Federal Register / Vol. 78, No. 189 / Monday, September 30, 2013 / Notices
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov or toll
free at 1–866–208–3676, or for TTY,
(202) 502–8659. Although the
Commission strongly encourages
electronic filing, documents may also be
paper-filed. To paper-file, mail an
original and five copies to: Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE., Washington, DC 20426.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of Commission’s Web site at https://
www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P–13519) in
the docket number field to access the
document. For assistance, contact FERC
Online Support.
Dated: September 23, 2013.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2013–23751 Filed 9–27–13; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP13–546–000]
tkelley on DSK3SPTVN1PROD with NOTICES
ANR Pipeline Company; Notice of
Request Under Blanket Authorization
Take notice that on September 9,
2013, ANR Pipeline Company (ANR),
717 Texas Street, Houston, Texas
77002–2761, filed in Docket No. CP13–
546–000, a prior notice request pursuant
to sections 157.205, 157.208(b), and
157.211(b) of the Commission’s
Regulations under the Natural Gas Act
(NGA) as amended, requesting
authorization to construct
approximately 1.34 miles of 16-inch
diameter pipeline, construct an
associated delivery meter station,
modify appurtenant facilities at two
locations on its Southwest Mainline
system, and improve an existing county
road in conjunction with the local
government, all located in Lee,
Jefferson, and Des Moines County, Iowa
(Iowa Fertilizer Project). ANR states that
the Iowa Fertilizer Project will deliver
81,000 dekatherms per day to a new
nitrogen fertilizer manufacturing plant.
ANR estimates the cost of the Iowa
Fertilizer Project to be approximately
$15 million, all as more fully set forth
VerDate Mar<15>2010
18:06 Sep 27, 2013
Jkt 229001
in the application which is on file with
the Commission and open to public
inspection. The filing may also be
viewed on the web at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, please contact FERC Online
Support at FERCOnlineSupport@
ferc.gov or toll free at (866) 208–3676, or
TTY, contact (202) 502–8659.
Any questions concerning this
application may be directed to Linda
Farquhar, Manager, Project
Determinations & Regulatory
Administration, ANR Pipeline
Company, 717 Texas Street, Houston,
Texas 77002–2761, by telephone at
(832) 320–5685, by facsimile at (832)
320–6685, or by email at linda_
farquhar@transcanada.com.
Any person or the Commission’s staff
may, within 60 days after issuance of
the instant notice by the Commission,
file pursuant to Rule 214 of the
Commission’s Procedural Rules (18 CFR
385.214) a motion to intervene or notice
of intervention and pursuant to Section
157.205 of the regulations under the
NGA (18 CFR 157.205), a protest to the
request. If no protest is filed within the
time allowed therefore, the proposed
activity shall be deemed to be
authorized effective the day after the
time allowed for filing a protest. If a
protest is filed and not withdrawn
within 30 days after the allowed time
for filing a protest, the instant request
shall be treated as an application for
authorization pursuant to section 7 of
the NGA.
Pursuant to section 157.9 of the
Commission’s rules, 18 CFR 157.9,
within 90 days of this Notice the
Commission staff will either: complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding, or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or EA for this proposal. The filing of the
EA in the Commission’s public record
for this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s FEIS or EA.
Persons who wish to comment only
on the environmental review of this
PO 00000
Frm 00017
Fmt 4703
Sfmt 4703
59927
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commenter’s will be
placed on the Commission’s
environmental mailing list, will receive
copies of the environmental documents,
and will be notified of meetings
associated with the Commission’s
environmental review process.
Environmental commenter’s will not be
required to serve copies of filed
documents on all other parties.
However, the non-party commentary,
will not receive copies of all documents
filed by other parties or issued by the
Commission (except for the mailing of
environmental documents issued by the
Commission) and will not have the right
to seek court review of the
Commission’s final order.
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the ‘‘eFiling’’ link at https://
www.ferc.gov. Persons unable to file
electronically should submit an original
and 5 copies of the protest or
intervention to the Federal Energy
Regulatory Commission, 888 First Street
NE., Washington, DC 20426.
Dated: September 19, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013–23706 Filed 9–27–13; 8:45 am]
BILLING CODE 6717–01–P
ENVIRONMENTAL PROTECTION
AGENCY
[FRL–9901–49–ORD; Docket ID No. EPA–
HQ–ORD–2013–0680]
Next Generation Risk Assessment:
Incorporation of Recent Advances in
Molecular, Computational, and
Systems Biology [External Review
Draft]
Environmental Protection
Agency (EPA).
ACTION: Notice of public comment
period and external peer review.
AGENCY:
EPA is announcing a 45-day
public comment period for the draft
document titled, ‘‘Next Generation Risk
Assessment: Incorporation of Recent
Advances in Molecular, Computational,
and Systems Biology [External Review
Draft]’’ (EPA/600/R–13/214A). EPA is
also announcing that Eastern Research
Group, Inc., an EPA contractor, will
select a group of external experts to
conduct an external peer review of the
draft document. The document was
prepared by the National Center for
Environmental Assessment within
SUMMARY:
E:\FR\FM\30SEN1.SGM
30SEN1
Agencies
[Federal Register Volume 78, Number 189 (Monday, September 30, 2013)]
[Notices]
[Page 59927]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-23706]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP13-546-000]
ANR Pipeline Company; Notice of Request Under Blanket
Authorization
Take notice that on September 9, 2013, ANR Pipeline Company (ANR),
717 Texas Street, Houston, Texas 77002-2761, filed in Docket No. CP13-
546-000, a prior notice request pursuant to sections 157.205,
157.208(b), and 157.211(b) of the Commission's Regulations under the
Natural Gas Act (NGA) as amended, requesting authorization to construct
approximately 1.34 miles of 16-inch diameter pipeline, construct an
associated delivery meter station, modify appurtenant facilities at two
locations on its Southwest Mainline system, and improve an existing
county road in conjunction with the local government, all located in
Lee, Jefferson, and Des Moines County, Iowa (Iowa Fertilizer Project).
ANR states that the Iowa Fertilizer Project will deliver 81,000
dekatherms per day to a new nitrogen fertilizer manufacturing plant.
ANR estimates the cost of the Iowa Fertilizer Project to be
approximately $15 million, all as more fully set forth in the
application which is on file with the Commission and open to public
inspection. The filing may also be viewed on the web at https://www.ferc.gov using the ``eLibrary'' link. Enter the docket number
excluding the last three digits in the docket number field to access
the document. For assistance, please contact FERC Online Support at
FERCOnlineSupport@ferc.gov or toll free at (866) 208-3676, or TTY,
contact (202) 502-8659.
Any questions concerning this application may be directed to Linda
Farquhar, Manager, Project Determinations & Regulatory Administration,
ANR Pipeline Company, 717 Texas Street, Houston, Texas 77002-2761, by
telephone at (832) 320-5685, by facsimile at (832) 320-6685, or by
email at linda_farquhar@transcanada.com.
Any person or the Commission's staff may, within 60 days after
issuance of the instant notice by the Commission, file pursuant to Rule
214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to
intervene or notice of intervention and pursuant to Section 157.205 of
the regulations under the NGA (18 CFR 157.205), a protest to the
request. If no protest is filed within the time allowed therefore, the
proposed activity shall be deemed to be authorized effective the day
after the time allowed for filing a protest. If a protest is filed and
not withdrawn within 30 days after the allowed time for filing a
protest, the instant request shall be treated as an application for
authorization pursuant to section 7 of the NGA.
Pursuant to section 157.9 of the Commission's rules, 18 CFR 157.9,
within 90 days of this Notice the Commission staff will either:
complete its environmental assessment (EA) and place it into the
Commission's public record (eLibrary) for this proceeding, or issue a
Notice of Schedule for Environmental Review. If a Notice of Schedule
for Environmental Review is issued, it will indicate, among other
milestones, the anticipated date for the Commission staff's issuance of
the final environmental impact statement (FEIS) or EA for this
proposal. The filing of the EA in the Commission's public record for
this proceeding or the issuance of a Notice of Schedule for
Environmental Review will serve to notify federal and state agencies of
the timing for the completion of all necessary reviews, and the
subsequent need to complete all federal authorizations within 90 days
of the date of issuance of the Commission staff's FEIS or EA.
Persons who wish to comment only on the environmental review of
this project should submit an original and two copies of their comments
to the Secretary of the Commission. Environmental commenter's will be
placed on the Commission's environmental mailing list, will receive
copies of the environmental documents, and will be notified of meetings
associated with the Commission's environmental review process.
Environmental commenter's will not be required to serve copies of filed
documents on all other parties. However, the non-party commentary, will
not receive copies of all documents filed by other parties or issued by
the Commission (except for the mailing of environmental documents
issued by the Commission) and will not have the right to seek court
review of the Commission's final order.
The Commission strongly encourages electronic filings of comments,
protests and interventions in lieu of paper using the ``eFiling'' link
at https://www.ferc.gov. Persons unable to file electronically should
submit an original and 5 copies of the protest or intervention to the
Federal Energy Regulatory Commission, 888 First Street NE., Washington,
DC 20426.
Dated: September 19, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013-23706 Filed 9-27-13; 8:45 am]