Environmental Impacts Statements; Notice of Availability, 57849 [2013-22963]
Download as PDF
mstockstill on DSK4VPTVN1PROD with NOTICES
Federal Register / Vol. 78, No. 183 / Friday, September 20, 2013 / Notices
National Science Foundation and other
interested Federal agencies regarding
the monitoring regime.
In cases of emergency related to the
safety of human life or of ships, aircraft,
equipment and facilities of high value,
or the protection of the environment
which would require an activity to be
undertaken without completion of the
documentation procedures set out in the
Rule, the operator would need to notify
the Department of State within 15 days
of any activities which would have
otherwise required preparation of a CEE,
and provide a full explanation of the
activities carried out within 45 days of
those activities. (During the time the
Interim Final and Final Rules have been
in effect, there were no emergencies
requiring notification by U.S. operators.
An Interim Final Rule was in effect from
April 30, 1997, until replaced on
December 6, 2001, by the Final Rule).
Environmental documents (e.g.,
PERM, IEE, CEE) are submitted to OFA.
Environmental documents are reviewed
by OFA, in consultation with the
National Science Foundation and other
interested Federal agencies, and also
made available to other Parties and the
public as required under the Protocol or
otherwise requested. OFA notifies the
public of document availability via the
World Wide Web at: https://www.epa.
gov/compliance/international/
antarctica/. The types of
nongovernmental activities currently
being carried out (e.g., ship-based tours,
land-based tours, flights, and privately
funded research expeditions) are
typically unlikely to have impacts that
are more than minor or transitory, thus
an IEE is the typical level of
environmental documentation
submitted. For the 1997–1998 through
2012–2013 austral summer seasons
during the time the Rule has been in
effect, all respondents submitted IEEs
with the exception of two PERMs.
Paperwork reduction provisions in the
Rule that are used by the operators
include: a) Incorporation of material in
the environmental document by
referring to it in the IEE, b) inclusion of
all proposed expeditions by one
operator within one IEE; c) use of one
IEE to address expeditions being carried
out by more than one operator; and d)
use of multi-year environmental
documentation to address proposed
expeditions for a period of up to five
consecutive austral summer seasons.
Coordination of Review of
Information Received from Other Parties
to the Treaty. The Rule also provides for
the coordination of review of
information received from other Parties
and the public availability of that
information including: (1) A description
VerDate Mar<15>2010
17:24 Sep 19, 2013
Jkt 229001
of national procedures for considering
the environmental impacts of proposed
activities; (2) an annual list of any IEEs
and any decisions taken in consequence
thereof; (3) significant information
obtained and any action taken in
consequence thereof with regard to
monitoring from IEEs to CEEs; and (4)
information in a final CEE. This
provision fulfills the United States’
obligation to meet the requirements of
Article 6 of Annex I to the Protocol. The
Department of State is responsible for
coordination of these reviews of drafts
with interested Federal agencies, and for
public availability of documents and
information. This portion of the Rule
does not impose paperwork
requirements on any nongovernmental
person subject to U.S. regulation.
Form Numbers: None.
Respondents/affected entities: Entities
potentially affected by this action are all
nongovernmental operators with
activities in Antarctica, including tour
operators, for which the United States is
required to give advance notice under
paragraph 5 of Article VII of the
Antarctic Treaty of 1959; this includes
all nongovernmental expeditions to and
within Antarctica organized in or
proceeding from the territory of the
United States.
Respondent’s obligation to respond:
Mandatory (40 CFR Part 8).
Estimated number of respondents: 18.
Frequency of response: Annual.
Total estimated burden: 1,254 hours.
Total estimated cost: $100,575
includes $3,390 annualized capital or
operation & maintenance costs.
Changes in Estimates: There is a
decrease of 454 hours in the total
estimated respondent burden compared
with the ICR currently approved by
OMB. This decrease is the result of a
change to the level of environmental
documentation EPA anticipates the
operators will submit as well as an
anticipated decrease of operators
submitting documentation.
Dated: September 17, 2013.
Cliff Rader,
Director, NEPA Compliance Division, Office
of Federal Activities.
[FR Doc. 2013–22927 Filed 9–19–13; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–9011–2]
Environmental Impacts Statements;
Notice of Availability
Responsible Agency: Office of Federal
Activities, General Information (202)
PO 00000
Frm 00013
Fmt 4703
Sfmt 9990
57849
564–7146 or https://www.epa.gov/
compliance/nepa/.
Weekly receipt of Environmental Impact
Statements
Filed 09/09/2013 Through 09/13/2013
Pursuant to 40 CFR 1506.9.
Notice
Section 309(a) of the Clean Air Act
requires that EPA make public its
comments on EISs issued by other
Federal agencies. EPA’s comment letters
on EISs are available at: https://www.epa.
gov/compliance/nepa/eisdata.html.
EIS No. 20130273, Final EIS, USFS, WY,
Mackey Road Relocation, Review
Period Ends: 11/04/2013, Contact:
Misty Hays 307–358–4690.
EIS No. 20130274, Final EIS, USFS, OR,
Galena Project, Review Period Ends:
11/04/2013, Contact: Dave Halemeier
541–575–3401.
EIS No. 20130275, Final EIS, AFS, BLM,
CO, San Juan National Forest and
Proposed Tres Rios, Field Office Land
and Resource Management Plan,
Review Period Ends: 10/21/2013,
Contact: Mark Lambert 970–385–
1240.
The U.S. Department of Agriculture’s
Forest Service and the U.S. Department
of the Interior’s Bureau of Land
Management are joint lead agencies for
the above project.
EIS No. 20130276, Draft Supplement,
USN, WA, Introduction of the P–8A
Multi-Mission Aircraft into the U.S.
Navy Fleet, Comment Period Ends:
11/04/2013, Contact: Cory Zahm 757–
322–4347.
EIS No. 20130277, Final Supplement,
BLM, NV, Silver State Solar South
Project Proposed Resource
Management Plan Amendment,
Review Period Ends: 10/21/2013,
Contact: Nancy Christ 702–515–5136.
Amended Notices
EIS No. 20130227, Draft EIS, NASA, CA,
Proposed Demolition and
Environmental Cleanup Activities at
Santa Susana Field Laboratory,
Comment Period Ends: 10/01/2013,
Contact: Allen Elliott 256–544–0662.
Revision to FR Notice Published 08/02/
2013; Extending Comment Period
from 09/16/2013 to 0/01/2013.
Dated: September 17, 2013.
Aimee S. Hessert,
Deputy Director, NEPA Compliance Division,
Office of Federal Activities.
[FR Doc. 2013–22963 Filed 9–19–13; 8:45 am]
BILLING CODE 6560–50–P
E:\FR\FM\20SEN1.SGM
20SEN1
Agencies
[Federal Register Volume 78, Number 183 (Friday, September 20, 2013)]
[Notices]
[Page 57849]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-22963]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-9011-2]
Environmental Impacts Statements; Notice of Availability
Responsible Agency: Office of Federal Activities, General
Information (202) 564-7146 or https://www.epa.gov/compliance/nepa/.
Weekly receipt of Environmental Impact Statements
Filed 09/09/2013 Through 09/13/2013
Pursuant to 40 CFR 1506.9.
Notice
Section 309(a) of the Clean Air Act requires that EPA make public
its comments on EISs issued by other Federal agencies. EPA's comment
letters on EISs are available at: https://www.epa.gov/compliance/nepa/eisdata.html.
EIS No. 20130273, Final EIS, USFS, WY, Mackey Road Relocation, Review
Period Ends: 11/04/2013, Contact: Misty Hays 307-358-4690.
EIS No. 20130274, Final EIS, USFS, OR, Galena Project, Review Period
Ends: 11/04/2013, Contact: Dave Halemeier 541-575-3401.
EIS No. 20130275, Final EIS, AFS, BLM, CO, San Juan National Forest and
Proposed Tres Rios, Field Office Land and Resource Management Plan,
Review Period Ends: 10/21/2013, Contact: Mark Lambert 970-385-1240.
The U.S. Department of Agriculture's Forest Service and the U.S.
Department of the Interior's Bureau of Land Management are joint lead
agencies for the above project.
EIS No. 20130276, Draft Supplement, USN, WA, Introduction of the P-8A
Multi-Mission Aircraft into the U.S. Navy Fleet, Comment Period Ends:
11/04/2013, Contact: Cory Zahm 757-322-4347.
EIS No. 20130277, Final Supplement, BLM, NV, Silver State Solar South
Project Proposed Resource Management Plan Amendment, Review Period
Ends: 10/21/2013, Contact: Nancy Christ 702-515-5136.
Amended Notices
EIS No. 20130227, Draft EIS, NASA, CA, Proposed Demolition and
Environmental Cleanup Activities at Santa Susana Field Laboratory,
Comment Period Ends: 10/01/2013, Contact: Allen Elliott 256-544-0662.
Revision to FR Notice Published 08/02/2013; Extending Comment Period
from 09/16/2013 to 0/01/2013.
Dated: September 17, 2013.
Aimee S. Hessert,
Deputy Director, NEPA Compliance Division, Office of Federal
Activities.
[FR Doc. 2013-22963 Filed 9-19-13; 8:45 am]