Corbett Water District; Notice of Preliminary Determination of a Qualifying Conduit Hydropower Facility and Soliciting Comments and Motions To Intervene, 61987-61988 [2013-24407]
Download as PDF
Federal Register / Vol. 78, No. 196 / Wednesday, October 9, 2013 / Notices
to this application must be accompanied
by proof of service on all persons listed
in the service list prepared by the
Commission in this proceeding, in
accordance with 18 CFR 4.34(b) and
385.2010.
Locations of Notice of Intent: Copies
of the notice of intent can be obtained
directly from the applicant or such
copies can be viewed and reproduced at
the Commission in its Public Reference
Room, Room 2A, 888 First Street NE.,
Washington, DC 20426. The filing may
also be viewed on the Web at https://
www.ferc.gov/docs-filing/elibrary.asp
using the ‘‘eLibrary’’ link. Enter the
docket number (e.g., CD13–7) in the
docket number field to access the
document. For assistance, call toll-free
1–866–208–3676 or email
FERCOnlineSupport@ferc.gov. For TTY,
call (202) 502–8659.
Dated: October 2, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013–24409 Filed 10–8–13; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CD13–5–000]
Corbett Water District; Notice of
Preliminary Determination of a
Qualifying Conduit Hydropower
Facility and Soliciting Comments and
Motions To Intervene
On September 23, 2013, Corbett Water
District filed a notice of intent to
construct a qualifying conduit
hydropower facility, pursuant to section
30 of the Federal Power Act, as
amended by section 4 of the
Hydropower Regulatory Efficiency Act
of 2013 (HREA). The Corbett
61987
Hydroelectric Project would be located
at the existing Corbett Water District
water treatment facility in Corbett,
Multnomah County, Oregon.
Applicant Contact: James Jans,
Corbett Water District, P.O. Box 6,
Corbett, OR 97019, Phone No. (503)
695–2284.
FERC Contact: Christopher Chaney,
Phone No. (202) 502–6778, email:
christopher.chaney@ferc.gov.
Qualifying Conduit Hydropower
Facility Description: The proposed
project would consist of: (1) A new
eight-inch diameter intake pipeline
receiving water flows from an existing
8-inch diameter filter pond diversion
pipeline; (2) a new fiberglass shelter
containing one 10-kilowatt generating
unit; and (3) appurtenant facilities. The
proposed project would have an
estimated annual generating capacity of
72 megawatt-hours.
A qualifying conduit hydropower
facility is one that is determined or
deemed to meet all of the criteria shown
in the table below.
TABLE 1—CRITERIA FOR QUALIFYING CONDUIT HYDROPOWER FACILITY
Statutory provision
Description
Satisfies
(Y/N)
FPA 30(a)(3)(A), as amended by HREA ....
The conduit the facility uses is a tunnel, canal, pipeline, aqueduct, flume, ditch, or
similar manmade water conveyance that is operated for the distribution of water
for agricultural, municipal, or industrial consumption and not primarily for the generation of electricity.
The facility is constructed, operated, or maintained for the generation of electric
power, and uses for such generation only the hydroelectric potential of a non-federally owned conduit.
The facility has an installed capacity that does not exceed 5 megawatts ....................
On or before August 9, 2013, the facility is not licensed, or exempted from the licensing requirements of Part I of the FPA.
Y
FPA 30(a)(3)(C)(i), as amended by HREA
ehiers on DSK2VPTVN1PROD with NOTICES
FPA 30(a)(3)(C)(ii), as amended by HREA
FPA 30(a)(3)(C)(iii), as amended by HREA
Preliminary Determination: Based
upon the above criteria, Commission
staff preliminarily determines that the
proposal satisfies the requirements for a
qualifying conduit hydropower facility
not required to be licensed or exempted
from licensing.
Comments and Motions To Intervene:
Deadline for filing comments contesting
whether the facility meets the qualifying
criteria is 45 days from the issuance
date of this notice.
Deadline for filing motions to
intervene is 30 days from the issuance
date of this notice.
Anyone may submit comments or a
motion to intervene in accordance with
the requirements of Rules of Practice
and Procedure, 18 CFR 385.210 and
385.214. Any motions to intervene must
be received on or before the specified
deadline date for the particular
proceeding.
Filing and Service of Responsive
Documents: All filings must (1) bear in
VerDate Mar<15>2010
12:27 Oct 08, 2013
Jkt 232001
all capital letters the ‘‘COMMENTS
CONTESTING QUALIFICATION FOR A
CONDUIT HYDROPOWER FACILITY’’
or ‘‘MOTION TO INTERVENE,’’ as
applicable; (2) state in the heading the
name of the applicant and the project
number of the application to which the
filing responds; (3) state the name,
address, and telephone number of the
person filing; and (4) otherwise comply
with the requirements of sections
385.2001 through 385.2005 of the
Commission’s regulations.1 All
comments contesting Commission staff’s
preliminary determination that the
facility meets the qualifying criteria
must set forth their evidentiary basis.
The Commission strongly encourages
electronic filing. Please file motions to
intervene and comments using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
1 18
PO 00000
CFR 385.2001–385.2005 (2013).
Frm 00005
Fmt 4703
Sfmt 4703
Y
Y
Y
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
A copy of all other filings in reference
to this application must be accompanied
by proof of service on all persons listed
in the service list prepared by the
Commission in this proceeding, in
accordance with 18 CFR 4.34(b) and
385.2010.
Locations of Notice of Intent: Copies
of the notice of intent can be obtained
directly from the applicant or such
copies can be viewed and reproduced at
E:\FR\FM\09OCN1.SGM
09OCN1
61988
Federal Register / Vol. 78, No. 196 / Wednesday, October 9, 2013 / Notices
the Commission in its Public Reference
Room, Room 2A, 888 First Street NE.,
Washington, DC 20426. The filing may
also be viewed on the Web at https://
www.ferc.gov/docs-filing/elibrary.asp
using the ‘‘eLibrary’’ link. Enter the
docket number (e.g., CD13–5) in the
docket number field to access the
document. For assistance, call toll-free
1–866–208–3676 or email
FERCOnlineSupport@ferc.gov. For TTY,
call (202) 502–8659.
Dated: October 2, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013–24407 Filed 10–8–13; 8:45 am]
BILLING CODE 6717–01–P
FEDERAL RESERVE SYSTEM
Change in Bank Control Notices;
Acquisitions of Shares of a Bank or
Bank Holding Company
ehiers on DSK2VPTVN1PROD with NOTICES
The notificants listed below have
applied under the Change in Bank
Control Act (12 U.S.C. 1817(j)) and
VerDate Mar<15>2010
12:27 Oct 08, 2013
Jkt 232001
§ 225.41 of the Board’s Regulation Y (12
CFR 225.41) to acquire shares of a bank
or bank holding company. The factors
that are considered in acting on the
notices are set forth in paragraph 7 of
the Act (12 U.S.C. 1817(j)(7)).
The notices are available for
immediate inspection at the Federal
Reserve Bank indicated. The notices
also will be available for inspection at
the offices of the Board of Governors.
Interested persons may express their
views in writing to the Reserve Bank
indicated for that notice or to the offices
of the Board of Governors. Comments
must be received not later than October
24, 2013.
A. Federal Reserve Bank of Dallas (E.
Ann Worthy, Vice President) 2200
North Pearl Street, Dallas, Texas 75201–
2272:
1. William E. Dorroh, Shreveport,
Louisiana, individually and as trustee
for the Stephanie D. O’Dowd Family
Trust; Catherine B. Dorroh, Houston,
Texas; Walter E. Dorroh, Jr., Mary
Elizabeth Dorroh, both of Jena,
Louisiana; Tjaden O’Dowd Cox, Mobile,
Alabama; John Michael O’Dowd, Jr.,
PO 00000
Frm 00006
Fmt 4703
Sfmt 9990
Tuscaloosa, Alabama; and John Michael
O’Dowd, Sr., Mobile, Alabama,
individually and as trustee for the
George W. O’Dowd Trust and the
Stephanie D. O’Dowd Family Trust, to
acquire voting shares of Mansfield
Bancshares, Inc., and thereby indirectly
acquire voting shares of Community
Bank of Louisiana, both in Mansfield,
Louisiana.
B. Federal Reserve Bank of San
Francisco (Gerald C. Tsai, Director,
Applications and Enforcement) 101
Market Street, San Francisco, California
94105–1579:
1. Alex Meruelo, Newport, California;
to acquire voting shares of NCAL
Bancorp, and thereby indirectly acquire
voting shares of National Bank of
California, both in Los Angeles,
California.
Board of Governors of the Federal Reserve
System, October 4, 2013.
Robert deV. Frierson,
Secretary of the Board.
[FR Doc. 2013–24405 Filed 10–8–13; 8:45 am]
BILLING CODE 6210–01–P
E:\FR\FM\09OCN1.SGM
09OCN1
Agencies
[Federal Register Volume 78, Number 196 (Wednesday, October 9, 2013)]
[Notices]
[Pages 61987-61988]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-24407]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CD13-5-000]
Corbett Water District; Notice of Preliminary Determination of a
Qualifying Conduit Hydropower Facility and Soliciting Comments and
Motions To Intervene
On September 23, 2013, Corbett Water District filed a notice of
intent to construct a qualifying conduit hydropower facility, pursuant
to section 30 of the Federal Power Act, as amended by section 4 of the
Hydropower Regulatory Efficiency Act of 2013 (HREA). The Corbett
Hydroelectric Project would be located at the existing Corbett Water
District water treatment facility in Corbett, Multnomah County, Oregon.
Applicant Contact: James Jans, Corbett Water District, P.O. Box 6,
Corbett, OR 97019, Phone No. (503) 695-2284.
FERC Contact: Christopher Chaney, Phone No. (202) 502-6778, email:
christopher.chaney@ferc.gov.
Qualifying Conduit Hydropower Facility Description: The proposed
project would consist of: (1) A new eight-inch diameter intake pipeline
receiving water flows from an existing 8-inch diameter filter pond
diversion pipeline; (2) a new fiberglass shelter containing one 10-
kilowatt generating unit; and (3) appurtenant facilities. The proposed
project would have an estimated annual generating capacity of 72
megawatt-hours.
A qualifying conduit hydropower facility is one that is determined
or deemed to meet all of the criteria shown in the table below.
Table 1--Criteria for Qualifying Conduit Hydropower Facility
----------------------------------------------------------------------------------------------------------------
Satisfies (Y/
Statutory provision Description N)
----------------------------------------------------------------------------------------------------------------
FPA 30(a)(3)(A), as amended by HREA....... The conduit the facility uses is a tunnel, canal, Y
pipeline, aqueduct, flume, ditch, or similar manmade
water conveyance that is operated for the
distribution of water for agricultural, municipal, or
industrial consumption and not primarily for the
generation of electricity.
FPA 30(a)(3)(C)(i), as amended by HREA.... The facility is constructed, operated, or maintained Y
for the generation of electric power, and uses for
such generation only the hydroelectric potential of a
non-federally owned conduit.
FPA 30(a)(3)(C)(ii), as amended by HREA... The facility has an installed capacity that does not Y
exceed 5 megawatts.
FPA 30(a)(3)(C)(iii), as amended by HREA.. On or before August 9, 2013, the facility is not Y
licensed, or exempted from the licensing requirements
of Part I of the FPA.
----------------------------------------------------------------------------------------------------------------
Preliminary Determination: Based upon the above criteria,
Commission staff preliminarily determines that the proposal satisfies
the requirements for a qualifying conduit hydropower facility not
required to be licensed or exempted from licensing.
Comments and Motions To Intervene: Deadline for filing comments
contesting whether the facility meets the qualifying criteria is 45
days from the issuance date of this notice.
Deadline for filing motions to intervene is 30 days from the
issuance date of this notice.
Anyone may submit comments or a motion to intervene in accordance
with the requirements of Rules of Practice and Procedure, 18 CFR
385.210 and 385.214. Any motions to intervene must be received on or
before the specified deadline date for the particular proceeding.
Filing and Service of Responsive Documents: All filings must (1)
bear in all capital letters the ``COMMENTS CONTESTING QUALIFICATION FOR
A CONDUIT HYDROPOWER FACILITY'' or ``MOTION TO INTERVENE,'' as
applicable; (2) state in the heading the name of the applicant and the
project number of the application to which the filing responds; (3)
state the name, address, and telephone number of the person filing; and
(4) otherwise comply with the requirements of sections 385.2001 through
385.2005 of the Commission's regulations.\1\ All comments contesting
Commission staff's preliminary determination that the facility meets
the qualifying criteria must set forth their evidentiary basis.
---------------------------------------------------------------------------
\1\ 18 CFR 385.2001-385.2005 (2013).
---------------------------------------------------------------------------
The Commission strongly encourages electronic filing. Please file
motions to intervene and comments using the Commission's eFiling system
at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit
brief comments up to 6,000 characters, without prior registration,
using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information at the
end of your comments. For assistance, please contact FERC Online
Support at FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or
(202) 502-8659 (TTY). In lieu of electronic filing, please send a paper
copy to: Secretary, Federal Energy Regulatory Commission, 888 First
Street NE., Washington, DC 20426. A copy of all other filings in
reference to this application must be accompanied by proof of service
on all persons listed in the service list prepared by the Commission in
this proceeding, in accordance with 18 CFR 4.34(b) and 385.2010.
Locations of Notice of Intent: Copies of the notice of intent can
be obtained directly from the applicant or such copies can be viewed
and reproduced at
[[Page 61988]]
the Commission in its Public Reference Room, Room 2A, 888 First Street
NE., Washington, DC 20426. The filing may also be viewed on the Web at
https://www.ferc.gov/docs-filing/elibrary.asp using the ``eLibrary''
link. Enter the docket number (e.g., CD13-5) in the docket number field
to access the document. For assistance, call toll-free 1-866-208-3676
or email FERCOnlineSupport@ferc.gov. For TTY, call (202) 502-8659.
Dated: October 2, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013-24407 Filed 10-8-13; 8:45 am]
BILLING CODE 6717-01-P