Drawbridge Operation Regulations; Reynolds Channel, Lawrence, NY, 56609-56610 [2013-22270]
Download as PDF
Federal Register / Vol. 78, No. 178 / Friday, September 13, 2013 / Rules and Regulations
standards would be inconsistent with
applicable law or otherwise impractical.
Voluntary consensus standards are
technical standards (e.g., specifications
of materials, performance, design, or
operation; test methods; sampling
procedures; and related management
systems practices) that are developed or
adopted by voluntary consensus
standards bodies.
This rule does not use technical
standards. Therefore, we did not
consider the use of voluntary consensus
standards.
(2) From December 16 through March
31, the draw need not open for the
passage of vessel traffic.
Dated: August 26, 2013.
V.B. Gifford, Jr.,
Captain, U.S. Coast Guard, Acting
Commander, First Coast Guard District.
[FR Doc. 2013–22268 Filed 9–12–13; 8:45 am]
BILLING CODE 9110–04–P
DEPARTMENT OF HOMELAND
SECURITY
14. Environment
Coast Guard
We have analyzed this rule under
Department of Homeland Security
Management Directive 023–01 and
Commandant Instruction M16475.lD,
which guides the Coast Guard in
complying with the National
Environmental Policy Act of 1969
(NEPA) (42 U.S.C. 4321–4370f), and
have concluded that this action is one
of a category of actions which do not
individually or cumulatively have a
significant effect on the human
environment. This final rule simply
promulgates the operating regulations or
procedures for drawbridges. This rule is
categorically excluded, under figure 2–
1, paragraph (32)(e), of the Instruction.
Under figure 2–1, paragraph (32)(e), of
the Instruction, an environmental
analysis checklist and a categorical
exclusion determination are not
required for this rule.
33 CFR Part 117
List of Subjects in 33 CFR Part 117
Bridges.
For the reasons discussed in the
preamble, the Coast Guard amends 33
CFR part 117 as follows:
PART 117—DRAWBRIDGE
OPERATION REGULATIONS
1. The authority citation for part 117
continues to read as follows:
■
Authority: 33 U.S.C. 499; 33 CFR 1.05–1;
Department of Homeland Security Delegation
No. 0170.1.
2. Amend § 117.791 by removing
paragraph (f) and revising paragraph (e)
to read as follows:
■
§ 117.791
Hudson River.
emcdonald on DSK67QTVN1PROD with RULES
*
*
*
*
*
(e) The draw of the highway bridge,
mile 152.7, between Troy and Green
Island, operates as follows:
(1) From April 1 through December 15
the draw shall open on signal if at least
a twenty four hour advance notice is
given by calling the number posted at
the bridge.
VerDate Mar<15>2010
17:44 Sep 12, 2013
Jkt 229001
[Docket Number USCG–2013–0798]
Drawbridge Operation Regulation;
Illinois Waterway, Beardstown, IL
Coast Guard, DHS.
Notice of deviation from
drawbridge regulation.
AGENCY:
ACTION:
The Coast Guard has issued a
temporary deviation from the operating
schedule that governs the Burlington
Northern Santa Fe Railroad Bridge
across the Illinois Waterway, mile 88.8,
at Beardstown, Illinois. The deviation is
necessary to install new conley rail
components which can only be done
when the bridge is in the closed-tonavigation position. The deviation
allows the bridge to remain in the
closed-to-navigation position during
two 12-hour periods.
DATES: This deviation is effective from
7 a.m. to 7 p.m., October 15 and October
22, 2013.
ADDRESSES: The docket for this
deviation, USCG–2013–0798, is
available at https://www.regulations.gov.
Type the docket number in the
‘‘SEARCH’’ box and click ‘‘SEARCH.’’
Click on Open Docket Folder on the line
associated with this deviation. You may
also visit the Docket Management
Facility in Room W12–140 on the
ground floor of the Department of
Transportation West Building, 1200
New Jersey Avenue SE., Washington,
DC 20590, between 9 a.m. and 5 p.m.,
Monday through Friday, except Federal
holidays.
FOR FURTHER INFORMATION CONTACT: If
you have questions on this temporary
deviation, call or email Eric A.
Washburn, Bridge Administrator,
Western Rivers, Coast Guard; telephone
(314) 269–2378, email Eric.Washburn@
uscg.mil. If you have questions on
viewing the docket, call Barbara
Hairston, Program Manager, Docket
Operations, telephone (202) 366–9826.
SUMMARY:
PO 00000
Frm 00027
Fmt 4700
Sfmt 4700
56609
The
Burlington Northern Santa Fe Railway
Company requested a temporary
deviation for the Burlington Northern
Santa Fe (BNSF) Railroad Bridge, mile
88.8, at Beardstown, Illinois across the
Illinois Waterway. It has a vertical
clearance of 19.6 feet above normal pool
in the closed position. The BNSF
Railroad Bridge currently operates in
accordance with 33 CFR 117.393(a)
which requires that the bridge be
maintained in the open-to-navigation
position; closing only when a train
needs to transit the bridge.
The deviation period is from 7 a.m. to
7 p.m., October 15 and October 22, 2013
when the draw span will remain in the
closed-to-navigation position. During
these times the new conley rail
components will be installed. The draw
span will not be returned to its fully
open position until installation is
completed after each closure. For the
duration of the repair, work vessels will
not be allowed to pass through the
bridge while the installation of the
conley rail components is in progress.
The bridge will not be able to open for
emergencies and there is no immediate
alternate route for vessels to pass this
section of the Illinois Waterway. The
Coast Guard will also inform the users
of the waterway through our Local and
Broadcast Notices to Mariners of the
change in operating schedule for the
bridge so that vessels can arrange their
transits to minimize any impact caused
by the temporary deviation.
In accordance with 33 CFR 117.35(e),
the drawbridge must return to its regular
operating schedule immediately at the
end of the effective period of this
temporary deviation. This deviation
from the operating regulations is
authorized under 33 CFR 117.35.
SUPPLEMENTARY INFORMATION:
Dated: August 30, 2013.
Eric A. Washburn,
Bridge Administrator, Western Rivers.
[FR Doc. 2013–22265 Filed 9–12–13; 8:45 am]
BILLING CODE 9110–04–P
DEPARTMENT OF HOMELAND
SECURITY
Coast Guard
33 CFR Part 117
[USCG–2013–0416]
Drawbridge Operation Regulations;
Reynolds Channel, Lawrence, NY
Coast Guard, DHS.
Notice canceling temporary
deviation from regulations.
AGENCY:
ACTION:
E:\FR\FM\13SER1.SGM
13SER1
56610
Federal Register / Vol. 78, No. 178 / Friday, September 13, 2013 / Rules and Regulations
The Coast Guard is canceling
the temporary deviation from the
regulations published on June 11, 2013,
(78 FR 34893) governing the operation
of the Atlantic Beach Bridge, mile 0.4,
across Reynolds Channel, at Lawrence,
New York. The owner of the bridge,
Nassau County Bridge Authority,
requested six, five hour closure periods,
scheduled to occur during the effective
period of the above temporary
deviation. As a result of the bridge
owner’s recent request we must cancel
the existing temporary deviation and
issue a new temporary deviation to
include the bridge closures.
DATES: The temporary deviation, (78 FR
34893), published on June 11, 2013, is
cancelled as of August 31, 2013.
ADDRESSES: The docket for this
deviation, [USCG–2013–0416] is
available at https://www.regulations.gov.
Type the docket number in the
‘‘SEARCH’’ box and click ‘‘SEARCH.’’
Click on Open Docket Folder on the line
associated with this deviation. You may
also visit the Docket Management
Facility in Room W12–140 on the
Ground Floor of the Department of
Transportation West Building, 1200
New Jersey Avenue SE., Washington,
DC 20590, between 9 a.m. and 5 p.m.,
Monday through Friday, except Federal
holidays.
FOR FURTHER INFORMATION CONTACT: If
you have questions on this rule, call or
email Ms. Judy Leung-Yee, Project
Officer, First Coast Guard District,
telephone (212) 668–7165, email
judy.k.leung-yee@uscg.mil. If you have
questions on viewing the docket, call
Barbara Hairston, Program Manager,
Docket Operations, telephone 202–366–
9826.
SUPPLEMENTARY INFORMATION:
Bridge at mile 0.4, across Reynolds
Channel was required to operate as
follows:
(1) From June 9, 2013 through
September 30, 2013, Monday through
Friday, the draw may operate a single
span on signal, every two hours, on the
even hour, between 6 a.m. and 8 p.m.
From 8 p.m. through 6 a.m. the draw
may operate a single span on signal. On
weekends and holidays from Friday at
8 p.m. through Monday at 6 a.m. the
bridge shall open both spans every hour
on the hour.
(2) From October 1, 2013 through
December 1, 2013, the bridge shall
operate a single span on signal at 6 a.m.,
12 p.m., 4 p.m., and 8 p.m. and at any
time between 8 p.m. and 6 a.m. The
draw shall open both spans at all times
for commercial vessel traffic after at
least a 48 hour advance notice is given
by calling the number posted at the
bridge.
The bridge owner recently advised the
Coast Guard that six, five hour, bridge
closures would be necessary in order to
facilitate the completion of the electrical
and structural rehabilitation at the
bridge. These closures cannot occur
under the current temporary deviation.
As a result, the Coast Guard is
cancelling the temporary deviation
published on June 11, 2013 in the
Federal Register (78 FR 34893) and will
publish a new temporary deviation that
will include the six, five hour, bridge
closures.
A. Basis and Purpose
On June 11, 2013, we published a
temporary deviation entitled
‘‘Drawbridge Operation Regulations;
Reynolds Channel, Lawrence, NY’’, in
the Federal Register (78 FR 34893). The
temporary deviation concerned was for
the Atlantic Beach Bridge, across
Reynolds Channel, mile 0.4, at
Lawrence, New York. The owner of the
bridge, Nassau County Bridge Authority,
requested a temporary deviation for 176
days to facilitate electrical and
structural rehabilitation at the bridge.
This deviation from the operating
regulations was authorized under 33
CFR 117.35.
DEPARTMENT OF HOMELAND
SECURITY
emcdonald on DSK67QTVN1PROD with RULES
SUMMARY:
B. Cancellation
Under the temporary deviation
published on June 11, 2013, (78 FR
34893) the draw of the Atlantic Beach
VerDate Mar<15>2010
17:44 Sep 12, 2013
Jkt 229001
Dated: August 29, 2013.
Gary Kassof,
Bridge Program Manager, First Coast Guard
District.
[FR Doc. 2013–22270 Filed 9–12–13; 8:45 am]
BILLING CODE 9110–04–P
Coast Guard
33 CFR Part 117
[USCG–2013–0780]
Drawbridge Operation Regulations;
Reynolds Channel, Lawrence, NY
Coast Guard, DHS.
Notice of temporary deviation
from regulations.
AGENCY:
ACTION:
The Commander, First Coast
Guard District, has issued a temporary
deviation from the regulations
governing the operation of the Atlantic
Beach Bridge, mile 0.4, across Reynolds
Channel, at Lawrence, New York. This
temporary deviation authorizes the
Atlantic Beach Bridge to operate under
SUMMARY:
PO 00000
Frm 00028
Fmt 4700
Sfmt 4700
an alternate schedule for 92 days, to
facilitate electrical and structural
rehabilitation at the bridge.
DATES: This deviation is effective from
September 13, 2013 through December
1, 2013, and has been enforced with
actual notice since September 1, 2013.
ADDRESSES: Documents mentioned in
this preamble as being available in the
docket are part of docket USCG–2013–
0780 and are available online at
www.regulations.gov, inserting USCG–
2013–0780 in the ‘‘Keyword’’ and then
clicking ‘‘Search’’. They are also
available for inspection or copying at
the Docket Management Facility (M–30),
U.S. Department of Transportation,
West Building Ground Floor, Room
W12–140, 1200 New Jersey Avenue SE.,
Washington, DC 20590, between 9 a.m.
and 5 p.m., Monday through Friday,
except Federal holidays.
FOR FURTHER INFORMATION CONTACT: If
you have questions on this rule, call or
email Ms. Judy Leung-Yee, Project
Officer, First Coast Guard District,
telephone (212) 668–7165, email
judy.k.leung-yee@uscg.mil. If you have
questions on viewing the docket, call
Barbara Hairston, Program Manager,
Docket Operations, telephone 202–366–
9826.
SUPPLEMENTARY INFORMATION: The
Atlantic Beach Bridge, across Reynolds
Channel, mile 0.4, at Lawrence, New
York, has a vertical clearance in the
closed position of 25 feet at mean high
water and 30 feet at mean low water.
The existing drawbridge operation
regulations are listed at 33 CFR
117.799(e).
The owner of the bridge, Nassau
County Bridge Authority, requested a
temporary deviation to facilitate
electrical and structural rehabilitation at
the bridge.
The waterway has commercial and
seasonal recreational vessels of various
sizes.
Under this temporary deviation the
draw of the Atlantic Beach Bridge at
mile 0.4, across Reynolds Channel shall
operate as follows:
(1) From September 1, 2013 through
September 30, 2013, Monday through
Friday, the draw may operate a single
span on signal, every two hours, on the
even hour, between 6 a.m. and 8 p.m.
From 8 p.m. through 6 a.m. the draw
may operate a single span on signal. On
weekends and holidays from Friday at
8 p.m. through Monday at 6 a.m. the
bridge shall open both spans every hour
on the hour. The draw may remain in
the closed position between 12 a.m. and
5 a.m. on September 12, 13, 24, and 25,
2013.
E:\FR\FM\13SER1.SGM
13SER1
Agencies
[Federal Register Volume 78, Number 178 (Friday, September 13, 2013)]
[Rules and Regulations]
[Pages 56609-56610]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-22270]
-----------------------------------------------------------------------
DEPARTMENT OF HOMELAND SECURITY
Coast Guard
33 CFR Part 117
[USCG-2013-0416]
Drawbridge Operation Regulations; Reynolds Channel, Lawrence, NY
AGENCY: Coast Guard, DHS.
ACTION: Notice canceling temporary deviation from regulations.
-----------------------------------------------------------------------
[[Page 56610]]
SUMMARY: The Coast Guard is canceling the temporary deviation from the
regulations published on June 11, 2013, (78 FR 34893) governing the
operation of the Atlantic Beach Bridge, mile 0.4, across Reynolds
Channel, at Lawrence, New York. The owner of the bridge, Nassau County
Bridge Authority, requested six, five hour closure periods, scheduled
to occur during the effective period of the above temporary deviation.
As a result of the bridge owner's recent request we must cancel the
existing temporary deviation and issue a new temporary deviation to
include the bridge closures.
DATES: The temporary deviation, (78 FR 34893), published on June 11,
2013, is cancelled as of August 31, 2013.
ADDRESSES: The docket for this deviation, [USCG-2013-0416] is available
at https://www.regulations.gov. Type the docket number in the ``SEARCH''
box and click ``SEARCH.'' Click on Open Docket Folder on the line
associated with this deviation. You may also visit the Docket
Management Facility in Room W12-140 on the Ground Floor of the
Department of Transportation West Building, 1200 New Jersey Avenue SE.,
Washington, DC 20590, between 9 a.m. and 5 p.m., Monday through Friday,
except Federal holidays.
FOR FURTHER INFORMATION CONTACT: If you have questions on this rule,
call or email Ms. Judy Leung-Yee, Project Officer, First Coast Guard
District, telephone (212) 668-7165, email judy.k.leung-yee@uscg.mil. If
you have questions on viewing the docket, call Barbara Hairston,
Program Manager, Docket Operations, telephone 202-366-9826.
SUPPLEMENTARY INFORMATION:
A. Basis and Purpose
On June 11, 2013, we published a temporary deviation entitled
``Drawbridge Operation Regulations; Reynolds Channel, Lawrence, NY'',
in the Federal Register (78 FR 34893). The temporary deviation
concerned was for the Atlantic Beach Bridge, across Reynolds Channel,
mile 0.4, at Lawrence, New York. The owner of the bridge, Nassau County
Bridge Authority, requested a temporary deviation for 176 days to
facilitate electrical and structural rehabilitation at the bridge. This
deviation from the operating regulations was authorized under 33 CFR
117.35.
B. Cancellation
Under the temporary deviation published on June 11, 2013, (78 FR
34893) the draw of the Atlantic Beach Bridge at mile 0.4, across
Reynolds Channel was required to operate as follows:
(1) From June 9, 2013 through September 30, 2013, Monday through
Friday, the draw may operate a single span on signal, every two hours,
on the even hour, between 6 a.m. and 8 p.m. From 8 p.m. through 6 a.m.
the draw may operate a single span on signal. On weekends and holidays
from Friday at 8 p.m. through Monday at 6 a.m. the bridge shall open
both spans every hour on the hour.
(2) From October 1, 2013 through December 1, 2013, the bridge shall
operate a single span on signal at 6 a.m., 12 p.m., 4 p.m., and 8 p.m.
and at any time between 8 p.m. and 6 a.m. The draw shall open both
spans at all times for commercial vessel traffic after at least a 48
hour advance notice is given by calling the number posted at the
bridge.
The bridge owner recently advised the Coast Guard that six, five
hour, bridge closures would be necessary in order to facilitate the
completion of the electrical and structural rehabilitation at the
bridge. These closures cannot occur under the current temporary
deviation.
As a result, the Coast Guard is cancelling the temporary deviation
published on June 11, 2013 in the Federal Register (78 FR 34893) and
will publish a new temporary deviation that will include the six, five
hour, bridge closures.
Dated: August 29, 2013.
Gary Kassof,
Bridge Program Manager, First Coast Guard District.
[FR Doc. 2013-22270 Filed 9-12-13; 8:45 am]
BILLING CODE 9110-04-P