Environmental Impacts Statements; Notice of Availability, 54893 [2013-21793]

Download as PDF mstockstill on DSK4VPTVN1PROD with NOTICES Federal Register / Vol. 78, No. 173 / Friday, September 6, 2013 / Notices public docket, visit https://www.epa.gov/ dockets. Abstract: The affected entities are subject to the General Provisions of the NESHAP at 40 CFR part 63, subpart A, and any changes, or additions to the Provisions specified at 40 CFR part 63, subpart UUU. Owners or operators of the affected facilities must submit initial notification, performance tests, and periodic reports, and results. Owners or operators are also required to maintain records of the occurrence and duration of any startup, shutdown, or malfunction in the operation of an affected facility, or any period during which the monitoring system is inoperative. Reports, at a minimum, are required semiannually. Form Numbers: None. Respondents/affected entities: Owners or operators of petroleum refineries. Respondent’s obligation to respond: Mandatory (40 CFR part 63, subpart UUU). Estimated number of respondents: 123 (total). Frequency of response: Initially and semiannually. Total estimated burden: 10,237 hours (per year). ‘‘Burden’’ is defined at 5 CFR 1320.3(b). Total estimated cost: $9,399,440 (per year), includes $8,398,136 annualized capital or operation & maintenance costs. Changes in the Estimates: There is an adjustment decrease in the respondent and Agency labor hours in this ICR compared to the previous ICR. The decrease occurred because all sources have met the initial compliance requirement and, therefore, will not incur burden associated with initial notification and performance test during the three-year period of this ICR. The decrease also resulted from a reduction in the respondent universe from 132 to 123 major source facilities. The estimate was obtained from EPA’s non-CBI Component 1 Section 114 ICR database and is based on 2010 data. However, there is an overall increase in respondent labor costs due to an adjustment in labor rates. This ICR uses updated labor rates in calculating all costs. There is also an increase in the total O&M costs due to an update in the estimated number of sources. John Moses, Director, Collection Strategies Division. [FR Doc. 2013–21704 Filed 9–5–13; 8:45 am] BILLING CODE 6560–50–P VerDate Mar<15>2010 18:05 Sep 05, 2013 Jkt 229001 ENVIRONMENTAL PROTECTION AGENCY [ER–FRL–9010–9] Environmental Impacts Statements; Notice of Availability Responsible Agency: Office of Federal Activities, General Information (202) 564–7146 or https://www.epa.gov/ compliance/nepa/. Weekly receipt of Environmental Impact Statements Filed 08/26/2013 Through 08/30/2013 Pursuant to 40 CFR 1506.9. Section 309(a) of the Clean Air Act requires that EPA make public its comments on EISs issued by other Federal agencies. EPA’s comment letters on EISs are available at: https:// www.epa.gov/compliance/nepa/ eisdata.html EIS No. 20130256, Draft Supplement, USFWS, CA, Coachella Valley Multiple Species Habitat Conservation Plan and Natural Community Conservation Plan, Comment Period Ends: 10/21/2013, Contact: Ken Corey 760–322–2070. EIS No. 20130257, Final EIS, BLM, NV, Winnemucca District Proposed Resource Management Plan, Review Period Ends: 10/07/2013, Contact: Zwaantje Rorex 775–623–1727. EIS No. 20130258, Final EIS, USFS, WI, Lakewood Southeast Project, Review Period Ends: 10/15/2013, Contact: Marilee Houtler 715–276–6333 EIS No. 20130259, Final EIS, FTA, MD, Purple Line Draft Section 4(f) Evaluation, Review Period Ends: 10/ 07/2013, Contact: Daniel Koenig 202– 219–3528. EIS No. 20130260, Draft EIS, BIA, NV, Moapa Solar Energy Center, Comment Period Ends: 10/14/2013, Contact: Amy Heuslein 602–379–7650 EIS No. 20130261, Draft Supplement, NPS, CA, Golden Gate National Recreation Area Draft Dog Management Plan, Comment Period Ends: 12/04/2013, Contact: Michael B. Edwards 303–969–2694. EIS No. 20130262, Final EIS, USCG, NY, ADOPTION—Kosciuszko Bridge Project, Queens, Kings and Queens Counties, NY, Contact: Gary Kassof 212–668–7021. The U.S. Coast Guard has adopted the U.S. Department of Transportation’s Federal Highway Administration FEIS #20080517, filed 12/10/2008 with the USEPA. The USCG was a cooperating agency to the project. Recirculation of the EIS is not necessary under 1506.3(c) of the CEQ Regulations. Frm 00032 Amended Notices EIS No. 20130223, Draft EIS, USACE, MO, St. Johns Bayou and New Madrid Floodway Project, Comment Period Ends: 11/25/2013, Contact: Joshua Koontz 901–544–3975. Revision to FR Notice Published on 07/26/2013; Extending Comment Period from 09/09/2013 to 11/25/2013. Dated: September 3, 2013. Cliff Rader, Director, NEPA Compliance Division, Office of Federal Activities. [FR Doc. 2013–21793 Filed 9–5–13; 8:45 am] BILLING CODE 6560–50–P Notice PO 00000 54893 Fmt 4703 Sfmt 4703 FARM CREDIT ADMINISTRATION Farm Credit Administration Board; Sunshine Act Meeting AGENCY: Farm Credit Administration. SUMMARY: Notice is hereby given, pursuant to the Government in the Sunshine Act, of the regular meeting of the Farm Credit Administration Board (Board). DATE AND TIME: The regular meeting of the Board will be held at the offices of the Farm Credit Administration in McLean, Virginia, on September 12, 2013, from 9:00 a.m. until such time as the Board concludes its business. FOR FURTHER INFORMATION CONTACT: Dale L. Aultman, Secretary to the Farm Credit Administration Board, (703) 883– 4009, TTY (703) 883–4056. ADDRESSES: Farm Credit Administration, 1501 Farm Credit Drive, McLean, Virginia 22102–5090. SUPPLEMENTARY INFORMATION: Parts of this meeting of the Board will be open to the public (limited space available) and parts will be closed to the public. In order to increase the accessibility to Board meetings, persons requiring assistance should make arrangements in advance. The matters to be considered at the meeting are: OPEN SESSION Approval of Minutes • August 8, 2013 New Business • Proposed Merger of Lone Star, ACA and Texas Land Bank, ACA • Farmer Mac Capital Planning— Final Rule Reports • Quarterly Report on Economic Conditions and Farm Credit System Condition and Performance E:\FR\FM\06SEN1.SGM 06SEN1

Agencies

[Federal Register Volume 78, Number 173 (Friday, September 6, 2013)]
[Notices]
[Page 54893]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-21793]


-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY

[ER-FRL-9010-9]


Environmental Impacts Statements; Notice of Availability

    Responsible Agency: Office of Federal Activities, General 
Information (202) 564-7146 or https://www.epa.gov/compliance/nepa/.

Weekly receipt of Environmental Impact Statements
Filed 08/26/2013 Through 08/30/2013
Pursuant to 40 CFR 1506.9.

Notice

    Section 309(a) of the Clean Air Act requires that EPA make public 
its comments on EISs issued by other Federal agencies. EPA's comment 
letters on EISs are available at: https://www.epa.gov/compliance/nepa/eisdata.html

EIS No. 20130256, Draft Supplement, USFWS, CA, Coachella Valley 
Multiple Species Habitat Conservation Plan and Natural Community 
Conservation Plan, Comment Period Ends: 10/21/2013, Contact: Ken Corey 
760-322-2070.
EIS No. 20130257, Final EIS, BLM, NV, Winnemucca District Proposed 
Resource Management Plan, Review Period Ends: 10/07/2013, Contact: 
Zwaantje Rorex 775-623-1727.
EIS No. 20130258, Final EIS, USFS, WI, Lakewood Southeast Project, 
Review Period Ends: 10/15/2013, Contact: Marilee Houtler 715-276-6333
EIS No. 20130259, Final EIS, FTA, MD, Purple Line Draft Section 4(f) 
Evaluation, Review Period Ends: 10/07/2013, Contact: Daniel Koenig 202-
219-3528.
EIS No. 20130260, Draft EIS, BIA, NV, Moapa Solar Energy Center, 
Comment Period Ends: 10/14/2013, Contact: Amy Heuslein 602-379-7650
EIS No. 20130261, Draft Supplement, NPS, CA, Golden Gate National 
Recreation Area Draft Dog Management Plan, Comment Period Ends: 12/04/
2013, Contact: Michael B. Edwards 303-969-2694.
EIS No. 20130262, Final EIS, USCG, NY, ADOPTION--Kosciuszko Bridge 
Project, Queens, Kings and Queens Counties, NY, Contact: Gary Kassof 
212-668-7021.

    The U.S. Coast Guard has adopted the U.S. Department of 
Transportation's Federal Highway Administration FEIS 20080517, 
filed 12/10/2008 with the USEPA. The USCG was a cooperating agency to 
the project. Recirculation of the EIS is not necessary under 1506.3(c) 
of the CEQ Regulations.

Amended Notices

EIS No. 20130223, Draft EIS, USACE, MO, St. Johns Bayou and New Madrid 
Floodway Project, Comment Period Ends: 11/25/2013, Contact: Joshua 
Koontz 901-544-3975.

    Revision to FR Notice Published on 07/26/2013; Extending Comment 
Period from 09/09/2013 to 11/25/2013.

    Dated: September 3, 2013.
Cliff Rader,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. 2013-21793 Filed 9-5-13; 8:45 am]
BILLING CODE 6560-50-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.