KC Scoby Hydro, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions to Intervene, and Competing Applications, 54643 [2013-21527]
Download as PDF
Federal Register / Vol. 78, No. 172 / Thursday, September 5, 2013 / Notices
All filings must: (1) bear in all capital
letters the title ‘‘PROTEST’’ or
‘‘MOTION TO INTERVENE,’’ ‘‘NOTICE
OF INTENT TO FILE COMPETING
APPLICATION,’’ or ‘‘COMPETING
APPLICATION’’; (2) set forth in the
heading the name of the applicant and
the project number of the application to
which the filing responds; (3) furnish
the name, address, and telephone
number of the person protesting or
intervening; and (4) otherwise comply
with the requirements of 18 CFR
385.2001 through 385.2005. Agencies
may obtain copies of the application
directly from the applicant. A copy of
any protest or motion to intervene must
be served upon each representative of
the applicant specified in the particular
application.
Dated: August 28, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013–21524 Filed 9–4–13; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14526–000]
ehiers on DSK2VPTVN1PROD with NOTICES
KC Scoby Hydro, LLC; Notice of
Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions to Intervene, and
Competing Applications
On May 28, 2013, KC Scoby Hydro,
LLC, filed an application for a
preliminary permit, pursuant to section
4(f) of the Federal Power Act (FPA),
proposing to study the feasibility of
hydropower at the existing Union Street
Dam located on the Dan River in the
City of Danville, Virginia. The sole
purpose of a preliminary permit, if
issued, is to grant the permit holder
priority to file a license application
during the permit term. A preliminary
permit does not authorize the permit
holder to perform any land-disturbing
activities or otherwise enter upon lands
or waters owned by others without the
owners’ express permission.
The proposed Danville Union Dam
Hydroelectric Project would consist of
the following: (1) An existing 820-footlong and 10-foot-high dam made of
granite slabs; (2) an existing
impoundment having a surface area of
119.4 acres at an elevation of 410 feet
mean sea level, and a storage capacity
of 59.7 acre-feet at a 6-inch drawdown
from the dam crest; (3) an existing
1,460-foot-long canal that would be
extended an additional 1,000 feet
VerDate Mar<15>2010
14:10 Sep 04, 2013
Jkt 229001
downstream from the current terminus
to the proposed powerhouse; (4) a new
30-foot by 100-foot powerhouse with
three identical turbine-generator units
with an installed capacity of 620
kilowatts each; (5) a 550-foot-long
tailrace; (6) a new 12.48-kilovolt
transmission line extending 500 feet
from the powerhouse to an existing
substation; and (7) appurtenant
facilities. The proposed project would
have an annual generation of 9.5
gigawatt-hours.
Applicant Contact: Kelly Sackheim,
KC Scoby Hydro, LLC, 5096 Cocoa Palm
Way, Fair Oaks, CA 95628; phone: (301)
401–5978.
FERC Contact: Monir Chowdhury;
phone: (202) 502–6736.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36.
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, notices of intent,
and competing applications using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
The first page of any filing should
include docket number P–14526–000.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of the Commission’s Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–14526) in the docket number field to
access the document. For assistance,
contact FERC Online Support.
Dated: August 28, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013–21527 Filed 9–4–13; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00027
Fmt 4703
Sfmt 4703
54643
ENVIRONMENTAL PROTECTION
AGENCY
[EPA–HQ–OW–2002–0011; FRL–9900–75–
OW]
Proposed Information Collection
Request; Comment Request;
Laboratory Quality Assurance
Evaluation Program for Analysis of
Cryptosporidium Under the Safe
Drinking Water Act (Renewal)
Environmental Protection
Agency (EPA).
ACTION: Notice.
AGENCY:
The Environmental Protection
Agency is planning to submit an
information collection request (ICR),
‘‘Laboratory Quality Assurance
Evaluation Program for Analysis of
Cryptosporidium Under the Safe
Drinking Water Act’’ (EPA ICR No.
2067.05, OMB Control No. 2040–0246)
to the Office of Management and Budget
(OMB) for review and approval in
accordance with the Paperwork
Reduction Act (44 U.S.C. 3501 et seq.).
Before doing so, EPA is soliciting public
comments on specific aspects of the
proposed information collection as
described below. This is a proposed
extension of the ICR, which is currently
approved through January 31, 2014. An
Agency may not conduct or sponsor and
a person is not required to respond to
a collection of information unless it
displays a currently valid OMB control
number.
DATES: Comments must be submitted on
or before November 4, 2013.
ADDRESSES: Submit your comments,
referencing Docket ID No. EPA–HQ–
OW–2002–0011, online using
www.regulations.gov (our preferred
method), by email to ow-docket@
epa.gov, or by mail to: EPA Docket
Center, Environmental Protection
Agency, Mail Code 28221T, 1200
Pennsylvania Ave. NW., Washington,
DC 20460.
EPA’s policy is that all comments
received will be included in the public
docket without change including any
personal information provided, unless
the comment includes profanity, threats,
information claimed to be Confidential
Business Information (CBI) or other
information whose disclosure is
restricted by statute.
FOR FURTHER INFORMATION CONTACT:
Carrie Miller, Technical Support Center
(TSC), Office of Ground Water and
Drinking Water, (MS–140),
Environmental Protection Agency, 26
West Martin Luther King Drive,
Cincinnati, Ohio 45268; telephone
number: 513–569–7919; fax number:
SUMMARY:
E:\FR\FM\05SEN1.SGM
05SEN1
Agencies
[Federal Register Volume 78, Number 172 (Thursday, September 5, 2013)]
[Notices]
[Page 54643]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-21527]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 14526-000]
KC Scoby Hydro, LLC; Notice of Preliminary Permit Application
Accepted for Filing and Soliciting Comments, Motions to Intervene, and
Competing Applications
On May 28, 2013, KC Scoby Hydro, LLC, filed an application for a
preliminary permit, pursuant to section 4(f) of the Federal Power Act
(FPA), proposing to study the feasibility of hydropower at the existing
Union Street Dam located on the Dan River in the City of Danville,
Virginia. The sole purpose of a preliminary permit, if issued, is to
grant the permit holder priority to file a license application during
the permit term. A preliminary permit does not authorize the permit
holder to perform any land-disturbing activities or otherwise enter
upon lands or waters owned by others without the owners' express
permission.
The proposed Danville Union Dam Hydroelectric Project would consist
of the following: (1) An existing 820-foot-long and 10-foot-high dam
made of granite slabs; (2) an existing impoundment having a surface
area of 119.4 acres at an elevation of 410 feet mean sea level, and a
storage capacity of 59.7 acre-feet at a 6-inch drawdown from the dam
crest; (3) an existing 1,460-foot-long canal that would be extended an
additional 1,000 feet downstream from the current terminus to the
proposed powerhouse; (4) a new 30-foot by 100-foot powerhouse with
three identical turbine-generator units with an installed capacity of
620 kilowatts each; (5) a 550-foot-long tailrace; (6) a new 12.48-
kilovolt transmission line extending 500 feet from the powerhouse to an
existing substation; and (7) appurtenant facilities. The proposed
project would have an annual generation of 9.5 gigawatt-hours.
Applicant Contact: Kelly Sackheim, KC Scoby Hydro, LLC, 5096 Cocoa
Palm Way, Fair Oaks, CA 95628; phone: (301) 401-5978.
FERC Contact: Monir Chowdhury; phone: (202) 502-6736.
Deadline for filing comments, motions to intervene, competing
applications (without notices of intent), or notices of intent to file
competing applications: 60 days from the issuance of this notice.
Competing applications and notices of intent must meet the requirements
of 18 CFR 4.36.
The Commission strongly encourages electronic filing. Please file
comments, motions to intervene, notices of intent, and competing
applications using the Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief
comments up to 6,000 characters, without prior registration, using the
eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You
must include your name and contact information at the end of your
comments. For assistance, please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to:
Secretary, Federal Energy Regulatory Commission, 888 First Street NE.,
Washington, DC 20426. The first page of any filing should include
docket number P-14526-000.
More information about this project, including a copy of the
application, can be viewed or printed on the ``eLibrary'' link of the
Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P-14526) in the docket number field to access
the document. For assistance, contact FERC Online Support.
Dated: August 28, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013-21527 Filed 9-4-13; 8:45 am]