Notice of Quarterly Report (April 1 2013-June 30, 2013), 57889-57903 [2013-22936]

Download as PDF Federal Register / Vol. 78, No. 183 / Friday, September 20, 2013 / Notices Annex C Income Classification for Scorecards Since MCC was created, it has relied on the World Bank’s gross national income (GNI) per capita income data (Atlas method) and the historical ceiling for eligibility as set by the World Bank’s International Development Association (IDA) to divide countries into two income categories for purposes of creating scorecards: LICs and LMICs. These categories are used to account for the income bias that occurs when countries with more per capita resources perform better than countries with fewer. Using the historical IDA eligibility ceiling for the scorecards ensures that the poorest countries compete with their income level peers and are not compared against countries with more resources to mobilize. MCC will continue to use the traditional income categories for eligibility to divide countries into two groups for FY 2014 scorecard comparisons: • Scorecard LICs are countries with GNI per capita below IDA’s historical ceiling for eligibility ($1,965 for FY 2014). • Scorecard LMICs are countries with GNI per capita above IDA’s historical ceiling for eligibility but below the World Bank’s upper middle income country threshold ($1,966– $4,085 for FY 2014). The list of countries categorized as LICs and LMICs for the purpose of scorecard assessments can be found below.1 Low Income Countries (FY 2014 Scorecard) 1. Afghanistan mstockstill on DSK4VPTVN1PROD with NOTICES 1 In December 2011, a statutory change requested by the agency altered the way MCC must group countries in determining whether MCC’s 25 percent LMIC funding cap applies. This change, designed to bring stability to the funding stream, affects how MCC funds countries selected as eligible and does not affect the way scorecards are created. For determining whether a country can be funded as an LMIC or LIC: Æ The poorest 75 countries are now considered low income for the purposes of MCC funding. They are not limited by the 25 percent funding cap on LMICs. Æ Countries with a GNI per capita above the poorest 75 but below the World Bank’s upper middle income country threshold ($4,035 in FY 2014) are considered LMICs for the purposes of MCC funding. By law, no more than 25 percent of all compact funds for a given fiscal year can be provided to these countries. The FY 2014 Candidate Country Report lists LIC and LMIC countries based on this new definition and outlines which countries are subject to the 25 percent funding cap. VerDate Mar<15>2010 17:24 Sep 19, 2013 Jkt 229001 2. Bangladesh 3. Benin 4. Burkina Faso 5. Burma 6. Burundi 7. Cambodia 8. Cameroon 9. Central African Republic 10. Chad 11. Comoros 12. Congo, the Democratic Republic of 13. Cote d’Ivoire 14. Djibouti 15. Eritrea 16. Ethiopia 17. Gambia 18. Ghana 19. Guinea 20. Guinea-Bissau 21. Haiti 22. India 23. Kenya 24. Korea, Democratic People’s Republic of 25. Kyrgyz Republic 26. Laos 27. Lesotho 28. Liberia 29. Madagascar 30. Malawi 31. Mali 32. Mauritania 33. Mozambique 34. Nepal 35. Nicaragua 36. Niger 37. Nigeria 38. Pakistan 39. Papua New Guinea 40. Rwanda 41. Sao Tome and Principe 42. Senegal 43. Sierra Leone 44. Solomon Islands 45. Somalia 46. South Sudan 47. Sudan 48. Tajikistan 49. Tanzania 50. Togo 51. Uganda 52. Uzbekistan 53. Vietnam 54. Yemen 55. Zambia 56. Zimbabwe Lower Middle Income Countries (FY 2014 Scorecard) 1. Armenia 2. Bhutan 3. Bolivia PO 00000 Frm 00053 Fmt 4703 Sfmt 4703 57889 4. Cape Verde 5. Congo, Republic of 6. Egypt 7. El Salvador 8. Georgia 9. Guatemala 10. Guyana 11. Honduras 12. Indonesia 13. Kiribati 14. Kosovo 15. Micronesia 16. Moldova 17. Mongolia 18. Morocco 19. Paraguay 20. Philippines 21. Samoa 22. Sri Lanka 23. Swaziland 24. Syria 25. Timor-Leste 26. Ukraine 27. Vanuatu [FR Doc. 2013–22929 Filed 9–19–13; 8:45 am] BILLING CODE 9211–03–P MILLENNIUM CHALLENGE CORPORATION [MCC FR 13–07] Notice of Quarterly Report (April 1 2013–June 30, 2013) Millennium Challenge Corporation. SUMMARY: The Millennium Challenge Corporation (MCC) is reporting for the quarter April 1, 2013, through June 30, 2013, on assistance provided under section 605 of the Millennium Challenge Act of 2003 (22 U.S.C. 7701 et seq.), as amended (the Act), and on transfers or allocations of funds to other federal agencies under section 619(b) of the Act. The following report will be made available to the public by publication in the Federal Register and on the Internet Web site of the MCC (www.mcc.gov) in accordance with section 612(b) of the Act. AGENCY: Dated: September 16, 2013. Paul C. Weinberger, Vice President, Congressional and Public Affairs, Millennium Challenge Corporation. E:\FR\FM\20SEN1.SGM 20SEN1 57890 Federal Register / Vol. 78, No. 183 / Friday, September 20, 2013 / Notices Projects Obligated Objective Cumulative disbursements Measures 2 Country: Burkina Faso Year: 2013 Quarter 3 Total Obligation: $478,696,259 Entity to which the assistance is provided: MCA Burkina Faso Total Quarterly Disbursements: 1 $33,949,891 Roads Project ................... $194,130,681 Enhance access to markets through investments in the road network. $61,770,826 International Roughness Index: Sabou-KoudougouPerkoa-Didyr. International Roughness Index: Dedougou-NounaBomborukuy-Nouna Border. International Roughness Index: Banfora-Sindou. Kilometers of road under works contract (primary roads). Access time to the closest market via paved roads in the Sourou and Comoe (minutes). Kilometers of road under works contract (rural roads). Personnel trained in procurement, contract management and financial systems. Periodic road maintenance coverage rate (for all funds) (percent). Rural Land Governance Project. $59,934,615 Increase investment in land and rural productivity through improved land tenure security and land management. $23,680,863 Trend in incidence of conflict over land rights reported in the 17 pilot communes (annual rate of change in the occurrence of conflicts over land rights). Legal and regulatory reforms adopted. Stakeholders reached by public outreach efforts. Personnel trained. Rural land service offices installed and functioning. Rural hectares formalized. Extent of confidence in land tenure security (percent). Agriculture Development Project. $141,910,059 Expand the productive use of land in order to increase the volume and value of agricultural production in project zones. $77,934,993 New irrigated perimeters developed in Di (hectares). Value of contracts for irrigation systems works disbursed. Water users’ associations leaders trained in the Sourou. Farmers trained in improved agriculture and livestock production techniques. Households that have applied improved agriculture and livestock production techniques. Agro-sylvo-pastoral groups that receive technical assistance. Loans provided by the rural finance facility. Volume of loans made to end borrowers by participating financial institutions using Rural Finance Facility funds (millions of U.S. dollars). Increase primary school completion rates. $26,582,359 Girls and boys graduating from BRIGHT II primary schools. Percent of girls regularly attending (90 percent attendance) BRIGHT II schools. Girls enrolled in the MCC/USAID-supported BRIGHT II schools. Boys enrolled in the MCC/USAID-supported BRIGHT II schools. Educational facilities constructed or rehabilitated. Teachers trained through 10 provincial workshops. $26,582,359 Program Administration 3 and Control, Monitoring and Evaluation. mstockstill on DSK4VPTVN1PROD with NOTICES Bright II Schools Project ... $56,138,545 $38,605,722 Pending Subsequent Report 4. VerDate Mar<15>2010 17:24 Sep 19, 2013 $1,205,924 Jkt 229001 PO 00000 Frm 00054 Fmt 4703 Sfmt 4703 E:\FR\FM\20SEN1.SGM 20SEN1 Federal Register / Vol. 78, No. 183 / Friday, September 20, 2013 / Notices Projects Obligated Objective Cumulative disbursements Country: Cape Verde II Year: 2013 Quarter 3 Entity to which the assistance is provided: MCA Cape Verde II 57891 Measures 2 Total Obligation: $66,230,000 Total Quarterly Disbursements: 1 $685,182 Land Management for Investment Projects. $17,260,000 Increased investments in and value of property; improved ease of doing business; increased investments and value added in tourism; increased employment. $521,324 Number of legal and regulatory reforms adopted. Number of stakeholders receiving formal on the job training or technical assistance regarding roles, responsibilities or new technologies. Field test of ‘‘Fieldwork Operations Manual’’ and methodology completed on Sal. Water, Sanitation, and Hygiene Project. $41,030,000 Increased access to improved water and sanitation; reduced household costs for water; reduced incidence of waterborne disease; improved capital accumulation; increase productive government spending. $142,732 Value of implicit subsidy reduction. Service coverage by corporatized utilities (percent). Operating cost coverage (percent) (operational revenue/annual operating costs). Continuity of service (average hours of service per day for water supply). Objective measure of water quality (randomized water samples, fecal coliform counts, number per 100 mL). Non-revenue water for multiple municipal utility/utilities. Individuals adopting improved water, sanitation, and hygiene behaviors and practices (percent). Value of signed water and sanitation construction contracts. Percent disbursed of water and sanitation construction contracts. Program Administration 3 and Control, Monitoring and Evaluation. $7,940,000 $1,008,373 Not Applicable ................... $60,168 Projects Obligated Objective Cumulative disbursements Country: El Salvador Year: 2013 Quarter 3 Entity to which the assistance is provided: MCA El Salvador mstockstill on DSK4VPTVN1PROD with NOTICES Human Development Project. Connectivity Project .......... Total Obligation: $449,566,762 Total Quarterly Disbursements: 1 ¥$194,700 $84,210,866 Increase human and physical capital of residents of the Northern Zone to take advantage of employment and business opportunities. $84,210,865 Non-formal trained students that complete the training. Students participating in MCC-supported education activities. Additional school female students enrolled in MCCsupported activities. Instructors trained or certified through MCC-supported activities. Educational facilities constructed/rehabilitated and/or equipped through MCC-supported activities Households with access to improved water supply. Households with access to improved sanitation. Persons trained in hygiene and sanitary best practices. Households benefiting from a connection to the electricity network. Households benefiting from the installation of isolated solar systems. Kilometers of new electrical lines with construction contracts signed. Population benefiting from strategic infrastructure (number of people). $270,051,380 Reduce travel cost and time within the Northern Zone, with the rest of the country, and within the region. $270,051,380 Average annual daily traffic on the Northern Transnational Highway. Travel time from Guatemala to Honduras through the Northern Zone (hours and minutes). Kilometers of roads completed. $65,973,922 Employment created (number of jobs). Investment in productive chains by selected beneficiaries (U.S. dollars). Productive Development Project. VerDate Mar<15>2010 Measures 2 17:24 Sep 19, 2013 $65,973,922 Jkt 229001 Increase production and employment in the Northern Zone. PO 00000 Frm 00055 Fmt 4703 Sfmt 4703 E:\FR\FM\20SEN1.SGM 20SEN1 57892 Federal Register / Vol. 78, No. 183 / Friday, September 20, 2013 / Notices Projects Obligated Objective Cumulative disbursements Measures 2 Hectares under production with MCC support. Beneficiaries of technical assistance and training. Amount of Investment Support Fund (FIDENORTE) approved. Value of agricultural loans to farmers/agribusiness. Value of loans guaranteed. Guarantees granted. Program Administration 3 and Control, Monitoring and Evaluation. $29,330,595 $29,330,595 Pending Subsequent Report 4. Projects Obligated Objective Cumulative expenditures Measures 2 Country: Georgia 5 Year: 2013 Quarter 3 Total Obligation: $387,149,610 Entity to which the assistance is provided: MCA Georgia Total Quarterly Expenditures: 1 $0 Regional Infrastructure Rehabilitation Project. $309,877,104 Key Regional Infrastructure Rehabilitated. $309,899,714 Savings in vehicle operating costs. International roughness index. Annual average daily traffic. Travel time. Kilometers of road completed. Sites rehabilitated (phases I, II, III)—pipeline. Construction works completed (phase II)—pipeline. Savings in household expenditures for all regional infrastructure development subprojects. Population served by all RID subprojects. RID subprojects completed. Value of grant agreements signed. Subprojects with works initiated. Regional Enterprise Development Project. $52,034,500 Enterprises in Regions Developed. $52,040,699 Jobs created by Agribusiness Development Activity (ADA) and by Georgia Regional Development Fund (GRDF). Household net income—ADA and GRDF. Number of enterprises assisted. Jobs created—ADA. Firm income—ADA. Household net income—ADA. Number of direct beneficiaries. Number of indirect beneficiaries. Grant agreements signed—ADA. Increase in gross revenues of portfolio companies. Increase in portfolio company employees. Increase in wages paid to the portfolio company employees. Portfolio companies. Amount of grant funds disbursed. Funds disbursed to the portfolio companies. Program Administration2, Due Diligence, Monitoring and Evaluation. $25,238,005 $25,238,005 mstockstill on DSK4VPTVN1PROD with NOTICES Pending subsequent reports 3. VerDate Mar<15>2010 17:24 Sep 19, 2013 $101 Jkt 229001 PO 00000 Frm 00056 Fmt 4703 Sfmt 4703 E:\FR\FM\20SEN1.SGM 20SEN1 Federal Register / Vol. 78, No. 183 / Friday, September 20, 2013 / Notices Projects Obligated Objective Cumulative disbursements 57893 Measures 2 Country: Ghana Year: 2013 Quarter 3 Total Obligation: $536,288,969 Entity to which the assistance is provided: MCA Ghana Total Quarterly Disbursements: 1 $0 Agriculture Project ............. $188,958,630 Enhance profitability of cultivation, services to agriculture and product handling in support of the expansion of commercial agriculture among groups of smallholder farms. $188,666,884 Farmers trained in commercial agriculture. Additional hectares irrigated with MCC support. Hectares under production with MCC support. Kilometers of feeder road completed. Percent of contracted road works disbursed: feeder roads. Value of loans disbursed to clients from agriculture loan fund. Portfolio-at-risk of Agriculture Loan Fund (percent). Cooling facilities installed. Percent of value of contracted irrigation works disbursed. Parcels surveyed in the Pilot Land Registration. Land parcels registered in the Pilot Land Registration Areas. Volume of products passing through post-harvest treatment (metric tons). Rural Development Project $76,157,856 Strengthen the rural institutions that provide services complementary to, and supportive of, agricultural and agriculture business development. $75,903,274 Students enrolled in schools affected by Education Facilities Sub-Activity. Agricultural facilities in target districts with electricity due to Rural Electrification Activity. Additional female students enrolled in schools affected by Education Facilities Sub-Activity, Individuals completing internships at ministries, departments and agencies and metropolitan, municipal and district assemblies. School blocks rehabilitated and constructed. Distance to collect water (meters). Households with access to improved water supply. Water points constructed. Kilometers of electricity lines identified and diligence. Inter-bank transactions. Rural banks automated under the Automation/Computerization and Interconnectivity of Rural Banks activity. Rural banks connected to the wide area network. Transportation Project ....... $231,056,120 Reduce the transportation costs affecting agriculture commerce at sub-regional levels. $224,364,904 N1 Highway: annualized average daily traffic. N1 Highway: kilometers of road completed. N1 Highway: Travel time at peak hours (minutes). N1 Highway: Vehicles per hour at peak hours. Trunk roads kilometers of roads completed. Percent disbursed of contracted trunk road works. Ferry activity: annualized average daily traffic vehicles. Ferry activity: annual average daily traffic (passengers). Percent of contracted road works disbursed: N1. Percent of contracted work disbursed: ferry and floating dock. Percent of contracted work disbursed: landings and terminals. $43,816,363 $43,816,360 Pending subsequent reports4. mstockstill on DSK4VPTVN1PROD with NOTICES Program Administration 3, Due Diligence, Monitoring and Evaluation. ¥$3,700,000 $3,537,546 Projects Obligated Objective Cumulative disbursements Measures 2 Country: Indonesia Year: 2013 Quarter 3 Total Obligation: $600,000,000 Entity to which the assistance is provided: MCA Indonesia Total Quarterly Disbursements: 1 $23,842,743 Community Nutrition Project. VerDate Mar<15>2010 $131,500,000 17:24 Sep 19, 2013 Jkt 229001 need objectives and measures. PO 00000 Frm 00057 Fmt 4703 $22,457,048 Sfmt 4703 E:\FR\FM\20SEN1.SGM 20SEN1 57894 Federal Register / Vol. 78, No. 183 / Friday, September 20, 2013 / Notices Objective Cumulative disbursements Projects Obligated Green Prosperity Project .. $332,500,000 $40,280 Program Administration 3 and Control, Monitoring and Evaluation. $86,000,000 Measures 2 $2,661,266 Pending subsequent reports 4. $124,820 Projects Obligated Objective Cumulative disbursements Country: Jordan Year: 2013 Quarter 3 Entity to which the assistance is provided: MCA Jordan Water Network Project ...... Measures 2 Total Obligation: $275,100,000 Total Quarterly Disbursements: 1 $6,349,039 $102,570,034 Improve the overall drinking water system efficiency in Jordan’s Zarqa Governorate. $1,930,222 Network water consumption per capita (residential and non-residential); liters/capita/day. Operating cost coverage—Water Authority Jordan Zarqa. Non-revenue water (percent). Continuity of supply time; hours per week. Restructure and rehabilitate primary and secondary pipelines (kilometers). Restructure and rehabilitate tertiary pipelines (kilometers). Value disbursed of water construction contracts—Infrastructure Activity and Water Smart Homes Activity. Number of National Aid Fund households with improved water and wastewater network. Number of National Aid Fund households connected to the wastewater network as a result of the Water Smart Homes Activity. Wastewater Network Project $54,274,261 Improve the overall waste water system efficiency in Jordan’s Zarqa Governorate. $8,282,788 Sewer blockage events (annual). Volume of wastewater collected; cubic meters/year/ million. Residential population connected to the sewer system. Expand network (kilometers). Value disbursed of sanitation construction contracts. As Samra Wastewater Treatment Plant Expansion Project. $98,703,598 Increase the volume of treated waste water available as a substitute for fresh water in agriculture use. $28,991,700 Treated wastewater used in agriculture (as a percent of all water used for irrigation in Northern and Middle Jordan Valley). Value disbursed of construction contracts. Total engineering, procurement and construction cost of As-Samra expansion. Program Administration 3 and Control, Monitoring and Evaluation. $19,552,107 $1,577,925 Pending subsequent reports 4. $294,046 Projects Obligated Objective Cumulative disbursements Measures 2 Country: Lesotho Year: 2013 Quarter 3 Total Obligation: $362,551,000 Entity to which the assistance is provided: MCA Lesotho Total Quarterly Disbursements: 1 $19,046,425 mstockstill on DSK4VPTVN1PROD with NOTICES Water Project .................... VerDate Mar<15>2010 $167,886,999 17:24 Sep 19, 2013 Jkt 229001 Improve the water supply for industrial and domestic needs, and enhance rural livelihoods through improved watershed management. PO 00000 Frm 00058 Fmt 4703 $111,678,399 Sfmt 4703 Physical completion of Metolong water treatment works contract (percent). Physical completion of urban water supply works contracts (percent). People with access to rural water supply. Ventilated improved pit latrines built. Households with provisions to connect to water networks. Non-revenue water (percent). Knowledge of good hygiene practices (percent). Water points constructed. E:\FR\FM\20SEN1.SGM 20SEN1 Federal Register / Vol. 78, No. 183 / Friday, September 20, 2013 / Notices Cumulative disbursements 57895 Measures 2 Projects Obligated Objective Health Project ................... $121,377,822 Increase access to life-extending antiretroviral therapy and essential health services by providing a sustainable delivery platform. $90,685,461 People with HIV still alive 12 months after initiation of treatment. Health centers with required staff complement (fulltime employees). Tuberculosis notification (per 100,000 people). Health centers equipped. Deliveries conducted in the health facilities. Physical completion of health center facilities (percent). Physical completion of outpatient departments (percent). Physical completion of the Botsabelo facilities (percent). Stimulate investment by improving access to credit, reducing transaction costs and increasing the participation of women in the economy. $20,827,192 Time required to resolve commercial disputes (number of days). Cases filed at the commercial court. Debit/smart cards issued. Bonds registered. Urban land parcels regularized and registered. People trained on gender equality and economic rights. Stakeholders trained. Change in time for property transactions (percent). Women holding titles to land. Private Sector Development Project. $27,386,469 Program Administration 3 and Control, Monitoring and Evaluation. $45,899,709 $34,839,137 Pending Subsequent Report 4. $342,818 Projects Obligated Objective Cumulative disbursements Measures 2 Country: Mali Year: 2013 Quarter 3 Total Obligation: $435,628,223 Entity to which the assistance is provided: MCA Mali Total Quarterly Disbursements: 1 $0 $143,403,391 Alatona Irrigation Project .. mstockstill on DSK4VPTVN1PROD with NOTICES Bamako-Senou Airport Improvement Project. $252,895,691 Industrial Park Project ....... $2,637,472 VerDate Mar<15>2010 17:24 Sep 19, 2013 Jkt 229001 $143,403,391 Increase the agricultural production and productivity in the Alatona zone of the Office du Niger. Terminated ....................... PO 00000 Frm 00059 Fmt 4703 Annual foreign visitors, non-residents. Percent of work completed on the airside infrastructure. Percent of work completed on the landside infrastructure. Security and safety deficiencies corrected at the airport. $252,895,691 Cultivation intensity during the dry season (percent). Value of agricultural products sold by farmers (millions of francs CFA). Percent of works completed on Niono-Goma Coura road. Hectares under new irrigation. Percent of contracted irrigation construction works disbursed. Market gardens allocated in Alatona zones to populations affected by the project or New Settler women. Five-hectare farms distributed to new settlers. Rural hectares formalized. Net primary school enrollment rate (in Alatona zone). Functional producer organization. Hectares under production (rainy season). Hectares under production (dry season). Organisation d’exploitation des reseaux secondaires or water user associations established. Active microfinance institution clients. $2,637,472 Sfmt 4703 E:\FR\FM\20SEN1.SGM 20SEN1 57896 Federal Register / Vol. 78, No. 183 / Friday, September 20, 2013 / Notices Projects Obligated Program Administration 3 and Control, Monitoring and Evaluation. Objective $36,691,668 Cumulative disbursements Measures 2 $36,691,670 Pending Subsequent Report 4. On May 4, 2012, the MCC Board of Directors concurred with the recommendation of MCC to terminate the Mali Compact following the undemocratic change of government in the country. Projects Obligated Objective Cumulative disbursements Country: Moldova Year: 2013 Quarter 3 Entity to which the assistance is provided: MCA Moldova Measures 2 Total Obligation: $262,000,000 Total Quarterly Disbursements: 1 $7,679,511 Road Rehabilitation Project $132,840,000 Enhance transportation conditions. $21,346,259 Reduced cost for road users. Average annual daily traffic. Road maintenance expenditure. Kilometers of roads completed. Percent of contracted roads works disbursed. Children participants in the road safety trainings. Resettlement action plans implemented. Final design (date received). Trafficking in persons training participants. Transition to High Value Agriculture Project. $101,773,402 Increase incomes in the agricultural sector; create models for transition to high value agriculture in centralized irrigation system areas and an enabling environment (legal, financial and market) for replication. $16,496,367 Hectares under improved or new irrigation. Centralized irrigation systems rehabilitated. Percent of contracted irrigation feasibility and/or design studies disbursed. Value of irrigation feasibility and/or detailed design contracts signed. Water user associations achieving financial sustainability. Management transfer agreements signed. Revised water management policy framework—with long-term water rights defined—established. Contracts of association signed. New high value agriculture infrastructure in place (metric tons of cold storage capacity). Loans past due. Value of agricultural and rural loans. Loan borrowers. Loan borrowers (female). Value of sales facilitated. Farmers that have applied improved techniques (Growing High Value Agriculture Sales [GHS]). Farmers that have applied improved techniques (GHS) (female). Farmers trained. Farmers trained (female). Enterprises assisted. Enterprises assisted (female). Program Administration 3 and Monitoring and Evaluation. $27,386,598 $8,770,110 mstockstill on DSK4VPTVN1PROD with NOTICES Pending Subsequent Report 4. VerDate Mar<15>2010 17:24 Sep 19, 2013 $85,150 Jkt 229001 PO 00000 Frm 00060 Fmt 4703 Sfmt 4703 E:\FR\FM\20SEN1.SGM 20SEN1 Federal Register / Vol. 78, No. 183 / Friday, September 20, 2013 / Notices Projects Obligated Objective Cumulative disbursements 57897 Measures 2 Country: Mongolia Year: 2013 Quarter 3 Total Obligation: $284,894,187 Entity to which the assistance is provided: MCA Mongolia Total Quarterly Disbursements: 1 $14,270,048 Property Rights Project ..... $28,777,619 Increase security and capitalization of land assets held by lower-income Mongolians, and increased peri-urban herder productivity and incomes. $24,293,451 Wells completed. Legal and regulatory reforms adopted. Stakeholders trained (Peri-Urban and Land Plots). Herder groups limiting their livestock population to the carrying capacity of their leases on semi-intensive farms. Cost for property transactions (first time) (U.S. dollars). Urban parcels formalized. Stakeholders trained (Ger Area Land Plots). Leaseholds awarded. Vocational Education Project. $50,197,859 Increase employment and income among unemployed and underemployed Mongolians. $44,106,552 Students participating in MCC-supported educational facilities. Nongovernmental funding of vocational education (percent). Instructors trained or certified through MCC-supported activities. Educational facilities constructed/rehabilitated or equipped through MCC-supported activities. Health Project ................... $42,045,259 Increase the adoption of behaviors that reduce noncommunicable diseases and injuries (NCDIs) among target populations and improved medical treatment and control of NCDIs. $31,725,167 Screening for hypertension (percent). Civil society mobilization (grants) (U.S. dollars). Early detections of cervical cancer—early diagnosis. Training of health staff by MCA Mongolia. Capacity of school teachers. Improved services in non-communicable diseaseprimary health care facilities (percent). Roads Project ................... $84,961,586 More efficient transport for trade and access to services. $43,506,460 Kilometers of roads completed. Kilometers of roads under design. Percent of contracted roads works disbursed. Energy and Environmental Project. $41,518,019 Increased wealth and productivity through greater fuel use efficiency and decreasing health costs from air. $39,877,446 Wind power dispatched from substation (million kilowatt hours). Heat only boilers sites upgraded. Stoves distributed by MCA Mongolia. Rail Project ........................ $369,560 Terminated ....................... $369,560 Program Administration 3 and Control, Monitoring and Evaluation. $37,024,286 Terminated. $28,327,092 Pending subsequent reports 4. $3,905,305 Projects Obligated Objective Cumulative disbursements Measures 2 Country: Morocco Year: 2013 Quarter 3 Total Obligation: $697,500,000 Entity to which the assistance is provided: MCA Morocco Total Quarterly Disbursements: 1 $55,626,184 mstockstill on DSK4VPTVN1PROD with NOTICES Fruit Tree Productivity Project. VerDate Mar<15>2010 $339,987,321 17:24 Sep 19, 2013 Jkt 229001 Reduce volatility of agricultural production and increase volume of fruit agricultural production. PO 00000 Frm 00061 Fmt 4703 $261,807,300 Sfmt 4703 Farmers trained. Olive and date producers assisted. Percent of virgin and extra virgin olive oil of total olive oil production in targeted areas. Number of Catalyst Fund proposals approved. Disbursements under the Catalyst Fund (U.S. dollars). Average agricultural revenue per farm in rehabilitation rain-fed areas (U.S. dollars). Area planted and delivered to farmers (hectares). Area in expansion perimeters for which water and soil conservation measures have been implemented (hectares). Yield of rehabilitated olive trees in rain-fed areas (metric tons per hectare) (‘‘mt/ha’’). E:\FR\FM\20SEN1.SGM 20SEN1 57898 Federal Register / Vol. 78, No. 183 / Friday, September 20, 2013 / Notices Projects Obligated Objective Cumulative disbursements Measures 2 Average agricultural revenue per farm in irrigated areas. Cumulative area of irrigated perimeters rehabilitated (hectares). Yield of rehabilitated olive trees in irrigated areas (mt/ha). Average agricultural revenue per farm in oasis areas. Hectares under improved irrigation. Yield of rehabilitated date palms in oasis areas (mt/ ha). Number of in-vitro seedlings successfully planted. Small Scale Fisheries Project. $122,488,658 Improve quality of fish moving through domestic channels and assure the sustainable use of fishing resources. $76,241,887 Boats benefitting from landing sites and ports. Number of artisan fishers who received a training certificate. Number of jobs created in wholesale fish markets. Per capita fish consumption in areas of new market construction (kg/year). Active mobile fish vendors trained and equipped by the project. Average price of fish at auction markets. Net annual income of mobile fish vendors. $96,149,856 Increase value added to tourism and artisan sectors. $58,262,752 Total receiving literacy training. Graduates of MCC-supported functional literacy program (female). Graduates of MCC-supported functional literacy program (male). Total receiving professional training. Females receiving professional training. Graduates vocational training program (residential, apprenticeship and continuing education). Drop-out rates of participants of residential and apprenticeship programs. Potters trained. MCC-subsidized gas kilns bought by artisans. Adoption rate of improved production practices promoted by the project (percent). Tourist circuits improved or created. Number of small and medium enterprises (SMEs) that append the label on their products. Number of SMEs participating in promotion events. Sites constructed or rehabilitated (4 Fondouks, Place Lalla Ydouna, Ain Nokbi). Beneficiaries of Ain Nokbi construction and artisan resettlement program. Enterprise Support Project $15,042,301 Improved survival rate of new small and medium enterprises (SMEs) and National Initiative for Human Development (INDH)-funded income generating activities; increased revenue for new SMEs and INDHfunded income generating activities. $14,822,877 Survival rate after two years (percent). Days of individual coaching (total days). Beneficiaries trained. Financial Services Project mstockstill on DSK4VPTVN1PROD with NOTICES Artisan and Fez Medina Project. $44,175,252 To be determined ............ $33,456,957 Portfolio at risk at 30 days (percent). Value of loans granted through mobile branches (U.S. dollars). Clients of microcredit associations reached through mobile branches. Value of loan agreements between micro credit associations and Jaida (millions of dirhams). Value of loan disbursements to Jaida. Program Administration 3 and Control, Monitoring and Evaluation. $79,656,612 VerDate Mar<15>2010 17:24 Sep 19, 2013 Jkt 229001 PO 00000 $59,164,695 Frm 00062 Fmt 4703 Sfmt 4703 E:\FR\FM\20SEN1.SGM 20SEN1 Federal Register / Vol. 78, No. 183 / Friday, September 20, 2013 / Notices Projects Obligated Objective Pending Subsequent Report 4. Cumulative disbursements 57899 Measures 2 $4,811,155 Projects Obligated Objective Cumulative disbursements Measures 2 Country: Mozambique Year: 2013 Quarter 3 Total Obligation: $506,924,053 Entity to which the assistance is provided: MCA Mozambique Total Quarterly Disbursements: 1 $49,438,726 Water Supply and Sanitation Project. $207,385,393 Increase access to reliable and quality water and sanitation facilities. $144,872,115 Value of municipal sanitation and drainage systems construction contracts signed. Amount disbursed for municipal sanitation and drainage construction contracts. Volume of water produced. Value of contracts signed for construction of water systems. Percent of construction contract disbursed for water systems. Rural water points constructed. Percent of rural population of the six intervention districts with access to improved water sources. Amount disbursed for rural water points construction contracts. Persons trained in hygiene and sanitary best practices. Road Rehabilitation Project $176,307,480 Increase access to productive resources and markets. $94,375,668 Percent of roads works contracts disbursed. Kilometers of roads issued ‘‘Take-over Certificates’’. Land Tenure Project ......... $40,068,307 Establish efficient, secure land access for households and investors. $33,078,332 People trained (paralegal courses at Centre for Juridical and Judicial Training, general training at National Directorate of Land and Forest, etc.). Land administration offices established or upgraded. Rural hectares mapped. Urban parcels mapped. Rural hectares formalized. Urban parcels formalized. Communities delimited. Farmer Income Support Project. $19,250,117 Improve coconut productivity and diversification into cash crop. $16,755,203 Coconut seedlings planted. Survival rate of coconut seedlings (percent). Hectares of alternate crops under production. Farmers trained in surveillance and pest and disease control for coconuts. Farmers trained in alternative crop production and productivity enhancing strategies. Farmers trained in planting and post-planting management of coconuts. Farmers using alternative crop production and productivity enhancing strategies. Businesses receiving Business Development Fund grants. Program Administration 3 and Control, Monitoring and Evaluation. $63,912,756 $40,157,874 Pending Subsequent Report 4. $3,009,654 mstockstill on DSK4VPTVN1PROD with NOTICES Projects Obligated Objective Cumulative disbursements Measures 2 Country: Namibia Year: 2013 Quarter 3 Total Obligation: $304,477,815 Entity to which the assistance is provided: MCA Namibia Total Quarterly Disbursements: 1 $20,169,366 Education Project .............. VerDate Mar<15>2010 $141,554,809 17:24 Sep 19, 2013 Jkt 229001 Improve the quality of the workforce in Namibia by enhancing the equity and effectiveness of basic. PO 00000 Frm 00063 Fmt 4703 $82,626,351 Sfmt 4703 Learners (any level) participating in the 47 schools sub-activity. Educational facilities constructed, rehabilitated, equipped in the 47 schools sub-activity. Percent of contracted construction works disbursed for 47 schools. Textbooks delivered. E:\FR\FM\20SEN1.SGM 20SEN1 57900 Federal Register / Vol. 78, No. 183 / Friday, September 20, 2013 / Notices Projects Obligated Objective Cumulative disbursements Measures 2 Educators trained to be textbook management trainers. Educators trained to be textbook utilization trainers. Percent disbursed against works contracts for Regional Study Resource Centers Activity. Visits to MCA Namibia assisted Regional Study and Resource Centres. Compliance rate for National Training Fund levy. Graduates from MCC-supported education activities. Percent disbursed against construction, rehabilitation, and equipment contracts for Community Skills and Development Centres. Namibia Student Financial Assistance Fund Policy in place (date). Tourism Project ................. $68,579,170 Grow the Namibian tourism industry with a focus on increasing income to households in communal. $21,901,525 Tourists to Etosha National Park (ENP). Galton Gate Plan implemented (percent). Percent disbursed against construction, rehabilitation and equipment contracts for ENP housing units/management structures. Game translocated with MCA Namibia support. Unique visits on Namibia Tourism Board website. Leisure tourist arrivals. North American tourism businesses (travel agencies and tour operators) that offer Namibian tours or tour packages. Value of grants issued by the Conservancy Development Support Grant Fund (Namibian dollars). Amount of new private sector investment secured by MCA Namibia assisted conservancies (Namibian dollars). Annual gross revenue to conservancies receiving MCA Namibia assistance. Agriculture Project ............. $51,439,491 Enhance the health and marketing efficiency of livestock in the NCAs of Namibia and to increase income. $27,544,761 Participating households registered in the Community-Based Rangeland and Livestock Management sub-activity. Grazing areas with documented combined management plans. Parcels corrected or incorporated in land system. Stakeholders trained. Cattle tagged with radio frequency identification tags. Percent disbursed against works contracts for State Veterinary Offices. Value of grant agreements signed under Livestock Market Efficiency Fund. Farmers trained. Value of grant agreements signed under Indigenous Natural Product Innovation Fund. Program Administration 3 and Control, Monitoring and Evaluation. $42,904,344 $24,689,146 Pending Subsequent Report 4. $2,091,246 Projects Obligated Objective Cumulative disbursements Measures 2 mstockstill on DSK4VPTVN1PROD with NOTICES Country: Philippines Year: 2013 Quarter 3 Total Obligation: $433,202,350 Entity to which the assistance is provided: MCA Philippines Total Quarterly Disbursements: 1 $16,393,465 Kalahi-CIDSS Project ........ VerDate Mar<15>2010 ........................ 17:24 Sep 19, 2013 Jkt 229001 Improve the responsiveness of local governments to community needs, encourage communities to engage in development activities. PO 00000 Frm 00064 Fmt 4703 ........................ Sfmt 4703 Percent of Municipal Local Government Units that provide funding support for Kalahi-CIDSS (KC) subproject operations and maintenance. Completed KC subprojects implemented in compliance with technical plans and within schedule and budget. Barangays that have completed specific training on subproject management and implementation. E:\FR\FM\20SEN1.SGM 20SEN1 Federal Register / Vol. 78, No. 183 / Friday, September 20, 2013 / Notices Objective Cumulative disbursements Projects Obligated Secondary National Roads Development Project. $213,785,350 Reduce transportation costs and improve access to markets and social services. $35,591,275 Revenue Administration Reform Project. $54,300,000 Increase tax revenues over time and support the Department of Finance’s initiatives to detect and deter corruption within its revenue agencies. $5,463,951 Program Administration 3 and Control, Monitoring and Evaluation. $45,117,000 Measures 2 Kilometers of road sections completed. Bridges replaced. Bridges rehabilitated. Value of road construction contracts signed. Value of road construction contracts disbursed. Number of Audits. Revenue District Offices using the electronic tax information system. Percent of audit completed in compliance with prescribed period of 120 days. Percent of audit cases performed using automated audit tool. Successful case resolutions. Personnel charged with graft, corruption, lifestyle and/or criminal cases. Time taken to complete investigation (average). $8,693,238 Pending Subsequent Reports 4. Community Development Grants Project. 57901 $2,201,829 $120,000,000 Projects $36,619,693 Obligated Objective Cumulative disbursements Measures 2 Country: Senegal Year: 2013 Quarter 3 Total Obligation: $540,000,000 Entity to which the assistance is provided: MCA Senegal Total Quarterly Disbursements: 1 $27,079,579 $324,712,499 Expand access to markets and services. $44,082,155 Value of contracts signed for the feasibility, design, supervision and program management of the RN2 and RN6 National Roads. Percent of disbursements for the contract signed for the constructions of the RN 2 and RN6. Kilometers of roads rehabilitated on the RN2. Annual average daily traffic Richard-Toll—Ndioum. Percent change in travel time on the RN2. International Roughness Index on the RN2. Kilometers of roads covered by the contract for the studies, the supervision and management of the RN2. Kilometers of roads rehabilitated on the RN6. Annual average daily traffic Ziguinchor—Tanaff. Annual average daily traffic Tanaff—Kolda. ´ Annual average daily traffic Kolda—Kounkane. Percent change in travel time on the RN6. International roughness index on the RN6 (lower number = smoother road). Kilometers of roads covered by the contract for the studies, the supervision and management of the RN6. Irrigation and Water Resources Management Project. mstockstill on DSK4VPTVN1PROD with NOTICES Road Rehabilitation Project $170,008,860 Improve productivity of the agricultural sector. $15,087,482 Tons of irrigated rice production. Potentially irrigable lands area (Delta and Ngallenka). Hectares under production. Percent of the disbursements on the contracts signed for the studies in the Delta and the Ngallenka. Value of the construction contracts signed for the irrigation infrastructure in the Delta and the Ngallenka. Cropping intensity (hectares under production per year/cultivable hectares) (Delta and Ngallenka). Hectares mapped. New conflicts resolved (percent). People trained on land security tools. Women trained on land security tools. VerDate Mar<15>2010 17:24 Sep 19, 2013 Jkt 229001 PO 00000 Frm 00065 Fmt 4703 Sfmt 4703 E:\FR\FM\20SEN1.SGM 20SEN1 57902 Federal Register / Vol. 78, No. 183 / Friday, September 20, 2013 / Notices Projects Obligated Program Administration 3 and Monitoring and Evaluation. Objective $45,278,641 Cumulative disbursements Measures 2 $12,868,838 Pending Subsequent Report 4. $687,201 Projects Obligated Objective Cumulative disbursements Measures 2 Country: Tanzania Year: 2013 Quarter 3 Total Obligation: $698,136,000 Entity to which the assistance is provided: MCA Tanzania Total Quarterly Disbursements: 1 $58,306,778 $205,614,640 Increase value added to businesses. $165,361,906 Number of current power customers (Zanzibar). Transmission and distribution substations capacity (megawatt-peak) (Zanzibar). Technical and non-technical losses (Zanzibar) (percent). Kilometers of 132 kilovolt (KV) lines constructed (Zanzibar). Percent disbursed on overhead lines contract (Zanzibar). Number of Current power customers (Malagarasi/ Kigoma). Capacity of photovoltaic systems installed (kilowattpeak) (Malagarasi/Kigoma). Current power customers (all six project regions) (Mainland). Kilometers of 33/11KV lines constructed (Mainland). Transmission and distribution substations capacity (megavolt ampere) (all six project regions) (Mainland). Technical and nontechnical losses (Mainland and Kigoma) (percent). Cost recovery ratio (Mainland). Transport Sector Project ... $388,138,380 Increase cash crop revenue and aggregate visitor spending. $258,988,770 Percent disbursed on construction contracts. Surfacing complete: Tunduma—Sumbawanga (percent). Surfacing complete: Tanga—Horohoro (percent). Surfacing complete: Namtumba—Songea (percent). Surfacing complete: Permiho—Mbinga (percent). Kilometers of roads completed (taken over). Pemba: Percent disbursed on construction contract. Surfacing complete: Pemba (percent). Kilometers of roads completed (taken over): Zanzibar. Road maintenance expenditures: Mainland trunk roads (percent). Road maintenance expenditures: Zanzibar rural roads (percent). Runway surfacing complete (percent). Water Sector Project ......... $65,027,607 Increase investment in human and physical capital and to reduce the prevalence of water-related disease. $45,508,381 Volume of water produced—Lower Ruvu (millions of liters per day). Operations and maintenance cost recovery—Lower Ruvu (percent). Volume of water produced—Morogoro (millions of liters per day). Operations and maintenance cost recovery— Morogoro (percent). Program Administration 3 and Control, Monitoring and Evaluation. mstockstill on DSK4VPTVN1PROD with NOTICES Energy Sector Project ....... $39,355,373 $30,964,944 Pending Subsequent Report 4. 1 Disbursements are cash outlays 2 These measures are the same rather than expenditures. Key Performance Indicators that MCC reports each quarter. The Key Performance Indicators may change over time to more accurately reflect compact implementation progress. The unit for these measures is ‘‘a number of’’ unless otherwise indicated. 3 Program administration funds are used to pay items such as salaries, rent, and the cost of office equipment. 4 These amounts represent disbursements made that will be allocated to individual projects in the subsequent quarter(s) and reported as such in subsequent quarterly report(s). VerDate Mar<15>2010 17:24 Sep 19, 2013 Jkt 229001 PO 00000 Frm 00066 Fmt 4703 Sfmt 4703 E:\FR\FM\20SEN1.SGM 20SEN1 Federal Register / Vol. 78, No. 183 / Friday, September 20, 2013 / Notices 57903 5 These compacts are closed; however, deobligations took place during the reporting period. The following MCC compacts are closed and, therefore, do not have any quarterly disbursements: Armenia, Benin, Cape Verde I, Honduras, Madagascar, Nicaragua and Vanuatu. 619(b) TRANSFER OR ALLOCATION OF FUNDS United States agency to which funds were transferred or allocated Amount Description of program or project None None None NATIONAL SCIENCE FOUNDATION BILLING CODE 9211–03–P Abstract Notice of Intent To Seek Approval To Renew an Information Collection [FR Doc. 2013–22936 Filed 9–19–13; 8:45 am] Proposed Project The Industry/University Cooperative Research Centers (I/UCRC) Program was initiated in 1973 to develop long-term partnerships among industry, academe and government. The National Science Foundation invests in these partnerships to promote research programs of mutual interest, contribute to the Nation’s research infrastructure base and enhance the intellectual capacity of the engineering or science workforce through the integration of research and education. As appropriate, NSF encourages international collaborations that advance these goals within the global context. The I/UCRC program seeks to achieve this by: 1. Contributing to the nation’s research enterprise by developing longterm partnerships among industry, academe, and government; 2. Leveraging NSF funds with industry to support graduate students performing industrially relevant research; 3. Expanding the innovation capacity of our nation’s competitive workforce through partnerships between industries and universities; and 4. Encouraging the nation’s research enterprise to remain competitive through active engagement with academic and industrial leaders throughout the world. The centers are catalyzed by a small investment from NSF and they are primarily supported by other private and public sector center members, with NSF taking a supporting role in the development and evolution of the I/ UCRC. The I/UCRC program initially offers five-year (Phase I) continuing awards. This five-year period of support allows for the development of a strong partnership between the academic researchers and their industrial and government members. After five years, centers that continue to meet the I/ UCRC program requirements may request support for a second five-year (Phase II) period. These awards allow centers to continue to grow and diversify their non-NSF memberships during their Phase II period. After ten AGENCY: NATIONAL AERONAUTICS AND SPACE ADMINISTRATION National Science Foundation. Notice and request for comments. ACTION: [Notice: 13–116] The National Science Foundation (NSF) is announcing plans to request clearance of this collection. In accordance with the requirement of Section 3506(c)(2)(A) of the Paperwork Reduction Act of 1995 (Pub. L. 104–13), we are providing opportunity for public comment on this action. After obtaining and considering public comment, NSF will prepare the submission requesting that OMB approve clearance of this collection for no longer than three years. SUMMARY: Aerospace Safety Advisory Panel; Charter Renewal National Aeronautics and Space Administration (NASA). AGENCY: Notice of renewal and amendment of the charter of the Aerospace Safety Advisory Panel. ACTION: Pursuant to sections 14(b)(1) and 9(c) of the Federal Advisory Committee Act (Pub. L. 92–463), and after consultation with the Committee Management Secretariat, General Services Administration, the NASA Administrator has determined that renewal and amendment of the charter of the Aerospace Safety Advisory Panel is in the public interest in connection with the performance of duties imposed on NASA by law. The renewed charter is for a two-year period ending September 12, 2015. It is identical to the previous charter in all respects except it adds verbiage that a member of the panel shall be allowed necessary travel expenses per statute and updates the annual operating cost. SUMMARY: Ms. Harmony Myers, Aerospace Safety Advisory Panel Executive Director, Advisory Committee Management Division, Office of International and Interagency Relations, (202) 358–1857, National Aeronautics and Space Administration Headquarters, Washington, DC 20546–0001. mstockstill on DSK4VPTVN1PROD with NOTICES FOR FURTHER INFORMATION CONTACT: Patricia D. Rausch, Advisory Committee Management Officer, National Aeronautics and Space Administration. [FR Doc. 2013–22940 Filed 9–19–13; 8:45 am] BILLING CODE 7510–13–P VerDate Mar<15>2010 17:24 Sep 19, 2013 Jkt 229001 Written comments on this notice must be received by November 19, 2013 to be assured of consideration. Comments received after that date will be considered to the extent practicable. For Additional Information or Comments: Contact Suzanne H. Plimpton, Reports Clearance Officer, National Science Foundation, 4201 Wilson Boulevard, Room 1265, Arlington, Virginia 22230; telephone (703) 292–7556; or send email to splimpto@nsf.gov. Individuals who use a telecommunications device for the deaf (TDD) may call the Federal Information Relay Service (FIRS) at 1– 800–877–8339, which is accessible 24 hours a day, 7 days a week, 365 days a year (including federal holidays). You also may obtain a copy of the data collection instrument and instructions from Ms. Plimpton. DATES: SUPPLEMENTARY INFORMATION: Title of Collection: Grantee Reporting Requirements for the Industry University Cooperative Research Centers Program (I/UCRC). OMB Number: 3145–0088. Expiration Date of Approval: June 30, 2014. Type of Request: Intent to seek approval to renew an information collection. PO 00000 Frm 00067 Fmt 4703 Sfmt 4703 E:\FR\FM\20SEN1.SGM 20SEN1

Agencies

[Federal Register Volume 78, Number 183 (Friday, September 20, 2013)]
[Notices]
[Pages 57889-57903]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-22936]


-----------------------------------------------------------------------

MILLENNIUM CHALLENGE CORPORATION

[MCC FR 13-07]


Notice of Quarterly Report (April 1 2013-June 30, 2013)

AGENCY: Millennium Challenge Corporation.
SUMMARY: The Millennium Challenge Corporation (MCC) is reporting for 
the quarter April 1, 2013, through June 30, 2013, on assistance 
provided under section 605 of the Millennium Challenge Act of 2003 (22 
U.S.C. 7701 et seq.), as amended (the Act), and on transfers or 
allocations of funds to other federal agencies under section 619(b) of 
the Act. The following report will be made available to the public by 
publication in the Federal Register and on the Internet Web site of the 
MCC (www.mcc.gov) in accordance with section 612(b) of the Act.

    Dated: September 16, 2013.
Paul C. Weinberger,
Vice President, Congressional and Public Affairs, Millennium Challenge 
Corporation.

[[Page 57890]]



----------------------------------------------------------------------------------------------------------------
                                                                          Cumulative
             Projects                 Obligated         Objective        disbursements        Measures \2\
----------------------------------------------------------------------------------------------------------------
                    Country: Burkina Faso Year: 2013 Quarter 3 Total Obligation: $478,696,259
   Entity to which the assistance is provided: MCA Burkina Faso Total Quarterly Disbursements: \1\ $33,949,891
----------------------------------------------------------------------------------------------------------------
Roads Project....................    $194,130,681  Enhance access to       $61,770,826  International Roughness
                                                    markets through                      Index: Sabou-Koudougou-
                                                    investments in the                   Perkoa-Didyr.
                                                    road network.                       International Roughness
                                                                                         Index: Dedougou-Nouna-
                                                                                         Bomborukuy-Nouna
                                                                                         Border.
                                                                                        International Roughness
                                                                                         Index: Banfora-Sindou.
                                                                                        Kilometers of road under
                                                                                         works contract (primary
                                                                                         roads).
                                                                                        Access time to the
                                                                                         closest market via
                                                                                         paved roads in the
                                                                                         Sourou and Comoe
                                                                                         (minutes).
                                                                                        Kilometers of road under
                                                                                         works contract (rural
                                                                                         roads).
                                                                                        Personnel trained in
                                                                                         procurement, contract
                                                                                         management and
                                                                                         financial systems.
                                   ..............                       ..............  Periodic road
                                                                                         maintenance coverage
                                                                                         rate (for all funds)
                                                                                         (percent).
----------------------------------------------------------------------------------------------------------------
Rural Land Governance Project....     $59,934,615  Increase investment     $23,680,863  Trend in incidence of
                                                    in land and rural                    conflict over land
                                                    productivity                         rights reported in the
                                                    through improved                     17 pilot communes
                                                    land tenure                          (annual rate of change
                                                    security and land                    in the occurrence of
                                                    management.                          conflicts over land
                                                                                         rights).
                                                                                        Legal and regulatory
                                                                                         reforms adopted.
                                                                                        Stakeholders reached by
                                                                                         public outreach
                                                                                         efforts.
                                                                                        Personnel trained.
                                                                                        Rural land service
                                                                                         offices installed and
                                                                                         functioning.
                                                                                        Rural hectares
                                                                                         formalized.
                                   ..............                       ..............  Extent of confidence in
                                                                                         land tenure security
                                                                                         (percent).
----------------------------------------------------------------------------------------------------------------
Agriculture Development Project..    $141,910,059  Expand the              $77,934,993  New irrigated perimeters
                                                    productive use of                    developed in Di
                                                    land in order to                     (hectares).
                                                    increase the                        Value of contracts for
                                                    volume and value                     irrigation systems
                                                    of agricultural                      works disbursed.
                                                    production in                       Water users'
                                                    project zones.                       associations leaders
                                                                                         trained in the Sourou.
                                                                                        Farmers trained in
                                                                                         improved agriculture
                                                                                         and livestock
                                                                                         production techniques.
                                                                                        Households that have
                                                                                         applied improved
                                                                                         agriculture and
                                                                                         livestock production
                                                                                         techniques.
                                   ..............                       ..............  Agro-sylvo-pastoral
                                                                                         groups that receive
                                                                                         technical assistance.
                                   ..............                       ..............  Loans provided by the
                                                                                         rural finance facility.
                                   ..............                       ..............  Volume of loans made to
                                                                                         end borrowers by
                                                                                         participating financial
                                                                                         institutions using
                                                                                         Rural Finance Facility
                                                                                         funds (millions of U.S.
                                                                                         dollars).
----------------------------------------------------------------------------------------------------------------
Bright II Schools Project........     $26,582,359  Increase primary        $26,582,359  Girls and boys
                                                    school completion                    graduating from BRIGHT
                                                    rates.                               II primary schools.
                                                                                        Percent of girls
                                                                                         regularly attending (90
                                                                                         percent attendance)
                                                                                         BRIGHT II schools.
                                   ..............                       ..............  Girls enrolled in the
                                                                                         MCC/USAID-supported
                                                                                         BRIGHT II schools.
                                   ..............                       ..............  Boys enrolled in the MCC/
                                                                                         USAID-supported BRIGHT
                                                                                         II schools.
                                   ..............                       ..............  Educational facilities
                                                                                         constructed or
                                                                                         rehabilitated.
                                   ..............                       ..............  Teachers trained through
                                                                                         10 provincial
                                                                                         workshops.
----------------------------------------------------------------------------------------------------------------
Program Administration \3\ and        $56,138,545                          $38,605,722
 Control, Monitoring and
 Evaluation.
----------------------------------------------------------------------------------------------------------------
Pending Subsequent Report \4\....                                           $1,205,924
----------------------------------------------------------------------------------------------------------------


[[Page 57891]]


 
                                                                          Cumulative
             Projects                 Obligated         Objective        disbursements        Measures \2\
----------------------------------------------------------------------------------------------------------------
                    Country: Cape Verde II Year: 2013 Quarter 3 Total Obligation: $66,230,000
    Entity to which the assistance is provided: MCA Cape Verde II Total Quarterly Disbursements: \1\ $685,182
----------------------------------------------------------------------------------------------------------------
Land Management for Investment        $17,260,000  Increased                  $521,324  Number of legal and
 Projects.                                          investments in and                   regulatory reforms
                                                    value of property;                   adopted.
                                                    improved ease of                    Number of stakeholders
                                                    doing business;                      receiving formal on the
                                                    increased                            job training or
                                                    investments and                      technical assistance
                                                    value added in                       regarding roles,
                                                    tourism; increased                   responsibilities or new
                                                    employment.                          technologies.
                                                                                        Field test of
                                                                                         ``Fieldwork Operations
                                                                                         Manual'' and
                                                                                         methodology completed
                                                                                         on Sal.
----------------------------------------------------------------------------------------------------------------
Water, Sanitation, and Hygiene        $41,030,000  Increased access to        $142,732  Value of implicit
 Project.                                           improved water and                   subsidy reduction.
                                                    sanitation;                         Service coverage by
                                                    reduced household                    corporatized utilities
                                                    costs for water;                     (percent).
                                                    reduced incidence                   Operating cost coverage
                                                    of waterborne                        (percent) (operational
                                                    disease; improved                    revenue/annual
                                                    capital                              operating costs).
                                                    accumulation;                       Continuity of service
                                                    increase                             (average hours of
                                                    productive                           service per day for
                                                    government                           water supply).
                                                    spending.                           Objective measure of
                                                                                         water quality
                                                                                         (randomized water
                                                                                         samples, fecal coliform
                                                                                         counts, number per 100
                                                                                         mL).
                                                                                        Non-revenue water for
                                                                                         multiple municipal
                                                                                         utility/utilities.
                                   ..............                       ..............  Individuals adopting
                                                                                         improved water,
                                                                                         sanitation, and hygiene
                                                                                         behaviors and practices
                                                                                         (percent).
                                   ..............                       ..............  Value of signed water
                                                                                         and sanitation
                                                                                         construction contracts.
                                   ..............                       ..............  Percent disbursed of
                                                                                         water and sanitation
                                                                                         construction contracts.
----------------------------------------------------------------------------------------------------------------
Program Administration \3\ and         $7,940,000                           $1,008,373
 Control, Monitoring and
 Evaluation.
----------------------------------------------------------------------------------------------------------------
Not Applicable...................                                              $60,168
----------------------------------------------------------------------------------------------------------------


 
                                                                          Cumulative
             Projects                 Obligated         Objective        disbursements        Measures \2\
----------------------------------------------------------------------------------------------------------------
                    Country: El Salvador Year: 2013 Quarter 3 Total Obligation: $449,566,762
    Entity to which the assistance is provided: MCA El Salvador Total Quarterly Disbursements: \1\ -$194,700
----------------------------------------------------------------------------------------------------------------
Human Development Project........     $84,210,866  Increase human and      $84,210,865  Non-formal trained
                                                    physical capital                     students that complete
                                                    of residents of                      the training.
                                                    the Northern Zone                   Students participating
                                                    to take advantage                    in MCC-supported
                                                    of employment and                    education activities.
                                                    business                            Additional school female
                                                    opportunities.                       students enrolled in
                                                                                         MCC-supported
                                                                                         activities.
                                                                                        Instructors trained or
                                                                                         certified through MCC-
                                                                                         supported activities.
                                   ..............                       ..............  Educational facilities
                                                                                         constructed/
                                                                                         rehabilitated and/or
                                                                                         equipped through MCC-
                                                                                         supported activities
                                   ..............                       ..............  Households with access
                                                                                         to improved water
                                                                                         supply.
                                   ..............                       ..............  Households with access
                                                                                         to improved sanitation.
                                   ..............                       ..............  Persons trained in
                                                                                         hygiene and sanitary
                                                                                         best practices.
                                   ..............                       ..............  Households benefiting
                                                                                         from a connection to
                                                                                         the electricity
                                                                                         network.
                                   ..............                       ..............  Households benefiting
                                                                                         from the installation
                                                                                         of isolated solar
                                                                                         systems.
                                   ..............                       ..............  Kilometers of new
                                                                                         electrical lines with
                                                                                         construction contracts
                                                                                         signed.
                                   ..............                       ..............  Population benefiting
                                                                                         from strategic
                                                                                         infrastructure (number
                                                                                         of people).
----------------------------------------------------------------------------------------------------------------
Connectivity Project.............    $270,051,380  Reduce travel cost     $270,051,380  Average annual daily
                                                    and time within                      traffic on the Northern
                                                    the Northern Zone,                   Transnational Highway.
                                                    with the rest of                    Travel time from
                                                    the country, and                     Guatemala to Honduras
                                                    within the region.                   through the Northern
                                                                                         Zone (hours and
                                                                                         minutes).
                                                                                        Kilometers of roads
                                                                                         completed.
----------------------------------------------------------------------------------------------------------------
Productive Development Project...     $65,973,922  Increase production     $65,973,922  Employment created
                                                    and employment in                    (number of jobs).
                                                    the Northern Zone.                  Investment in productive
                                                                                         chains by selected
                                                                                         beneficiaries (U.S.
                                                                                         dollars).

[[Page 57892]]

 
                                   ..............                       ..............  Hectares under
                                                                                         production with MCC
                                                                                         support.
                                   ..............                       ..............  Beneficiaries of
                                                                                         technical assistance
                                                                                         and training.
                                   ..............                       ..............  Amount of Investment
                                                                                         Support Fund
                                                                                         (FIDENORTE) approved.
                                   ..............                       ..............  Value of agricultural
                                                                                         loans to farmers/
                                                                                         agribusiness.
                                   ..............                       ..............  Value of loans
                                                                                         guaranteed.
                                   ..............                       ..............  Guarantees granted.
----------------------------------------------------------------------------------------------------------------
Program Administration \3\ and        $29,330,595                          $29,330,595
 Control, Monitoring and
 Evaluation.
----------------------------------------------------------------------------------------------------------------
Pending Subsequent Report \4\....  ..............                                       ........................
----------------------------------------------------------------------------------------------------------------


 
                                                                          Cumulative
             Projects                 Obligated         Objective        expenditures         Measures \2\
----------------------------------------------------------------------------------------------------------------
                    Country: Georgia \5\ Year: 2013 Quarter 3 Total Obligation: $387,149,610
          Entity to which the assistance is provided: MCA Georgia Total Quarterly Expenditures: \1\ $0
----------------------------------------------------------------------------------------------------------------
Regional Infrastructure              $309,877,104  Key Regional           $309,899,714  Savings in vehicle
 Rehabilitation Project.                            Infrastructure                       operating costs.
                                                    Rehabilitated.                      International roughness
                                                                                         index.
                                                                                        Annual average daily
                                                                                         traffic.
                                   ..............                       ..............  Travel time.
                                   ..............                       ..............  Kilometers of road
                                                                                         completed.
                                   ..............                       ..............  Sites rehabilitated
                                                                                         (phases I, II, III)--
                                                                                         pipeline.
                                   ..............                       ..............  Construction works
                                                                                         completed (phase II)--
                                                                                         pipeline.
                                   ..............                       ..............  Savings in household
                                                                                         expenditures for all
                                                                                         regional infrastructure
                                                                                         development
                                                                                         subprojects.
                                   ..............                       ..............  Population served by all
                                                                                         RID subprojects.
                                   ..............                       ..............  RID subprojects
                                                                                         completed.
                                   ..............                       ..............  Value of grant
                                                                                         agreements signed.
                                   ..............                       ..............  Subprojects with works
                                                                                         initiated.
----------------------------------------------------------------------------------------------------------------
Regional Enterprise Development       $52,034,500  Enterprises in          $52,040,699  Jobs created by
 Project.                                           Regions Developed.                   Agribusiness
                                                                                         Development Activity
                                                                                         (ADA) and by Georgia
                                                                                         Regional Development
                                                                                         Fund (GRDF).
                                                                                        Household net income--
                                                                                         ADA and GRDF.
                                                                                        Number of enterprises
                                                                                         assisted.
                                                                                        Jobs created--ADA.
                                                                                        Firm income--ADA.
                                   ..............                       ..............  Household net income--
                                                                                         ADA.
                                   ..............                       ..............  Number of direct
                                                                                         beneficiaries.
                                   ..............                       ..............  Number of indirect
                                                                                         beneficiaries.
                                   ..............                       ..............  Grant agreements signed--
                                                                                         ADA.
                                   ..............                       ..............  Increase in gross
                                                                                         revenues of portfolio
                                                                                         companies.
                                   ..............                       ..............  Increase in portfolio
                                                                                         company employees.
                                   ..............                       ..............  Increase in wages paid
                                                                                         to the portfolio
                                                                                         company employees.
                                   ..............                       ..............  Portfolio companies.
                                   ..............                       ..............  Amount of grant funds
                                                                                         disbursed.
                                   ..............                       ..............  Funds disbursed to the
                                                                                         portfolio companies.
----------------------------------------------------------------------------------------------------------------
Program Administration\2\, Due        $25,238,005                          $25,238,005
 Diligence, Monitoring and
 Evaluation.
----------------------------------------------------------------------------------------------------------------
Pending subsequent reports \3\...  ..............                                 $101  ........................
----------------------------------------------------------------------------------------------------------------


[[Page 57893]]


 
                                                                          Cumulative
             Projects                 Obligated         Objective        disbursements        Measures \2\
----------------------------------------------------------------------------------------------------------------
                       Country: Ghana Year: 2013 Quarter 3 Total Obligation: $536,288,969
           Entity to which the assistance is provided: MCA Ghana Total Quarterly Disbursements: \1\ $0
----------------------------------------------------------------------------------------------------------------
Agriculture Project..............    $188,958,630  Enhance                $188,666,884  Farmers trained in
                                                    profitability of                     commercial agriculture.
                                                    cultivation,                        Additional hectares
                                                    services to                          irrigated with MCC
                                                    agriculture and                      support.
                                                    product handling                    Hectares under
                                                    in support of the                    production with MCC
                                                    expansion of                         support.
                                                    commercial                          Kilometers of feeder
                                                    agriculture among                    road completed.
                                                    groups of                           Percent of contracted
                                                    smallholder farms.                   road works disbursed:
                                                                                         feeder roads.
                                                                                        Value of loans disbursed
                                                                                         to clients from
                                                                                         agriculture loan fund.
                                                                                        Portfolio-at-risk of
                                                                                         Agriculture Loan Fund
                                                                                         (percent).
                                   ..............                       ..............  Cooling facilities
                                                                                         installed.
                                   ..............                       ..............  Percent of value of
                                                                                         contracted irrigation
                                                                                         works disbursed.
                                   ..............                       ..............  Parcels surveyed in the
                                                                                         Pilot Land
                                                                                         Registration.
                                   ..............                       ..............  Land parcels registered
                                                                                         in the Pilot Land
                                                                                         Registration Areas.
                                   ..............                       ..............  Volume of products
                                                                                         passing through post-
                                                                                         harvest treatment
                                                                                         (metric tons).
----------------------------------------------------------------------------------------------------------------
Rural Development Project........     $76,157,856  Strengthen the          $75,903,274  Students enrolled in
                                                    rural institutions                   schools affected by
                                                    that provide                         Education Facilities
                                                    services                             Sub-Activity.
                                                    complementary to,                   Agricultural facilities
                                                    and supportive of,                   in target districts
                                                    agricultural and                     with electricity due to
                                                    agriculture                          Rural Electrification
                                                    business                             Activity.
                                                    development.                        Additional female
                                                                                         students enrolled in
                                                                                         schools affected by
                                                                                         Education Facilities
                                                                                         Sub-Activity,
                                                                                        Individuals completing
                                                                                         internships at
                                                                                         ministries, departments
                                                                                         and agencies and
                                                                                         metropolitan, municipal
                                                                                         and district
                                                                                         assemblies.
                                                                                        School blocks
                                                                                         rehabilitated and
                                                                                         constructed.
                                   ..............                       ..............  Distance to collect
                                                                                         water (meters).
                                   ..............                       ..............  Households with access
                                                                                         to improved water
                                                                                         supply.
                                   ..............                       ..............  Water points
                                                                                         constructed.
                                   ..............                       ..............  Kilometers of
                                                                                         electricity lines
                                                                                         identified and
                                                                                         diligence.
                                   ..............                       ..............  Inter-bank transactions.
                                   ..............                       ..............  Rural banks automated
                                                                                         under the Automation/
                                                                                         Computerization and
                                                                                         Interconnectivity of
                                                                                         Rural Banks activity.
                                   ..............                       ..............  Rural banks connected to
                                                                                         the wide area network.
----------------------------------------------------------------------------------------------------------------
Transportation Project...........    $231,056,120  Reduce the             $224,364,904  N1 Highway: annualized
                                                    transportation                       average daily traffic.
                                                    costs affecting                     N1 Highway: kilometers
                                                    agriculture                          of road completed.
                                                    commerce at sub-                    N1 Highway: Travel time
                                                    regional levels.                     at peak hours
                                                                                         (minutes).
                                                                                        N1 Highway: Vehicles per
                                                                                         hour at peak hours.
                                                                                        Trunk roads kilometers
                                                                                         of roads completed.
                                   ..............                       ..............  Percent disbursed of
                                                                                         contracted trunk road
                                                                                         works.
                                   ..............                       ..............  Ferry activity:
                                                                                         annualized average
                                                                                         daily traffic vehicles.
                                   ..............                       ..............  Ferry activity: annual
                                                                                         average daily traffic
                                                                                         (passengers).
                                   ..............                       ..............  Percent of contracted
                                                                                         road works disbursed:
                                                                                         N1.
                                   ..............                       ..............  Percent of contracted
                                                                                         work disbursed: ferry
                                                                                         and floating dock.
                                   ..............                       ..............  Percent of contracted
                                                                                         work disbursed:
                                                                                         landings and terminals.
----------------------------------------------------------------------------------------------------------------
Program Administration \3\, Due       $43,816,363                          $43,816,360
 Diligence, Monitoring and
 Evaluation.
----------------------------------------------------------------------------------------------------------------
Pending subsequent reports\4\....     -$3,700,000                           $3,537,546
----------------------------------------------------------------------------------------------------------------


 
                                                                          Cumulative
             Projects                 Obligated         Objective        disbursements        Measures \2\
----------------------------------------------------------------------------------------------------------------
                     Country: Indonesia Year: 2013 Quarter 3 Total Obligation: $600,000,000
    Entity to which the assistance is provided: MCA Indonesia Total Quarterly Disbursements: \1\ $23,842,743
----------------------------------------------------------------------------------------------------------------
Community Nutrition Project......    $131,500,000  need objectives and     $22,457,048
                                                    measures.
----------------------------------------------------------------------------------------------------------------

[[Page 57894]]

 
Green Prosperity Project.........    $332,500,000                              $40,280
----------------------------------------------------------------------------------------------------------------
Program Administration \3\ and        $86,000,000                           $2,661,266
 Control, Monitoring and
 Evaluation.
----------------------------------------------------------------------------------------------------------------
Pending subsequent reports \4\...  ..............                             $124,820
----------------------------------------------------------------------------------------------------------------


 
                                                                          Cumulative
             Projects                 Obligated         Objective        disbursements        Measures \2\
----------------------------------------------------------------------------------------------------------------
                       Country: Jordan Year: 2013 Quarter 3 Total Obligation: $275,100,000
      Entity to which the assistance is provided: MCA Jordan Total Quarterly Disbursements: \1\ $6,349,039
----------------------------------------------------------------------------------------------------------------
Water Network Project............    $102,570,034  Improve the overall      $1,930,222  Network water
                                                    drinking water                       consumption per capita
                                                    system efficiency                    (residential and non-
                                                    in Jordan's Zarqa                    residential); liters/
                                                    Governorate.                         capita/day.
                                                                                        Operating cost coverage--
                                                                                         Water Authority Jordan
                                                                                         Zarqa.
                                   ..............                       ..............  Non-revenue water
                                                                                         (percent).
                                   ..............                       ..............  Continuity of supply
                                                                                         time; hours per week.
                                   ..............                       ..............  Restructure and
                                                                                         rehabilitate primary
                                                                                         and secondary pipelines
                                                                                         (kilometers).
                                   ..............                       ..............  Restructure and
                                                                                         rehabilitate tertiary
                                                                                         pipelines (kilometers).
                                   ..............                       ..............  Value disbursed of water
                                                                                         construction contracts--
                                                                                         Infrastructure Activity
                                                                                         and Water Smart Homes
                                                                                         Activity.
                                   ..............                       ..............  Number of National Aid
                                                                                         Fund households with
                                                                                         improved water and
                                                                                         wastewater network.
                                   ..............                       ..............  Number of National Aid
                                                                                         Fund households
                                                                                         connected to the
                                                                                         wastewater network as a
                                                                                         result of the Water
                                                                                         Smart Homes Activity.
----------------------------------------------------------------------------------------------------------------
Wastewater Network Project            $54,274,261  Improve the overall      $8,282,788  Sewer blockage events
                                                    waste water system                   (annual).
                                                    efficiency in                       Volume of wastewater
                                                    Jordan's Zarqa                       collected; cubic meters/
                                                    Governorate.                         year/million.
                                                                                        Residential population
                                                                                         connected to the sewer
                                                                                         system.
                                   ..............                       ..............  Expand network
                                                                                         (kilometers).
                                   ..............                       ..............  Value disbursed of
                                                                                         sanitation construction
                                                                                         contracts.
----------------------------------------------------------------------------------------------------------------
As Samra Wastewater Treatment         $98,703,598  Increase the volume     $28,991,700  Treated wastewater used
 Plant Expansion Project.                           of treated waste                     in agriculture (as a
                                                    water available as                   percent of all water
                                                    a substitute for                     used for irrigation in
                                                    fresh water in                       Northern and Middle
                                                    agriculture use.                     Jordan Valley).
                                                                                        Value disbursed of
                                                                                         construction contracts.
                                                                                        Total engineering,
                                                                                         procurement and
                                                                                         construction cost of As-
                                                                                         Samra expansion.
----------------------------------------------------------------------------------------------------------------
Program Administration \3\ and        $19,552,107                           $1,577,925
 Control, Monitoring and
 Evaluation.
----------------------------------------------------------------------------------------------------------------
Pending subsequent reports \4\...  ..............                             $294,046
----------------------------------------------------------------------------------------------------------------


 
                                                                          Cumulative
             Projects                 Obligated         Objective        disbursements        Measures \2\
----------------------------------------------------------------------------------------------------------------
                      Country: Lesotho Year: 2013 Quarter 3 Total Obligation: $362,551,000
     Entity to which the assistance is provided: MCA Lesotho Total Quarterly Disbursements: \1\ $19,046,425
----------------------------------------------------------------------------------------------------------------
Water Project....................    $167,886,999  Improve the water      $111,678,399  Physical completion of
                                                    supply for                           Metolong water
                                                    industrial and                       treatment works
                                                    domestic needs,                      contract (percent).
                                                    and enhance rural                   Physical completion of
                                                    livelihoods                          urban water supply
                                                    through improved                     works contracts
                                                    watershed                            (percent).
                                                    management.                         People with access to
                                                                                         rural water supply.
                                                                                        Ventilated improved pit
                                                                                         latrines built.
                                                                                        Households with
                                                                                         provisions to connect
                                                                                         to water networks.
                                   ..............                       ..............  Non-revenue water
                                                                                         (percent).
                                   ..............                       ..............  Knowledge of good
                                                                                         hygiene practices
                                                                                         (percent).
                                   ..............                       ..............  Water points
                                                                                         constructed.
----------------------------------------------------------------------------------------------------------------

[[Page 57895]]

 
Health Project...................    $121,377,822  Increase access to      $90,685,461  People with HIV still
                                                    life-extending                       alive 12 months after
                                                    antiretroviral                       initiation of
                                                    therapy and                          treatment.
                                                    essential health                    Health centers with
                                                    services by                          required staff
                                                    providing a                          complement (full-time
                                                    sustainable                          employees).
                                                    delivery platform.                  Tuberculosis
                                                                                         notification (per
                                                                                         100,000 people).
                                                                                        Health centers equipped.
                                                                                        Deliveries conducted in
                                                                                         the health facilities.
                                   ..............                       ..............  Physical completion of
                                                                                         health center
                                                                                         facilities (percent).
                                   ..............                       ..............  Physical completion of
                                                                                         outpatient departments
                                                                                         (percent).
                                   ..............                       ..............  Physical completion of
                                                                                         the Botsabelo
                                                                                         facilities (percent).
----------------------------------------------------------------------------------------------------------------
Private Sector Development            $27,386,469  Stimulate               $20,827,192  Time required to resolve
 Project.                                           investment by                        commercial disputes
                                                    improving access                     (number of days).
                                                    to credit,                          Cases filed at the
                                                    reducing                             commercial court.
                                                    transaction costs                   Debit/smart cards
                                                    and increasing the                   issued.
                                                    participation of                    Bonds registered.
                                                    women in the                        Urban land parcels
                                                    economy.                             regularized and
                                                                                         registered.
                                                                                        People trained on gender
                                                                                         equality and economic
                                                                                         rights.
                                   ..............                       ..............  Stakeholders trained.
                                   ..............                       ..............  Change in time for
                                                                                         property transactions
                                                                                         (percent).
                                   ..............                       ..............  Women holding titles to
                                                                                         land.
----------------------------------------------------------------------------------------------------------------
Program Administration \3\ and        $45,899,709                          $34,839,137
 Control, Monitoring and
 Evaluation.
----------------------------------------------------------------------------------------------------------------
Pending Subsequent Report \4\....  ..............                             $342,818
----------------------------------------------------------------------------------------------------------------


 
                                                                          Cumulative
             Projects                 Obligated         Objective        disbursements        Measures \2\
----------------------------------------------------------------------------------------------------------------
                        Country: Mali Year: 2013 Quarter 3 Total Obligation: $435,628,223
           Entity to which the assistance is provided: MCA Mali Total Quarterly Disbursements: \1\ $0
----------------------------------------------------------------------------------------------------------------
Bamako-Senou Airport Improvement     $143,403,391                         $143,403,391  Annual foreign visitors,
 Project.                                                                                non-residents.
                                                                                        Percent of work
                                                                                         completed on the
                                                                                         airside infrastructure.
                                                                                        Percent of work
                                                                                         completed on the
                                                                                         landside
                                                                                         infrastructure.
                                   ..............                       ..............  Security and safety
                                                                                         deficiencies corrected
                                                                                         at the airport.
----------------------------------------------------------------------------------------------------------------
Alatona Irrigation Project.......    $252,895,691  Increase the           $252,895,691  Cultivation intensity
                                                    agricultural                         during the dry season
                                                    production and                       (percent).
                                                    productivity in                     Value of agricultural
                                                    the Alatona zone                     products sold by
                                                    of the Office du                     farmers (millions of
                                                    Niger.                               francs CFA).
                                                                                        Percent of works
                                                                                         completed on Niono-Goma
                                                                                         Coura road.
                                                                                        Hectares under new
                                                                                         irrigation.
                                   ..............                       ..............  Percent of contracted
                                                                                         irrigation construction
                                                                                         works disbursed.
                                   ..............                       ..............  Market gardens allocated
                                                                                         in Alatona zones to
                                                                                         populations affected by
                                                                                         the project or New
                                                                                         Settler women.
                                   ..............                       ..............  Five-hectare farms
                                                                                         distributed to new
                                                                                         settlers.
                                   ..............                       ..............  Rural hectares
                                                                                         formalized.
                                   ..............                       ..............  Net primary school
                                                                                         enrollment rate (in
                                                                                         Alatona zone).
                                   ..............                       ..............  Functional producer
                                                                                         organization.
                                   ..............                       ..............  Hectares under
                                                                                         production (rainy
                                                                                         season).
                                   ..............                       ..............  Hectares under
                                                                                         production (dry
                                                                                         season).
                                   ..............                       ..............  Organisation
                                                                                         d'exploitation des
                                                                                         reseaux secondaires or
                                                                                         water user associations
                                                                                         established.
                                   ..............                       ..............  Active microfinance
                                                                                         institution clients.
----------------------------------------------------------------------------------------------------------------
Industrial Park Project..........      $2,637,472  Terminated.........      $2,637,472
----------------------------------------------------------------------------------------------------------------

[[Page 57896]]

 
Program Administration \3\ and        $36,691,668                          $36,691,670
 Control, Monitoring and
 Evaluation.
----------------------------------------------------------------------------------------------------------------
Pending Subsequent Report \4\....
----------------------------------------------------------------------------------------------------------------
On May 4, 2012, the MCC Board of Directors concurred with the recommendation of MCC to terminate the Mali
 Compact following the undemocratic change of government in the country.
----------------------------------------------------------------------------------------------------------------


 
                                                                          Cumulative
             Projects                 Obligated         Objective        disbursements        Measures \2\
----------------------------------------------------------------------------------------------------------------
                      Country: Moldova Year: 2013 Quarter 3 Total Obligation: $262,000,000
      Entity to which the assistance is provided: MCA Moldova Total Quarterly Disbursements: \1\ $7,679,511
----------------------------------------------------------------------------------------------------------------
Road Rehabilitation Project......    $132,840,000  Enhance                 $21,346,259  Reduced cost for road
                                                    transportation                       users.
                                                    conditions.                         Average annual daily
                                                                                         traffic.
                                   ..............                       ..............  Road maintenance
                                                                                         expenditure.
                                   ..............                       ..............  Kilometers of roads
                                                                                         completed.
                                   ..............                       ..............  Percent of contracted
                                                                                         roads works disbursed.
                                   ..............                       ..............  Children participants in
                                                                                         the road safety
                                                                                         trainings.
                                   ..............                       ..............  Resettlement action
                                                                                         plans implemented.
                                   ..............                       ..............  Final design (date
                                                                                         received).
                                   ..............                       ..............  Trafficking in persons
                                                                                         training participants.
----------------------------------------------------------------------------------------------------------------
Transition to High Value             $101,773,402  Increase incomes in     $16,496,367  Hectares under improved
 Agriculture Project.                               the agricultural                     or new irrigation.
                                                    sector; create                      Centralized irrigation
                                                    models for                           systems rehabilitated.
                                                    transition to high                  Percent of contracted
                                                    value agriculture                    irrigation feasibility
                                                    in centralized                       and/or design studies
                                                    irrigation system                    disbursed.
                                                    areas and an                        Value of irrigation
                                                    enabling                             feasibility and/or
                                                    environment                          detailed design
                                                    (legal, financial                    contracts signed.
                                                    and market) for                     Water user associations
                                                    replication.                         achieving financial
                                                                                         sustainability.
                                                                                        Management transfer
                                                                                         agreements signed.
                                                                                        Revised water management
                                                                                         policy framework--with
                                                                                         long-term water rights
                                                                                         defined--established.
                                                                                        Contracts of association
                                                                                         signed.
                                   ..............                       ..............  New high value
                                                                                         agriculture
                                                                                         infrastructure in place
                                                                                         (metric tons of cold
                                                                                         storage capacity).
                                   ..............                       ..............  Loans past due.
                                   ..............                       ..............  Value of agricultural
                                                                                         and rural loans.
                                   ..............                       ..............  Loan borrowers.
                                   ..............                       ..............  Loan borrowers (female).
                                   ..............                       ..............  Value of sales
                                                                                         facilitated.
                                   ..............                       ..............  Farmers that have
                                                                                         applied improved
                                                                                         techniques (Growing
                                                                                         High Value Agriculture
                                                                                         Sales [GHS]).
                                   ..............                       ..............  Farmers that have
                                                                                         applied improved
                                                                                         techniques (GHS)
                                                                                         (female).
                                   ..............                       ..............  Farmers trained.
                                   ..............                       ..............  Farmers trained
                                                                                         (female).
                                   ..............                       ..............  Enterprises assisted.
                                   ..............                       ..............  Enterprises assisted
                                                                                         (female).
----------------------------------------------------------------------------------------------------------------
Program Administration \3\ and        $27,386,598                           $8,770,110
 Monitoring and Evaluation.
----------------------------------------------------------------------------------------------------------------
Pending Subsequent Report \4\....  ..............                              $85,150
----------------------------------------------------------------------------------------------------------------


[[Page 57897]]


 
                                                                          Cumulative
             Projects                 Obligated         Objective        disbursements        Measures \2\
----------------------------------------------------------------------------------------------------------------
                      Country: Mongolia Year: 2013 Quarter 3 Total Obligation: $284,894,187
     Entity to which the assistance is provided: MCA Mongolia Total Quarterly Disbursements: \1\ $14,270,048
----------------------------------------------------------------------------------------------------------------
Property Rights Project..........     $28,777,619  Increase security       $24,293,451  Wells completed.
                                                    and capitalization                  Legal and regulatory
                                                    of land assets                       reforms adopted.
                                                    held by lower-                      Stakeholders trained
                                                    income Mongolians,                   (Peri-Urban and Land
                                                    and increased peri-                  Plots).
                                                    urban herder                        Herder groups limiting
                                                    productivity and                     their livestock
                                                    incomes.                             population to the
                                                                                         carrying capacity of
                                                                                         their leases on semi-
                                                                                         intensive farms.
                                                                                        Cost for property
                                                                                         transactions (first
                                                                                         time) (U.S. dollars).
                                                                                        Urban parcels
                                                                                         formalized.
                                   ..............                       ..............  Stakeholders trained
                                                                                         (Ger Area Land Plots).
                                   ..............                       ..............  Leaseholds awarded.
----------------------------------------------------------------------------------------------------------------
Vocational Education Project.....     $50,197,859  Increase employment     $44,106,552  Students participating
                                                    and income among                     in MCC-supported
                                                    unemployed and                       educational facilities.
                                                    underemployed                       Nongovernmental funding
                                                    Mongolians.                          of vocational education
                                                                                         (percent).
                                                                                        Instructors trained or
                                                                                         certified through MCC-
                                                                                         supported activities.
                                   ..............                       ..............  Educational facilities
                                                                                         constructed/
                                                                                         rehabilitated or
                                                                                         equipped through MCC-
                                                                                         supported activities.
----------------------------------------------------------------------------------------------------------------
Health Project...................     $42,045,259  Increase the            $31,725,167  Screening for
                                                    adoption of                          hypertension (percent).
                                                    behaviors that                      Civil society
                                                    reduce                               mobilization (grants)
                                                    noncommunicable                      (U.S. dollars).
                                                    diseases and                        Early detections of
                                                    injuries (NCDIs)                     cervical cancer--early
                                                    among target                         diagnosis.
                                                    populations and                     Training of health staff
                                                    improved medical                     by MCA Mongolia.
                                                    treatment and                       Capacity of school
                                                    control of NCDIs.                    teachers.
                                                                                        Improved services in non-
                                                                                         communicable disease-
                                                                                         primary health care
                                                                                         facilities (percent).
----------------------------------------------------------------------------------------------------------------
Roads Project....................     $84,961,586  More efficient          $43,506,460  Kilometers of roads
                                                    transport for                        completed.
                                                    trade and access                    Kilometers of roads
                                                    to services.                         under design.
                                                                                        Percent of contracted
                                                                                         roads works disbursed.
----------------------------------------------------------------------------------------------------------------
Energy and Environmental Project.     $41,518,019  Increased wealth        $39,877,446  Wind power dispatched
                                                    and productivity                     from substation
                                                    through greater                      (million kilowatt
                                                    fuel use                             hours).
                                                    efficiency and                      Heat only boilers sites
                                                    decreasing health                    upgraded.
                                                    costs from air.                     Stoves distributed by
                                                                                         MCA Mongolia.
----------------------------------------------------------------------------------------------------------------
Rail Project.....................        $369,560  Terminated.........        $369,560  Terminated.
----------------------------------------------------------------------------------------------------------------
Program Administration \3\ and        $37,024,286                          $28,327,092
 Control, Monitoring and
 Evaluation.
----------------------------------------------------------------------------------------------------------------
Pending subsequent reports \4\...                                           $3,905,305
----------------------------------------------------------------------------------------------------------------


 
                                                                          Cumulative
             Projects                 Obligated         Objective        disbursements        Measures \2\
----------------------------------------------------------------------------------------------------------------
                      Country: Morocco Year: 2013 Quarter 3 Total Obligation: $697,500,000
     Entity to which the assistance is provided: MCA Morocco Total Quarterly Disbursements: \1\ $55,626,184
----------------------------------------------------------------------------------------------------------------
Fruit Tree Productivity Project..    $339,987,321  Reduce volatility      $261,807,300  Farmers trained.
                                                    of agricultural                     Olive and date producers
                                                    production and                       assisted.
                                                    increase volume of                  Percent of virgin and
                                                    fruit agricultural                   extra virgin olive oil
                                                    production.                          of total olive oil
                                                                                         production in targeted
                                                                                         areas.
                                   ..............                       ..............  Number of Catalyst Fund
                                                                                         proposals approved.
                                   ..............                       ..............  Disbursements under the
                                                                                         Catalyst Fund (U.S.
                                                                                         dollars).
                                   ..............                       ..............  Average agricultural
                                                                                         revenue per farm in
                                                                                         rehabilitation rain-fed
                                                                                         areas (U.S. dollars).
                                   ..............                       ..............  Area planted and
                                                                                         delivered to farmers
                                                                                         (hectares).
                                   ..............                       ..............  Area in expansion
                                                                                         perimeters for which
                                                                                         water and soil
                                                                                         conservation measures
                                                                                         have been implemented
                                                                                         (hectares).
                                   ..............                       ..............  Yield of rehabilitated
                                                                                         olive trees in rain-fed
                                                                                         areas (metric tons per
                                                                                         hectare) (``mt/ha'').

[[Page 57898]]

 
                                   ..............                       ..............  Average agricultural
                                                                                         revenue per farm in
                                                                                         irrigated areas.
                                   ..............                       ..............  Cumulative area of
                                                                                         irrigated perimeters
                                                                                         rehabilitated
                                                                                         (hectares).
                                   ..............                       ..............  Yield of rehabilitated
                                                                                         olive trees in
                                                                                         irrigated areas (mt/
                                                                                         ha).
                                   ..............                       ..............  Average agricultural
                                                                                         revenue per farm in
                                                                                         oasis areas.
                                   ..............                       ..............  Hectares under improved
                                                                                         irrigation.
                                   ..............                       ..............  Yield of rehabilitated
                                                                                         date palms in oasis
                                                                                         areas (mt/ha).
                                   ..............                       ..............  Number of in-vitro
                                                                                         seedlings successfully
                                                                                         planted.
----------------------------------------------------------------------------------------------------------------
Small Scale Fisheries Project....    $122,488,658  Improve quality of      $76,241,887  Boats benefitting from
                                                    fish moving                          landing sites and
                                                    through domestic                     ports.
                                                    channels and                        Number of artisan
                                                    assure the                           fishers who received a
                                                    sustainable use of                   training certificate.
                                                    fishing resources.                  Number of jobs created
                                                                                         in wholesale fish
                                                                                         markets.
                                                                                        Per capita fish
                                                                                         consumption in areas of
                                                                                         new market construction
                                                                                         (kg/year).
                                   ..............                       ..............  Active mobile fish
                                                                                         vendors trained and
                                                                                         equipped by the
                                                                                         project.
                                   ..............                       ..............  Average price of fish at
                                                                                         auction markets.
                                   ..............                       ..............  Net annual income of
                                                                                         mobile fish vendors.
----------------------------------------------------------------------------------------------------------------
Artisan and Fez Medina Project...     $96,149,856  Increase value          $58,262,752  Total receiving literacy
                                                    added to tourism                     training.
                                                    and artisan                         Graduates of MCC-
                                                    sectors.                             supported functional
                                                                                         literacy program
                                                                                         (female).
                                   ..............                       ..............  Graduates of MCC-
                                                                                         supported functional
                                                                                         literacy program
                                                                                         (male).
                                   ..............                       ..............  Total receiving
                                                                                         professional training.
                                   ..............                       ..............  Females receiving
                                                                                         professional training.
                                   ..............                       ..............  Graduates vocational
                                                                                         training program
                                                                                         (residential,
                                                                                         apprenticeship and
                                                                                         continuing education).
                                   ..............                       ..............  Drop-out rates of
                                                                                         participants of
                                                                                         residential and
                                                                                         apprenticeship
                                                                                         programs.
                                   ..............                       ..............  Potters trained.
                                   ..............                       ..............  MCC-subsidized gas kilns
                                                                                         bought by artisans.
                                   ..............                       ..............  Adoption rate of
                                                                                         improved production
                                                                                         practices promoted by
                                                                                         the project (percent).
                                   ..............                       ..............  Tourist circuits
                                                                                         improved or created.
                                   ..............                       ..............  Number of small and
                                                                                         medium enterprises
                                                                                         (SMEs) that append the
                                                                                         label on their
                                                                                         products.
                                   ..............                       ..............  Number of SMEs
                                                                                         participating in
                                                                                         promotion events.
                                   ..............                       ..............  Sites constructed or
                                                                                         rehabilitated (4
                                                                                         Fondouks, Place Lalla
                                                                                         Ydouna, Ain Nokbi).
                                   ..............                       ..............  Beneficiaries of Ain
                                                                                         Nokbi construction and
                                                                                         artisan resettlement
                                                                                         program.
----------------------------------------------------------------------------------------------------------------
Enterprise Support Project.......     $15,042,301  Improved survival       $14,822,877  Survival rate after two
                                                    rate of new small                    years (percent).
                                                    and medium                          Days of individual
                                                    enterprises (SMEs)                   coaching (total days).
                                                    and National                        Beneficiaries trained.
                                                    Initiative for
                                                    Human Development
                                                    (INDH)-funded
                                                    income generating
                                                    activities;
                                                    increased revenue
                                                    for new SMEs and
                                                    INDH-funded income
                                                    generating
                                                    activities.
----------------------------------------------------------------------------------------------------------------
Financial Services Project.......     $44,175,252  To be determined...     $33,456,957  Portfolio at risk at 30
                                                                                         days (percent).
                                   ..............                       ..............  Value of loans granted
                                                                                         through mobile branches
                                                                                         (U.S. dollars).
                                   ..............                       ..............  Clients of microcredit
                                                                                         associations reached
                                                                                         through mobile
                                                                                         branches.
                                   ..............                       ..............  Value of loan agreements
                                                                                         between micro credit
                                                                                         associations and Jaida
                                                                                         (millions of dirhams).
                                   ..............                       ..............  Value of loan
                                                                                         disbursements to Jaida.
----------------------------------------------------------------------------------------------------------------
Program Administration \3\ and        $79,656,612                          $59,164,695
 Control, Monitoring and
 Evaluation.
----------------------------------------------------------------------------------------------------------------

[[Page 57899]]

 
Pending Subsequent Report \4\....  ..............                           $4,811,155
----------------------------------------------------------------------------------------------------------------


 
                                                                          Cumulative
             Projects                 Obligated         Objective        disbursements        Measures \2\
----------------------------------------------------------------------------------------------------------------
                     Country: Mozambique Year: 2013 Quarter 3 Total Obligation: $506,924,053
    Entity to which the assistance is provided: MCA Mozambique Total Quarterly Disbursements: \1\ $49,438,726
----------------------------------------------------------------------------------------------------------------
Water Supply and Sanitation          $207,385,393  Increase access to     $144,872,115  Value of municipal
 Project.                                           reliable and                         sanitation and drainage
                                                    quality water and                    systems construction
                                                    sanitation                           contracts signed.
                                                    facilities.                         Amount disbursed for
                                                                                         municipal sanitation
                                                                                         and drainage
                                                                                         construction contracts.
                                   ..............                       ..............  Volume of water
                                                                                         produced.
                                   ..............                       ..............  Value of contracts
                                                                                         signed for construction
                                                                                         of water systems.
                                   ..............                       ..............  Percent of construction
                                                                                         contract disbursed for
                                                                                         water systems.
                                   ..............                       ..............  Rural water points
                                                                                         constructed.
                                   ..............                       ..............  Percent of rural
                                                                                         population of the six
                                                                                         intervention districts
                                                                                         with access to improved
                                                                                         water sources.
                                   ..............                       ..............  Amount disbursed for
                                                                                         rural water points
                                                                                         construction contracts.
                                   ..............                       ..............  Persons trained in
                                                                                         hygiene and sanitary
                                                                                         best practices.
----------------------------------------------------------------------------------------------------------------
Road Rehabilitation Project......    $176,307,480  Increase access to      $94,375,668  Percent of roads works
                                                    productive                           contracts disbursed.
                                                    resources and                       Kilometers of roads
                                                    markets.                             issued ``Take-over
                                                                                         Certificates''.
----------------------------------------------------------------------------------------------------------------
Land Tenure Project..............     $40,068,307  Establish               $33,078,332  People trained
                                                    efficient, secure                    (paralegal courses at
                                                    land access for                      Centre for Juridical
                                                    households and                       and Judicial Training,
                                                    investors.                           general training at
                                                                                         National Directorate of
                                                                                         Land and Forest, etc.).
                                   ..............                       ..............  Land administration
                                                                                         offices established or
                                                                                         upgraded.
                                   ..............                       ..............  Rural hectares mapped.
                                   ..............                       ..............  Urban parcels mapped.
                                   ..............                       ..............  Rural hectares
                                                                                         formalized.
                                   ..............                       ..............  Urban parcels
                                                                                         formalized.
                                   ..............                       ..............  Communities delimited.
----------------------------------------------------------------------------------------------------------------
Farmer Income Support Project....     $19,250,117  Improve coconut         $16,755,203  Coconut seedlings
                                                    productivity and                     planted.
                                                    diversification                     Survival rate of coconut
                                                    into cash crop.                      seedlings (percent).
                                                                                        Hectares of alternate
                                                                                         crops under production.
                                   ..............                       ..............  Farmers trained in
                                                                                         surveillance and pest
                                                                                         and disease control for
                                                                                         coconuts.
                                   ..............                       ..............  Farmers trained in
                                                                                         alternative crop
                                                                                         production and
                                                                                         productivity enhancing
                                                                                         strategies.
                                   ..............                       ..............  Farmers trained in
                                                                                         planting and post-
                                                                                         planting management of
                                                                                         coconuts.
                                   ..............                       ..............  Farmers using
                                                                                         alternative crop
                                                                                         production and
                                                                                         productivity enhancing
                                                                                         strategies.
                                   ..............                       ..............  Businesses receiving
                                                                                         Business Development
                                                                                         Fund grants.
----------------------------------------------------------------------------------------------------------------
Program Administration \3\ and        $63,912,756                          $40,157,874
 Control, Monitoring and
 Evaluation.
----------------------------------------------------------------------------------------------------------------
Pending Subsequent Report \4\....  ..............                           $3,009,654
----------------------------------------------------------------------------------------------------------------


 
                                                                          Cumulative
             Projects                 Obligated         Objective        disbursements        Measures \2\
----------------------------------------------------------------------------------------------------------------
                      Country: Namibia Year: 2013 Quarter 3 Total Obligation: $304,477,815
     Entity to which the assistance is provided: MCA Namibia Total Quarterly Disbursements: \1\ $20,169,366
----------------------------------------------------------------------------------------------------------------
Education Project................    $141,554,809  Improve the quality     $82,626,351  Learners (any level)
                                                    of the workforce                     participating in the 47
                                                    in Namibia by                        schools sub-activity.
                                                    enhancing the                       Educational facilities
                                                    equity and                           constructed,
                                                    effectiveness of                     rehabilitated, equipped
                                                    basic.                               in the 47 schools
                                                                                         sub[hyphen]activity.
                                                                                        Percent of contracted
                                                                                         construction works
                                                                                         disbursed for 47
                                                                                         schools.
                                   ..............                       ..............  Textbooks delivered.

[[Page 57900]]

 
                                   ..............                       ..............  Educators trained to be
                                                                                         textbook management
                                                                                         trainers.
                                   ..............                       ..............  Educators trained to be
                                                                                         textbook utilization
                                                                                         trainers.
                                   ..............                       ..............  Percent disbursed
                                                                                         against works contracts
                                                                                         for Regional Study
                                                                                         Resource Centers
                                                                                         Activity.
                                   ..............                       ..............  Visits to MCA Namibia
                                                                                         assisted Regional Study
                                                                                         and Resource Centres.
                                   ..............                       ..............  Compliance rate for
                                                                                         National Training Fund
                                                                                         levy.
                                   ..............                       ..............  Graduates from MCC-
                                                                                         supported education
                                                                                         activities.
                                   ..............                       ..............  Percent disbursed
                                                                                         against construction,
                                                                                         rehabilitation, and
                                                                                         equipment contracts for
                                                                                         Community Skills and
                                                                                         Development Centres.
                                   ..............                       ..............  Namibia Student
                                                                                         Financial Assistance
                                                                                         Fund Policy in place
                                                                                         (date).
----------------------------------------------------------------------------------------------------------------
Tourism Project..................     $68,579,170  Grow the Namibian       $21,901,525  Tourists to Etosha
                                                    tourism industry                     National Park (ENP).
                                                    with a focus on                     Galton Gate Plan
                                                    increasing income                    implemented (percent).
                                                    to households in                    Percent disbursed
                                                    communal.                            against construction,
                                                                                         rehabilitation and
                                                                                         equipment contracts for
                                                                                         ENP housing units/
                                                                                         management structures.
                                   ..............                       ..............  Game translocated with
                                                                                         MCA Namibia support.
                                   ..............                       ..............  Unique visits on Namibia
                                                                                         Tourism Board website.
                                   ..............                       ..............  Leisure tourist
                                                                                         arrivals.
                                   ..............                       ..............  North American tourism
                                                                                         businesses (travel
                                                                                         agencies and tour
                                                                                         operators) that offer
                                                                                         Namibian tours or tour
                                                                                         packages.
                                   ..............                       ..............  Value of grants issued
                                                                                         by the Conservancy
                                                                                         Development Support
                                                                                         Grant Fund (Namibian
                                                                                         dollars).
                                   ..............                       ..............  Amount of new private
                                                                                         sector investment
                                                                                         secured by MCA Namibia
                                                                                         assisted conservancies
                                                                                         (Namibian dollars).
                                   ..............                       ..............  Annual gross revenue to
                                                                                         conservancies receiving
                                                                                         MCA Namibia assistance.
----------------------------------------------------------------------------------------------------------------
Agriculture Project..............     $51,439,491  Enhance the health      $27,544,761  Participating households
                                                    and marketing                        registered in the
                                                    efficiency of                        Community-Based
                                                    livestock in the                     Rangeland and Livestock
                                                    NCAs of Namibia                      Management sub-
                                                    and to increase                      activity.
                                                    income.                             Grazing areas with
                                                                                         documented combined
                                                                                         management plans.
                                   ..............                       ..............  Parcels corrected or
                                                                                         incorporated in land
                                                                                         system.
                                   ..............                       ..............  Stakeholders trained.
                                   ..............                       ..............  Cattle tagged with radio
                                                                                         frequency
                                                                                         identification tags.
                                   ..............                       ..............  Percent disbursed
                                                                                         against works contracts
                                                                                         for State Veterinary
                                                                                         Offices.
                                   ..............                       ..............  Value of grant
                                                                                         agreements signed under
                                                                                         Livestock Market
                                                                                         Efficiency Fund.
                                   ..............                       ..............  Farmers trained.
                                   ..............                       ..............  Value of grant
                                                                                         agreements signed under
                                                                                         Indigenous Natural
                                                                                         Product Innovation
                                                                                         Fund.
----------------------------------------------------------------------------------------------------------------
Program Administration \3\ and        $42,904,344                          $24,689,146
 Control, Monitoring and
 Evaluation.
----------------------------------------------------------------------------------------------------------------
Pending Subsequent Report \4\....  ..............                           $2,091,246
----------------------------------------------------------------------------------------------------------------


 
                                                                          Cumulative
             Projects                 Obligated         Objective        disbursements        Measures \2\
----------------------------------------------------------------------------------------------------------------
                    Country: Philippines Year: 2013 Quarter 3 Total Obligation: $433,202,350
   Entity to which the assistance is provided: MCA Philippines Total Quarterly Disbursements: \1\ $16,393,465
----------------------------------------------------------------------------------------------------------------
Kalahi-CIDSS Project.............  ..............  Improve the          ..............  Percent of Municipal
                                                    responsiveness of                    Local Government Units
                                                    local governments                    that provide funding
                                                    to community                         support for Kalahi-
                                                    needs, encourage                     CIDSS (KC) subproject
                                                    communities to                       operations and
                                                    engage in                            maintenance.
                                                    development                         Completed KC subprojects
                                                    activities.                          implemented in
                                                                                         compliance with
                                                                                         technical plans and
                                                                                         within schedule and
                                                                                         budget.
                                   ..............                       ..............  Barangays that have
                                                                                         completed specific
                                                                                         training on subproject
                                                                                         management and
                                                                                         implementation.
----------------------------------------------------------------------------------------------------------------

[[Page 57901]]

 
Secondary National Roads             $213,785,350  Reduce                  $35,591,275  Kilometers of road
 Development Project.                               transportation                       sections completed.
                                                    costs and improve                   Bridges replaced.
                                                    access to markets                   Bridges rehabilitated.
                                                    and social                          Value of road
                                                    services.                            construction contracts
                                                                                         signed.
                                                                                        Value of road
                                                                                         construction contracts
                                                                                         disbursed.
----------------------------------------------------------------------------------------------------------------
Revenue Administration Reform         $54,300,000  Increase tax             $5,463,951  Number of Audits.
 Project.                                           revenues over time                  Revenue District Offices
                                                    and support the                      using the electronic
                                                    Department of                        tax information system.
                                                    Finance's                           Percent of audit
                                                    initiatives to                       completed in compliance
                                                    detect and deter                     with prescribed period
                                                    corruption within                    of 120 days.
                                                    its revenue                         Percent of audit cases
                                                    agencies.                            performed using
                                                                                         automated audit tool.
                                   ..............                       ..............  Successful case
                                                                                         resolutions.
                                   ..............                       ..............  Personnel charged with
                                                                                         graft, corruption,
                                                                                         lifestyle and/or
                                                                                         criminal cases.
                                   ..............                       ..............  Time taken to complete
                                                                                         investigation
                                                                                         (average).
----------------------------------------------------------------------------------------------------------------
Program Administration \3\ and        $45,117,000                           $8,693,238
 Control, Monitoring and
 Evaluation.
----------------------------------------------------------------------------------------------------------------
Pending Subsequent Reports \4\...  ..............                           $2,201,829
----------------------------------------------------------------------------------------------------------------
Community Development Grants         $120,000,000                          $36,619,693
 Project.
----------------------------------------------------------------------------------------------------------------


 
                                                                          Cumulative
             Projects                 Obligated         Objective        disbursements        Measures \2\
----------------------------------------------------------------------------------------------------------------
                      Country: Senegal Year: 2013 Quarter 3 Total Obligation: $540,000,000
     Entity to which the assistance is provided: MCA Senegal Total Quarterly Disbursements: \1\ $27,079,579
----------------------------------------------------------------------------------------------------------------
Road Rehabilitation Project......    $324,712,499  Expand access to        $44,082,155  Value of contracts
                                                    markets and                          signed for the
                                                    services.                            feasibility, design,
                                                                                         supervision and program
                                                                                         management of the RN2
                                                                                         and RN6 National Roads.
                                   ..............                       ..............  Percent of disbursements
                                                                                         for the contract signed
                                                                                         for the constructions
                                                                                         of the RN 2 and RN6.
                                   ..............                       ..............  Kilometers of roads
                                                                                         rehabilitated on the
                                                                                         RN2.
                                   ..............                       ..............  Annual average daily
                                                                                         traffic Richard-Toll--
                                                                                         Ndioum.
                                   ..............                       ..............  Percent change in travel
                                                                                         time on the RN2.
                                   ..............                       ..............  International Roughness
                                                                                         Index on the RN2.
                                   ..............                       ..............  Kilometers of roads
                                                                                         covered by the contract
                                                                                         for the studies, the
                                                                                         supervision and
                                                                                         management of the RN2.
                                   ..............                       ..............  Kilometers of roads
                                                                                         rehabilitated on the
                                                                                         RN6.
                                   ..............                       ..............  Annual average daily
                                                                                         traffic Ziguinchor--
                                                                                         Tanaff.
                                   ..............                       ..............  Annual average daily
                                                                                         traffic Tanaff--Kolda.
                                   ..............                       ..............  Annual average daily
                                                                                         traffic Kolda--
                                                                                         Kounkan[eacute].
                                   ..............                       ..............  Percent change in travel
                                                                                         time on the RN6.
                                   ..............                       ..............  International roughness
                                                                                         index on the RN6 (lower
                                                                                         number = smoother
                                                                                         road).
                                   ..............                       ..............  Kilometers of roads
                                                                                         covered by the contract
                                                                                         for the studies, the
                                                                                         supervision and
                                                                                         management of the RN6.
----------------------------------------------------------------------------------------------------------------
Irrigation and Water Resources       $170,008,860  Improve                 $15,087,482  Tons of irrigated rice
 Management Project.                                productivity of                      production.
                                                    the agricultural                    Potentially irrigable
                                                    sector.                              lands area (Delta and
                                                                                         Ngallenka).
                                                                                        Hectares under
                                                                                         production.
                                   ..............                       ..............  Percent of the
                                                                                         disbursements on the
                                                                                         contracts signed for
                                                                                         the studies in the
                                                                                         Delta and the
                                                                                         Ngallenka.
                                   ..............                       ..............  Value of the
                                                                                         construction contracts
                                                                                         signed for the
                                                                                         irrigation
                                                                                         infrastructure in the
                                                                                         Delta and the
                                                                                         Ngallenka.
                                   ..............                       ..............  Cropping intensity
                                                                                         (hectares under
                                                                                         production per year/
                                                                                         cultivable hectares)
                                                                                         (Delta and Ngallenka).
                                   ..............                       ..............  Hectares mapped.
                                   ..............                       ..............  New conflicts resolved
                                                                                         (percent).
                                   ..............                       ..............  People trained on land
                                                                                         security tools.
                                   ..............                       ..............  Women trained on land
                                                                                         security tools.
----------------------------------------------------------------------------------------------------------------

[[Page 57902]]

 
Program Administration \3\ and        $45,278,641                          $12,868,838
 Monitoring and Evaluation.
----------------------------------------------------------------------------------------------------------------
Pending Subsequent Report \4\....                                             $687,201
----------------------------------------------------------------------------------------------------------------


 
                                                                          Cumulative
             Projects                 Obligated         Objective        disbursements        Measures \2\
----------------------------------------------------------------------------------------------------------------
                      Country: Tanzania Year: 2013 Quarter 3 Total Obligation: $698,136,000
     Entity to which the assistance is provided: MCA Tanzania Total Quarterly Disbursements: \1\ $58,306,778
----------------------------------------------------------------------------------------------------------------
Energy Sector Project............    $205,614,640  Increase value         $165,361,906  Number of current power
                                                    added to                             customers (Zanzibar).
                                                    businesses.                         Transmission and
                                                                                         distribution
                                                                                         substations capacity
                                                                                         (megawatt-peak)
                                                                                         (Zanzibar).
                                   ..............                       ..............  Technical and non-
                                                                                         technical losses
                                                                                         (Zanzibar) (percent).
                                   ..............                       ..............  Kilometers of 132
                                                                                         kilovolt (KV) lines
                                                                                         constructed (Zanzibar).
                                   ..............                       ..............  Percent disbursed on
                                                                                         overhead lines contract
                                                                                         (Zanzibar).
                                   ..............                       ..............  Number of Current power
                                                                                         customers (Malagarasi/
                                                                                         Kigoma).
                                   ..............                       ..............  Capacity of photovoltaic
                                                                                         systems installed
                                                                                         (kilowatt-peak)
                                                                                         (Malagarasi/Kigoma).
                                   ..............                       ..............  Current power customers
                                                                                         (all six project
                                                                                         regions) (Mainland).
                                   ..............                       ..............  Kilometers of 33/11KV
                                                                                         lines constructed
                                                                                         (Mainland).
                                   ..............                       ..............  Transmission and
                                                                                         distribution
                                                                                         substations capacity
                                                                                         (megavolt ampere) (all
                                                                                         six project regions)
                                                                                         (Mainland).
                                   ..............                       ..............  Technical and
                                                                                         nontechnical losses
                                                                                         (Mainland and Kigoma)
                                                                                         (percent).
                                   ..............                       ..............  Cost recovery ratio
                                                                                         (Mainland).
----------------------------------------------------------------------------------------------------------------
Transport Sector Project.........    $388,138,380  Increase cash crop     $258,988,770  Percent disbursed on
                                                    revenue and                          construction contracts.
                                                    aggregate visitor                   Surfacing complete:
                                                    spending.                            Tunduma--Sumbawanga
                                                                                         (percent).
                                   ..............                       ..............  Surfacing complete:
                                                                                         Tanga--Horohoro
                                                                                         (percent).
                                   ..............                       ..............  Surfacing complete:
                                                                                         Namtumba--Songea
                                                                                         (percent).
                                   ..............                       ..............  Surfacing complete:
                                                                                         Permiho--Mbinga
                                                                                         (percent).
                                   ..............                       ..............  Kilometers of roads
                                                                                         completed (taken over).
                                   ..............                       ..............  Pemba: Percent disbursed
                                                                                         on construction
                                                                                         contract.
                                   ..............                       ..............  Surfacing complete:
                                                                                         Pemba (percent).
                                   ..............                       ..............  Kilometers of roads
                                                                                         completed (taken over):
                                                                                         Zanzibar.
                                   ..............                       ..............  Road maintenance
                                                                                         expenditures: Mainland
                                                                                         trunk roads (percent).
                                   ..............                       ..............  Road maintenance
                                                                                         expenditures: Zanzibar
                                                                                         rural roads (percent).
                                   ..............                       ..............  Runway surfacing
                                                                                         complete (percent).
----------------------------------------------------------------------------------------------------------------
Water Sector Project.............     $65,027,607  Increase investment     $45,508,381  Volume of water
                                                    in human and                         produced--Lower Ruvu
                                                    physical capital                     (millions of liters per
                                                    and to reduce the                    day).
                                                    prevalence of                       Operations and
                                                    water-related                        maintenance cost
                                                    disease.                             recovery--Lower Ruvu
                                                                                         (percent).
                                                                                        Volume of water
                                                                                         produced--Morogoro
                                                                                         (millions of liters per
                                                                                         day).
                                   ..............                       ..............  Operations and
                                                                                         maintenance cost
                                                                                         recovery--Morogoro
                                                                                         (percent).
----------------------------------------------------------------------------------------------------------------
Program Administration \3\ and        $39,355,373                          $30,964,944
 Control, Monitoring and
 Evaluation.
----------------------------------------------------------------------------------------------------------------
Pending Subsequent Report \4\....  ..............
----------------------------------------------------------------------------------------------------------------
\1\ Disbursements are cash outlays rather than expenditures.
\2\ These measures are the same Key Performance Indicators that MCC reports each quarter. The Key Performance
  Indicators may change over time to more accurately reflect compact implementation progress. The unit for these
  measures is ``a number of'' unless otherwise indicated.
\3\ Program administration funds are used to pay items such as salaries, rent, and the cost of office equipment.
\4\ These amounts represent disbursements made that will be allocated to individual projects in the subsequent
  quarter(s) and reported as such in subsequent quarterly report(s).

[[Page 57903]]

 
\5\ These compacts are closed; however, deobligations took place during the reporting period.
The following MCC compacts are closed and, therefore, do not have any quarterly disbursements: Armenia, Benin,
  Cape Verde I, Honduras, Madagascar, Nicaragua and Vanuatu.


                                                         619(b) Transfer or Allocation of Funds
--------------------------------------------------------------------------------------------------------------------------------------------------------
 United States agency to which funds were transferred or
                        allocated                                         Amount                            Description of program or project
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                               None                                 None                                                      None
--------------------------------------------------------------------------------------------------------------------------------------------------------

[FR Doc. 2013-22936 Filed 9-19-13; 8:45 am]
BILLING CODE 9211-03-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.