FirstEnergy Generation, LLC, Allegheny Energy Supply Company, LLC, and Green Valley Hydro, LLC, Seneca Generation, LLC, Lake Lynn Generation, LLC, All Dams Generation, LLC, and PE Hydro Generation, LLC; Notice of Application for Transfer of Licenses, and Soliciting Comments and Motions to Intervene, 58533-58534 [2013-23172]
Download as PDF
58533
Federal Register / Vol. 78, No. 185 / Tuesday, September 24, 2013 / Notices
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Filings Instituting Proceedings
Docket Numbers: PR13–62–000
Applicants: Columbia Gas of
Maryland, Inc.
Description: Tariff filing per 284.123/
.224: Statement of Operating
Conditions to be effective 8/30/2013
Filed Date: 8/30/13
Accession Number: 20130830–5107
Comments Due: 5 p.m. ET 9/20/13
Docket Numbers: PR13–63–000
Applicants: American Midstream
(SIGCO Intrastate), LLC
Description: Tariff filing per
284.123(b)(2)/.: SIGCO Rate Petition to
be effective 8/12/2013
Filed Date: 9/11/13
Accession Number: 20130911–5073
Comments Due: 5 p.m. ET 10/2/13
Docket Numbers: CP13–548–000
Applicants: Montana-Dakota Utilities
Co.
Project numbers
Description: Application for a Limited
Jurisdiction Blanket Certificate of Public
Convenience and Necessity
Filed Date: 9/17/13
Accession Number: 20130917–5080
Comments Due: 5 p.m. ET 9/30/13
Docket Numbers: RP13–1329–000
Applicants: Southeast Supply Header,
LLC
Description: Hourly Nomination/
Scheduling Flexibility to be effective
10/16/2013
Filed Date: 9/16/13
Accession Number: 20130916–5112
Comments Due: 5 p.m. ET 9/30/13
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
Dated: September 18, 2013.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2013–23168 Filed 9–23–13; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project Nos. 2280–017, 2343–084, 2459–
245, 2516–057, 2517–036, 3494–091, 3671–
086, 2391–046, 2425–052, and 2509–046]
FirstEnergy Generation, LLC,
Allegheny Energy Supply Company,
LLC, and Green Valley Hydro, LLC,
Seneca Generation, LLC, Lake Lynn
Generation, LLC, All Dams Generation,
LLC, and PE Hydro Generation, LLC;
Notice of Application for Transfer of
Licenses, and Soliciting Comments
and Motions to Intervene
September 18, 2013.
On September 4, 2013, a transfer of
license application was filed to include
the following projects:
Transferees
Project names
Locations
FirstEnergy Generation,
LLC.
Allegheny Energy Supply
Company, L.L.C..
Allegheny Energy Supply
Company, L.L.C..
Seneca Generation, LLC ...
Kinzua Pumped Storage ....
PE Hydro Generation, LLC
Millville ................................
Lake Lynn Generation, LLC
Lake Lynn ..........................
PE Hydro Generation, LLC
Dam No. 4 Hydro Station ..
PE Hydro Generation, LLC
Dam No. 5 Hydro Station ..
All Dams Generation, LLC
P–2391–046 .......
Allegheny Energy Supply
Company, L.L.C..
Allegheny Energy Supply
Company, L.L.C..
Allegheny Energy Supply
Company, L.L.C..
Allegheny Energy Supply
Company, L.L.C..
Green Valley Hydro, LLC ...
Allegheny Lock & Dam No.
6.
Allegheny Lock & Dam No.
5.
Warren ...............................
P–2425–052 .......
Green Valley Hydro, LLC ...
PE Hydro Generation, LLC
P–2509–046 .......
Green Valley Hydro, LLC ...
PE Hydro Generation, LLC
Allegheny River, Warren County,
PA
Shenandoah
River,
Jefferson
County, WV
Cheat River a tributary of the
Monongahela River, Monongalia
County, WV & Fayette County,
PA
Potomac River, Berkeley and Jefferson counties, WV
Potomac River, Berkeley County,
WV
Allegheny River, Armstrong County, PA
Allegheny River, Armstrong County, PA
Shenandoah River, Warren County, VA
Shenandoah River, Page County,
VA
Shenandoah River, Page County,
VA
P–2280–017 .......
P–2343–084 .......
P–2459–245 .......
P–2516–057 .......
P–2517–036 .......
P–3494–091 .......
mstockstill on DSK4VPTVN1PROD with NOTICES
P–3671–086 .......
Transferors
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Applicants seek Commission approval
to transfer the licenses for the above
projects from the transferors to the
transferees.
Applicants’ Contact: For Transferors:
Mr. Morgan E. Parke, FirstEnergy
Service Company, 76 South Main Street,
Akron, OH 44308–1890, (330) 384–4595
and Mr. John A. Whittaker, IV, Winston
& Strawn LLP, 1700 K Street NW.,
VerDate Mar<15>2010
19:49 Sep 23, 2013
Jkt 229001
All Dams Generation, LLC
PE Hydro Generation, LLC
Luray and Newport ............
Developments ....................
Shenandoah .......................
Washington, DC 20006–3817, (202) 282–
5766. For Transferees: Mr. Scott Carver,
LS Power Development, LLC, Two
Tower Center, 11th Floor, East
Brunswick, NJ 08816, (732) 249–6750
and Mr. James B. Vasile, Davis Wright
Tremaine LLP, 1919 Pennsylvania
Avenue NW., Suite 800, Washington,
DC 20006, (202) 973–4262.
PO 00000
Frm 00023
Fmt 4703
Sfmt 4703
FERC Contact: Patricia W. Gillis (202)
502–8735, patricia.gillis@ferc.gov.
Deadline for filing comments and
motions to intervene: 30 days from the
issuance date of this notice by the
Commission. Comments and motions to
intervene may be filed electronically via
the Internet. See 18 CFR 385.2001(a)(1)
and the instructions on the
Commission’s Web site under https://
E:\FR\FM\24SEN1.SGM
24SEN1
58534
Federal Register / Vol. 78, No. 185 / Tuesday, September 24, 2013 / Notices
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. If unable to be filed
electronically, documents may be paperfiled. To paper-file, an original plus
seven copies should be mailed to:
Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
More information about this project can
be viewed or printed on the eLibrary
link of Commission’s Web site at https://
www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number(s) (P–2280, P–
2343, P–2459, P–2516, P–2517, P–3494,
P–3671, P–2391, P–2425, or P–2509) in
the docket number field to access the
document. For assistance, call toll-free
1–866–208–3372.
Dated: September 18, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013–23172 Filed 9–23–13; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13570–002]
mstockstill on DSK4VPTVN1PROD with NOTICES
Warm Springs Irrigation District;
Notice of Technical Meeting
a. Project Name and Number: Warm
Springs Dam Hydroelectric Project No.
13570
b. Date and Time of Meeting: October
1, 2013; 11:00 a.m. Pacific Time (2:00
p.m. Eastern Time).
c. Place: Telephone conference call.
d. FERC Contact: Kelly Wolcott,
kelly.wolcott@ferc.gov or (202) 502–
6480.
e. Purpose of Meeting: Discuss the
special status species plant survey for
Stanleya confertiflora requested by the
U.S. Bureau of Land Management on
June 7, 2013; the coordination of the
National Environmental Policy Act
(NEPA) analysis; and the overall
processing schedule for the project.
f. Proposed Agenda:
1. Introduction.
2. Meeting objectives.
3. Plant survey discussion.
4. NEPA coordination.
5. Schedule of Project.
g. A summary of the meeting will be
prepared for the project’s record.
h. All local, state, and federal
agencies, Indian tribes, and other
VerDate Mar<15>2010
19:49 Sep 23, 2013
Jkt 229001
interested parties are invited to
participate by phone. Please contact
Kelly Wolcott at kelly.wolcott@ferc.gov
or (202) 502–6480 by close of business
Thursday, September 26, 2013, to RSVP
and to receive specific instructions on
how to participate.
Dated: September 17, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013–23130 Filed 9–23–13; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13705–002]
White Pine Waterpower, LLC; Notice of
Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions to Intervene, and
Competing Applications
On September 4, 2013, White Pine
Waterpower, LLC, Idaho, filed an
application for a preliminary permit,
pursuant to section 4(f) of the Federal
Power Act (FPA), proposing to study the
feasibility of the White Pine Pumped
Storage Project (or project) to be located
near the town of Ely, White Pine
County, Nevada. The sole purpose of a
preliminary permit, if issued, is to grant
the permit holder priority to file a
license application during the permit
term. A preliminary permit does not
authorize the permit holder to perform
any land-disturbing activities or
otherwise enter upon lands or waters
owned by others without the owners’
express permission.
The proposed project would consist of
the following: (1) An artificially lined,
upper reservoir having a capacity of
5,535 acre-feet at 8,550 feet above mean
sea level (msl); (2) an artificially lined,
lower reservoir having a capacity of
5,535 acre-feet at 6,325 feet msl; (3) a
1,270-foot-long, 185-foot-high concreteface, rock-fill (CFRD) or rollercompacted concrete (RCC) upper dam;
(4) a 250-foot-long, 10-foot-high earthen
dike; (5) a 630-foot-long, 40-foot-high
CRFD or earthen dike; (6) a 7,200-footlong, 40-foot-high zoned earth-and rockfill or earthen dam; (7) a 3,400-foot-long,
17-foot-diameter unlined or concretelined low pressure tunnel; (8) a 2,200foot-long, 17-foot-diameter concretelined and steel-lined vertical pressure
shaft; (9) a 6,500-foot-long, 17-footdiameter steel-lined high pressure
tunnel; (10) a 2,200-foot-long, 20.5-footdiameter unlined or concrete-lined
tailrace; (11) a 350-foot-long by 100-foot-
PO 00000
Frm 00024
Fmt 4703
Sfmt 4703
wide by 120-foot-high powerhouse
located underground approximately
1,500 feet east of the lower reservoir at
an elevation of approximately 6,000 feet
msl; (12) three 250-megawatt (MW)
reversible pump-turbines, totaling 750
MW of generating capacity; (13) a 2,950foot-long, 24-foot-diamter access tunnel
that would lead from ground level to the
powerhouse; (14) either a single-circuit
345-kilovolt (kV) or double-circuit 230kV transmission line extending
approximately 1.1 mile in length to the
Gondor substation, operated by Sierra
Pacific Power and owned by Mt. White
Power and partners in the
Intermountain Power Project; and (15)
associated interconnection equipment.
The estimated annual generation of the
project would be 1,970 gigawatt-hours.
Applicant Contact: Mr. Matthew
Shapiro, CEO, Gridflex Energy, LLC,
1210 W. Franklin St., Ste. 2, Boise,
Idaho 83702; phone: (208) 246–9925.
FERC Contact: Mary Greene; phone:
(202) 502–8865.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36.
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, notices of intent,
and competing applications using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
The first page of any filing should
include docket number P–13705–002.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of Commission’s Web site at https://
www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P–13705) in
the docket number field to access the
document. For assistance, contact FERC
Online Support.
E:\FR\FM\24SEN1.SGM
24SEN1
Agencies
[Federal Register Volume 78, Number 185 (Tuesday, September 24, 2013)]
[Notices]
[Pages 58533-58534]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-23172]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project Nos. 2280-017, 2343-084, 2459-245, 2516-057, 2517-036, 3494-
091, 3671-086, 2391-046, 2425-052, and 2509-046]
FirstEnergy Generation, LLC, Allegheny Energy Supply Company,
LLC, and Green Valley Hydro, LLC, Seneca Generation, LLC, Lake Lynn
Generation, LLC, All Dams Generation, LLC, and PE Hydro Generation,
LLC; Notice of Application for Transfer of Licenses, and Soliciting
Comments and Motions to Intervene
September 18, 2013.
On September 4, 2013, a transfer of license application was filed
to include the following projects:
----------------------------------------------------------------------------------------------------------------
Project numbers Transferors Transferees Project names Locations
----------------------------------------------------------------------------------------------------------------
P-2280-017.................... FirstEnergy Seneca Generation, Kinzua Pumped Allegheny River,
Generation, LLC. LLC. Storage. Warren County, PA
P-2343-084.................... Allegheny Energy PE Hydro Millville........ Shenandoah River,
Supply Company, Generation, LLC. Jefferson County, WV
L.L.C..
P-2459-245.................... Allegheny Energy Lake Lynn Lake Lynn........ Cheat River a
Supply Company, Generation, LLC. tributary of the
L.L.C.. Monongahela River,
Monongalia County,
WV & Fayette County,
PA
P-2516-057.................... Allegheny Energy PE Hydro Dam No. 4 Hydro Potomac River,
Supply Company, Generation, LLC. Station. Berkeley and
L.L.C.. Jefferson counties,
WV
P-2517-036.................... Allegheny Energy PE Hydro Dam No. 5 Hydro Potomac River,
Supply Company, Generation, LLC. Station. Berkeley County, WV
L.L.C..
P-3494-091.................... Allegheny Energy All Dams Allegheny Lock & Allegheny River,
Supply Company, Generation, LLC. Dam No. 6. Armstrong County, PA
L.L.C..
P-3671-086.................... Allegheny Energy All Dams Allegheny Lock & Allegheny River,
Supply Company, Generation, LLC. Dam No. 5. Armstrong County, PA
L.L.C..
P-2391-046.................... Green Valley PE Hydro Warren........... Shenandoah River,
Hydro, LLC. Generation, LLC. Warren County, VA
P-2425-052.................... Green Valley PE Hydro Luray and Newport Shenandoah River,
Hydro, LLC. Generation, LLC. Developments..... Page County, VA
P-2509-046.................... Green Valley PE Hydro Shenandoah....... Shenandoah River,
Hydro, LLC. Generation, LLC. Page County, VA
----------------------------------------------------------------------------------------------------------------
Applicants seek Commission approval to transfer the licenses for
the above projects from the transferors to the transferees.
Applicants' Contact: For Transferors: Mr. Morgan E. Parke,
FirstEnergy Service Company, 76 South Main Street, Akron, OH 44308-
1890, (330) 384-4595 and Mr. John A. Whittaker, IV, Winston & Strawn
LLP, 1700 K Street NW., Washington, DC 20006-3817, (202) 282-5766. For
Transferees: Mr. Scott Carver, LS Power Development, LLC, Two Tower
Center, 11th Floor, East Brunswick, NJ 08816, (732) 249-6750 and Mr.
James B. Vasile, Davis Wright Tremaine LLP, 1919 Pennsylvania Avenue
NW., Suite 800, Washington, DC 20006, (202) 973-4262.
FERC Contact: Patricia W. Gillis (202) 502-8735,
patricia.gillis@ferc.gov.
Deadline for filing comments and motions to intervene: 30 days from
the issuance date of this notice by the Commission. Comments and
motions to intervene may be filed electronically via the Internet. See
18 CFR 385.2001(a)(1) and the instructions on the Commission's Web site
under https://
[[Page 58534]]
www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief
comments up to 6,000 characters, without prior registration, using the
eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You
must include your name and contact information at the end of your
comments. If unable to be filed electronically, documents may be paper-
filed. To paper-file, an original plus seven copies should be mailed
to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC 20426. More information about this
project can be viewed or printed on the eLibrary link of Commission's
Web site at https://www.ferc.gov/docs-filing/elibrary.asp. Enter the
docket number(s) (P-2280, P-2343, P-2459, P-2516, P-2517, P-3494, P-
3671, P-2391, P-2425, or P-2509) in the docket number field to access
the document. For assistance, call toll-free 1-866-208-3372.
Dated: September 18, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013-23172 Filed 9-23-13; 8:45 am]
BILLING CODE 6717-01-P