Drawbridge Operation Regulation; Illinois Waterway, Beardstown, IL, 56609 [2013-22265]
Download as PDF
Federal Register / Vol. 78, No. 178 / Friday, September 13, 2013 / Rules and Regulations
standards would be inconsistent with
applicable law or otherwise impractical.
Voluntary consensus standards are
technical standards (e.g., specifications
of materials, performance, design, or
operation; test methods; sampling
procedures; and related management
systems practices) that are developed or
adopted by voluntary consensus
standards bodies.
This rule does not use technical
standards. Therefore, we did not
consider the use of voluntary consensus
standards.
(2) From December 16 through March
31, the draw need not open for the
passage of vessel traffic.
Dated: August 26, 2013.
V.B. Gifford, Jr.,
Captain, U.S. Coast Guard, Acting
Commander, First Coast Guard District.
[FR Doc. 2013–22268 Filed 9–12–13; 8:45 am]
BILLING CODE 9110–04–P
DEPARTMENT OF HOMELAND
SECURITY
14. Environment
Coast Guard
We have analyzed this rule under
Department of Homeland Security
Management Directive 023–01 and
Commandant Instruction M16475.lD,
which guides the Coast Guard in
complying with the National
Environmental Policy Act of 1969
(NEPA) (42 U.S.C. 4321–4370f), and
have concluded that this action is one
of a category of actions which do not
individually or cumulatively have a
significant effect on the human
environment. This final rule simply
promulgates the operating regulations or
procedures for drawbridges. This rule is
categorically excluded, under figure 2–
1, paragraph (32)(e), of the Instruction.
Under figure 2–1, paragraph (32)(e), of
the Instruction, an environmental
analysis checklist and a categorical
exclusion determination are not
required for this rule.
33 CFR Part 117
List of Subjects in 33 CFR Part 117
Bridges.
For the reasons discussed in the
preamble, the Coast Guard amends 33
CFR part 117 as follows:
PART 117—DRAWBRIDGE
OPERATION REGULATIONS
1. The authority citation for part 117
continues to read as follows:
■
Authority: 33 U.S.C. 499; 33 CFR 1.05–1;
Department of Homeland Security Delegation
No. 0170.1.
2. Amend § 117.791 by removing
paragraph (f) and revising paragraph (e)
to read as follows:
■
§ 117.791
Hudson River.
emcdonald on DSK67QTVN1PROD with RULES
*
*
*
*
*
(e) The draw of the highway bridge,
mile 152.7, between Troy and Green
Island, operates as follows:
(1) From April 1 through December 15
the draw shall open on signal if at least
a twenty four hour advance notice is
given by calling the number posted at
the bridge.
VerDate Mar<15>2010
17:44 Sep 12, 2013
Jkt 229001
[Docket Number USCG–2013–0798]
Drawbridge Operation Regulation;
Illinois Waterway, Beardstown, IL
Coast Guard, DHS.
Notice of deviation from
drawbridge regulation.
AGENCY:
ACTION:
The Coast Guard has issued a
temporary deviation from the operating
schedule that governs the Burlington
Northern Santa Fe Railroad Bridge
across the Illinois Waterway, mile 88.8,
at Beardstown, Illinois. The deviation is
necessary to install new conley rail
components which can only be done
when the bridge is in the closed-tonavigation position. The deviation
allows the bridge to remain in the
closed-to-navigation position during
two 12-hour periods.
DATES: This deviation is effective from
7 a.m. to 7 p.m., October 15 and October
22, 2013.
ADDRESSES: The docket for this
deviation, USCG–2013–0798, is
available at https://www.regulations.gov.
Type the docket number in the
‘‘SEARCH’’ box and click ‘‘SEARCH.’’
Click on Open Docket Folder on the line
associated with this deviation. You may
also visit the Docket Management
Facility in Room W12–140 on the
ground floor of the Department of
Transportation West Building, 1200
New Jersey Avenue SE., Washington,
DC 20590, between 9 a.m. and 5 p.m.,
Monday through Friday, except Federal
holidays.
FOR FURTHER INFORMATION CONTACT: If
you have questions on this temporary
deviation, call or email Eric A.
Washburn, Bridge Administrator,
Western Rivers, Coast Guard; telephone
(314) 269–2378, email Eric.Washburn@
uscg.mil. If you have questions on
viewing the docket, call Barbara
Hairston, Program Manager, Docket
Operations, telephone (202) 366–9826.
SUMMARY:
PO 00000
Frm 00027
Fmt 4700
Sfmt 4700
56609
The
Burlington Northern Santa Fe Railway
Company requested a temporary
deviation for the Burlington Northern
Santa Fe (BNSF) Railroad Bridge, mile
88.8, at Beardstown, Illinois across the
Illinois Waterway. It has a vertical
clearance of 19.6 feet above normal pool
in the closed position. The BNSF
Railroad Bridge currently operates in
accordance with 33 CFR 117.393(a)
which requires that the bridge be
maintained in the open-to-navigation
position; closing only when a train
needs to transit the bridge.
The deviation period is from 7 a.m. to
7 p.m., October 15 and October 22, 2013
when the draw span will remain in the
closed-to-navigation position. During
these times the new conley rail
components will be installed. The draw
span will not be returned to its fully
open position until installation is
completed after each closure. For the
duration of the repair, work vessels will
not be allowed to pass through the
bridge while the installation of the
conley rail components is in progress.
The bridge will not be able to open for
emergencies and there is no immediate
alternate route for vessels to pass this
section of the Illinois Waterway. The
Coast Guard will also inform the users
of the waterway through our Local and
Broadcast Notices to Mariners of the
change in operating schedule for the
bridge so that vessels can arrange their
transits to minimize any impact caused
by the temporary deviation.
In accordance with 33 CFR 117.35(e),
the drawbridge must return to its regular
operating schedule immediately at the
end of the effective period of this
temporary deviation. This deviation
from the operating regulations is
authorized under 33 CFR 117.35.
SUPPLEMENTARY INFORMATION:
Dated: August 30, 2013.
Eric A. Washburn,
Bridge Administrator, Western Rivers.
[FR Doc. 2013–22265 Filed 9–12–13; 8:45 am]
BILLING CODE 9110–04–P
DEPARTMENT OF HOMELAND
SECURITY
Coast Guard
33 CFR Part 117
[USCG–2013–0416]
Drawbridge Operation Regulations;
Reynolds Channel, Lawrence, NY
Coast Guard, DHS.
Notice canceling temporary
deviation from regulations.
AGENCY:
ACTION:
E:\FR\FM\13SER1.SGM
13SER1
Agencies
[Federal Register Volume 78, Number 178 (Friday, September 13, 2013)]
[Rules and Regulations]
[Page 56609]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-22265]
-----------------------------------------------------------------------
DEPARTMENT OF HOMELAND SECURITY
Coast Guard
33 CFR Part 117
[Docket Number USCG-2013-0798]
Drawbridge Operation Regulation; Illinois Waterway, Beardstown,
IL
AGENCY: Coast Guard, DHS.
ACTION: Notice of deviation from drawbridge regulation.
-----------------------------------------------------------------------
SUMMARY: The Coast Guard has issued a temporary deviation from the
operating schedule that governs the Burlington Northern Santa Fe
Railroad Bridge across the Illinois Waterway, mile 88.8, at Beardstown,
Illinois. The deviation is necessary to install new conley rail
components which can only be done when the bridge is in the closed-to-
navigation position. The deviation allows the bridge to remain in the
closed-to-navigation position during two 12-hour periods.
DATES: This deviation is effective from 7 a.m. to 7 p.m., October 15
and October 22, 2013.
ADDRESSES: The docket for this deviation, USCG-2013-0798, is available
at https://www.regulations.gov. Type the docket number in the ``SEARCH''
box and click ``SEARCH.'' Click on Open Docket Folder on the line
associated with this deviation. You may also visit the Docket
Management Facility in Room W12-140 on the ground floor of the
Department of Transportation West Building, 1200 New Jersey Avenue SE.,
Washington, DC 20590, between 9 a.m. and 5 p.m., Monday through Friday,
except Federal holidays.
FOR FURTHER INFORMATION CONTACT: If you have questions on this
temporary deviation, call or email Eric A. Washburn, Bridge
Administrator, Western Rivers, Coast Guard; telephone (314) 269-2378,
email Eric.Washburn@uscg.mil. If you have questions on viewing the
docket, call Barbara Hairston, Program Manager, Docket Operations,
telephone (202) 366-9826.
SUPPLEMENTARY INFORMATION: The Burlington Northern Santa Fe Railway
Company requested a temporary deviation for the Burlington Northern
Santa Fe (BNSF) Railroad Bridge, mile 88.8, at Beardstown, Illinois
across the Illinois Waterway. It has a vertical clearance of 19.6 feet
above normal pool in the closed position. The BNSF Railroad Bridge
currently operates in accordance with 33 CFR 117.393(a) which requires
that the bridge be maintained in the open-to-navigation position;
closing only when a train needs to transit the bridge.
The deviation period is from 7 a.m. to 7 p.m., October 15 and
October 22, 2013 when the draw span will remain in the closed-to-
navigation position. During these times the new conley rail components
will be installed. The draw span will not be returned to its fully open
position until installation is completed after each closure. For the
duration of the repair, work vessels will not be allowed to pass
through the bridge while the installation of the conley rail components
is in progress. The bridge will not be able to open for emergencies and
there is no immediate alternate route for vessels to pass this section
of the Illinois Waterway. The Coast Guard will also inform the users of
the waterway through our Local and Broadcast Notices to Mariners of the
change in operating schedule for the bridge so that vessels can arrange
their transits to minimize any impact caused by the temporary
deviation.
In accordance with 33 CFR 117.35(e), the drawbridge must return to
its regular operating schedule immediately at the end of the effective
period of this temporary deviation. This deviation from the operating
regulations is authorized under 33 CFR 117.35.