Sunshine Act Meeting Notice, 57375-57377 [2013-22777]
Download as PDF
Federal Register / Vol. 78, No. 181 / Wednesday, September 18, 2013 / Notices
Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5:00 p.m. Eastern
Time on October 1, 2013.
Dated: September 12, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013–22693 Filed 9–17–13; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER13–1931–000]
Dated: September 12, 2013.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
emcdonald on DSK67QTVN1PROD with NOTICES
South Jersey Energy ISO3, LLC;
Supplemental Notice That Initial
Market-Based Rate Filing Includes
Request for Blanket Section 204
Authorization
[FR Doc. 2013–22670 Filed 9–17–13; 8:45 am]
BILLING CODE 6717–01–P
16:45 Sep 17, 2013
Jkt 229001
and the instructions on the
Commission’s Web site under https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. If unable to be filed
electronically, documents may be paperfiled. To paper-file, an original plus
seven copies should be mailed to:
Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
More information about this project can
be viewed or printed on the eLibrary
link of Commission’s Web site at https://
www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P–5679) in the
docket number field to access the
document. For assistance, call toll-free
1–866–208–3372.
Dated: September 12, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013–22695 Filed 9–17–13; 8:45 am]
This is a supplemental notice in the
above-referenced proceeding, of South
Jersey Energy ISO3, LLC’s application
for market-based rate authority, with an
accompanying rate schedule, noting that
such application includes a request for
blanket authorization, under 18 CFR
Part 34, of future issuances of securities
and assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR Part 34, of
future issuances of securities and
assumptions of liability is September
23, 2013.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with Internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
VerDate Mar<15>2010
Persons unable to file electronically
should submit an original and 5 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
The filings in the above-referenced
proceeding(s) are accessible in the
Commission’s eLibrary system by
clicking on the appropriate link in the
above list. They are also available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an eSubscription link on the
Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov. or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
57375
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
DEPARTMENT OF ENERGY
[Project No. 5679–033]
Federal Energy Regulatory
Commission
Toutant Hydro Power, Inc.; Energy
System, LLC.; Notice of Application for
Transfer of License, and Soliciting
Comments and Motions To Intervene
On September 6, 2013, Toutant Hydro
Power, Inc. (transferor) and Energy
System, LLC (transferee) filed an
application for transfer of license for the
M.S.C. Power Project, FERC No. 5679,
located on the Quinebaug River in
Windham County, Connecticut.
Applicants seek Commission approval
to transfer the license for the M.S.C.
Power Project from transferor to
transferee.
Applicants’ Contact: For Transferor:
Mr. Roland Toutant, Vice President,
Toutant Hydro Power, Incorporated, 80
Bungay Hill Road, Woodstock, CT
06281, telephone (860) 234–4032. For
Transferee: Mr. Rolland Zeleny,
President, Energy Stream, LLC, 18
Washington Street, Suite 18, Canton,
MA 02021, telephone (603) 498–8089.
FERC Contact: Patricia W. Gillis (202)
502–8735, patricia.gillis@ferc.gov.
Deadline for filing comments and
motions to intervene: 30 days from the
issuance date of this notice by the
Commission. Comments and motions to
intervene may be filed electronically via
the Internet. See 18 CFR 385.2001(a)(1)
PO 00000
Frm 00025
Fmt 4703
Sfmt 4703
Sunshine Act Meeting Notice
The following notice of meeting is
published pursuant to section 3(a) of the
government in the Sunshine Act (Pub.
L. 94–409), 5 U.S.C. 552b:
AGENCY HOLDING MEETING: Federal
Energy Regulatory Commission.
DATE AND TIME: September 19, 2013
10:00 a.m.
PLACE: Room 2C, 888 First Street NE.,
Washington, DC 20426.
STATUS: Open.
MATTERS TO BE CONSIDERED: Agenda.
* Note—Items listed on the agenda
may be deleted without further notice.
CONTACT PERSON FOR MORE INFORMATION:
Kimberly D. Bose, Secretary, Telephone
(202) 502–8400.
For a recorded message listing items
struck from or added to the meeting, call
(202) 502–8627.
This is a list of matters to be
considered by the Commission. It does
not include a listing of all documents
relevant to the items on the agenda. All
public documents, however, may be
viewed on line at the Commission’s
Web site at https://www.ferc.gov using
the eLibrary link, or may be examined
in the Commission’s Public Reference
Room.
E:\FR\FM\18SEN1.SGM
18SEN1
57376
Federal Register / Vol. 78, No. 181 / Wednesday, September 18, 2013 / Notices
997TH-MEETING, REGULAR MEETING
[September 19, 2013, 10:00 a.m.]
Item No.
Docket No.
Company
Administrative
A–1 ....................
A–2 ....................
A–3 ....................
AD02–1–000
AD02–7–000
AD12–12–000
Agency Business Matters.
Customer Matters, Reliability, Security and Market Operations.
Coordination Between Natural Gas and Electricity Markets.
Electric
E–1 ....................
E–2
E–3
E–4
E–5
E–6
E–7
....................
....................
....................
....................
....................
....................
E–8 ....................
E–9 ....................
E–10 ..................
E–11 ..................
E–12 ..................
ER12–1179–003
ER12–1179–004
ER12–1179–005
ER13–1173–000
OMITTED
OMITTED
RM12–16–000
RM13–16–000
RM10–11–002
ER11–2814–000
ER11–2814–001
ER11–2815–001
ER11–2815–002
ER11–2815–004
ER11–2814–000
ER11–2814–001
ER11–2815–000
ER11–2815–001
ER11–2815–002
ER11–2815–004
ER11–3279–000
ER11–3279–001
ER12–91–000
ER12–91–002
ER12–91–005
ER12–92–000
ER12–92–002
ER12–92–005
OMITTED
ER13–2031–000
ER13–2033–000
ER12–2292–001
ER12–2292–002
ER12–2292–003
ER13–1123–000
Southwest Power Pool, Inc.
Generator Requirements at the Transmission Interface.
Generator Verification Reliability Standards.
Integration of Variable Energy Resources.
PJM Interconnection, L.L.C.
PJM Interconnection, L.L.C.
Midwest Independent Transmission System Operator, Inc.
PJM Interconnection, L.L.C.
Duke Energy Ohio, Inc., and
Duke Energy Kentucky, Inc.
Southwest Power Pool, Inc.
Southwest Power Pool, Inc.
Gas
G–1 ....................
G–2 ....................
RP12–813–002
RP12–813–001
RP13–423–002
RP12–765–002
Gulf South Pipeline Company, LP.
Rockies Express Pipeline LLC.
Hydro
H–1
H–2
H–3
H–4
H–5
H–6
....................
....................
....................
....................
....................
....................
P–2149–160
P–2114–261
P–2197–103
P–2790–059
P–2216–081
P–2232–598
Public Utility District No. 1 of Douglas County, Washington.
Public Utility District No. 2 of Grant County, Washington.
Alcoa Power Generating Inc.
Boott Hydropower, Inc., and Eldred L. Field Hydroelectric Facility Trust.
New York Power Authority.
Duke Energy Carolinas, LLC.
emcdonald on DSK67QTVN1PROD with NOTICES
Certificates
C–1 ....................
CP06–407–008
C–2 ....................
CP13–3–000
VerDate Mar<15>2010
16:45 Sep 17, 2013
Missouri Interstate Gas, LLC.
Missouri Gas Company, LLC.
Missouri Pipeline Company, LLC.
Tennessee Gas Pipeline Company, L.L.C.
Jkt 229001
PO 00000
Frm 00026
Fmt 4703
Sfmt 4703
E:\FR\FM\18SEN1.SGM
18SEN1
Federal Register / Vol. 78, No. 181 / Wednesday, September 18, 2013 / Notices
Issued September 12, 2013.
Kimberly D. Bose,
Secretary.
A free webcast of this event is
available through www.ferc.gov. Anyone
with Internet access who desires to view
this event can do so by navigating to
www.ferc.gov’s Calendar of Events and
locating this event in the Calendar. The
event will contain a link to its webcast.
The Capitol Connection provides
technical support for the free webcasts.
It also offers access to this event via
television in the DC area and via phone
bridge for a fee. If you have any
questions, visit
www.CapitolConnection.org or contact
Danelle Springer or David Reininger at
703–993–3100.
Immediately following the conclusion
of the Commission Meeting, a press
briefing will be held in the Commission
Meeting Room. Members of the public
may view this briefing in the designated
overflow room. This statement is
intended to notify the public that the
press briefings that follow Commission
meetings may now be viewed remotely
at Commission headquarters, but will
not be telecast through the Capitol
Connection service.
[FR Doc. 2013–22777 Filed 9–16–13; 11:15 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14553–000]
emcdonald on DSK67QTVN1PROD with NOTICES
Mid-Atlantic Hydro, LLC; Notice of
Competing Preliminary Permit
Application Accepted for Filing and
Soliciting Comments and Motions To
Intervene
On August 30, 2013, Mid-Atlantic
Hydro, LLC (MAH) filed an application
for a preliminary permit, pursuant to
section 4(f) of the Federal Power Act
(FPA), proposing to study the feasibility
of the Dashields Lock and Dam
Hydroelectric Project (Dashields Project
or project) to be located at the U.S.
Army Corps of Engineers’ Dashields
Lock and Dam on the Ohio River in
Allegheny County, Pennsylvania. The
sole purpose of a preliminary permit, if
issued, is to grant the permit holder
priority to file a license application
during the permit term. A preliminary
permit does not authorize the permit
holder to perform any land-disturbing
activities or otherwise enter upon lands
or waters owned by others without the
owners’ express permission.
MAH’s permit application is filed in
competition with FFP Project 133, LLC’s
VerDate Mar<15>2010
16:45 Sep 17, 2013
Jkt 229001
proposed Dashields Lock and Dam
Hydroelectric Project No. 14524–000,
which was publicly noticed July 3,
2013. The deadline for filing competing
applications was September 1, 2013.
MAH’s competing permit application is
timely filed.
The proposed project would consist of
the following: (1) A new powerhouse
located adjacent to the right descending
bank immediately downstream of a 350linear-foot section of the existing dam;
(2) fourteen Very Low Head (VLH) 4000
turbine units with a total capacity of 7
megawatts; (3) a permanent submersible
magnet generator housed in each
turbine hub; and (4) a new 69-kilovolt
transmission line approximately 2.1
miles long. The estimated annual
generation of the Dashields Project
would be 41.4 gigawatt-hours.
Applicant Contact: Kristina Johnson,
Mid-Atlantic Hydro, LLC, 5425
Wisconsin Avenue, Suite 600, Chevy
Chase, MD 20815; phone: (301) 718–
4432.
FERC Contact: Woohee Choi; phone:
(202) 502–6336.
Deadline for filing comments and
motions to intervene: 60 days from the
issuance of this notice.
The Commission strongly encourages
electronic filing. Please file comments
and motions to intervene using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
The first page of any filing should
include docket number P–14553–000.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of the Commission’s Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–14553) in the docket number field to
access the document. For assistance,
contact FERC Online Support.
Dated: September 12, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013–22697 Filed 9–17–13; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00027
Fmt 4703
Sfmt 4703
57377
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14493–000]
KC Pittsfield LLC; Notice of
Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Competing Applications
On February 1, 2013, KC Pittsfield
LLC filed an application for a
preliminary permit, pursuant to section
4(f) of the Federal Power Act (FPA),
proposing to study the feasibility of the
Drum-Spaulding Small Hydro Project
(Drum-Spaulding Small Hydro Project
or project) to be located on the Bear and
American Rivers, near the city of
Auburn, Placer County, California. The
sole purpose of a preliminary permit, if
issued, is to grant the permit holder
priority to file a license application
during the permit term. A preliminary
permit does not authorize the permit
holder to perform any land-disturbing
activities or otherwise enter upon lands
or waters owned by others without the
owners’ express permission.
The proposed project would use
facilities that are part of Pacific Gas &
Electric Company’s (PG&E) DrumSpaulding Project, FERC No. 2310. The
proposed project would consist of two
new development sites and a proposed
re-commission of an existing
powerhouse.
KC Pittsfield’s Lake Valley Canal
development, located at the drop
between the Lake Valley canal and the
Drum canal, would consist of: (1) The
8,400-foot-long Lake Valley canal; (2) an
existing 30-inch-diameter, 2,100-footlong pipeline serving as a penstock; (3)
a new powerhouse containing a single
Pelton type turbine generator rated at
1,300 kilowatts; and (4) approximately
800 feet of a new three-phase power line
that will follow an existing PG&E road,
and an upgrade of 1,600 feet of existing
transmission line from single-phase to
three-phase. KC Pittsfield’s proposed
development would have an average
annual generation of 4 gigawatt-hours.
KC Pittsfield’s proposed Bear-Halsey
Canal Drop development would consist
of: (1) An existing 30-foot drop at the
end of the Bear River canal into the
Halsey forebay; (2) a new powerhouse
enclosing a propeller or bulb-type
turbine generator rated at 800 kilowatts,
located at the terminus of the Bear River
canal discharge to the Halsey forebay;
and (3) approximately 200 feet of new
three-phase power line and the upgrade
of approximately 1,400 feet of singlephase line to three-phase line. This
E:\FR\FM\18SEN1.SGM
18SEN1
Agencies
[Federal Register Volume 78, Number 181 (Wednesday, September 18, 2013)]
[Notices]
[Pages 57375-57377]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-22777]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Sunshine Act Meeting Notice
The following notice of meeting is published pursuant to section
3(a) of the government in the Sunshine Act (Pub. L. 94-409), 5 U.S.C.
552b:
AGENCY HOLDING MEETING: Federal Energy Regulatory Commission.
DATE AND TIME: September 19, 2013 10:00 a.m.
PLACE: Room 2C, 888 First Street NE., Washington, DC 20426.
STATUS: Open.
MATTERS TO BE CONSIDERED: Agenda.
* Note--Items listed on the agenda may be deleted without further
notice.
CONTACT PERSON FOR MORE INFORMATION: Kimberly D. Bose, Secretary,
Telephone (202) 502-8400.
For a recorded message listing items struck from or added to the
meeting, call (202) 502-8627.
This is a list of matters to be considered by the Commission. It
does not include a listing of all documents relevant to the items on
the agenda. All public documents, however, may be viewed on line at the
Commission's Web site at https://www.ferc.gov using the eLibrary link,
or may be examined in the Commission's Public Reference Room.
[[Page 57376]]
997th-Meeting, Regular Meeting
[September 19, 2013, 10:00 a.m.]
----------------------------------------------------------------------------------------------------------------
Item No. Docket No. Company
----------------------------------------------------------------------------------------------------------------
Administrative
----------------------------------------------------------------------------------------------------------------
A-1.............................. AD02-1-000 Agency Business Matters.
A-2.............................. AD02-7-000 Customer Matters, Reliability, Security
and Market Operations.
A-3.............................. AD12-12-000 Coordination Between Natural Gas and
Electricity Markets.
----------------------------------------------------------------------------------------------------------------
Electric
----------------------------------------------------------------------------------------------------------------
E-1.............................. ER12-1179-003 Southwest Power Pool, Inc.
ER12-1179-004
ER12-1179-005
ER13-1173-000
E-2.............................. OMITTED
E-3.............................. OMITTED
E-4.............................. RM12-16-000 Generator Requirements at the Transmission
Interface.
E-5.............................. RM13-16-000 Generator Verification Reliability
Standards.
E-6.............................. RM10-11-002 Integration of Variable Energy Resources.
E-7.............................. ER11-2814-000 PJM Interconnection, L.L.C.
ER11-2814-001
ER11-2815-001
ER11-2815-002
ER11-2815-004
E-8.............................. ER11-2814-000 PJM Interconnection, L.L.C.
ER11-2814-001
ER11-2815-000
ER11-2815-001
ER11-2815-002
ER11-2815-004
ER11-3279-000 Midwest Independent Transmission System
Operator, Inc.
ER11-3279-001
E-9.............................. ER12-91-000 PJM Interconnection, L.L.C.
ER12-91-002 Duke Energy Ohio, Inc., and
ER12-91-005 Duke Energy Kentucky, Inc.
ER12-92-000
ER12-92-002
ER12-92-005
E-10............................. OMITTED
E-11............................. ER13-2031-000 Southwest Power Pool, Inc.
ER13-2033-000
E-12............................. ER12-2292-001 Southwest Power Pool, Inc.
ER12-2292-002
ER12-2292-003
ER13-1123-000
----------------------------------------------------------------------------------------------------------------
Gas
----------------------------------------------------------------------------------------------------------------
G-1.............................. RP12-813-002 Gulf South Pipeline Company, LP.
RP12-813-001
G-2.............................. RP13-423-002 Rockies Express Pipeline LLC.
RP12-765-002
----------------------------------------------------------------------------------------------------------------
Hydro
----------------------------------------------------------------------------------------------------------------
H-1.............................. P-2149-160 Public Utility District No. 1 of Douglas
County, Washington.
H-2.............................. P-2114-261 Public Utility District No. 2 of Grant
County, Washington.
H-3.............................. P-2197-103 Alcoa Power Generating Inc.
H-4.............................. P-2790-059 Boott Hydropower, Inc., and Eldred L.
Field Hydroelectric Facility Trust.
H-5.............................. P-2216-081 New York Power Authority.
H-6.............................. P-2232-598 Duke Energy Carolinas, LLC.
----------------------------------------------------------------------------------------------------------------
Certificates
----------------------------------------------------------------------------------------------------------------
C-1.............................. CP06-407-008 Missouri Interstate Gas, LLC.
................................. Missouri Gas Company, LLC.
................................. Missouri Pipeline Company, LLC.
C-2.............................. CP13-3-000 Tennessee Gas Pipeline Company, L.L.C.
----------------------------------------------------------------------------------------------------------------
[[Page 57377]]
Issued September 12, 2013.
Kimberly D. Bose,
Secretary.
A free webcast of this event is available through www.ferc.gov.
Anyone with Internet access who desires to view this event can do so by
navigating to www.ferc.gov's Calendar of Events and locating this event
in the Calendar. The event will contain a link to its webcast. The
Capitol Connection provides technical support for the free webcasts. It
also offers access to this event via television in the DC area and via
phone bridge for a fee. If you have any questions, visit
www.CapitolConnection.org or contact Danelle Springer or David
Reininger at 703-993-3100.
Immediately following the conclusion of the Commission Meeting, a
press briefing will be held in the Commission Meeting Room. Members of
the public may view this briefing in the designated overflow room. This
statement is intended to notify the public that the press briefings
that follow Commission meetings may now be viewed remotely at
Commission headquarters, but will not be telecast through the Capitol
Connection service.
[FR Doc. 2013-22777 Filed 9-16-13; 11:15 am]
BILLING CODE 6717-01-P