Environmental Impacts Statements; Notice of Availability, 54893 [2013-21793]
Download as PDF
mstockstill on DSK4VPTVN1PROD with NOTICES
Federal Register / Vol. 78, No. 173 / Friday, September 6, 2013 / Notices
public docket, visit https://www.epa.gov/
dockets.
Abstract: The affected entities are
subject to the General Provisions of the
NESHAP at 40 CFR part 63, subpart A,
and any changes, or additions to the
Provisions specified at 40 CFR part 63,
subpart UUU. Owners or operators of
the affected facilities must submit initial
notification, performance tests, and
periodic reports, and results. Owners or
operators are also required to maintain
records of the occurrence and duration
of any startup, shutdown, or
malfunction in the operation of an
affected facility, or any period during
which the monitoring system is
inoperative. Reports, at a minimum, are
required semiannually.
Form Numbers: None.
Respondents/affected entities:
Owners or operators of petroleum
refineries.
Respondent’s obligation to respond:
Mandatory (40 CFR part 63, subpart
UUU).
Estimated number of respondents:
123 (total).
Frequency of response: Initially and
semiannually.
Total estimated burden: 10,237 hours
(per year). ‘‘Burden’’ is defined at 5 CFR
1320.3(b).
Total estimated cost: $9,399,440 (per
year), includes $8,398,136 annualized
capital or operation & maintenance
costs.
Changes in the Estimates: There is an
adjustment decrease in the respondent
and Agency labor hours in this ICR
compared to the previous ICR. The
decrease occurred because all sources
have met the initial compliance
requirement and, therefore, will not
incur burden associated with initial
notification and performance test during
the three-year period of this ICR. The
decrease also resulted from a reduction
in the respondent universe from 132 to
123 major source facilities. The estimate
was obtained from EPA’s non-CBI
Component 1 Section 114 ICR database
and is based on 2010 data.
However, there is an overall increase
in respondent labor costs due to an
adjustment in labor rates. This ICR uses
updated labor rates in calculating all
costs. There is also an increase in the
total O&M costs due to an update in the
estimated number of sources.
John Moses,
Director, Collection Strategies Division.
[FR Doc. 2013–21704 Filed 9–5–13; 8:45 am]
BILLING CODE 6560–50–P
VerDate Mar<15>2010
18:05 Sep 05, 2013
Jkt 229001
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–9010–9]
Environmental Impacts Statements;
Notice of Availability
Responsible Agency: Office of Federal
Activities, General Information (202)
564–7146 or https://www.epa.gov/
compliance/nepa/.
Weekly receipt of Environmental Impact
Statements
Filed 08/26/2013 Through 08/30/2013
Pursuant to 40 CFR 1506.9.
Section 309(a) of the Clean Air Act
requires that EPA make public its
comments on EISs issued by other
Federal agencies. EPA’s comment letters
on EISs are available at: https://
www.epa.gov/compliance/nepa/
eisdata.html
EIS No. 20130256, Draft Supplement,
USFWS, CA, Coachella Valley
Multiple Species Habitat
Conservation Plan and Natural
Community Conservation Plan,
Comment Period Ends: 10/21/2013,
Contact: Ken Corey 760–322–2070.
EIS No. 20130257, Final EIS, BLM, NV,
Winnemucca District Proposed
Resource Management Plan, Review
Period Ends: 10/07/2013, Contact:
Zwaantje Rorex 775–623–1727.
EIS No. 20130258, Final EIS, USFS, WI,
Lakewood Southeast Project, Review
Period Ends: 10/15/2013, Contact:
Marilee Houtler 715–276–6333
EIS No. 20130259, Final EIS, FTA, MD,
Purple Line Draft Section 4(f)
Evaluation, Review Period Ends: 10/
07/2013, Contact: Daniel Koenig 202–
219–3528.
EIS No. 20130260, Draft EIS, BIA, NV,
Moapa Solar Energy Center, Comment
Period Ends: 10/14/2013, Contact:
Amy Heuslein 602–379–7650
EIS No. 20130261, Draft Supplement,
NPS, CA, Golden Gate National
Recreation Area Draft Dog
Management Plan, Comment Period
Ends: 12/04/2013, Contact: Michael B.
Edwards 303–969–2694.
EIS No. 20130262, Final EIS, USCG, NY,
ADOPTION—Kosciuszko Bridge
Project, Queens, Kings and Queens
Counties, NY, Contact: Gary Kassof
212–668–7021.
The U.S. Coast Guard has adopted the
U.S. Department of Transportation’s
Federal Highway Administration FEIS
#20080517, filed 12/10/2008 with the
USEPA. The USCG was a cooperating
agency to the project. Recirculation of
the EIS is not necessary under 1506.3(c)
of the CEQ Regulations.
Frm 00032
Amended Notices
EIS No. 20130223, Draft EIS, USACE,
MO, St. Johns Bayou and New Madrid
Floodway Project, Comment Period
Ends: 11/25/2013, Contact: Joshua
Koontz 901–544–3975.
Revision to FR Notice Published on
07/26/2013; Extending Comment Period
from 09/09/2013 to 11/25/2013.
Dated: September 3, 2013.
Cliff Rader,
Director, NEPA Compliance Division, Office
of Federal Activities.
[FR Doc. 2013–21793 Filed 9–5–13; 8:45 am]
BILLING CODE 6560–50–P
Notice
PO 00000
54893
Fmt 4703
Sfmt 4703
FARM CREDIT ADMINISTRATION
Farm Credit Administration Board;
Sunshine Act Meeting
AGENCY: Farm Credit Administration.
SUMMARY: Notice is hereby given,
pursuant to the Government in the
Sunshine Act, of the regular meeting of
the Farm Credit Administration Board
(Board).
DATE AND TIME: The regular meeting of
the Board will be held at the offices of
the Farm Credit Administration in
McLean, Virginia, on September 12,
2013, from 9:00 a.m. until such time as
the Board concludes its business.
FOR FURTHER INFORMATION CONTACT: Dale
L. Aultman, Secretary to the Farm
Credit Administration Board, (703) 883–
4009, TTY (703) 883–4056.
ADDRESSES: Farm Credit
Administration, 1501 Farm Credit Drive,
McLean, Virginia 22102–5090.
SUPPLEMENTARY INFORMATION: Parts of
this meeting of the Board will be open
to the public (limited space available)
and parts will be closed to the public.
In order to increase the accessibility to
Board meetings, persons requiring
assistance should make arrangements in
advance. The matters to be considered
at the meeting are:
OPEN SESSION
Approval of Minutes
• August 8, 2013
New Business
• Proposed Merger of Lone Star, ACA
and Texas Land Bank, ACA
• Farmer Mac Capital Planning—
Final Rule
Reports
• Quarterly Report on Economic
Conditions and Farm Credit System
Condition and Performance
E:\FR\FM\06SEN1.SGM
06SEN1
Agencies
[Federal Register Volume 78, Number 173 (Friday, September 6, 2013)]
[Notices]
[Page 54893]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-21793]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-9010-9]
Environmental Impacts Statements; Notice of Availability
Responsible Agency: Office of Federal Activities, General
Information (202) 564-7146 or https://www.epa.gov/compliance/nepa/.
Weekly receipt of Environmental Impact Statements
Filed 08/26/2013 Through 08/30/2013
Pursuant to 40 CFR 1506.9.
Notice
Section 309(a) of the Clean Air Act requires that EPA make public
its comments on EISs issued by other Federal agencies. EPA's comment
letters on EISs are available at: https://www.epa.gov/compliance/nepa/eisdata.html
EIS No. 20130256, Draft Supplement, USFWS, CA, Coachella Valley
Multiple Species Habitat Conservation Plan and Natural Community
Conservation Plan, Comment Period Ends: 10/21/2013, Contact: Ken Corey
760-322-2070.
EIS No. 20130257, Final EIS, BLM, NV, Winnemucca District Proposed
Resource Management Plan, Review Period Ends: 10/07/2013, Contact:
Zwaantje Rorex 775-623-1727.
EIS No. 20130258, Final EIS, USFS, WI, Lakewood Southeast Project,
Review Period Ends: 10/15/2013, Contact: Marilee Houtler 715-276-6333
EIS No. 20130259, Final EIS, FTA, MD, Purple Line Draft Section 4(f)
Evaluation, Review Period Ends: 10/07/2013, Contact: Daniel Koenig 202-
219-3528.
EIS No. 20130260, Draft EIS, BIA, NV, Moapa Solar Energy Center,
Comment Period Ends: 10/14/2013, Contact: Amy Heuslein 602-379-7650
EIS No. 20130261, Draft Supplement, NPS, CA, Golden Gate National
Recreation Area Draft Dog Management Plan, Comment Period Ends: 12/04/
2013, Contact: Michael B. Edwards 303-969-2694.
EIS No. 20130262, Final EIS, USCG, NY, ADOPTION--Kosciuszko Bridge
Project, Queens, Kings and Queens Counties, NY, Contact: Gary Kassof
212-668-7021.
The U.S. Coast Guard has adopted the U.S. Department of
Transportation's Federal Highway Administration FEIS 20080517,
filed 12/10/2008 with the USEPA. The USCG was a cooperating agency to
the project. Recirculation of the EIS is not necessary under 1506.3(c)
of the CEQ Regulations.
Amended Notices
EIS No. 20130223, Draft EIS, USACE, MO, St. Johns Bayou and New Madrid
Floodway Project, Comment Period Ends: 11/25/2013, Contact: Joshua
Koontz 901-544-3975.
Revision to FR Notice Published on 07/26/2013; Extending Comment
Period from 09/09/2013 to 11/25/2013.
Dated: September 3, 2013.
Cliff Rader,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. 2013-21793 Filed 9-5-13; 8:45 am]