on the notice. Interested persons are invited to send comments regarding the burden estimate or any other aspect of this collection of information, including any of the following subjects: (1) The necessity and utility of the proposed information collection for the proper performance of the agency’s functions; (2) the accuracy of the estimated burden; (3) ways to enhance the quality, utility, and clarity of the information to be collected; and (4) the use of automated collection techniques or other forms of information technology to minimize the information collection burden. DATES: Comments on the collection(s) of information must be received by the OMB desk officer by November 15, 2013. SUMMARY: When commenting on the proposed information collections, please reference the document identifier or OMB control number. To be assured consideration, comments and recommendations must be received by ADDRESSES: CFR 385.2001–2005 (2013). VerDate Mar<15>2010 Y Frm 00009 Fmt 4703 Sfmt 4703 E:\FR\FM\16OCN1.SGM 16OCN1

Agencies

[Federal Register Volume 78, Number 200 (Wednesday, October 16, 2013)]
[Notices]
[Pages 62324-62325]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-24464]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CD13-8-000]


Village of Oak Lawn, Illinois; Notice of Preliminary 
Determination of a Qualifying Conduit Hydropower Facility and 
Soliciting Comments and Motions To Intervene

    On September 30, 2013, Village of Oak Lawn, Illinois (Oak Lawn) 
filed a notice of intent to construct a qualifying conduit hydropower 
facility, pursuant to section 30 of the Federal Power Act, as amended 
by section 4 of the Hydropower Regulatory Efficiency Act of 2013 
(HREA). The 250 kW Charles J. Reich Pumping Storage Complex 
Hydroelectric Turbine Installation Project would utilize Oak Lawn's 
water distribution system, and it would be located in Cook County, 
Illinois.
    Applicant Contact: Kirk Hipps, CDM Smith, Inc, 125 South Wacker 
Drive, Suite 600, Chicago, IL 60453, Phone No. (708) 499-7743.
    FERC Contact: Robert Bell, Phone No. (202) 502-6062, email: 
robert.bell@ferc.gov.
    Qualifying Conduit Hydropower Facility Description: The proposed 
project would consist of: (1) A new intake pipeline receiving water 
from an existing 26-inch conduit pipeline; (2) a new powerhouse 
containing one new 250-kilowatt generating unit; (3) a new, small 
pipeline discharging water into an existing 36-inch pipeline; and (4) 
appurtenant facilities. The proposed project would have an estimated 
annual generating capacity of 1,006 megawatt-hours.
    A qualifying conduit hydropower facility is one that is determined 
or deemed to meet all of the criteria shown in the table below.

[[Page 62325]]



      Table 1--Criteria for Qualifying Conduit Hydropower Facility
------------------------------------------------------------------------
                                                               Satisfies
       Statutory provision                Description            (Y/N)
------------------------------------------------------------------------
FPA 30(a)(3)(A), as amended by    The conduit the facility            Y
 HREA.                             uses is a tunnel, canal,
                                   pipeline, aqueduct,
                                   flume, ditch, or similar
                                   manmade water conveyance
                                   that is operated for the
                                   distribution of water for
                                   agricultural, municipal,
                                   or industrial consumption
                                   and not primarily for the
                                   generation of electricity.
FPA 30(a)(3)(C)(i), as amended    The facility is                     Y
 by HREA.                          constructed, operated, or
                                   maintained for the
                                   generation of electric
                                   power and uses for such
                                   generation only the
                                   hydroelectric potential
                                   of a non-federally owned
                                   conduit.
FPA 30(a)(3)(C)(ii), as amended   The facility has an                 Y
 by HREA.                          installed capacity that
                                   does not exceed 5
                                   megawatts.
FPA 30(a)(3)(C)(iii), as amended  On or before August 9,              Y
 by HREA.                          2013, the facility is not
                                   licensed, or exempted
                                   from the licensing
                                   requirements of Part I of
                                   the FPA.
------------------------------------------------------------------------

    Preliminary Determination: Based upon the above criteria, 
Commission staff preliminarily determines that the proposal satisfies 
the requirements for a qualifying conduit hydropower facility not 
required to be licensed or exempted from licensing.
    Comments and Motions to Intervene: Deadline for filing comments 
contesting whether the facility meets the qualifying criteria is 45 
days from the issuance date of this notice.
    Deadline for filing motions to intervene is 30 days from the 
issuance date of this notice.
    Anyone may submit comments or a motion to intervene in accordance 
with the requirements of Rules of Practice and Procedure, 18 CFR 
385.210 and 385.214. Any motions to intervene must be received on or 
before the specified deadline date for the particular proceeding.
    Filing and Service of Responsive Documents: All filings must (1) 
bear in all capital letters the ``COMMENTS CONTESTING QUALIFICATION FOR 
A CONDUIT HYDROPOWER FACILITY'' or ``MOTION TO INTERVENE,'' as 
applicable; (2) state in the heading the name of the applicant and the 
project number of the application to which the filing responds; (3) 
state the name, address, and telephone number of the person filing; and 
(4) otherwise comply with the requirements of sections 385.2001 through 
385.2005 of the Commission's regulations.\1\ All comments contesting 
Commission staff's preliminary determination that the facility meets 
the qualifying criteria must set forth their evidentiary basis.
---------------------------------------------------------------------------

    \1\ 18 CFR 385.2001-2005 (2013).
---------------------------------------------------------------------------

    The Commission strongly encourages electronic filing. Please file 
motions to intervene and comments using the Commission's eFiling system 
at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit 
brief comments up to 6,000 characters, without prior registration, 
using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information at the 
end of your comments. For assistance, please contact FERC Online 
Support at FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or 
(202) 502-8659 (TTY). In lieu of electronic filing, please send a paper 
copy to: Secretary, Federal Energy Regulatory Commission, 888 First 
Street NE., Washington, DC 20426. A copy of all other filings in 
reference to this application must be accompanied by proof of service 
on all persons listed in the service list prepared by the Commission in 
this proceeding, in accordance with 18 CFR 4.34(b) and 385.2010.
    Locations of Notice of Intent: Copies of the notice of intent can 
be obtained directly from the applicant or such copies can be viewed 
and reproduced at the Commission in its Public Reference Room, Room 2A, 
888 First Street NE., Washington, DC 20426. The filing may also be 
viewed on the web at https://www.ferc.gov/docs-filing/elibrary.asp using 
the ``eLibrary'' link. Enter the docket number (e.g., CD13-8-000) in 
the docket number field to access the document. For assistance, call 
toll-free 1-866-208-3676 or email FERCOnlineSupport@ferc.gov. For TTY, 
call (202) 502-8659.

    Dated: October 7, 2013.
Kimberly D. Bose,
Secretary.