Sutton Hydroelectric Company, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications, 55072 [2013-21830]
Download as PDF
55072
Federal Register / Vol. 78, No. 174 / Monday, September 9, 2013 / Notices
‘‘eLibrary’’ link. Follow the directions
for accessing information in paragraph
n. Based on all oral and written
comments, a Scoping Document 2 (SD2)
may be issued. SD2 may include a
revised process plan and schedule, as
well as a list of issues, identified
through the scoping process.
Environmental Site Review
PacifiCorp Energy and Commission
staff will conduct an Environmental Site
Review of the project on Tuesday,
September 24, 2013, starting at 1:00
p.m. (PST). All participants should meet
at the Prospect Warehouse, located at
1111 Mill Creek Drive, Prospect, OR
97536. Please contact Mr. Steve
Albertelli at (541) 776–6676 or
steve.albertelli@pacificorp.com by
September 23, 2013, if you plan to
attend the environmental site review.
Meeting Objectives
At the scoping meetings, staff will: (1)
Initiate scoping of the issues; (2) review
and discuss existing conditions and
resource management objectives; (3)
review and discuss existing information
and identify preliminary information
and study needs; (4) review and discuss
the process plan and schedule for prefiling activity that incorporates the time
frames provided for in Part 5 of the
Commission’s regulations and, to the
extent possible, maximizes coordination
of federal, state, and tribal permitting
and certification processes; and (5)
discuss the appropriateness of any
federal or state agency or Indian tribe
acting as a cooperating agency for
development of an environmental
document.
Meeting participants should come
prepared to discuss their issues and/or
concerns. Please review the PAD in
preparation for the scoping meetings.
Directions on how to obtain a copy of
the PAD and SD1 are included in item
n. of this document.
Meeting Procedures
tkelley on DSK3SPTVN1PROD with NOTICES
The meetings will be recorded by a
stenographer and will be placed in the
public records of the project.
Dated: August 30, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013–21829 Filed 9–6–13; 8:45 am]
BILLING CODE 6717–01–P
VerDate Mar<15>2010
15:01 Sep 06, 2013
Jkt 229001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 12693–003]
Sutton Hydroelectric Company, LLC;
Notice of Preliminary Permit
Application Accepted for Filing and
Soliciting Comments, Motions To
Intervene, and Competing Applications
On March 1, 2013, Sutton
Hydroelectric Company, LLC filed an
application for a successive preliminary
permit, pursuant to section 4(f) of the
Federal Power Act (FPA), proposing to
study the feasibility of the Sutton
Hydroelectric Project (project) to be
located at the U.S. Army Corps of
Engineers Sutton Dam, on the Elk River,
in Sutton, Braxton County, West
Virginia. The sole purpose of a
preliminary permit, if issued, is to grant
the permit holder priority to file a
license application during the permit
term. A preliminary permit does not
authorize the permit holder to perform
any land-disturbing activities or
otherwise enter upon lands or waters
owned by others without the owners’
express permission.
The proposed project would utilize
the existing U.S. Army Corps of
Engineers’ Sutton Dam and would
consist of: (1) A proposed powerhouse
containing three generating units with a
total generating capacity of 9.2
megawatts; (2) a 12-foot-diameter
penstock; (3) a proposed 4,000-footlong, 138-kilovolt transmission line; (4)
a tailrace, and (5) appurtenant facilities.
The project would have an estimated
average annual generation of 36.0
gigawatt-hours.
Applicant Contact: Mr. David C.
Sinclair, President, Advanced Hydro
Solutions, LLC, 3000 Auburn Drive,
Suite 430, Beachwood, OH 4122–4340;
phone: (216) 472–5581.
FERC Contact: Tim Looney; phone:
(202) 502–6096.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36.
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, notices of intent,
and competing applications using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
PO 00000
Frm 00021
Fmt 4703
Sfmt 4703
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
The first page of any filing should
include docket number P–12693–003.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of Commission’s Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–12693) in the docket number field to
access the document. For assistance,
contact FERC Online Support.
Dated: August 30, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013–21830 Filed 9–6–13; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP13–523–000]
Transcontinental Gas Pipe Line
Company, LLC; Notice of Intent To
Prepare an Environmental Assessment
for the Proposed Mobile Bay South III
Expansion Project and Request for
Comments on Environmental Issues
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) will prepare an
environmental assessment (EA) that will
discuss the environmental impacts of
the Mobile Bay South III Expansion
Project involving construction and
operation of facilities by
Transcontinental Gas Pipe Line
Company, LLC (Transco) in Mobile
County, Alabama. The Commission will
use this EA in its decision-making
process to determine whether the
project is in the public convenience and
necessity.
This notice announces the opening of
the scoping process the Commission
will use to gather input from the public
and interested agencies on the project.
Your input will help the Commission
staff determine what issues they need to
evaluate in the EA. Please note that the
scoping period will close on September
30, 2013.
This notice is being sent to the
Commission’s current environmental
E:\FR\FM\09SEN1.SGM
09SEN1
Agencies
[Federal Register Volume 78, Number 174 (Monday, September 9, 2013)]
[Notices]
[Page 55072]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-21830]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 12693-003]
Sutton Hydroelectric Company, LLC; Notice of Preliminary Permit
Application Accepted for Filing and Soliciting Comments, Motions To
Intervene, and Competing Applications
On March 1, 2013, Sutton Hydroelectric Company, LLC filed an
application for a successive preliminary permit, pursuant to section
4(f) of the Federal Power Act (FPA), proposing to study the feasibility
of the Sutton Hydroelectric Project (project) to be located at the U.S.
Army Corps of Engineers Sutton Dam, on the Elk River, in Sutton,
Braxton County, West Virginia. The sole purpose of a preliminary
permit, if issued, is to grant the permit holder priority to file a
license application during the permit term. A preliminary permit does
not authorize the permit holder to perform any land-disturbing
activities or otherwise enter upon lands or waters owned by others
without the owners' express permission.
The proposed project would utilize the existing U.S. Army Corps of
Engineers' Sutton Dam and would consist of: (1) A proposed powerhouse
containing three generating units with a total generating capacity of
9.2 megawatts; (2) a 12-foot-diameter penstock; (3) a proposed 4,000-
foot-long, 138-kilovolt transmission line; (4) a tailrace, and (5)
appurtenant facilities. The project would have an estimated average
annual generation of 36.0 gigawatt-hours.
Applicant Contact: Mr. David C. Sinclair, President, Advanced Hydro
Solutions, LLC, 3000 Auburn Drive, Suite 430, Beachwood, OH 4122-4340;
phone: (216) 472-5581.
FERC Contact: Tim Looney; phone: (202) 502-6096.
Deadline for filing comments, motions to intervene, competing
applications (without notices of intent), or notices of intent to file
competing applications: 60 days from the issuance of this notice.
Competing applications and notices of intent must meet the requirements
of 18 CFR 4.36.
The Commission strongly encourages electronic filing. Please file
comments, motions to intervene, notices of intent, and competing
applications using the Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief
comments up to 6,000 characters, without prior registration, using the
eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You
must include your name and contact information at the end of your
comments. For assistance, please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to:
Secretary, Federal Energy Regulatory Commission, 888 First Street NE.,
Washington, DC 20426. The first page of any filing should include
docket number P-12693-003.
More information about this project, including a copy of the
application, can be viewed or printed on the ``eLibrary'' link of
Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P-12693) in the docket number field to access
the document. For assistance, contact FERC Online Support.
Dated: August 30, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013-21830 Filed 9-6-13; 8:45 am]
BILLING CODE 6717-01-P