Lake Lynn Generation, LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization, 56691-56692 [2013-22279]

Download as PDF Federal Register / Vol. 78, No. 178 / Friday, September 13, 2013 / Notices 385.214). Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. Notice is hereby given that the deadline for filing protests with regard to the applicant’s request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability is September 30, 2013. The Commission encourages electronic submission of protests and interventions in lieu of paper, using the FERC Online links at https:// www.ferc.gov. To facilitate electronic service, persons with Internet access who will eFile a document and/or be listed as a contact for an intervenor must create and validate an eRegistration account using the eRegistration link. Select the eFiling link to log on and submit the intervention or protests. Persons unable to file electronically should submit an original and 5 copies of the intervention or protest to the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. The filings in the above-referenced proceeding(s) are accessible in the Commission’s eLibrary system by clicking on the appropriate link in the above list. They are also available for review in the Commission’s Public Reference Room in Washington, DC. There is an eSubscription link on the Web site that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov. or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: September 9, 2013. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2013–22280 Filed 9–12–13; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission tkelley on DSK3SPTVN1PROD with NOTICES [Docket No. ER13–2308–000] Sapphire Power Marketing LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization This is a supplemental notice in the above-referenced proceeding, of Sapphire Power Marketing LLC’s application for market-based rate VerDate Mar<15>2010 18:23 Sep 12, 2013 Jkt 229001 authority, with an accompanying rate schedule, noting that such application includes a request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability. Any person desiring to intervene or to protest should file with the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426, in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. Notice is hereby given that the deadline for filing protests with regard to the applicant’s request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability is September 30, 2013. The Commission encourages electronic submission of protests and interventions in lieu of paper, using the FERC Online links at https:// www.ferc.gov. To facilitate electronic service, persons with Internet access who will eFile a document and/or be listed as a contact for an intervenor must create and validate an eRegistration account using the eRegistration link. Select the eFiling link to log on and submit the intervention or protests. Persons unable to file electronically should submit an original and 5 copies of the intervention or protest to the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. The filings in the above-referenced proceeding(s) are accessible in the Commission’s eLibrary system by clicking on the appropriate link in the above list. They are also available for review in the Commission’s Public Reference Room in Washington, DC. There is an eSubscription link on the Web site that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov. or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: September 9, 2013. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2013–22277 Filed 9–12–13; 8:45 am] BILLING CODE 6717–01–P PO 00000 Frm 00046 Fmt 4703 Sfmt 4703 56691 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. ER13–2317–000] Lake Lynn Generation, LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization This is a supplemental notice in the above-referenced proceeding, of Lake Lynn Generation, LLC’s application for market-based rate authority, with an accompanying rate schedule, noting that such application includes a request for blanket authorization, under 18 CFR Part 34, of future issuances of securities and assumptions of liability. Any person desiring to intervene or to protest should file with the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426, in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. Notice is hereby given that the deadline for filing protests with regard to the applicant’s request for blanket authorization, under 18 CFR Part 34, of future issuances of securities and assumptions of liability is September 30, 2013. The Commission encourages electronic submission of protests and interventions in lieu of paper, using the FERC Online links at https:// www.ferc.gov. To facilitate electronic service, persons with Internet access who will eFile a document and/or be listed as a contact for an intervenor must create and validate an eRegistration account using the eRegistration link. Select the eFiling link to log on and submit the intervention or protests. Persons unable to file electronically should submit an original and 5 copies of the intervention or protest to the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. The filings in the above-referenced proceeding(s) are accessible in the Commission’s eLibrary system by clicking on the appropriate link in the above list. They are also available for review in the Commission’s Public Reference Room in Washington, DC. There is an eSubscription link on the Web site that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC E:\FR\FM\13SEN1.SGM 13SEN1 56692 Federal Register / Vol. 78, No. 178 / Friday, September 13, 2013 / Notices Online service, please email FERCOnlineSupport@ferc.gov. or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: September 9, 2013. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2013–22279 Filed 9–12–13; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 12741–003] tkelley on DSK3SPTVN1PROD with NOTICES Albany Engineering Corporation; Notice of Successive Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On August 20, 2013, Albany Engineering Corporation (Albany Engineering) filed an application for a successive preliminary permit, pursuant to section 4(f) of the Federal Power Act (FPA), proposing to study the feasibility of hydropower adjacent to the New York State Canal Corporation’s Lock C5 located on the Hudson River in Saratoga and Washington Counties, New York. The sole purpose of a preliminary permit, if issued, is to grant the permit holder priority to file a license application during the permit term. A preliminary permit does not authorize the permit holder to perform any landdisturbing activities or otherwise enter upon lands or waters owned by others without the owners’ express permission. The proposed Thomson Project would consist of: (1) A new arc-shaped dam consisting of six 111-foot-long 12-foothigh spillway sections integrated with five 50-foot-diameter circular-shell piers, located 1,600 feet downstream of the existing Northumberland Dam; (2) a new 324-acre impoundment between the new dam and the existing Northumberland Dam, that would extend an existing impoundment having a surface area of 2,750 acres at a normal water surface elevation of 101.1 feet mean sea level by lowering the crest of the existing dam; (3) a 4,000-foot-long by 12-foot-deep segment of the existing Champlain Canal; (4) the existing Lock No. 5 facilities; (5) five identical turbine-generating units each housed in one of five circular-shell piers, with a total capacity of 23.7 megawatts; (6) a new 8,000-foot-long, 34.5-kilovolt transmission line; and (7) appurtenant facilities. The proposed project would have an estimated average annual generation of 68.9 gigawatt-hours. VerDate Mar<15>2010 18:23 Sep 12, 2013 Jkt 229001 Applicant Contact: Wendy Jo Carey, Albany Engineering Corporation, 5 Washington Square, Albany, NY 12205; phone: (518) 456–7712. FERC Contact: Monir Chowdhury; phone: (202) 502–6736. Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Competing applications and notices of intent must meet the requirements of 18 CFR 4.36. The Commission strongly encourages electronic filing. Please file comments, motions to intervene, notices of intent, and competing applications using the Commission’s eFiling system at https:// www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, please send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. The first page of any filing should include docket number P–12741–003. More information about this project, including a copy of the application, can be viewed or printed on the ‘‘eLibrary’’ link of the Commission’s Web site at https://www.ferc.gov/docs-filing/ elibrary.asp. Enter the docket number (P–12741) in the docket number field to access the document. For assistance, contact FERC Online Support. Dated: September 9, 2013. Kimberly D. Bose, Secretary. [FR Doc. 2013–22320 Filed 9–12–13; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Western Area Power Administration Colorado River Storage Project-Rate Order No. WAPA–161 Western Area Power Administration, DOE. ACTION: Notice of Order Temporarily Extending Firm Power, Transmission, and Ancillary Services Rates. AGENCY: This action is to extend the existing Salt Lake City Area Integrated Projects (SLCA/IP) Firm Power Rate and the Colorado River Storage Project SUMMARY: PO 00000 Frm 00047 Fmt 4703 Sfmt 4703 (CRSP) Transmission and Ancillary Services Rates through September 30, 2015. The existing SLCA/IP Firm Power Rate and CRSP Transmission and Ancillary Services Rates are set to expire September 30, 2013. FOR FURTHER INFORMATION CONTACT: Ms. Lynn Jeka, CRSP Manager, CRSP Management Center, Western Area Power Administration, 150 East Social Hall Avenue, Suite 300, Salt Lake City, UT 84111–1580, (801) 524–6372, email jeka@wapa.gov, or Mr. Rodney Bailey, Power Marketing Manager, CRSP Management Center, Western Area Power Administration, 150 East Social Hall Avenue, Suite 300, Salt Lake City, UT 84111–1580, (801) 524–4007, email rbailey@wapa.gov. SUPPLEMENTARY INFORMATION: Rate Schedules SLIP–F9, SP–PTP7, SP–NW3, SP–NFT6, SP–SD3, SP–RS3, SP–EI3, SP–FR3, and SP–SSR3, contained in Rate Order No. WAPA–137,1 were approved by the Federal Energy Regulatory Commission (FERC) for a 5year period through September 30, 2013. Western Area Power Administration (Western) is proposing to temporarily extend the existing SLCA/IP Firm Power Rate and CRSP Transmission and Ancillary Services Rates under Rate Schedules SLIP–F9, SP–PTP7, SP–NW3, SP–NFT6, SP–SD3, SP–RS3, SP–EI3, SP–FR3, and SP–SSR3 pursuant to 10 CFR § 903.23(b). As required by the Grand Canyon Protection Act of 1992, the Bureau of Reclamation has been preparing a reallocation of the costs of the Glen Canyon Dam. The results of the reallocation were recently finalized, provided to Western, and will be implemented into the FY 2013 power repayment study. Due to uncertainties that the reallocation will have on the SLCA/IP Rate, Western is seeking a temporary extension of the existing rates to allow sufficient time for a new rate process to be completed and the new rates to be placed into effect. The existing rates collect sufficient annual revenue to recover annual expenses, including interest and capital requirements, thus ensuring repayment of the project within the cost recovery criteria set forth in DOE Order RA 6120.2. By Delegation Order No. 00–037.00, effective December 6, 2001, the Secretary of Energy delegated: (1) The authority to develop power and transmission rates to the Administrator of Western; (2) the authority to confirm, 1 The rates in WAPA–137 were approved by the Federal Energy Regulatory Commission on a final basis on June 19, 2009, in Docket No. EF08–5171– 000 (127 FERC ¶ 62,220). E:\FR\FM\13SEN1.SGM 13SEN1

Agencies

[Federal Register Volume 78, Number 178 (Friday, September 13, 2013)]
[Notices]
[Pages 56691-56692]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-22279]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. ER13-2317-000]


Lake Lynn Generation, LLC; Supplemental Notice That Initial 
Market-Based Rate Filing Includes Request for Blanket Section 204 
Authorization

    This is a supplemental notice in the above-referenced proceeding, 
of Lake Lynn Generation, LLC's application for market-based rate 
authority, with an accompanying rate schedule, noting that such 
application includes a request for blanket authorization, under 18 CFR 
Part 34, of future issuances of securities and assumptions of 
liability.
    Any person desiring to intervene or to protest should file with the 
Federal Energy Regulatory Commission, 888 First Street NE., Washington, 
DC 20426, in accordance with Rules 211 and 214 of the Commission's 
Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone 
filing a motion to intervene or protest must serve a copy of that 
document on the Applicant.
    Notice is hereby given that the deadline for filing protests with 
regard to the applicant's request for blanket authorization, under 18 
CFR Part 34, of future issuances of securities and assumptions of 
liability is September 30, 2013.
    The Commission encourages electronic submission of protests and 
interventions in lieu of paper, using the FERC Online links at https://www.ferc.gov. To facilitate electronic service, persons with Internet 
access who will eFile a document and/or be listed as a contact for an 
intervenor must create and validate an eRegistration account using the 
eRegistration link. Select the eFiling link to log on and submit the 
intervention or protests.
    Persons unable to file electronically should submit an original and 
5 copies of the intervention or protest to the Federal Energy 
Regulatory Commission, 888 First Street NE., Washington, DC 20426.
    The filings in the above-referenced proceeding(s) are accessible in 
the Commission's eLibrary system by clicking on the appropriate link in 
the above list. They are also available for review in the Commission's 
Public Reference Room in Washington, DC. There is an eSubscription link 
on the Web site that enables subscribers to receive email notification 
when a document is added to a subscribed docket(s). For assistance with 
any FERC

[[Page 56692]]

Online service, please email FERCOnlineSupport@ferc.gov. or call (866) 
208-3676 (toll free). For TTY, call (202) 502-8659.

    Dated: September 9, 2013.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2013-22279 Filed 9-12-13; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.