Mid-Atlantic Hydro, LLC; Notice of Competing Preliminary Permit Application Accepted for Filing and Soliciting Comments and Motions To Intervene, 57377 [2013-22697]
Download as PDF
Federal Register / Vol. 78, No. 181 / Wednesday, September 18, 2013 / Notices
Issued September 12, 2013.
Kimberly D. Bose,
Secretary.
A free webcast of this event is
available through www.ferc.gov. Anyone
with Internet access who desires to view
this event can do so by navigating to
www.ferc.gov’s Calendar of Events and
locating this event in the Calendar. The
event will contain a link to its webcast.
The Capitol Connection provides
technical support for the free webcasts.
It also offers access to this event via
television in the DC area and via phone
bridge for a fee. If you have any
questions, visit
www.CapitolConnection.org or contact
Danelle Springer or David Reininger at
703–993–3100.
Immediately following the conclusion
of the Commission Meeting, a press
briefing will be held in the Commission
Meeting Room. Members of the public
may view this briefing in the designated
overflow room. This statement is
intended to notify the public that the
press briefings that follow Commission
meetings may now be viewed remotely
at Commission headquarters, but will
not be telecast through the Capitol
Connection service.
[FR Doc. 2013–22777 Filed 9–16–13; 11:15 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14553–000]
emcdonald on DSK67QTVN1PROD with NOTICES
Mid-Atlantic Hydro, LLC; Notice of
Competing Preliminary Permit
Application Accepted for Filing and
Soliciting Comments and Motions To
Intervene
On August 30, 2013, Mid-Atlantic
Hydro, LLC (MAH) filed an application
for a preliminary permit, pursuant to
section 4(f) of the Federal Power Act
(FPA), proposing to study the feasibility
of the Dashields Lock and Dam
Hydroelectric Project (Dashields Project
or project) to be located at the U.S.
Army Corps of Engineers’ Dashields
Lock and Dam on the Ohio River in
Allegheny County, Pennsylvania. The
sole purpose of a preliminary permit, if
issued, is to grant the permit holder
priority to file a license application
during the permit term. A preliminary
permit does not authorize the permit
holder to perform any land-disturbing
activities or otherwise enter upon lands
or waters owned by others without the
owners’ express permission.
MAH’s permit application is filed in
competition with FFP Project 133, LLC’s
VerDate Mar<15>2010
16:45 Sep 17, 2013
Jkt 229001
proposed Dashields Lock and Dam
Hydroelectric Project No. 14524–000,
which was publicly noticed July 3,
2013. The deadline for filing competing
applications was September 1, 2013.
MAH’s competing permit application is
timely filed.
The proposed project would consist of
the following: (1) A new powerhouse
located adjacent to the right descending
bank immediately downstream of a 350linear-foot section of the existing dam;
(2) fourteen Very Low Head (VLH) 4000
turbine units with a total capacity of 7
megawatts; (3) a permanent submersible
magnet generator housed in each
turbine hub; and (4) a new 69-kilovolt
transmission line approximately 2.1
miles long. The estimated annual
generation of the Dashields Project
would be 41.4 gigawatt-hours.
Applicant Contact: Kristina Johnson,
Mid-Atlantic Hydro, LLC, 5425
Wisconsin Avenue, Suite 600, Chevy
Chase, MD 20815; phone: (301) 718–
4432.
FERC Contact: Woohee Choi; phone:
(202) 502–6336.
Deadline for filing comments and
motions to intervene: 60 days from the
issuance of this notice.
The Commission strongly encourages
electronic filing. Please file comments
and motions to intervene using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
The first page of any filing should
include docket number P–14553–000.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of the Commission’s Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–14553) in the docket number field to
access the document. For assistance,
contact FERC Online Support.
Dated: September 12, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013–22697 Filed 9–17–13; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00027
Fmt 4703
Sfmt 4703
57377
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14493–000]
KC Pittsfield LLC; Notice of
Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Competing Applications
On February 1, 2013, KC Pittsfield
LLC filed an application for a
preliminary permit, pursuant to section
4(f) of the Federal Power Act (FPA),
proposing to study the feasibility of the
Drum-Spaulding Small Hydro Project
(Drum-Spaulding Small Hydro Project
or project) to be located on the Bear and
American Rivers, near the city of
Auburn, Placer County, California. The
sole purpose of a preliminary permit, if
issued, is to grant the permit holder
priority to file a license application
during the permit term. A preliminary
permit does not authorize the permit
holder to perform any land-disturbing
activities or otherwise enter upon lands
or waters owned by others without the
owners’ express permission.
The proposed project would use
facilities that are part of Pacific Gas &
Electric Company’s (PG&E) DrumSpaulding Project, FERC No. 2310. The
proposed project would consist of two
new development sites and a proposed
re-commission of an existing
powerhouse.
KC Pittsfield’s Lake Valley Canal
development, located at the drop
between the Lake Valley canal and the
Drum canal, would consist of: (1) The
8,400-foot-long Lake Valley canal; (2) an
existing 30-inch-diameter, 2,100-footlong pipeline serving as a penstock; (3)
a new powerhouse containing a single
Pelton type turbine generator rated at
1,300 kilowatts; and (4) approximately
800 feet of a new three-phase power line
that will follow an existing PG&E road,
and an upgrade of 1,600 feet of existing
transmission line from single-phase to
three-phase. KC Pittsfield’s proposed
development would have an average
annual generation of 4 gigawatt-hours.
KC Pittsfield’s proposed Bear-Halsey
Canal Drop development would consist
of: (1) An existing 30-foot drop at the
end of the Bear River canal into the
Halsey forebay; (2) a new powerhouse
enclosing a propeller or bulb-type
turbine generator rated at 800 kilowatts,
located at the terminus of the Bear River
canal discharge to the Halsey forebay;
and (3) approximately 200 feet of new
three-phase power line and the upgrade
of approximately 1,400 feet of singlephase line to three-phase line. This
E:\FR\FM\18SEN1.SGM
18SEN1
Agencies
[Federal Register Volume 78, Number 181 (Wednesday, September 18, 2013)]
[Notices]
[Page 57377]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-22697]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 14553-000]
Mid-Atlantic Hydro, LLC; Notice of Competing Preliminary Permit
Application Accepted for Filing and Soliciting Comments and Motions To
Intervene
On August 30, 2013, Mid-Atlantic Hydro, LLC (MAH) filed an
application for a preliminary permit, pursuant to section 4(f) of the
Federal Power Act (FPA), proposing to study the feasibility of the
Dashields Lock and Dam Hydroelectric Project (Dashields Project or
project) to be located at the U.S. Army Corps of Engineers' Dashields
Lock and Dam on the Ohio River in Allegheny County, Pennsylvania. The
sole purpose of a preliminary permit, if issued, is to grant the permit
holder priority to file a license application during the permit term. A
preliminary permit does not authorize the permit holder to perform any
land-disturbing activities or otherwise enter upon lands or waters
owned by others without the owners' express permission.
MAH's permit application is filed in competition with FFP Project
133, LLC's proposed Dashields Lock and Dam Hydroelectric Project No.
14524-000, which was publicly noticed July 3, 2013. The deadline for
filing competing applications was September 1, 2013. MAH's competing
permit application is timely filed.
The proposed project would consist of the following: (1) A new
powerhouse located adjacent to the right descending bank immediately
downstream of a 350-linear-foot section of the existing dam; (2)
fourteen Very Low Head (VLH) 4000 turbine units with a total capacity
of 7 megawatts; (3) a permanent submersible magnet generator housed in
each turbine hub; and (4) a new 69-kilovolt transmission line
approximately 2.1 miles long. The estimated annual generation of the
Dashields Project would be 41.4 gigawatt-hours.
Applicant Contact: Kristina Johnson, Mid-Atlantic Hydro, LLC, 5425
Wisconsin Avenue, Suite 600, Chevy Chase, MD 20815; phone: (301) 718-
4432.
FERC Contact: Woohee Choi; phone: (202) 502-6336.
Deadline for filing comments and motions to intervene: 60 days from
the issuance of this notice.
The Commission strongly encourages electronic filing. Please file
comments and motions to intervene using the Commission's eFiling system
at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit
brief comments up to 6,000 characters, without prior registration,
using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information at the
end of your comments. For assistance, please contact FERC Online
Support at FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or
(202) 502-8659 (TTY). In lieu of electronic filing, please send a paper
copy to: Secretary, Federal Energy Regulatory Commission, 888 First
Street NE., Washington, DC 20426. The first page of any filing should
include docket number P-14553-000.
More information about this project, including a copy of the
application, can be viewed or printed on the ``eLibrary'' link of the
Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P-14553) in the docket number field to access
the document. For assistance, contact FERC Online Support.
Dated: September 12, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013-22697 Filed 9-17-13; 8:45 am]