Warm Springs Irrigation District; Notice of Technical Meeting, 58534 [2013-23130]
Download as PDF
58534
Federal Register / Vol. 78, No. 185 / Tuesday, September 24, 2013 / Notices
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. If unable to be filed
electronically, documents may be paperfiled. To paper-file, an original plus
seven copies should be mailed to:
Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
More information about this project can
be viewed or printed on the eLibrary
link of Commission’s Web site at https://
www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number(s) (P–2280, P–
2343, P–2459, P–2516, P–2517, P–3494,
P–3671, P–2391, P–2425, or P–2509) in
the docket number field to access the
document. For assistance, call toll-free
1–866–208–3372.
Dated: September 18, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013–23172 Filed 9–23–13; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13570–002]
mstockstill on DSK4VPTVN1PROD with NOTICES
Warm Springs Irrigation District;
Notice of Technical Meeting
a. Project Name and Number: Warm
Springs Dam Hydroelectric Project No.
13570
b. Date and Time of Meeting: October
1, 2013; 11:00 a.m. Pacific Time (2:00
p.m. Eastern Time).
c. Place: Telephone conference call.
d. FERC Contact: Kelly Wolcott,
kelly.wolcott@ferc.gov or (202) 502–
6480.
e. Purpose of Meeting: Discuss the
special status species plant survey for
Stanleya confertiflora requested by the
U.S. Bureau of Land Management on
June 7, 2013; the coordination of the
National Environmental Policy Act
(NEPA) analysis; and the overall
processing schedule for the project.
f. Proposed Agenda:
1. Introduction.
2. Meeting objectives.
3. Plant survey discussion.
4. NEPA coordination.
5. Schedule of Project.
g. A summary of the meeting will be
prepared for the project’s record.
h. All local, state, and federal
agencies, Indian tribes, and other
VerDate Mar<15>2010
19:49 Sep 23, 2013
Jkt 229001
interested parties are invited to
participate by phone. Please contact
Kelly Wolcott at kelly.wolcott@ferc.gov
or (202) 502–6480 by close of business
Thursday, September 26, 2013, to RSVP
and to receive specific instructions on
how to participate.
Dated: September 17, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013–23130 Filed 9–23–13; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13705–002]
White Pine Waterpower, LLC; Notice of
Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions to Intervene, and
Competing Applications
On September 4, 2013, White Pine
Waterpower, LLC, Idaho, filed an
application for a preliminary permit,
pursuant to section 4(f) of the Federal
Power Act (FPA), proposing to study the
feasibility of the White Pine Pumped
Storage Project (or project) to be located
near the town of Ely, White Pine
County, Nevada. The sole purpose of a
preliminary permit, if issued, is to grant
the permit holder priority to file a
license application during the permit
term. A preliminary permit does not
authorize the permit holder to perform
any land-disturbing activities or
otherwise enter upon lands or waters
owned by others without the owners’
express permission.
The proposed project would consist of
the following: (1) An artificially lined,
upper reservoir having a capacity of
5,535 acre-feet at 8,550 feet above mean
sea level (msl); (2) an artificially lined,
lower reservoir having a capacity of
5,535 acre-feet at 6,325 feet msl; (3) a
1,270-foot-long, 185-foot-high concreteface, rock-fill (CFRD) or rollercompacted concrete (RCC) upper dam;
(4) a 250-foot-long, 10-foot-high earthen
dike; (5) a 630-foot-long, 40-foot-high
CRFD or earthen dike; (6) a 7,200-footlong, 40-foot-high zoned earth-and rockfill or earthen dam; (7) a 3,400-foot-long,
17-foot-diameter unlined or concretelined low pressure tunnel; (8) a 2,200foot-long, 17-foot-diameter concretelined and steel-lined vertical pressure
shaft; (9) a 6,500-foot-long, 17-footdiameter steel-lined high pressure
tunnel; (10) a 2,200-foot-long, 20.5-footdiameter unlined or concrete-lined
tailrace; (11) a 350-foot-long by 100-foot-
PO 00000
Frm 00024
Fmt 4703
Sfmt 4703
wide by 120-foot-high powerhouse
located underground approximately
1,500 feet east of the lower reservoir at
an elevation of approximately 6,000 feet
msl; (12) three 250-megawatt (MW)
reversible pump-turbines, totaling 750
MW of generating capacity; (13) a 2,950foot-long, 24-foot-diamter access tunnel
that would lead from ground level to the
powerhouse; (14) either a single-circuit
345-kilovolt (kV) or double-circuit 230kV transmission line extending
approximately 1.1 mile in length to the
Gondor substation, operated by Sierra
Pacific Power and owned by Mt. White
Power and partners in the
Intermountain Power Project; and (15)
associated interconnection equipment.
The estimated annual generation of the
project would be 1,970 gigawatt-hours.
Applicant Contact: Mr. Matthew
Shapiro, CEO, Gridflex Energy, LLC,
1210 W. Franklin St., Ste. 2, Boise,
Idaho 83702; phone: (208) 246–9925.
FERC Contact: Mary Greene; phone:
(202) 502–8865.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36.
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, notices of intent,
and competing applications using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
The first page of any filing should
include docket number P–13705–002.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of Commission’s Web site at https://
www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P–13705) in
the docket number field to access the
document. For assistance, contact FERC
Online Support.
E:\FR\FM\24SEN1.SGM
24SEN1
Agencies
[Federal Register Volume 78, Number 185 (Tuesday, September 24, 2013)]
[Notices]
[Page 58534]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-23130]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 13570-002]
Warm Springs Irrigation District; Notice of Technical Meeting
a. Project Name and Number: Warm Springs Dam Hydroelectric Project
No. 13570
b. Date and Time of Meeting: October 1, 2013; 11:00 a.m. Pacific
Time (2:00 p.m. Eastern Time).
c. Place: Telephone conference call.
d. FERC Contact: Kelly Wolcott, kelly.wolcott@ferc.gov or (202)
502-6480.
e. Purpose of Meeting: Discuss the special status species plant
survey for Stanleya confertiflora requested by the U.S. Bureau of Land
Management on June 7, 2013; the coordination of the National
Environmental Policy Act (NEPA) analysis; and the overall processing
schedule for the project.
f. Proposed Agenda:
1. Introduction.
2. Meeting objectives.
3. Plant survey discussion.
4. NEPA coordination.
5. Schedule of Project.
g. A summary of the meeting will be prepared for the project's
record.
h. All local, state, and federal agencies, Indian tribes, and other
interested parties are invited to participate by phone. Please contact
Kelly Wolcott at kelly.wolcott@ferc.gov or (202) 502-6480 by close of
business Thursday, September 26, 2013, to RSVP and to receive specific
instructions on how to participate.
Dated: September 17, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013-23130 Filed 9-23-13; 8:45 am]
BILLING CODE 6717-01-P