Chicago Bridge and Iron; Confirmatory Order (Effective Immediately), 59068-59073 [2013-23318]

Download as PDF mstockstill on DSK4VPTVN1PROD with NOTICES 59068 Federal Register / Vol. 78, No. 186 / Wednesday, September 25, 2013 / Notices (2) A functional safety catch capable of working in slopes with knuckles and curves is not commercially available. If a makeshift device is installed it would activate on knuckles or curves when no emergency existed, causing a tumbling effect on the conveyance which would increase rather than decrease the hazard to miners. (3) A safer alternative is to operate the man cage or steel gunboat with secondary safety connections securely fastened around the gunboat and to the hoisting rope above the main connecting device and use hoisting ropes having a factor of safety greater than the American Standards Specifications for the Use of Wire Rope in Mines. (4) Furthermore, the slope and haulage system at this mine are essentially the same as those to which petitions granting the use of the alternative suggestion have been approved since 1973. The petitioner asserts that the proposed alternative method will provide no less than the same measure of protection afforded the miners under the existing standard. Docket Number: M–2013–044–C. Petitioner: Rosebud Mining Company, P.O. Box 1025, Northern Cambria, Pennsylvania 15714. Mines: Parkwood Mine, MSHA I.D. No. 36–08785, located in Armstrong County, Pennsylvania and Kocjancic Mine, MSHA I.D. No. 36–09436, located in Jefferson County, Pennsylvania. Regulation Affected: 30 CFR 75.503 (Permissible electric face equipment; maintenance), 30 CFR 18.35(a)(5)(i)(ii) (Portable (trailing) cables and cords). Modification Request: The petitioner requests a modification of the existing standard to permit the use of 480-volt trailing cables with a maximum length of 1200 feet when No. 2 American Gauge Wire (AWG) cable is used and 480-volt trailing cables with a maximum length of 950 feet when No. 4 AWG cable is used on roof bolters. The petitioner states that: (1) The trailing cable for the 480-volt roof bolters will not be smaller than No. 4 AWG cable. (2) All circuit breakers used to protect the No. 2 AWG trailing cable and No. 4 AWG trailing cable exceeding 700 feet in length will have instantaneous trip units calibrated to trip at 500 amperes. The trip setting of these circuit breakers will be sealed to insure that the settings on these breakers cannot be changed, and these breakers will have permanent, legible labels. Each label will identify the circuit breaker as being suitable for protecting the cables. (3) Replacement circuit breakers and/ or instantaneous trip units used to VerDate Mar<15>2010 17:20 Sep 24, 2013 Jkt 229001 protect No. 2 AWG trailing cable or No. 4 AWG trailing cable will be calibrated to trip at 500 amperes and will be sealed. (4) All components that provide shortcircuit protection will have a sufficient interruption rating in accordance with the maximum calculated fault currents available. (5) During each production day, the trailing cables, and the circuit breakers will be examined in accordance with all 30 CFR provisions. (6) Permanent warning labels will be installed and maintained on the load center to identify the location of each sealed short-circuit protection device. These labels will warn miners not to change or alter the sealed short-circuit settings of these devices. (7) If the affected trailing cables are damaged in any way during the shift, the cable will be de-energized and repairs made. (8) The petitioner’s alternative method will not be implemented until all miners who have been designated to operate the bolters, or any other person designated to examine the trailing cables or trip settings on the circuit breakers have received proper training as to the performance of their duties. (9) Within 60 days after this proposed decision and order becomes final, the proposed revisions for the petitioner’s approved 30 CFR part 48 training plan will be submitted to the District Manager. The training plan will include the following: (a) The hazards of setting the shortcircuit device(s) too high to adequately protect the trailing cables. (b) How to verify that the circuit interrupting device(s) protecting the trailing cable(s) are properly set and maintained. (c) Mining methods and operating procedures for protecting the trailing cables against damage. (d) Proper procedures for examining the trailing cables to ensure safe operating condition by visual inspection of the entire cable, observing the insulation, the integrity of the splices, nicks and abrasions. The petitioner further states that procedures specified in 30 CFR 48.3 for proposed revisions to approved training plans will apply. The petitioner asserts that the alternative method will guarantee no less than the same measure of protection for all miners than that of the existing standard. PO 00000 Frm 00078 Fmt 4703 Sfmt 4703 Dated: September 19, 2013. George F. Triebsch, Director, Office of Standards, Regulations and Variances. [FR Doc. 2013–23266 Filed 9–24–13; 8:45 am] BILLING CODE 4510–43–P NUCLEAR REGULATORY COMMISSION [EA–12–189; NRC–2013–0220] Chicago Bridge and Iron; Confirmatory Order (Effective Immediately) I. Chicago Bridge and Iron (CB&I), is a large multinational conglomerate engineering, procurement and construction company serving various industries in the United States and overseas; some of which are regulated by the U.S. Nuclear Regulatory Commission (NRC). CB&I’s main office is located in The Woodlands, Texas. II. This Confirmatory Order (referenced as Confirmatory Order or Order) is the result of an agreement reached during alternative dispute resolution (ADR) mediation sessions conducted on June 11, 2013, and July 29, 2013, in Rockville Maryland. On June 4, 2011, the NRC’s Office of Investigations (OI) issued its report of investigation (OI Report No. 2–2011– 047). The investigation related to a nuclear construction site in South Carolina, operated by CB&I, formerly known as Shaw Nuclear Services, Inc. and hereafter referred to as Shaw. Based upon evidence developed during its investigation, the NRC identified an apparent violation of Title 10 of the Code of Federal Regulations (10 CFR) 52.5, ‘‘Employee protection,’’ involving a former Shaw employee who was terminated, in part, for notifying Shaw and Louisiana Energy Service (at the direction of the individual’s supervisor, a Shaw official), of a potential 10 CFR part 21 issue regarding selected heats of rebar that had failed the ASME bend test and may have been shipped to the Louisiana Energy Service facility. In addition, the NRC found Shaw’s Code of Corporate Conduct to be overly restrictive and may prevent employees from raising nuclear safety concerns. By letter dated October 19, 2012, the NRC identified to CB&I the apparent violation of 10 CFR 52.5 and offered CB&I the opportunity to provide a response in writing, attend a predecisional enforcement conference, or to request ADR in which a neutral mediator with no decision-making E:\FR\FM\25SEN1.SGM 25SEN1 Federal Register / Vol. 78, No. 186 / Wednesday, September 25, 2013 / Notices mstockstill on DSK4VPTVN1PROD with NOTICES authority would facilitate discussions between the NRC and CB&I, and if possible, assist the NRC and the parties in reaching an agreement on resolving the concerns. In a letter dated January 15, 2013, CB&I provided a written response to the apparent violation. In the letter, CB&I denied it had violated 10 CFR 52.5, contending that the individual did not engage in a legally protected activity and was terminated solely for violating the company’s Code of Conduct, which prohibited disclosing company confidential material to an unauthorized third party. Based upon the information gathered through the NRC’s investigation and the information provided in the written response, the NRC issued a Notice of Violation (Notice) and Proposed Imposition of Civil Penalties to CB&I on April 18, 2013. As part of the Notice, the NRC required CB&I to either reply in writing to the Notice or to request ADR. CB&I continued to oppose the violation and, in lieu of continuing the enforcement process and eventually requesting a hearing on the violation, requested ADR. On June 11, 2013 and July 29, 2013, the NRC and CB&I met in Rockville, Maryland for ADR sessions mediated by a professional mediator, arranged through Cornell University’s Institute on Conflict Resolution. This Confirmatory Order is issued pursuant to the agreement reached during the ADR process. III. The NRC acknowledges that CB&I agreed to undertake actions related to a chilled work environment at its site in Lake Charles, Louisiana, formerly known as Shaw Modular Solutions. These actions were agreed to by CB&I in their May 17, 2013, letter in response to the NRC’s chilling effect letter dated April 18, 2013. These actions include: 1. Perform an independent focused assessment to determine if effective programmatic controls are in place at CB&I Lake Charles in the following five areas: control of special processes; inspections; personnel training and qualification; instructions, procedures, and drawings; and corrective actions. 2. Review the independent contractor’s 2012 nuclear safety culture assessment report and initiate corrective actions, as necessary. 3. Enter the conditions associated with the Chilling Effect Letter into its corrective action program (CAP), characterize it as a significant condition adverse to quality (SCAQ), and complete a root cause analysis. CB&I shall evaluate the potential for similar issues at other CB&I nuclear facilities. VerDate Mar<15>2010 17:20 Sep 24, 2013 Jkt 229001 During the ADR mediation session, an agreement in principle was reached in which CB&I agreed to take additional actions within CB&I’s business groups where nuclear related activities take place including: 1. Communicating CB&I’s strategy to improve its nuclear safety culture recognizing that efforts to date have not been fully effective. This communication is to include a brief summary regarding employee protection, the NRC’s concerns expressed in its April 18, 2013, Chilling Effect Letter regarding CB&I’s Lake Charles site, and CB&I’s experience, insights, lessons learned, and corrective actions both taken and planned. This communication will be followed by allhands meetings for management to discuss the importance of the above written communication; and to allow employees to provide feedback and ask questions of management. 2. Ensuring that its nuclear safety culture and safety conscious work environment policies, guidance and related materials are in place, updated, and consistent with: 1) The NRC’s March 2011 Safety Culture Policy Statement and associated traits; and 2) the NRC’s May 1996 Safety Conscious Work Environment Policy Statement; and is informed by: (1) The NRC’s Regulatory Issue Summary 2005–18, ‘‘Guidance for Establishing and Maintaining a Safety Conscious Work Environment’’; and (2) the industry’s common language initiative (i.e., INPO 12–012, Revision 1, April 2013). 3. Sharing the company’s experience and insights with respect to improving nuclear safety culture, including lessons learned and actions taken in a presentation to other nuclear vendors in the industry at an NRC sponsored vendor conference; and if requested by the NRC, as a panelist in a breakout session at the 2014 Regulatory Information Conference. 4. Hiring a third-party, independent consultant to assist CB&I to develop and/or revise its employee protection, nuclear safety culture and safety conscious work environment training for CB&I nuclear employees. 5. Establishing a uniform Executive Review Board (ERB) process to ensure independent management review of all proposed significant adverse actions for all of its nuclear employees to ensure these actions comport with applicable employee protection requirements and nuclear safety culture traits, and to assess and mitigate the potential for any chilling effect. 6. Developing a single Employee Concerns Program (ECP) for CB&I nuclear employees. PO 00000 Frm 00079 Fmt 4703 Sfmt 4703 59069 7. Developing individual performance appraisal assessment criteria for individual supervisor’s appraisals to evaluate if these individuals are meeting CB&I’s expectations with regards to employee protection, Nuclear Safety Culture and Safety Conscious Work Environment. 8. Establishing, where applicable, an active CAP trending process to include the ability to trend root and contributing causes related to CB&I’s nuclear safety culture and incorporate trending information in a process similar to that in NEI 09–07. 9. Developing a process by which personnel engaged in work associated with NRC-regulated activities departing the company are given the opportunity to participate in an Employee Concerns Program Exit Interview/Survey to facilitate identification of nuclear safety issues, resulting trends and conclusions. 10. Establishing a nuclear safety culture oversight program, including one or more committees advised by external consultants with extensive nuclear experience. 11. Establishing a CB&I Nuclear Safety Officer function to address companywide nuclear safety culture and safety conscious work environment activities. 12. Hiring a third-party, independent consultant to perform tailored comprehensive nuclear safety culture assessments, including site surveys, of all CB&I nuclear business entities not already assessed by a licensee and perform assessments or surveys to ensure effectiveness of the Nuclear Safety Culture and Safety Conscious Work Environment programs. Follow-up assessments or surveys shall be conducted every two years for a total of 4 years. 13. Revising its Code of Corporate Conduct to include a provision stating that all employees have the right to raise nuclear safety and quality concerns to CB&I, the NRC, and Congress, or engage in any other type of protective activity without being subject to disciplinary action or retaliation. On September 13, 2013, CB&I consented to the NRC issuing this Confirmatory Order with the commitments, as described in Section IV below. CB&I further agreed in its September 13, 2013, letter that this Order is to be effective upon issuance and that it has waived its right to a hearing. In view of the Confirmatory Order, consented by CB&I’s thereto as evidenced by their signed ‘‘Consent and Hearing Waiver Form’’ and subject to the satisfactory completion of the conditions of the Confirmatory Order by CB&I, the NRC is exercising its enforcement discretion and E:\FR\FM\25SEN1.SGM 25SEN1 59070 Federal Register / Vol. 78, No. 186 / Wednesday, September 25, 2013 / Notices withdrawing the Notice of Violation and Proposed Imposition of Civil Penalties. The NRC has concluded that its concerns can be resolved through effective implementation of CB&I’s commitments. I find that CB&I’s commitments as set forth in Section IV are acceptable and necessary and conclude that with these commitments the public health and safety are reasonably assured. In view of the foregoing, I have determined that the public health and safety require that CB&I’s commitments be confirmed by this Order. Based on the above and CB&I’s consent, this Order is immediately effective upon issuance. IV. Accordingly, pursuant to Sections 103, 161b, 161i, 161o, 182, and 186 of the Atomic Energy Act of 1954, as amended, and the Commission’s regulations in 10 CFR 2.202 and 10 CFR Part 52, it is hereby ordered, effective immediately, that: mstockstill on DSK4VPTVN1PROD with NOTICES Note: For purposes of this Confirmatory Order, the term ‘‘employees’’ shall mean persons employed by CB&I and its contractors and subcontractors, excluding (a) short term (less than ninety (90) days) contractors, and subcontractors, and (b) suppliers, who are engaged in work associated with NRC-regulated activities at or directly related to a CB&I site or project. A. Communication 1. By no later than two (2) months after issuance of the Confirmatory Order, the CB&I Chief Executive Officer shall: (a) Communicate, in writing, to its current employees CB&I’s strategy to improve its nuclear safety culture recognizing that efforts to date have not been fully effective. This communication shall include a brief summary of the subject of this settlement agreement regarding employee protection, the NRC’s concerns expressed in its April 18, 2013, Chilling Effect Letter regarding CB&I’s Lake Charles site, and CB&I’s experience, insights, lessons learned, and corrective actions both taken and planned. i. CB&I shall provide a copy of this communication to the NRC for prior review. (b) Require copies of the communication described above to be posted for forty-five (45) days in prominent locations where employees congregate. (c) Require all CB&I business units associated with NRC-regulated activities to hold all-hands meetings: (1) For management to discuss the importance of the above written communication; VerDate Mar<15>2010 17:20 Sep 24, 2013 Jkt 229001 and (2) to allow employees to provide feedback and ask questions of management related to the communication listed above. 2. By no later than three (3) months after issuance of the Confirmatory Order, CB&I shall ensure that its nuclear safety culture and safety conscious work environment policies, guidance (e.g., procedures), and related materials (e.g., brochures, posters) are in place, updated, and consistent with: (1) The NRC’s March 2011 Safety Culture Policy Statement and associated traits; and (2) the NRC’s May 1996 Safety Conscious Work Environment Policy Statement; and is informed by: (1) The NRC’s Regulatory Issue Summary 2005–18, ‘‘Guidance for Establishing and Maintaining a Safety Conscious Work Environment’’; and (2) the industry’s common language initiative (i.e., INPO 12–012, Revision 1, April 2013). (a) Copies of these materials shall be provided to the NRC for review at least two (2) weeks prior to issuance. (b) CB&I shall maintain and implement the materials in Section A.2. (c) CB&I will distribute copies of these updated policies and brochures to employees, and inform employees where all related materials can be located. These policies and brochures shall be maintained and provided to all new employees during initial orientation. 3. A senior CB&I manager shall share the company’s experience and insights with respect to improving nuclear safety culture, including lessons learned and actions taken in a presentation: (a) To other nuclear vendors in the industry at the next NRC vendor workshop currently scheduled for June 2014. The presentation shall be submitted to the NRC for review within one (1) month of the scheduled workshop. (b) If requested by the NRC, as a panelist in a breakout session at the 2014 Regulatory Information Conference. B. Training 1. By no later than three (3) months after the issuance of the Confirmatory Order, CB&I shall hire a third-party, independent consultant, unrelated to the proceedings at issue, who is experienced with NRC employee protection regulations, Section 211 of the Energy Reorganization Act, as amended, and nuclear safety culture and safety conscious work environment policies, to assist CB&I to develop and/ or revise its employee protection, nuclear safety culture and safety conscious work environment training for all CB&I employees. PO 00000 Frm 00080 Fmt 4703 Sfmt 4703 (a) Training shall include case studies of discriminatory practices. (b) Training shall define key terms included in employee protection regulations, nuclear safety culture and safety conscious work environment policy statements, and be informed by the industry’s common language initiative (e.g., nuclear safety issue, protected activity, adverse action, nuclear safety culture traits). (c) Training shall include topics such as behavioral expectations with regard to each nuclear safety culture trait. Training shall also include expectations for demonstrating support for raising nuclear safety and quality concerns, and all available avenues without fear of retaliation. (d) Training on CB&I’s Corrective Action Program will also be incorporated, and will emphasize the low threshold for reporting, employee’s rights, responsibilities and expectations for raising nuclear safety and quality issues and initiating corrective action documentation. (e) The training material shall be available to the NRC upon request. 2. Supervisory Training: Initial training, developed in paragraph B.1 above, for supervisors shall be piloted at least in part by a team consisting of the independent consultant and CB&I employees with expertise in these areas. Once finalized, this training will be conducted by the independent consultant at CB&I’s Lake Charles site and may be conducted by CB&I employees trained by the team who developed and piloted the training at the other CB&I sites. (a) The training shall commence within six (6) months after issuance of the Confirmatory Order. (b) All training must be completed within one (1) year of the issuance of the Confirmatory Order. (c) Refresher training: i. Shall be primarily instructor led and be provided at least every two years for a period of four (4) years. This training may be provided by CB&I training staff. ii. Thereafter, refresher training may be computer-based and shall be provided annually. (d) Training records shall be retained consistent with applicable CB&I record retention policies and be made available to the NRC upon request. 3. CB&I shall primarily conduct instructor led employee protection, nuclear safety culture and safety conscious work environment training twice per year for any new supervisors hired after the initial training conducted as described in paragraphs 1 and 2 above. E:\FR\FM\25SEN1.SGM 25SEN1 Federal Register / Vol. 78, No. 186 / Wednesday, September 25, 2013 / Notices mstockstill on DSK4VPTVN1PROD with NOTICES 4. Employee (Non-Supervisory) Training: Initial training, developed in paragraph B.1, for employees shall be piloted at least in part by a team consisting of the independent consultant and CB&I employees with expertise in these areas. Once finalized, this training will be conducted by the independent contractor at CB&I’s Lake Charles site and may be conducted by CB&I employees trained by the team who developed and piloted the training at other CB&I sites. (a) All employees training shall commence within six (6) months following completion of their designated line managements’ training. (b) All training must be completed within eighteen (18) months of the issuance of the Confirmatory Order. (c) Refresher training may be computer-based and shall be provided annually. (d) Training will primarily be instructor led for new employees as part of their orientation program/process. (e) Training records shall be retained consistent with applicable CB&I record retention policies and be made available to the NRC upon request. 5. Short-term Employee Training: Employees employed by CB&I for less than ninety (90) days will receive a ‘‘one pager’’ that captures the key elements of the training developed in Section B.1 above. C. Work Processes 1. By no later than six (6) months after issuance of the Confirmatory Order, where not already required by the applicable nuclear facility licensee, CB&I shall establish and maintain a uniform Executive Review Board (ERB) process to ensure independent management review of all proposed significant adverse actions (defined as three or more days off without pay up to and including termination for cause, but excluding reductions-in-force and other ordinary layoffs) for all of its employees to ensure these actions comport with applicable employee protection requirements and nuclear safety culture traits, and to assess and mitigate the potential for any chilling effect. The ERB shall review significant adverse actions prior to their execution. (a) The ERB process and procedure(s) shall be informed by benchmarking at least 2 organizations in the nuclear industry with developed processes. The ERB process shall be included as a topic in the training developed in Section B.1. (b) Each ERB shall be comprised of management personnel, including legal and/or human resources participation. The ERB shall be informed of any known relevant protected activity VerDate Mar<15>2010 17:20 Sep 24, 2013 Jkt 229001 engaged in by the subject employee, including via the Employee Concerns Program (ECP), but ECP personnel shall not be a participating member of the ERB. (c) Upon request, CB&I shall make available copies of the ERB process and procedure, including documentation of ERB decisions made after the Confirmatory Order, to the NRC. CB&I shall maintain documentation of each ERB decision for a minimum of five years. 2. By no later than six (6) months after issuance of the Confirmatory Order, CB&I shall develop and maintain a single Employee Concerns Program (ECP) for all CB&I employees. (a) The ECP, including position descriptions, shall be informed by benchmarking at least 2 organizations in the nuclear industry with developed processes. (b) The ECP Functional Manager will report to the Vice President, Nuclear Safety for these activities, with day-today reporting and oversight by the Director of Nuclear Compliance. (c) ECP personnel shall receive appropriate training, including investigative techniques. 3. CB&I shall develop and maintain individual performance appraisal assessment criteria for individual supervisor’s appraisals to evaluate if these individuals are meeting CB&I’s expectations with regards to employee protection, Nuclear Safety Culture and Safety Conscious Work Environment. Implementation will begin in the performance appraisal cycle in the year following completion of the supervisory training in B.2 above. 4. CB&I shall enhance or establish, where applicable, an active CAP trending process to include the ability to trend root and contributing causes related to CB&I’s nuclear safety culture and incorporate trending information in an NEI 09–07 like process; implementation will begin in concert with the implementation of the activities as described in C.7. 5. By no later than six (6) months after issuance of the Confirmatory Order, CB&I shall develop and implement a process by which personnel engaged in work associated with NRC-regulated activities departing the company are given the opportunity to participate in an Employee Concerns Program Exit Interview/Survey to facilitate identification of nuclear safety issues, resulting trends and conclusions. These assessments and any actions resulting from the exit interviews shall be made available to the NRC for review upon request. PO 00000 Frm 00081 Fmt 4703 Sfmt 4703 59071 6. CB&I shall maintain a toll-free anonymous reporting service manned by an independent company for use by all its employees to raise nuclear safety and quality concerns. 7. By no later than six (6) months after issuance of the Confirmatory Order, CB&I shall establish and maintain a nuclear safety culture oversight program, including one or more committees advised by external consultants with extensive nuclear experience. This program will provide input to CB&I facility and site management as described below. (a) The Program will assess at least twice a year the nuclear safety culture trends in process inputs that could be early indications of a nuclear safety culture weakness. (b) The Program shall be informed by NEI’s 09–07 guidance and by benchmarking at least 2 organizations in the nuclear industry with developed processes. (c) The Program shall be directed by the Vice President Nuclear Safety/ Nuclear Safety Officer who shall oversee actions as appropriate. D. Assess and Monitor Nuclear Safety Culture and Safety Conscious Work Environment 1. CB&I had previously established a CB&I Nuclear Safety Officer function to address company-wide nuclear safety culture and safety conscious work environment activities. The Vice President of Nuclear Safety has been assigned the duties of the Nuclear Safety Officer. 2. By no later than six (6) months after issuance of the Confirmatory Order, CB&I shall hire a third-party, independent consultant to perform tailored comprehensive nuclear safety culture assessments, including site surveys, of all CB&I nuclear business entities not already assessed by a licensee and perform assessments or surveys within twelve (12) months to ensure effectiveness of the Nuclear Safety Culture and Safety Conscious Work Environment programs. (a) Follow-up assessments or surveys shall be conducted every two years for a total of 4 years. These future nuclear safety culture assessments or surveys shall be comparable to one another to allow for effective evaluation of trends. (b) CB&I shall make available to the NRC, upon request, the results of the assessments or surveys, CB&I’s analysis of the trends, results, and proposed corrective actions, if any, CB&I will take to address the results in order to verify that a healthy nuclear safety culture and safety conscious work environment exists at CB&I nuclear business entities. E:\FR\FM\25SEN1.SGM 25SEN1 59072 Federal Register / Vol. 78, No. 186 / Wednesday, September 25, 2013 / Notices (c) The results of each assessment or survey and CB&I’s plan to address the results shall be communicated to employees within three (3) months of receiving the assessment/survey results. 3. As committed to in CB&I’s May 17, 2013, response to the NRC’s April 18, 2013, Chilling Effect Letter, CB&I shall: (a) By September 20, 2013, perform an independent focused assessment to determine if effective programmatic controls are in place at CB&I Lake Charles in the following five areas: control of special processes; inspections; personnel training and qualification; instructions, procedures, and drawings; and corrective action. The assessment team will include, but will not be limited to, representatives from Southern Nuclear Operating Company, South Carolina Electric and Gas Company, and CB&I Power. (b) Evaluate the results of the independent focused assessment and take corrective actions as appropriate by October 31, 2013. 4. As committed to in CB&I’s May 17, 2013, response to the NRC’s April 18, 2013, Chilling Effect Letter, CB&I reviewed the independent contractor’s 2012 nuclear safety culture assessment report and initiated corrective actions, as necessary. The results of this report were communicated to the Lake Charles workforce at an all hands meeting on July 24, 2013. mstockstill on DSK4VPTVN1PROD with NOTICES E. Other 1. As committed to in CB&I’s May 17, 2013, response to the NRC’s April 18, 2013, Chilling Effect Letter, CB&I Lake Charles has entered the conditions associated with the Chilling Effect Letter into its corrective action program, characterized it as a significant condition adverse to quality, and completed a root cause analysis. By no later than six (6) months after issuance of the Confirmatory Order, CB&I shall evaluate the potential for similar issues at other CB&I nuclear sites. 2. By no later than three (3) months of issuance of the Confirmatory Order, CB&I will revise and maintain its Code of Corporate Conduct to include a provision stating that all employees have the right to raise nuclear safety and quality concerns to CB&I, the NRC, and Congress, or engage in any other type of protected activity without being subject to disciplinary action or retaliation and that no other corporate policy may supersede, limit, or otherwise discourage an employee’s right to raise a nuclear safety or quality concern. (a) The new section must be included and explained in the training conducted in Section B above. VerDate Mar<15>2010 17:20 Sep 24, 2013 Jkt 229001 In consideration for the actions and/ or initiatives that CB&I agrees to undertake, as outlined above, the NRC agrees to the following: 1. The NRC agrees to exercise enforcement discretion and withdraw the Notice of Violation and Proposed Imposition of Civil Penalties relating to employee protection and the Shaw Code of Conduct (EA–2012–189). 2. The proposed settlement agreement does not affect other potential escalated enforcement actions, including ongoing investigations by the NRC’s Office of Investigations. However, as part of its deliberations and consistent with the philosophy of the Enforcement Policy, Section 3.3, ‘‘Violations Identified Because of Previous Enforcement Action,’’ the NRC will consider enforcement discretion for violations with similar root causes (i.e., EA–2012– 189) that occur prior to or during implementation of the corrective actions aimed at correcting that specific condition as specified in the Confirmatory Order. However, in the event that CB&I does not demonstrate that the work environment at its domestic sites and projects has improved as a result of the agreed-to corrective actions, the NRC may consider escalated enforcement action beyond the base civil penalty as provided for in the NRC Enforcement Policy. The Director, OE, may, in writing, relax or rescind any of the above conditions upon demonstration by CB&I of good cause. V In accordance with 10 CFR 2.202, CB&I must, and any other person adversely affected by this Order may, submit an answer to this Order within 20 days of its publication in the Federal Register. In addition, any other person adversely affected by this Order may request a hearing on this Order within 20 days of its publication in the Federal Register. Where good cause is shown, consideration will be given to extending the time to answer or request a hearing. A request for extension of time must be directed to the Director, Office of Enforcement, U.S. Nuclear Regulatory Commission, and include a statement of good cause for the extension. All documents filed in NRC adjudicatory proceedings, including a request for hearing, a petition for leave to intervene, any motion or other document filed in the proceeding prior to the submission of a request for hearing or petition to intervene, and documents filed by interested governmental entities participating under 10 CFR 2.315(c), must be filed in PO 00000 Frm 00082 Fmt 4703 Sfmt 4703 accordance with the NRC E-Filing rule (72 FR 49139, August 28, 2007, as amended by 77 FR 46562, August 3, 2012), codified in pertinent part at 10 CFR Part 2, Subpart C. The E-Filing process requires participants to submit and serve all adjudicatory documents over the internet, or in some cases to mail copies on electronic storage media. Participants may not submit paper copies of their filings unless they seek an exemption in accordance with the procedures described below. To comply with the procedural requirements of E-Filing, at least 10 days prior to the filing deadline, the participant should contact the Office of the Secretary by email at hearing.docket@nrc.gov, or by telephone at (301) 415–1677, to request (1) a digital ID certificate, which allows the participant (or its counsel or representative) to digitally sign documents and access the E-Submittal server for any proceeding in which it is participating; and (2) advise the Secretary that the participant will be submitting a request or petition for hearing (even in instances in which the participant, or its counsel or representative, already holds an NRCissued digital ID certificate). Based upon this information, the Secretary will establish an electronic docket for the hearing in this proceeding if the Secretary has not already established an electronic docket. Information about applying for a digital ID certificate is available on NRC’s public Web site at https:// www.nrc.gov/site-help/e-submittals/ apply-certificates.html. System requirements for accessing the ESubmittal server are detailed in NRC’s ‘‘Guidance for Electronic Submission,’’ which is available on the agency’s public Web site at https://www.nrc.gov/ site-help/e-submittals.html. Participants may attempt to use other software not listed on the Web site, but should note that the NRC’s E-Filing system does not support unlisted software, and the NRC Meta System Help Desk will not be able to offer assistance in using unlisted software. If a participant is electronically submitting a document to the NRC in accordance with the E-Filing rule, the participant must file the document using the NRC’s online, web-based submission form. In order to serve documents through EIE, users will be required to install a web browser plugin from the NRC Web site. Further information on the web-based submission form, including the installation of the Web browser plug-in, is available on the NRC’s public Web E:\FR\FM\25SEN1.SGM 25SEN1 mstockstill on DSK4VPTVN1PROD with NOTICES Federal Register / Vol. 78, No. 186 / Wednesday, September 25, 2013 / Notices site at https://www.nrc.gov/site-help/esubmittals.html. Once a participant has obtained a digital ID certificate and a docket has been created, the participant can then submit a request for hearing or petition for leave to intervene through the EIE. Submissions should be in Portable Document Format (PDF) in accordance with NRC guidance available on the NRC public Web site at https:// www.nrc.gov/site-help/esubmittals.html. A filing is considered complete at the time the documents are submitted through the NRC’s E-Filing system. To be timely, an electronic filing must be submitted to the E-Filing system no later than 11:59 p.m. Eastern Time (ET) on the due date. Upon receipt of a transmission, the E-Filing system time-stamps the document and sends the submitter an email notice confirming receipt of the document. The E-Filing system also distributes an email notice that provides access to the document to the NRC Office of the General Counsel and any others who have advised the Office of the Secretary that they wish to participate in the proceeding, so that the filer need not serve the documents on those participants separately. Therefore, any others who wish to participate in the proceeding (or their counsel or representative) must apply for and receive a digital ID certificate before a hearing request/petition to intervene is filed so that they can obtain access to the document via the E-Filing system. A person filing electronically using the agency’s adjudicatory E-Filing system may seek assistance by contacting the NRC Meta System Help Desk through the ‘‘Contact Us’’ link located on the NRC Web site at https:// www.nrc.gov/site-help/esubmittals.html, by email at MSHD.Resource@nrc.gov, or by a tollfree call at 866–672–7640. The NRC Meta System Help Desk is available between 8 a.m. and 8 p.m., ET, Monday through Friday, excluding government holidays. Participants who believe that they have a good cause for not submitting documents electronically must file an exemption request, in accordance with 10 CFR 2.302(g), with their initial paper filing requesting authorization to continue to submit documents in paper format. Such filings must be submitted by: (1) First class mail addressed to the Office of the Secretary of the Commission, U.S. Nuclear Regulatory Commission, Washington, DC 20555– 0001, Attention: Rulemaking and Adjudications Staff; or (2) courier, express mail, or expedited delivery service to the Office of the Secretary, VerDate Mar<15>2010 17:20 Sep 24, 2013 Jkt 229001 Sixteenth Floor, One White Flint North, 11555 Rockville Pike, Rockville, Maryland, 20852, Attention: Rulemaking and Adjudications Staff. Participants filing a document in this manner are responsible for serving the document on all other participants. Filing is considered complete by firstclass mail as of the time of deposit in the mail, or by courier, express mail, or expedited delivery service upon depositing the document with the provider of the service. A presiding officer, having granted an exemption request from using E-Filing, may require a participant or party to use E-Filing if the presiding officer subsequently determines that the reason for granting the exemption from use of E-Filing no longer exists. Documents submitted in adjudicatory proceedings will appear in NRC’s electronic hearing docket, which is available to the public at https:// ehd1.nrc.gov/ehd/, unless excluded pursuant to an order of the Commission or the presiding officer. Participants are requested not to include personal privacy information, such as social security numbers, home addresses, or home phone numbers in their filings, unless an NRC regulation or other law requires submission of such information. With respect to copyrighted works, except for limited excerpts that serve the purpose of the adjudicatory filings and would constitute a Fair Use application, participants are requested not to include copyrighted materials in their submission. If a person other than CB&I requests a hearing, that person shall set forth with particularity the manner in which his interest is adversely affected by this Order and shall address the criteria set forth in 10 CFR 2.309(d) and (f). If a hearing is requested by a person whose interest is adversely affected, the Commission will issue an Order designating the time and place of any hearings. If a hearing is held, the issue to be considered at such hearing shall be whether this Order should be sustained. Pursuant to 10 CFR 2.202(c)(2)(i), CB&I or any other person adversely affected by this Order, may, in addition to demanding a hearing, at the time the answer is filed or sooner, move the presiding officer to set aside the immediate effectiveness of the Order on the ground that the Order, including the need for immediate effectiveness, is not based on adequate evidence but on mere suspicion, unfounded allegations, or error. In the absence of any request for hearing, or written approval of an extension of time in which to request a hearing, the provisions specified in PO 00000 Frm 00083 Fmt 4703 Sfmt 4703 59073 Section IV above shall be final 20 days from the date this Order is published in the Federal Register without further order or proceedings. If an extension of time for requesting a hearing has been approved, the provisions specified in Section IV shall be final when the extension expires if a hearing request has not been received. An answer or a request for hearing shall not stay the immediate effectiveness of this order. Dated at Rockville, Maryland, this 16th day of September 2013. For the Nuclear Regulatory Commission. Roy P. Zimmerman, Director, Office of Enforcement. [FR Doc. 2013–23318 Filed 9–24–13; 8:45 am] BILLING CODE 7590–01–P NUCLEAR REGULATORY COMMISSION [Docket No. 72–27; NRC–2011–0115] Pacific Gas and Electric Company; Humboldt Bay Independent Spent Fuel Storage Installation; Amendment to Materials License No. SNM–2514 Nuclear Regulatory Commission. ACTION: License amendment application; issuance. AGENCY: The U.S. Nuclear Regulatory Commission (NRC) reviewed an application by Pacific Gas and Electric (PG&E) Company for amendment of Materials License No. SNM–2514 which authorizes PG&E to receive, possess, store, and transfer spent nuclear fuel and associated radioactive materials. The amendment would allow PG&E to store greater than Class C process waste at its Humboldt Bay (HB) independent spent fuel storage installation (ISFSI). ADDRESSES: Please refer to Docket ID NRC–2011–0115 when contacting the NRC about the availability of information regarding this document. You may access publicly-available information related to this document using any of the following methods: • Federal Rulemaking Web site: Go to https://www.regulations.gov and search for Docket ID NRC–2011–0115. Address questions about NRC dockets to Carol Gallagher; telephone: 301–287–3422; email: Carol.Gallagher@nrc.gov. For technical questions, contact the individual(s) listed in the FOR FURTHER INFORMATION CONTACT section of this document. • NRC’s Agencywide Documents Access and Management System (ADAMS): You may access publicly available documents online in the NRC SUMMARY: E:\FR\FM\25SEN1.SGM 25SEN1

Agencies

[Federal Register Volume 78, Number 186 (Wednesday, September 25, 2013)]
[Notices]
[Pages 59068-59073]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-23318]


=======================================================================
-----------------------------------------------------------------------

NUCLEAR REGULATORY COMMISSION

[EA-12-189; NRC-2013-0220]


Chicago Bridge and Iron; Confirmatory Order (Effective 
Immediately)

I.

    Chicago Bridge and Iron (CB&I), is a large multinational 
conglomerate engineering, procurement and construction company serving 
various industries in the United States and overseas; some of which are 
regulated by the U.S. Nuclear Regulatory Commission (NRC). CB&I's main 
office is located in The Woodlands, Texas.

II.

    This Confirmatory Order (referenced as Confirmatory Order or Order) 
is the result of an agreement reached during alternative dispute 
resolution (ADR) mediation sessions conducted on June 11, 2013, and 
July 29, 2013, in Rockville Maryland.
    On June 4, 2011, the NRC's Office of Investigations (OI) issued its 
report of investigation (OI Report No. 2-2011-047). The investigation 
related to a nuclear construction site in South Carolina, operated by 
CB&I, formerly known as Shaw Nuclear Services, Inc. and hereafter 
referred to as Shaw. Based upon evidence developed during its 
investigation, the NRC identified an apparent violation of Title 10 of 
the Code of Federal Regulations (10 CFR) 52.5, ``Employee protection,'' 
involving a former Shaw employee who was terminated, in part, for 
notifying Shaw and Louisiana Energy Service (at the direction of the 
individual's supervisor, a Shaw official), of a potential 10 CFR part 
21 issue regarding selected heats of rebar that had failed the ASME 
bend test and may have been shipped to the Louisiana Energy Service 
facility. In addition, the NRC found Shaw's Code of Corporate Conduct 
to be overly restrictive and may prevent employees from raising nuclear 
safety concerns.
    By letter dated October 19, 2012, the NRC identified to CB&I the 
apparent violation of 10 CFR 52.5 and offered CB&I the opportunity to 
provide a response in writing, attend a pre-decisional enforcement 
conference, or to request ADR in which a neutral mediator with no 
decision-making

[[Page 59069]]

authority would facilitate discussions between the NRC and CB&I, and if 
possible, assist the NRC and the parties in reaching an agreement on 
resolving the concerns. In a letter dated January 15, 2013, CB&I 
provided a written response to the apparent violation. In the letter, 
CB&I denied it had violated 10 CFR 52.5, contending that the individual 
did not engage in a legally protected activity and was terminated 
solely for violating the company's Code of Conduct, which prohibited 
disclosing company confidential material to an unauthorized third 
party.
    Based upon the information gathered through the NRC's investigation 
and the information provided in the written response, the NRC issued a 
Notice of Violation (Notice) and Proposed Imposition of Civil Penalties 
to CB&I on April 18, 2013. As part of the Notice, the NRC required CB&I 
to either reply in writing to the Notice or to request ADR. CB&I 
continued to oppose the violation and, in lieu of continuing the 
enforcement process and eventually requesting a hearing on the 
violation, requested ADR.
    On June 11, 2013 and July 29, 2013, the NRC and CB&I met in 
Rockville, Maryland for ADR sessions mediated by a professional 
mediator, arranged through Cornell University's Institute on Conflict 
Resolution. This Confirmatory Order is issued pursuant to the agreement 
reached during the ADR process.

III.

    The NRC acknowledges that CB&I agreed to undertake actions related 
to a chilled work environment at its site in Lake Charles, Louisiana, 
formerly known as Shaw Modular Solutions. These actions were agreed to 
by CB&I in their May 17, 2013, letter in response to the NRC's chilling 
effect letter dated April 18, 2013. These actions include:
    1. Perform an independent focused assessment to determine if 
effective programmatic controls are in place at CB&I Lake Charles in 
the following five areas: control of special processes; inspections; 
personnel training and qualification; instructions, procedures, and 
drawings; and corrective actions.
    2. Review the independent contractor's 2012 nuclear safety culture 
assessment report and initiate corrective actions, as necessary.
    3. Enter the conditions associated with the Chilling Effect Letter 
into its corrective action program (CAP), characterize it as a 
significant condition adverse to quality (SCAQ), and complete a root 
cause analysis. CB&I shall evaluate the potential for similar issues at 
other CB&I nuclear facilities.
    During the ADR mediation session, an agreement in principle was 
reached in which CB&I agreed to take additional actions within CB&I's 
business groups where nuclear related activities take place including:
    1. Communicating CB&I's strategy to improve its nuclear safety 
culture recognizing that efforts to date have not been fully effective. 
This communication is to include a brief summary regarding employee 
protection, the NRC's concerns expressed in its April 18, 2013, 
Chilling Effect Letter regarding CB&I's Lake Charles site, and CB&I's 
experience, insights, lessons learned, and corrective actions both 
taken and planned. This communication will be followed by all-hands 
meetings for management to discuss the importance of the above written 
communication; and to allow employees to provide feedback and ask 
questions of management.
    2. Ensuring that its nuclear safety culture and safety conscious 
work environment policies, guidance and related materials are in place, 
updated, and consistent with: 1) The NRC's March 2011 Safety Culture 
Policy Statement and associated traits; and 2) the NRC's May 1996 
Safety Conscious Work Environment Policy Statement; and is informed by: 
(1) The NRC's Regulatory Issue Summary 2005-18, ``Guidance for 
Establishing and Maintaining a Safety Conscious Work Environment''; and 
(2) the industry's common language initiative (i.e., INPO 12-012, 
Revision 1, April 2013).
    3. Sharing the company's experience and insights with respect to 
improving nuclear safety culture, including lessons learned and actions 
taken in a presentation to other nuclear vendors in the industry at an 
NRC sponsored vendor conference; and if requested by the NRC, as a 
panelist in a breakout session at the 2014 Regulatory Information 
Conference.
    4. Hiring a third-party, independent consultant to assist CB&I to 
develop and/or revise its employee protection, nuclear safety culture 
and safety conscious work environment training for CB&I nuclear 
employees.
    5. Establishing a uniform Executive Review Board (ERB) process to 
ensure independent management review of all proposed significant 
adverse actions for all of its nuclear employees to ensure these 
actions comport with applicable employee protection requirements and 
nuclear safety culture traits, and to assess and mitigate the potential 
for any chilling effect.
    6. Developing a single Employee Concerns Program (ECP) for CB&I 
nuclear employees.
    7. Developing individual performance appraisal assessment criteria 
for individual supervisor's appraisals to evaluate if these individuals 
are meeting CB&I's expectations with regards to employee protection, 
Nuclear Safety Culture and Safety Conscious Work Environment.
    8. Establishing, where applicable, an active CAP trending process 
to include the ability to trend root and contributing causes related to 
CB&I's nuclear safety culture and incorporate trending information in a 
process similar to that in NEI 09-07.
    9. Developing a process by which personnel engaged in work 
associated with NRC-regulated activities departing the company are 
given the opportunity to participate in an Employee Concerns Program 
Exit Interview/Survey to facilitate identification of nuclear safety 
issues, resulting trends and conclusions.
    10. Establishing a nuclear safety culture oversight program, 
including one or more committees advised by external consultants with 
extensive nuclear experience.
    11. Establishing a CB&I Nuclear Safety Officer function to address 
company-wide nuclear safety culture and safety conscious work 
environment activities.
    12. Hiring a third-party, independent consultant to perform 
tailored comprehensive nuclear safety culture assessments, including 
site surveys, of all CB&I nuclear business entities not already 
assessed by a licensee and perform assessments or surveys to ensure 
effectiveness of the Nuclear Safety Culture and Safety Conscious Work 
Environment programs. Follow-up assessments or surveys shall be 
conducted every two years for a total of 4 years.
    13. Revising its Code of Corporate Conduct to include a provision 
stating that all employees have the right to raise nuclear safety and 
quality concerns to CB&I, the NRC, and Congress, or engage in any other 
type of protective activity without being subject to disciplinary 
action or retaliation.
    On September 13, 2013, CB&I consented to the NRC issuing this 
Confirmatory Order with the commitments, as described in Section IV 
below. CB&I further agreed in its September 13, 2013, letter that this 
Order is to be effective upon issuance and that it has waived its right 
to a hearing. In view of the Confirmatory Order, consented by CB&I's 
thereto as evidenced by their signed ``Consent and Hearing Waiver 
Form'' and subject to the satisfactory completion of the conditions of 
the Confirmatory Order by CB&I, the NRC is exercising its enforcement 
discretion and

[[Page 59070]]

withdrawing the Notice of Violation and Proposed Imposition of Civil 
Penalties.
    The NRC has concluded that its concerns can be resolved through 
effective implementation of CB&I's commitments. I find that CB&I's 
commitments as set forth in Section IV are acceptable and necessary and 
conclude that with these commitments the public health and safety are 
reasonably assured. In view of the foregoing, I have determined that 
the public health and safety require that CB&I's commitments be 
confirmed by this Order. Based on the above and CB&I's consent, this 
Order is immediately effective upon issuance.

IV.

    Accordingly, pursuant to Sections 103, 161b, 161i, 161o, 182, and 
186 of the Atomic Energy Act of 1954, as amended, and the Commission's 
regulations in 10 CFR 2.202 and 10 CFR Part 52, it is hereby ordered, 
effective immediately, that:

    Note:  For purposes of this Confirmatory Order, the term 
``employees'' shall mean persons employed by CB&I and its 
contractors and subcontractors, excluding (a) short term (less than 
ninety (90) days) contractors, and subcontractors, and (b) 
suppliers, who are engaged in work associated with NRC-regulated 
activities at or directly related to a CB&I site or project.

A. Communication

    1. By no later than two (2) months after issuance of the 
Confirmatory Order, the CB&I Chief Executive Officer shall:
    (a) Communicate, in writing, to its current employees CB&I's 
strategy to improve its nuclear safety culture recognizing that efforts 
to date have not been fully effective. This communication shall include 
a brief summary of the subject of this settlement agreement regarding 
employee protection, the NRC's concerns expressed in its April 18, 
2013, Chilling Effect Letter regarding CB&I's Lake Charles site, and 
CB&I's experience, insights, lessons learned, and corrective actions 
both taken and planned.
    i. CB&I shall provide a copy of this communication to the NRC for 
prior review.
    (b) Require copies of the communication described above to be 
posted for forty-five (45) days in prominent locations where employees 
congregate.
    (c) Require all CB&I business units associated with NRC-regulated 
activities to hold all-hands meetings: (1) For management to discuss 
the importance of the above written communication; and (2) to allow 
employees to provide feedback and ask questions of management related 
to the communication listed above.
    2. By no later than three (3) months after issuance of the 
Confirmatory Order, CB&I shall ensure that its nuclear safety culture 
and safety conscious work environment policies, guidance (e.g., 
procedures), and related materials (e.g., brochures, posters) are in 
place, updated, and consistent with: (1) The NRC's March 2011 Safety 
Culture Policy Statement and associated traits; and (2) the NRC's May 
1996 Safety Conscious Work Environment Policy Statement; and is 
informed by: (1) The NRC's Regulatory Issue Summary 2005-18, ``Guidance 
for Establishing and Maintaining a Safety Conscious Work Environment''; 
and (2) the industry's common language initiative (i.e., INPO 12-012, 
Revision 1, April 2013).
    (a) Copies of these materials shall be provided to the NRC for 
review at least two (2) weeks prior to issuance.
    (b) CB&I shall maintain and implement the materials in Section A.2.
    (c) CB&I will distribute copies of these updated policies and 
brochures to employees, and inform employees where all related 
materials can be located. These policies and brochures shall be 
maintained and provided to all new employees during initial 
orientation.
    3. A senior CB&I manager shall share the company's experience and 
insights with respect to improving nuclear safety culture, including 
lessons learned and actions taken in a presentation:
    (a) To other nuclear vendors in the industry at the next NRC vendor 
workshop currently scheduled for June 2014. The presentation shall be 
submitted to the NRC for review within one (1) month of the scheduled 
workshop.
    (b) If requested by the NRC, as a panelist in a breakout session at 
the 2014 Regulatory Information Conference.

B. Training

    1. By no later than three (3) months after the issuance of the 
Confirmatory Order, CB&I shall hire a third-party, independent 
consultant, unrelated to the proceedings at issue, who is experienced 
with NRC employee protection regulations, Section 211 of the Energy 
Reorganization Act, as amended, and nuclear safety culture and safety 
conscious work environment policies, to assist CB&I to develop and/or 
revise its employee protection, nuclear safety culture and safety 
conscious work environment training for all CB&I employees.
    (a) Training shall include case studies of discriminatory 
practices.
    (b) Training shall define key terms included in employee protection 
regulations, nuclear safety culture and safety conscious work 
environment policy statements, and be informed by the industry's common 
language initiative (e.g., nuclear safety issue, protected activity, 
adverse action, nuclear safety culture traits).
    (c) Training shall include topics such as behavioral expectations 
with regard to each nuclear safety culture trait. Training shall also 
include expectations for demonstrating support for raising nuclear 
safety and quality concerns, and all available avenues without fear of 
retaliation.
    (d) Training on CB&I's Corrective Action Program will also be 
incorporated, and will emphasize the low threshold for reporting, 
employee's rights, responsibilities and expectations for raising 
nuclear safety and quality issues and initiating corrective action 
documentation.
    (e) The training material shall be available to the NRC upon 
request.
    2. Supervisory Training: Initial training, developed in paragraph 
B.1 above, for supervisors shall be piloted at least in part by a team 
consisting of the independent consultant and CB&I employees with 
expertise in these areas. Once finalized, this training will be 
conducted by the independent consultant at CB&I's Lake Charles site and 
may be conducted by CB&I employees trained by the team who developed 
and piloted the training at the other CB&I sites.
    (a) The training shall commence within six (6) months after 
issuance of the Confirmatory Order.
    (b) All training must be completed within one (1) year of the 
issuance of the Confirmatory Order.
    (c) Refresher training:
    i. Shall be primarily instructor led and be provided at least every 
two years for a period of four (4) years. This training may be provided 
by CB&I training staff.
    ii. Thereafter, refresher training may be computer-based and shall 
be provided annually.
    (d) Training records shall be retained consistent with applicable 
CB&I record retention policies and be made available to the NRC upon 
request.
    3. CB&I shall primarily conduct instructor led employee protection, 
nuclear safety culture and safety conscious work environment training 
twice per year for any new supervisors hired after the initial training 
conducted as described in paragraphs 1 and 2 above.

[[Page 59071]]

    4. Employee (Non-Supervisory) Training: Initial training, developed 
in paragraph B.1, for employees shall be piloted at least in part by a 
team consisting of the independent consultant and CB&I employees with 
expertise in these areas. Once finalized, this training will be 
conducted by the independent contractor at CB&I's Lake Charles site and 
may be conducted by CB&I employees trained by the team who developed 
and piloted the training at other CB&I sites.
    (a) All employees training shall commence within six (6) months 
following completion of their designated line managements' training.
    (b) All training must be completed within eighteen (18) months of 
the issuance of the Confirmatory Order.
    (c) Refresher training may be computer-based and shall be provided 
annually.
    (d) Training will primarily be instructor led for new employees as 
part of their orientation program/process.
    (e) Training records shall be retained consistent with applicable 
CB&I record retention policies and be made available to the NRC upon 
request.
    5. Short-term Employee Training: Employees employed by CB&I for 
less than ninety (90) days will receive a ``one pager'' that captures 
the key elements of the training developed in Section B.1 above.

C. Work Processes

    1. By no later than six (6) months after issuance of the 
Confirmatory Order, where not already required by the applicable 
nuclear facility licensee, CB&I shall establish and maintain a uniform 
Executive Review Board (ERB) process to ensure independent management 
review of all proposed significant adverse actions (defined as three or 
more days off without pay up to and including termination for cause, 
but excluding reductions-in-force and other ordinary layoffs) for all 
of its employees to ensure these actions comport with applicable 
employee protection requirements and nuclear safety culture traits, and 
to assess and mitigate the potential for any chilling effect. The ERB 
shall review significant adverse actions prior to their execution.
    (a) The ERB process and procedure(s) shall be informed by 
benchmarking at least 2 organizations in the nuclear industry with 
developed processes. The ERB process shall be included as a topic in 
the training developed in Section B.1.
    (b) Each ERB shall be comprised of management personnel, including 
legal and/or human resources participation. The ERB shall be informed 
of any known relevant protected activity engaged in by the subject 
employee, including via the Employee Concerns Program (ECP), but ECP 
personnel shall not be a participating member of the ERB.
    (c) Upon request, CB&I shall make available copies of the ERB 
process and procedure, including documentation of ERB decisions made 
after the Confirmatory Order, to the NRC. CB&I shall maintain 
documentation of each ERB decision for a minimum of five years.
    2. By no later than six (6) months after issuance of the 
Confirmatory Order, CB&I shall develop and maintain a single Employee 
Concerns Program (ECP) for all CB&I employees.
    (a) The ECP, including position descriptions, shall be informed by 
benchmarking at least 2 organizations in the nuclear industry with 
developed processes.
    (b) The ECP Functional Manager will report to the Vice President, 
Nuclear Safety for these activities, with day-to-day reporting and 
oversight by the Director of Nuclear Compliance.
    (c) ECP personnel shall receive appropriate training, including 
investigative techniques.
    3. CB&I shall develop and maintain individual performance appraisal 
assessment criteria for individual supervisor's appraisals to evaluate 
if these individuals are meeting CB&I's expectations with regards to 
employee protection, Nuclear Safety Culture and Safety Conscious Work 
Environment. Implementation will begin in the performance appraisal 
cycle in the year following completion of the supervisory training in 
B.2 above.
    4. CB&I shall enhance or establish, where applicable, an active CAP 
trending process to include the ability to trend root and contributing 
causes related to CB&I's nuclear safety culture and incorporate 
trending information in an NEI 09-07 like process; implementation will 
begin in concert with the implementation of the activities as described 
in C.7.
    5. By no later than six (6) months after issuance of the 
Confirmatory Order, CB&I shall develop and implement a process by which 
personnel engaged in work associated with NRC-regulated activities 
departing the company are given the opportunity to participate in an 
Employee Concerns Program Exit Interview/Survey to facilitate 
identification of nuclear safety issues, resulting trends and 
conclusions. These assessments and any actions resulting from the exit 
interviews shall be made available to the NRC for review upon request.
    6. CB&I shall maintain a toll-free anonymous reporting service 
manned by an independent company for use by all its employees to raise 
nuclear safety and quality concerns.
    7. By no later than six (6) months after issuance of the 
Confirmatory Order, CB&I shall establish and maintain a nuclear safety 
culture oversight program, including one or more committees advised by 
external consultants with extensive nuclear experience. This program 
will provide input to CB&I facility and site management as described 
below.
    (a) The Program will assess at least twice a year the nuclear 
safety culture trends in process inputs that could be early indications 
of a nuclear safety culture weakness.
    (b) The Program shall be informed by NEI's 09-07 guidance and by 
benchmarking at least 2 organizations in the nuclear industry with 
developed processes.
    (c) The Program shall be directed by the Vice President Nuclear 
Safety/Nuclear Safety Officer who shall oversee actions as appropriate.

D. Assess and Monitor Nuclear Safety Culture and Safety Conscious Work 
Environment

    1. CB&I had previously established a CB&I Nuclear Safety Officer 
function to address company-wide nuclear safety culture and safety 
conscious work environment activities. The Vice President of Nuclear 
Safety has been assigned the duties of the Nuclear Safety Officer.
    2. By no later than six (6) months after issuance of the 
Confirmatory Order, CB&I shall hire a third-party, independent 
consultant to perform tailored comprehensive nuclear safety culture 
assessments, including site surveys, of all CB&I nuclear business 
entities not already assessed by a licensee and perform assessments or 
surveys within twelve (12) months to ensure effectiveness of the 
Nuclear Safety Culture and Safety Conscious Work Environment programs.
    (a) Follow-up assessments or surveys shall be conducted every two 
years for a total of 4 years. These future nuclear safety culture 
assessments or surveys shall be comparable to one another to allow for 
effective evaluation of trends.
    (b) CB&I shall make available to the NRC, upon request, the results 
of the assessments or surveys, CB&I's analysis of the trends, results, 
and proposed corrective actions, if any, CB&I will take to address the 
results in order to verify that a healthy nuclear safety culture and 
safety conscious work environment exists at CB&I nuclear business 
entities.

[[Page 59072]]

    (c) The results of each assessment or survey and CB&I's plan to 
address the results shall be communicated to employees within three (3) 
months of receiving the assessment/survey results.
    3. As committed to in CB&I's May 17, 2013, response to the NRC's 
April 18, 2013, Chilling Effect Letter, CB&I shall:
    (a) By September 20, 2013, perform an independent focused 
assessment to determine if effective programmatic controls are in place 
at CB&I Lake Charles in the following five areas: control of special 
processes; inspections; personnel training and qualification; 
instructions, procedures, and drawings; and corrective action. The 
assessment team will include, but will not be limited to, 
representatives from Southern Nuclear Operating Company, South Carolina 
Electric and Gas Company, and CB&I Power.
    (b) Evaluate the results of the independent focused assessment and 
take corrective actions as appropriate by October 31, 2013.
    4. As committed to in CB&I's May 17, 2013, response to the NRC's 
April 18, 2013, Chilling Effect Letter, CB&I reviewed the independent 
contractor's 2012 nuclear safety culture assessment report and 
initiated corrective actions, as necessary. The results of this report 
were communicated to the Lake Charles workforce at an all hands meeting 
on July 24, 2013.

E. Other

    1. As committed to in CB&I's May 17, 2013, response to the NRC's 
April 18, 2013, Chilling Effect Letter, CB&I Lake Charles has entered 
the conditions associated with the Chilling Effect Letter into its 
corrective action program, characterized it as a significant condition 
adverse to quality, and completed a root cause analysis. By no later 
than six (6) months after issuance of the Confirmatory Order, CB&I 
shall evaluate the potential for similar issues at other CB&I nuclear 
sites.
    2. By no later than three (3) months of issuance of the 
Confirmatory Order, CB&I will revise and maintain its Code of Corporate 
Conduct to include a provision stating that all employees have the 
right to raise nuclear safety and quality concerns to CB&I, the NRC, 
and Congress, or engage in any other type of protected activity without 
being subject to disciplinary action or retaliation and that no other 
corporate policy may supersede, limit, or otherwise discourage an 
employee's right to raise a nuclear safety or quality concern.
    (a) The new section must be included and explained in the training 
conducted in Section B above.
    In consideration for the actions and/or initiatives that CB&I 
agrees to undertake, as outlined above, the NRC agrees to the 
following:
    1. The NRC agrees to exercise enforcement discretion and withdraw 
the Notice of Violation and Proposed Imposition of Civil Penalties 
relating to employee protection and the Shaw Code of Conduct (EA-2012-
189).
    2. The proposed settlement agreement does not affect other 
potential escalated enforcement actions, including ongoing 
investigations by the NRC's Office of Investigations. However, as part 
of its deliberations and consistent with the philosophy of the 
Enforcement Policy, Section 3.3, ``Violations Identified Because of 
Previous Enforcement Action,'' the NRC will consider enforcement 
discretion for violations with similar root causes (i.e., EA-2012-189) 
that occur prior to or during implementation of the corrective actions 
aimed at correcting that specific condition as specified in the 
Confirmatory Order. However, in the event that CB&I does not 
demonstrate that the work environment at its domestic sites and 
projects has improved as a result of the agreed-to corrective actions, 
the NRC may consider escalated enforcement action beyond the base civil 
penalty as provided for in the NRC Enforcement Policy.
    The Director, OE, may, in writing, relax or rescind any of the 
above conditions upon demonstration by CB&I of good cause.

V

    In accordance with 10 CFR 2.202, CB&I must, and any other person 
adversely affected by this Order may, submit an answer to this Order 
within 20 days of its publication in the Federal Register. In addition, 
any other person adversely affected by this Order may request a hearing 
on this Order within 20 days of its publication in the Federal 
Register. Where good cause is shown, consideration will be given to 
extending the time to answer or request a hearing. A request for 
extension of time must be directed to the Director, Office of 
Enforcement, U.S. Nuclear Regulatory Commission, and include a 
statement of good cause for the extension.
    All documents filed in NRC adjudicatory proceedings, including a 
request for hearing, a petition for leave to intervene, any motion or 
other document filed in the proceeding prior to the submission of a 
request for hearing or petition to intervene, and documents filed by 
interested governmental entities participating under 10 CFR 2.315(c), 
must be filed in accordance with the NRC E-Filing rule (72 FR 49139, 
August 28, 2007, as amended by 77 FR 46562, August 3, 2012), codified 
in pertinent part at 10 CFR Part 2, Subpart C. The E-Filing process 
requires participants to submit and serve all adjudicatory documents 
over the internet, or in some cases to mail copies on electronic 
storage media. Participants may not submit paper copies of their 
filings unless they seek an exemption in accordance with the procedures 
described below.
    To comply with the procedural requirements of E-Filing, at least 10 
days prior to the filing deadline, the participant should contact the 
Office of the Secretary by email at hearing.docket@nrc.gov, or by 
telephone at (301) 415-1677, to request (1) a digital ID certificate, 
which allows the participant (or its counsel or representative) to 
digitally sign documents and access the E-Submittal server for any 
proceeding in which it is participating; and (2) advise the Secretary 
that the participant will be submitting a request or petition for 
hearing (even in instances in which the participant, or its counsel or 
representative, already holds an NRC-issued digital ID certificate). 
Based upon this information, the Secretary will establish an electronic 
docket for the hearing in this proceeding if the Secretary has not 
already established an electronic docket.
    Information about applying for a digital ID certificate is 
available on NRC's public Web site at https://www.nrc.gov/site-help/e-submittals/apply-certificates.html. System requirements for accessing 
the E-Submittal server are detailed in NRC's ``Guidance for Electronic 
Submission,'' which is available on the agency's public Web site at 
https://www.nrc.gov/site-help/e-submittals.html. Participants may 
attempt to use other software not listed on the Web site, but should 
note that the NRC's E-Filing system does not support unlisted software, 
and the NRC Meta System Help Desk will not be able to offer assistance 
in using unlisted software.
    If a participant is electronically submitting a document to the NRC 
in accordance with the E-Filing rule, the participant must file the 
document using the NRC's online, web-based submission form. In order to 
serve documents through EIE, users will be required to install a web 
browser plug-in from the NRC Web site. Further information on the web-
based submission form, including the installation of the Web browser 
plug-in, is available on the NRC's public Web

[[Page 59073]]

site at https://www.nrc.gov/site-help/e-submittals.html.
    Once a participant has obtained a digital ID certificate and a 
docket has been created, the participant can then submit a request for 
hearing or petition for leave to intervene through the EIE. Submissions 
should be in Portable Document Format (PDF) in accordance with NRC 
guidance available on the NRC public Web site at https://www.nrc.gov/site-help/e-submittals.html. A filing is considered complete at the 
time the documents are submitted through the NRC's E-Filing system. To 
be timely, an electronic filing must be submitted to the E-Filing 
system no later than 11:59 p.m. Eastern Time (ET) on the due date. Upon 
receipt of a transmission, the E-Filing system time-stamps the document 
and sends the submitter an email notice confirming receipt of the 
document. The E-Filing system also distributes an email notice that 
provides access to the document to the NRC Office of the General 
Counsel and any others who have advised the Office of the Secretary 
that they wish to participate in the proceeding, so that the filer need 
not serve the documents on those participants separately. Therefore, 
any others who wish to participate in the proceeding (or their counsel 
or representative) must apply for and receive a digital ID certificate 
before a hearing request/petition to intervene is filed so that they 
can obtain access to the document via the E-Filing system.
    A person filing electronically using the agency's adjudicatory E-
Filing system may seek assistance by contacting the NRC Meta System 
Help Desk through the ``Contact Us'' link located on the NRC Web site 
at https://www.nrc.gov/site-help/e-submittals.html, by email at 
MSHD.Resource@nrc.gov, or by a toll-free call at 866-672-7640. The NRC 
Meta System Help Desk is available between 8 a.m. and 8 p.m., ET, 
Monday through Friday, excluding government holidays.
    Participants who believe that they have a good cause for not 
submitting documents electronically must file an exemption request, in 
accordance with 10 CFR 2.302(g), with their initial paper filing 
requesting authorization to continue to submit documents in paper 
format. Such filings must be submitted by: (1) First class mail 
addressed to the Office of the Secretary of the Commission, U.S. 
Nuclear Regulatory Commission, Washington, DC 20555-0001, Attention: 
Rulemaking and Adjudications Staff; or (2) courier, express mail, or 
expedited delivery service to the Office of the Secretary, Sixteenth 
Floor, One White Flint North, 11555 Rockville Pike, Rockville, 
Maryland, 20852, Attention: Rulemaking and Adjudications Staff. 
Participants filing a document in this manner are responsible for 
serving the document on all other participants. Filing is considered 
complete by first-class mail as of the time of deposit in the mail, or 
by courier, express mail, or expedited delivery service upon depositing 
the document with the provider of the service. A presiding officer, 
having granted an exemption request from using E-Filing, may require a 
participant or party to use E-Filing if the presiding officer 
subsequently determines that the reason for granting the exemption from 
use of E-Filing no longer exists.
    Documents submitted in adjudicatory proceedings will appear in 
NRC's electronic hearing docket, which is available to the public at 
https://ehd1.nrc.gov/ehd/, unless excluded pursuant to an order of the 
Commission or the presiding officer. Participants are requested not to 
include personal privacy information, such as social security numbers, 
home addresses, or home phone numbers in their filings, unless an NRC 
regulation or other law requires submission of such information. With 
respect to copyrighted works, except for limited excerpts that serve 
the purpose of the adjudicatory filings and would constitute a Fair Use 
application, participants are requested not to include copyrighted 
materials in their submission.
    If a person other than CB&I requests a hearing, that person shall 
set forth with particularity the manner in which his interest is 
adversely affected by this Order and shall address the criteria set 
forth in 10 CFR 2.309(d) and (f).
    If a hearing is requested by a person whose interest is adversely 
affected, the Commission will issue an Order designating the time and 
place of any hearings. If a hearing is held, the issue to be considered 
at such hearing shall be whether this Order should be sustained. 
Pursuant to 10 CFR 2.202(c)(2)(i), CB&I or any other person adversely 
affected by this Order, may, in addition to demanding a hearing, at the 
time the answer is filed or sooner, move the presiding officer to set 
aside the immediate effectiveness of the Order on the ground that the 
Order, including the need for immediate effectiveness, is not based on 
adequate evidence but on mere suspicion, unfounded allegations, or 
error. In the absence of any request for hearing, or written approval 
of an extension of time in which to request a hearing, the provisions 
specified in Section IV above shall be final 20 days from the date this 
Order is published in the Federal Register without further order or 
proceedings. If an extension of time for requesting a hearing has been 
approved, the provisions specified in Section IV shall be final when 
the extension expires if a hearing request has not been received.
    An answer or a request for hearing shall not stay the immediate 
effectiveness of this order.

    Dated at Rockville, Maryland, this 16th day of September 2013.

    For the Nuclear Regulatory Commission.
Roy P. Zimmerman,
Director, Office of Enforcement.
[FR Doc. 2013-23318 Filed 9-24-13; 8:45 am]