Disclosure to Shareholders, 58449 [2013-23370]
Download as PDF
58449
Rules and Regulations
Federal Register
Vol. 78, No. 185
Tuesday, September 24, 2013
This section of the FEDERAL REGISTER
contains regulatory documents having general
applicability and legal effect, most of which
are keyed to and codified in the Code of
Federal Regulations, which is published under
50 titles pursuant to 44 U.S.C. 1510.
The Code of Federal Regulations is sold by
the Superintendent of Documents. Prices of
new books are listed in the first FEDERAL
REGISTER issue of each week.
FARM CREDIT ADMINISTRATION
12 CFR Part 620
Disclosure to Shareholders
CFR Correction
In Title 12 of the Code of Federal
Regulations, Parts 600 to 899, revised as
of January 1, 2013, on page 253, in
§ 620.5, paragraphs (i), (j) and (k) are
removed and paragraphs (l), (m) and (n)
are redesignated as (i), (j) and (k).
[FR Doc. 2013–23370 Filed 9–23–13; 8:45 am]
BILLING CODE 1505–01–D
DEPARTMENT OF ENERGY
modifications improve reliability either
by extending applicability of the
Reliability Standard to certain generator
interconnection facilities, or by
clarifying that the existing Reliability
Standard is and remains applicable to
generator interconnection facilities. The
Commission also approves the related
Violation Risk Factors and Violation
Severity Levels, as well as the
implementation plan and effective dates
proposed by NERC.
DATES: Effective Date: This rule will
become effective November 25, 2013.
FOR FURTHER INFORMATION CONTACT:
Susan Morris (Technical Information),
Office of Electric Reliability, Division
of Reliability Standards and Security,
Federal Energy Regulatory
Commission, 888 First Street NE.,
Washington, DC 20426, (202) 502–
6803, susan.morris@ferc.gov.
Julie Greenisen (Legal Information),
Office of the General Counsel, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC
20426 (202) 502–6362,
julie.greenisen@ferc.gov.
SUPPLEMENTARY INFORMATION:
144 FERC ¶ 61,221
Federal Energy Regulatory
Commission
Order No. 785
18 CFR Part 40
Issued September 19, 2013
1. Pursuant to section 215 of the
Federal Power Act (FPA),1 the
Commission hereby approves
modifications to four existing Reliability
Standards submitted by the North
American Electric Reliability
Corporation (NERC), the Commission
certified Electric Reliability
Organization. Specifically, the
Commission approves Reliability
Standards FAC–001–1 (Facility
Connection Requirements), FAC–003–3
(Transmission Vegetation Management),
PRC–004–2.1a (Analysis and Mitigation
of Transmission and Generation
Protection System Misoperations), and
PRC–005–1.1b (Transmission and
Generation Protection System
Maintenance and Testing). The
modifications to these standards
improve reliability either by extending
their applicability to certain generator
interconnection facilities, or by
clarifying that the existing Reliability
Standard is and remains applicable to
Final Rule
[Docket No. RM12–16–000; Order No. 785]
Generator Requirements at the
Transmission Interface
Federal Energy Regulatory
Commission.
ACTION: Final rule.
AGENCY:
Pursuant to section 215 of the
Federal Power Act, the Federal Energy
Regulatory Commission (Commission)
approves modifications to four existing
Reliability Standards submitted by the
North American Electric Reliability
Corporation (NERC), the Commission
certified Electric Reliability
Organization. Specifically, the
Commission approves Reliability
Standards FAC–001–1 (Facility
Connection Requirements), FAC–003–3
(Transmission Vegetation Management),
PRC–004–2.1a (Analysis and Mitigation
of Transmission and Generation
Protection System Misoperations), and
PRC–005–1.1b (Transmission and
Generation Protection System
Maintenance and Testing). The
tkelley on DSK3SPTVN1PROD with RULES
SUMMARY:
VerDate Mar<15>2010
17:12 Sep 23, 2013
Jkt 229001
1 16
PO 00000
U.S.C. 824o (2006).
Frm 00001
Fmt 4700
Sfmt 4700
generator interconnection facilities. The
Commission also approves the related
Violation Risk Factors and Violation
Severity Levels, as well as the
implementation plan and effective dates
proposed by NERC.
I. Background
A. Regulatory Background—Section 215
of the FPA
Section 215 of the FPA requires a
Commission-certified Electric
Reliability Organization (ERO) to
develop mandatory and enforceable
Reliability Standards, which are subject
to Commission review and approval.2
Once approved, the Reliability
Standards may be enforced either by the
ERO (subject to Commission oversight),
or by the Commission independently.3
In 2006, the Commission established
a process to select and certify an ERO 4
and, subsequently, certified NERC as the
ERO.5 In 2007, in Order No. 693, the
Commission approved 83 Reliability
Standards submitted by NERC,
including initial versions of Reliability
Standards FAC–001, FAC–003, PRC–
004, and PRC–005.6 Further, in Order
No. 693, the Commission approved
NERC’s compliance registry process,
including NERC’s Statement of
Compliance Registry Criteria (Registry
Criteria), which describes how NERC
and the Regional Entities 7 will identify
the entities that should be registered for
compliance with mandatory Reliability
Standards.8 While that process allows a
Regional Entity to register an entity over
its objection, NERC’s Rules of Procedure
provide a mechanism for NERC review
2 Id.
824o(c) and (d).
id. 824o(e).
4 Rules Concerning Certification of the Electric
Reliability Organization; and Procedures for the
Establishment, Approval and Enforcement of
Electric Reliability Standards, Order No. 672, FERC
Stats. & Regs. ¶ 31,204, order on reh’g, Order No.
672–A, FERC Stats. & Regs. ¶ 31,212 (2006).
5 North American Electric Reliability Corp., 116
FERC ¶ 61,062, order on reh’g and compliance, 117
FERC ¶ 61,126 (2006), aff’d sub nom. Alcoa, Inc.
v. FERC, 564 F.3d 1342 (D.C. Cir. 2009).
6 Mandatory Reliability Standards for the BulkPower System, Order No. 693, FERC Stats. & Regs.
¶ 31,242 (2007) (Order No. 693), order on reh’g,
Order No. 693–A, 120 FERC ¶ 61,053 (2007).
7 NERC is authorized to delegate certain authority
to regional entities as prescribed by FPA section
215(e)(4). See 16 U.S.C. 824o(e)(4).
8 Order No. 693, FERC Stats. & Regs. ¶ 31,242 at
PP 92–95. The Commission has approved
subsequent amendments to the Registry Criteria.
See, e.g., North American Electric Reliability Corp.,
122 FERC ¶ 61,101 (2008).
3 See
E:\FR\FM\24SER1.SGM
24SER1
Agencies
[Federal Register Volume 78, Number 185 (Tuesday, September 24, 2013)]
[Rules and Regulations]
[Page 58449]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-23370]
========================================================================
Rules and Regulations
Federal Register
________________________________________________________________________
This section of the FEDERAL REGISTER contains regulatory documents
having general applicability and legal effect, most of which are keyed
to and codified in the Code of Federal Regulations, which is published
under 50 titles pursuant to 44 U.S.C. 1510.
The Code of Federal Regulations is sold by the Superintendent of Documents.
Prices of new books are listed in the first FEDERAL REGISTER issue of each
week.
========================================================================
Federal Register / Vol. 78, No. 185 / Tuesday, September 24, 2013 /
Rules and Regulations
[[Page 58449]]
FARM CREDIT ADMINISTRATION
12 CFR Part 620
Disclosure to Shareholders
CFR Correction
In Title 12 of the Code of Federal Regulations, Parts 600 to 899,
revised as of January 1, 2013, on page 253, in Sec. 620.5, paragraphs
(i), (j) and (k) are removed and paragraphs (l), (m) and (n) are
redesignated as (i), (j) and (k).