Lake Lynn Generation, LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization, 56691-56692 [2013-22279]
Download as PDF
Federal Register / Vol. 78, No. 178 / Friday, September 13, 2013 / Notices
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability is September
30, 2013.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with Internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 5 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
The filings in the above-referenced
proceeding(s) are accessible in the
Commission’s eLibrary system by
clicking on the appropriate link in the
above list. They are also available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an eSubscription link on the
Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov. or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Dated: September 9, 2013.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2013–22280 Filed 9–12–13; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
tkelley on DSK3SPTVN1PROD with NOTICES
[Docket No. ER13–2308–000]
Sapphire Power Marketing LLC;
Supplemental Notice That Initial
Market-Based Rate Filing Includes
Request for Blanket Section 204
Authorization
This is a supplemental notice in the
above-referenced proceeding, of
Sapphire Power Marketing LLC’s
application for market-based rate
VerDate Mar<15>2010
18:23 Sep 12, 2013
Jkt 229001
authority, with an accompanying rate
schedule, noting that such application
includes a request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability is September
30, 2013.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with Internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 5 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
The filings in the above-referenced
proceeding(s) are accessible in the
Commission’s eLibrary system by
clicking on the appropriate link in the
above list. They are also available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an eSubscription link on the
Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov. or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Dated: September 9, 2013.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2013–22277 Filed 9–12–13; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00046
Fmt 4703
Sfmt 4703
56691
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER13–2317–000]
Lake Lynn Generation, LLC;
Supplemental Notice That Initial
Market-Based Rate Filing Includes
Request for Blanket Section 204
Authorization
This is a supplemental notice in the
above-referenced proceeding, of Lake
Lynn Generation, LLC’s application for
market-based rate authority, with an
accompanying rate schedule, noting that
such application includes a request for
blanket authorization, under 18 CFR
Part 34, of future issuances of securities
and assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR Part 34, of
future issuances of securities and
assumptions of liability is September
30, 2013.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with Internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 5 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
The filings in the above-referenced
proceeding(s) are accessible in the
Commission’s eLibrary system by
clicking on the appropriate link in the
above list. They are also available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an eSubscription link on the
Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
E:\FR\FM\13SEN1.SGM
13SEN1
56692
Federal Register / Vol. 78, No. 178 / Friday, September 13, 2013 / Notices
Online service, please email
FERCOnlineSupport@ferc.gov. or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Dated: September 9, 2013.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2013–22279 Filed 9–12–13; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 12741–003]
tkelley on DSK3SPTVN1PROD with NOTICES
Albany Engineering Corporation;
Notice of Successive Preliminary
Permit Application Accepted for Filing
and Soliciting Comments, Motions To
Intervene, and Competing Applications
On August 20, 2013, Albany
Engineering Corporation (Albany
Engineering) filed an application for a
successive preliminary permit, pursuant
to section 4(f) of the Federal Power Act
(FPA), proposing to study the feasibility
of hydropower adjacent to the New York
State Canal Corporation’s Lock C5
located on the Hudson River in Saratoga
and Washington Counties, New York.
The sole purpose of a preliminary
permit, if issued, is to grant the permit
holder priority to file a license
application during the permit term. A
preliminary permit does not authorize
the permit holder to perform any landdisturbing activities or otherwise enter
upon lands or waters owned by others
without the owners’ express permission.
The proposed Thomson Project would
consist of: (1) A new arc-shaped dam
consisting of six 111-foot-long 12-foothigh spillway sections integrated with
five 50-foot-diameter circular-shell
piers, located 1,600 feet downstream of
the existing Northumberland Dam; (2) a
new 324-acre impoundment between
the new dam and the existing
Northumberland Dam, that would
extend an existing impoundment having
a surface area of 2,750 acres at a normal
water surface elevation of 101.1 feet
mean sea level by lowering the crest of
the existing dam; (3) a 4,000-foot-long
by 12-foot-deep segment of the existing
Champlain Canal; (4) the existing Lock
No. 5 facilities; (5) five identical
turbine-generating units each housed in
one of five circular-shell piers, with a
total capacity of 23.7 megawatts; (6) a
new 8,000-foot-long, 34.5-kilovolt
transmission line; and (7) appurtenant
facilities. The proposed project would
have an estimated average annual
generation of 68.9 gigawatt-hours.
VerDate Mar<15>2010
18:23 Sep 12, 2013
Jkt 229001
Applicant Contact: Wendy Jo Carey,
Albany Engineering Corporation, 5
Washington Square, Albany, NY 12205;
phone: (518) 456–7712.
FERC Contact: Monir Chowdhury;
phone: (202) 502–6736.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36.
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, notices of intent,
and competing applications using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
The first page of any filing should
include docket number P–12741–003.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of the Commission’s Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–12741) in the docket number field to
access the document. For assistance,
contact FERC Online Support.
Dated: September 9, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013–22320 Filed 9–12–13; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Western Area Power Administration
Colorado River Storage Project-Rate
Order No. WAPA–161
Western Area Power
Administration, DOE.
ACTION: Notice of Order Temporarily
Extending Firm Power, Transmission,
and Ancillary Services Rates.
AGENCY:
This action is to extend the
existing Salt Lake City Area Integrated
Projects (SLCA/IP) Firm Power Rate and
the Colorado River Storage Project
SUMMARY:
PO 00000
Frm 00047
Fmt 4703
Sfmt 4703
(CRSP) Transmission and Ancillary
Services Rates through September 30,
2015. The existing SLCA/IP Firm Power
Rate and CRSP Transmission and
Ancillary Services Rates are set to
expire September 30, 2013.
FOR FURTHER INFORMATION CONTACT: Ms.
Lynn Jeka, CRSP Manager, CRSP
Management Center, Western Area
Power Administration, 150 East Social
Hall Avenue, Suite 300, Salt Lake City,
UT 84111–1580, (801) 524–6372, email
jeka@wapa.gov, or Mr. Rodney Bailey,
Power Marketing Manager, CRSP
Management Center, Western Area
Power Administration, 150 East Social
Hall Avenue, Suite 300, Salt Lake City,
UT 84111–1580, (801) 524–4007, email
rbailey@wapa.gov.
SUPPLEMENTARY INFORMATION: Rate
Schedules SLIP–F9, SP–PTP7, SP–NW3,
SP–NFT6, SP–SD3, SP–RS3, SP–EI3,
SP–FR3, and SP–SSR3, contained in
Rate Order No. WAPA–137,1 were
approved by the Federal Energy
Regulatory Commission (FERC) for a 5year period through September 30,
2013. Western Area Power
Administration (Western) is proposing
to temporarily extend the existing
SLCA/IP Firm Power Rate and CRSP
Transmission and Ancillary Services
Rates under Rate Schedules SLIP–F9,
SP–PTP7, SP–NW3, SP–NFT6, SP–SD3,
SP–RS3, SP–EI3, SP–FR3, and SP–SSR3
pursuant to 10 CFR § 903.23(b). As
required by the Grand Canyon
Protection Act of 1992, the Bureau of
Reclamation has been preparing a
reallocation of the costs of the Glen
Canyon Dam. The results of the
reallocation were recently finalized,
provided to Western, and will be
implemented into the FY 2013 power
repayment study. Due to uncertainties
that the reallocation will have on the
SLCA/IP Rate, Western is seeking a
temporary extension of the existing rates
to allow sufficient time for a new rate
process to be completed and the new
rates to be placed into effect. The
existing rates collect sufficient annual
revenue to recover annual expenses,
including interest and capital
requirements, thus ensuring repayment
of the project within the cost recovery
criteria set forth in DOE Order RA
6120.2.
By Delegation Order No. 00–037.00,
effective December 6, 2001, the
Secretary of Energy delegated: (1) The
authority to develop power and
transmission rates to the Administrator
of Western; (2) the authority to confirm,
1 The rates in WAPA–137 were approved by the
Federal Energy Regulatory Commission on a final
basis on June 19, 2009, in Docket No. EF08–5171–
000 (127 FERC ¶ 62,220).
E:\FR\FM\13SEN1.SGM
13SEN1
Agencies
[Federal Register Volume 78, Number 178 (Friday, September 13, 2013)]
[Notices]
[Pages 56691-56692]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-22279]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. ER13-2317-000]
Lake Lynn Generation, LLC; Supplemental Notice That Initial
Market-Based Rate Filing Includes Request for Blanket Section 204
Authorization
This is a supplemental notice in the above-referenced proceeding,
of Lake Lynn Generation, LLC's application for market-based rate
authority, with an accompanying rate schedule, noting that such
application includes a request for blanket authorization, under 18 CFR
Part 34, of future issuances of securities and assumptions of
liability.
Any person desiring to intervene or to protest should file with the
Federal Energy Regulatory Commission, 888 First Street NE., Washington,
DC 20426, in accordance with Rules 211 and 214 of the Commission's
Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone
filing a motion to intervene or protest must serve a copy of that
document on the Applicant.
Notice is hereby given that the deadline for filing protests with
regard to the applicant's request for blanket authorization, under 18
CFR Part 34, of future issuances of securities and assumptions of
liability is September 30, 2013.
The Commission encourages electronic submission of protests and
interventions in lieu of paper, using the FERC Online links at https://www.ferc.gov. To facilitate electronic service, persons with Internet
access who will eFile a document and/or be listed as a contact for an
intervenor must create and validate an eRegistration account using the
eRegistration link. Select the eFiling link to log on and submit the
intervention or protests.
Persons unable to file electronically should submit an original and
5 copies of the intervention or protest to the Federal Energy
Regulatory Commission, 888 First Street NE., Washington, DC 20426.
The filings in the above-referenced proceeding(s) are accessible in
the Commission's eLibrary system by clicking on the appropriate link in
the above list. They are also available for review in the Commission's
Public Reference Room in Washington, DC. There is an eSubscription link
on the Web site that enables subscribers to receive email notification
when a document is added to a subscribed docket(s). For assistance with
any FERC
[[Page 56692]]
Online service, please email FERCOnlineSupport@ferc.gov. or call (866)
208-3676 (toll free). For TTY, call (202) 502-8659.
Dated: September 9, 2013.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2013-22279 Filed 9-12-13; 8:45 am]
BILLING CODE 6717-01-P