Corbett Water District; Notice of Preliminary Determination of a Qualifying Conduit Hydropower Facility and Soliciting Comments and Motions To Intervene, 61987-61988 [2013-24407]

Download as PDF Federal Register / Vol. 78, No. 196 / Wednesday, October 9, 2013 / Notices to this application must be accompanied by proof of service on all persons listed in the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 4.34(b) and 385.2010. Locations of Notice of Intent: Copies of the notice of intent can be obtained directly from the applicant or such copies can be viewed and reproduced at the Commission in its Public Reference Room, Room 2A, 888 First Street NE., Washington, DC 20426. The filing may also be viewed on the Web at https:// www.ferc.gov/docs-filing/elibrary.asp using the ‘‘eLibrary’’ link. Enter the docket number (e.g., CD13–7) in the docket number field to access the document. For assistance, call toll-free 1–866–208–3676 or email FERCOnlineSupport@ferc.gov. For TTY, call (202) 502–8659. Dated: October 2, 2013. Kimberly D. Bose, Secretary. [FR Doc. 2013–24409 Filed 10–8–13; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CD13–5–000] Corbett Water District; Notice of Preliminary Determination of a Qualifying Conduit Hydropower Facility and Soliciting Comments and Motions To Intervene On September 23, 2013, Corbett Water District filed a notice of intent to construct a qualifying conduit hydropower facility, pursuant to section 30 of the Federal Power Act, as amended by section 4 of the Hydropower Regulatory Efficiency Act of 2013 (HREA). The Corbett 61987 Hydroelectric Project would be located at the existing Corbett Water District water treatment facility in Corbett, Multnomah County, Oregon. Applicant Contact: James Jans, Corbett Water District, P.O. Box 6, Corbett, OR 97019, Phone No. (503) 695–2284. FERC Contact: Christopher Chaney, Phone No. (202) 502–6778, email: christopher.chaney@ferc.gov. Qualifying Conduit Hydropower Facility Description: The proposed project would consist of: (1) A new eight-inch diameter intake pipeline receiving water flows from an existing 8-inch diameter filter pond diversion pipeline; (2) a new fiberglass shelter containing one 10-kilowatt generating unit; and (3) appurtenant facilities. The proposed project would have an estimated annual generating capacity of 72 megawatt-hours. A qualifying conduit hydropower facility is one that is determined or deemed to meet all of the criteria shown in the table below. TABLE 1—CRITERIA FOR QUALIFYING CONDUIT HYDROPOWER FACILITY Statutory provision Description Satisfies (Y/N) FPA 30(a)(3)(A), as amended by HREA .... The conduit the facility uses is a tunnel, canal, pipeline, aqueduct, flume, ditch, or similar manmade water conveyance that is operated for the distribution of water for agricultural, municipal, or industrial consumption and not primarily for the generation of electricity. The facility is constructed, operated, or maintained for the generation of electric power, and uses for such generation only the hydroelectric potential of a non-federally owned conduit. The facility has an installed capacity that does not exceed 5 megawatts .................... On or before August 9, 2013, the facility is not licensed, or exempted from the licensing requirements of Part I of the FPA. Y FPA 30(a)(3)(C)(i), as amended by HREA ehiers on DSK2VPTVN1PROD with NOTICES FPA 30(a)(3)(C)(ii), as amended by HREA FPA 30(a)(3)(C)(iii), as amended by HREA Preliminary Determination: Based upon the above criteria, Commission staff preliminarily determines that the proposal satisfies the requirements for a qualifying conduit hydropower facility not required to be licensed or exempted from licensing. Comments and Motions To Intervene: Deadline for filing comments contesting whether the facility meets the qualifying criteria is 45 days from the issuance date of this notice. Deadline for filing motions to intervene is 30 days from the issuance date of this notice. Anyone may submit comments or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210 and 385.214. Any motions to intervene must be received on or before the specified deadline date for the particular proceeding. Filing and Service of Responsive Documents: All filings must (1) bear in VerDate Mar<15>2010 12:27 Oct 08, 2013 Jkt 232001 all capital letters the ‘‘COMMENTS CONTESTING QUALIFICATION FOR A CONDUIT HYDROPOWER FACILITY’’ or ‘‘MOTION TO INTERVENE,’’ as applicable; (2) state in the heading the name of the applicant and the project number of the application to which the filing responds; (3) state the name, address, and telephone number of the person filing; and (4) otherwise comply with the requirements of sections 385.2001 through 385.2005 of the Commission’s regulations.1 All comments contesting Commission staff’s preliminary determination that the facility meets the qualifying criteria must set forth their evidentiary basis. The Commission strongly encourages electronic filing. Please file motions to intervene and comments using the Commission’s eFiling system at https:// www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments 1 18 PO 00000 CFR 385.2001–385.2005 (2013). Frm 00005 Fmt 4703 Sfmt 4703 Y Y Y up to 6,000 characters, without prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, please send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. A copy of all other filings in reference to this application must be accompanied by proof of service on all persons listed in the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 4.34(b) and 385.2010. Locations of Notice of Intent: Copies of the notice of intent can be obtained directly from the applicant or such copies can be viewed and reproduced at E:\FR\FM\09OCN1.SGM 09OCN1 61988 Federal Register / Vol. 78, No. 196 / Wednesday, October 9, 2013 / Notices the Commission in its Public Reference Room, Room 2A, 888 First Street NE., Washington, DC 20426. The filing may also be viewed on the Web at https:// www.ferc.gov/docs-filing/elibrary.asp using the ‘‘eLibrary’’ link. Enter the docket number (e.g., CD13–5) in the docket number field to access the document. For assistance, call toll-free 1–866–208–3676 or email FERCOnlineSupport@ferc.gov. For TTY, call (202) 502–8659. Dated: October 2, 2013. Kimberly D. Bose, Secretary. [FR Doc. 2013–24407 Filed 10–8–13; 8:45 am] BILLING CODE 6717–01–P FEDERAL RESERVE SYSTEM Change in Bank Control Notices; Acquisitions of Shares of a Bank or Bank Holding Company ehiers on DSK2VPTVN1PROD with NOTICES The notificants listed below have applied under the Change in Bank Control Act (12 U.S.C. 1817(j)) and VerDate Mar<15>2010 12:27 Oct 08, 2013 Jkt 232001 § 225.41 of the Board’s Regulation Y (12 CFR 225.41) to acquire shares of a bank or bank holding company. The factors that are considered in acting on the notices are set forth in paragraph 7 of the Act (12 U.S.C. 1817(j)(7)). The notices are available for immediate inspection at the Federal Reserve Bank indicated. The notices also will be available for inspection at the offices of the Board of Governors. Interested persons may express their views in writing to the Reserve Bank indicated for that notice or to the offices of the Board of Governors. Comments must be received not later than October 24, 2013. A. Federal Reserve Bank of Dallas (E. Ann Worthy, Vice President) 2200 North Pearl Street, Dallas, Texas 75201– 2272: 1. William E. Dorroh, Shreveport, Louisiana, individually and as trustee for the Stephanie D. O’Dowd Family Trust; Catherine B. Dorroh, Houston, Texas; Walter E. Dorroh, Jr., Mary Elizabeth Dorroh, both of Jena, Louisiana; Tjaden O’Dowd Cox, Mobile, Alabama; John Michael O’Dowd, Jr., PO 00000 Frm 00006 Fmt 4703 Sfmt 9990 Tuscaloosa, Alabama; and John Michael O’Dowd, Sr., Mobile, Alabama, individually and as trustee for the George W. O’Dowd Trust and the Stephanie D. O’Dowd Family Trust, to acquire voting shares of Mansfield Bancshares, Inc., and thereby indirectly acquire voting shares of Community Bank of Louisiana, both in Mansfield, Louisiana. B. Federal Reserve Bank of San Francisco (Gerald C. Tsai, Director, Applications and Enforcement) 101 Market Street, San Francisco, California 94105–1579: 1. Alex Meruelo, Newport, California; to acquire voting shares of NCAL Bancorp, and thereby indirectly acquire voting shares of National Bank of California, both in Los Angeles, California. Board of Governors of the Federal Reserve System, October 4, 2013. Robert deV. Frierson, Secretary of the Board. [FR Doc. 2013–24405 Filed 10–8–13; 8:45 am] BILLING CODE 6210–01–P E:\FR\FM\09OCN1.SGM 09OCN1

Agencies

[Federal Register Volume 78, Number 196 (Wednesday, October 9, 2013)]
[Notices]
[Pages 61987-61988]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-24407]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CD13-5-000]


Corbett Water District; Notice of Preliminary Determination of a 
Qualifying Conduit Hydropower Facility and Soliciting Comments and 
Motions To Intervene

    On September 23, 2013, Corbett Water District filed a notice of 
intent to construct a qualifying conduit hydropower facility, pursuant 
to section 30 of the Federal Power Act, as amended by section 4 of the 
Hydropower Regulatory Efficiency Act of 2013 (HREA). The Corbett 
Hydroelectric Project would be located at the existing Corbett Water 
District water treatment facility in Corbett, Multnomah County, Oregon.
    Applicant Contact: James Jans, Corbett Water District, P.O. Box 6, 
Corbett, OR 97019, Phone No. (503) 695-2284.
    FERC Contact: Christopher Chaney, Phone No. (202) 502-6778, email: 
christopher.chaney@ferc.gov.
    Qualifying Conduit Hydropower Facility Description: The proposed 
project would consist of: (1) A new eight-inch diameter intake pipeline 
receiving water flows from an existing 8-inch diameter filter pond 
diversion pipeline; (2) a new fiberglass shelter containing one 10-
kilowatt generating unit; and (3) appurtenant facilities. The proposed 
project would have an estimated annual generating capacity of 72 
megawatt-hours.
    A qualifying conduit hydropower facility is one that is determined 
or deemed to meet all of the criteria shown in the table below.

                          Table 1--Criteria for Qualifying Conduit Hydropower Facility
----------------------------------------------------------------------------------------------------------------
                                                                                                    Satisfies (Y/
            Statutory provision                                   Description                            N)
----------------------------------------------------------------------------------------------------------------
FPA 30(a)(3)(A), as amended by HREA.......  The conduit the facility uses is a tunnel, canal,                 Y
                                             pipeline, aqueduct, flume, ditch, or similar manmade
                                             water conveyance that is operated for the
                                             distribution of water for agricultural, municipal, or
                                             industrial consumption and not primarily for the
                                             generation of electricity.
FPA 30(a)(3)(C)(i), as amended by HREA....  The facility is constructed, operated, or maintained              Y
                                             for the generation of electric power, and uses for
                                             such generation only the hydroelectric potential of a
                                             non-federally owned conduit.
FPA 30(a)(3)(C)(ii), as amended by HREA...  The facility has an installed capacity that does not              Y
                                             exceed 5 megawatts.
FPA 30(a)(3)(C)(iii), as amended by HREA..  On or before August 9, 2013, the facility is not                  Y
                                             licensed, or exempted from the licensing requirements
                                             of Part I of the FPA.
----------------------------------------------------------------------------------------------------------------

    Preliminary Determination: Based upon the above criteria, 
Commission staff preliminarily determines that the proposal satisfies 
the requirements for a qualifying conduit hydropower facility not 
required to be licensed or exempted from licensing.
    Comments and Motions To Intervene: Deadline for filing comments 
contesting whether the facility meets the qualifying criteria is 45 
days from the issuance date of this notice.
    Deadline for filing motions to intervene is 30 days from the 
issuance date of this notice.
    Anyone may submit comments or a motion to intervene in accordance 
with the requirements of Rules of Practice and Procedure, 18 CFR 
385.210 and 385.214. Any motions to intervene must be received on or 
before the specified deadline date for the particular proceeding.
    Filing and Service of Responsive Documents: All filings must (1) 
bear in all capital letters the ``COMMENTS CONTESTING QUALIFICATION FOR 
A CONDUIT HYDROPOWER FACILITY'' or ``MOTION TO INTERVENE,'' as 
applicable; (2) state in the heading the name of the applicant and the 
project number of the application to which the filing responds; (3) 
state the name, address, and telephone number of the person filing; and 
(4) otherwise comply with the requirements of sections 385.2001 through 
385.2005 of the Commission's regulations.\1\ All comments contesting 
Commission staff's preliminary determination that the facility meets 
the qualifying criteria must set forth their evidentiary basis.
---------------------------------------------------------------------------

    \1\ 18 CFR 385.2001-385.2005 (2013).
---------------------------------------------------------------------------

    The Commission strongly encourages electronic filing. Please file 
motions to intervene and comments using the Commission's eFiling system 
at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit 
brief comments up to 6,000 characters, without prior registration, 
using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information at the 
end of your comments. For assistance, please contact FERC Online 
Support at FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or 
(202) 502-8659 (TTY). In lieu of electronic filing, please send a paper 
copy to: Secretary, Federal Energy Regulatory Commission, 888 First 
Street NE., Washington, DC 20426. A copy of all other filings in 
reference to this application must be accompanied by proof of service 
on all persons listed in the service list prepared by the Commission in 
this proceeding, in accordance with 18 CFR 4.34(b) and 385.2010.
    Locations of Notice of Intent: Copies of the notice of intent can 
be obtained directly from the applicant or such copies can be viewed 
and reproduced at

[[Page 61988]]

the Commission in its Public Reference Room, Room 2A, 888 First Street 
NE., Washington, DC 20426. The filing may also be viewed on the Web at 
https://www.ferc.gov/docs-filing/elibrary.asp using the ``eLibrary'' 
link. Enter the docket number (e.g., CD13-5) in the docket number field 
to access the document. For assistance, call toll-free 1-866-208-3676 
or email FERCOnlineSupport@ferc.gov. For TTY, call (202) 502-8659.

    Dated: October 2, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013-24407 Filed 10-8-13; 8:45 am]
BILLING CODE 6717-01-P